Search NASA⌕ Search

SEARCH · Search NASA

Results for “LASER COMMUNICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,354 records · Page 76

Optical and microstructural studies of erbium-doped TiO 2 thin films on silicon, SrTiO 3 , and sapphire

Rare-earth ion doped oxide thin films integrated on silicon substrates provide a route toward scalable, chip-scale platforms for quantum coherent devices. Erbium-doped TiO 2 is an attractive candidate: the Er 3+ optical transition is compatible with C-band optical fiber communications, while TiO 2 is an insulating dielectric compatible with silicon process technology. Through structural and optical studies of Er-doped TiO 2 thin films grown via molecular beam deposition on silicon, SrTiO 3 , and sapphire substrates, we have explored the impact of polycrystallinity and microstructure on the optical properties of the Er emission. Comparing polycrystalline TiO 2 (rutile)/Si with single-crystalline TiO 2 (rutile)/r-sapphire and polycrystalline TiO 2 (anatase)/Si with single-crystalline TiO 2 (anatase)/SrTiO 3 , we observe that the inhomogeneous linewidth (Γ inh ) of the most prominent peak in the Er spectrum (the Y 1 –Z 1 transition, 1520 and 1533 nm in rutile and anatase TiO 2 ) is significantly narrower in the polycrystalline case. This implies a relative insensitivity to extended structural defects and grain boundaries in such films (as opposed to, e.g., point defects). We show that the growth of an undoped, underlying TiO 2 buffer on Si can reduce Γ inh by a factor of 4–5. Expectedly, Γ inh also reduces with decreasing Er concentrations: we observe a ∼2 order of magnitude reduction from ∼1000 ppm Er to ∼10 ppm Er. Γ inh then gets limited to a residual value of ∼5 GHz that is insensitive to further reduction in the Er concentration. Based upon the above results, we argue that the optical properties in these thin films are limited by the presence of high “grown-in” point defect concentrations.

Chemical elements↗

Sub-2 Kelvin Characterization of Nitrogen-Vacancy Centers in Silicon Carbide Nanopillars

The development of efficient quantum communication technologies depends on the innovation in multiple layers of its implementation, a challenge we address from the fundamental properties of the physical system at the nanoscale to the instrumentation level at the macroscale. We select a promising near-infrared quantum emitter, the nitrogen-vacancy (NV) center in 4H-SiC, and integrate it, at an ensemble level, with nanopillar structures that enhance photon collection efficiency into an objective lens. Moreover, changes in collection efficiency in pillars compared to bulk can serve as indicators of color center orientation in the lattice. To characterize NV center properties at the unprecedented sub-2 K temperatures, we incorporate compatible superconducting nanowire single photon detectors inside the chamber of an optical cryostat and create the ICECAP, the Integrated Cryogenic system for Emission, Collection And Photon detection. ICECAP measurements show no significant line-width broadening of NV ensemble emission and up to 14-fold enhancement in collected emission. With additional filtering, we measure emitter lifetimes of NV centers in a basal ( hk ) and axial ( kk ) orientation, unveiling their cryogenic values of 2.2 and 2.8 ns.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗