Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,354 records · Page 76

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Mechanical Stress Improvement Process for Mitigating Primary Water Stress Corrosion Cracking in Nickel Alloy Butt Welds in Piping Systems Approved for Leak-Before-Break

In recent years, operating experience has shown that Alloy 82/182/600 materials used in reactor coolant system (RCS) pressure boundaries of pressurized water reactors (PWRs) are susceptible to primary water stress corrosion cracking (PWSCC). Cracking can initiate at the inside surface of these materials, in part, because of tensile residual stresses introduced by welding. These materials are present in piping systems that were approved by the U.S. Nuclear Regulatory Commission (NRC) for leak before-break (LBB) before PWSCC was found in RCS dissimilar metal butt welds. The identification of PWSCC led to concerns regarding the potential effect of this degradation on existing LBB analyses. In response to these concerns, the NRC Office of Nuclear Regulatory Research initiated a program entitled, “PWSCC in Leak-Before-Break Systems,” and a follow-on program entitled, “Degradation in Extremely Low Probability of Rupture (xLPR) Systems.” Under these programs, Pacific Northwest National Laboratory (PNNL) is assessing the various strategies being used by industry to manage potential or existing PWSCC in susceptible welds in piping systems approved for LBB. The commercial nuclear power industry has implemented strategies to manage potential or existing PWSCC at Alloy 82/182 dissimilar metal welds (DMW) in PWRs. One general strategy consists of management by a combination of mitigation plus inspection, where several mitigation techniques have been used by industry. The other general strategy is to manage potential PWSCC by inspection alone. At the request of the NRC, the American Society of Mechanical Engineers (ASME) took actions to develop improvements to the existing Code requirements to address the potential for PWSCC in Class 1 PWR piping butt welds fabricated with Alloy 82/182 weld materials. The ASME developed Code Case N-770, “Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities, Section XI, Division 1.” It was realized that the Code Case needed to be revised to address specific examinations such as welds with a design life of less than 10 years and post-weld preservice surface examinations. In general, the revised Code Case (N-770-1) has requirements for inspection of unmitigated as well as mitigated Alloy 82/182 RCS butt welds. As such, specific inspection requirements for welds mitigated by the Mechanical Stress Improvement Process (MSIP®), the subject of this technical letter report (TLR), are contained in the Code Case. The NRC incorporated ASME Code Case N-770-1 by reference into §50.55a (76 FR 36232, p. 36278) in June 2011.

MSIP↗

Decontamination of Tritiated-Water Using Super-hydrophobic Pt-Catalyst Synthesized with Water-in-Supercritical CO{sub 2}

Tritium, {sup 3}H, is one of the hydrogen isotopes, created in coolant of a fission reactor and to be utilized as fuel for nuclear fusion reactors. Since a large amount of tritium will be contained in a fusion reactor or in a fission reactor, a small fraction of the tritiated chemical species, in most cases, tritiated water, may leak to the environment. Tritium is, however, a radioactive isotope whose specific radioactivity is 4 x 10{sup 17} Bq kg{sup -1}, and easy to transfer in human body, its confinement is very important from the safety aspect. One of the problems of tritium confinement and decontamination of tritiated chemical species is related with necessity of its isotope separation from lighter hydrogen isotopes, {sup 2}H and {sup 1}H. Most of principles for the isotope separations are based on fractionations of isotopes in different chemical species. A large fractionation for hydrogen isotopes is observed in a chemical exchange of hydrogen atoms between water, Q{sub 2}O, and hydrogen gas, Q{sub 2}, where 'Q' denotes one of the hydrogen isotopes. Heavier isotopes are enriched significantly into Q{sub 2}O rather than Q{sub 2}. Therefore practical method of tritium removal would be established by hydrogen isotope separation with chemical exchange of water and hydrogen gas. At first, we prepared a catalyst, by reducing Pt{sup 4+} in reversed micelles where the reducing agent, aqueous solution of sodium tetra borohydrate, NaBH{sub 4} was also contained in reversed micelles prepared separately. In this situation, micelles containing Pt{sup 4+} and reducing reagent collided and produced Pt nanoparticles, which were expected to be impregnated in the hydrophobic structure after depressurization. After this type of earlier experiment we determined a mass of impregnated Pt by total dissolution of gauze with aqua regia followed by concentration measurement of Pt with ICP-AES. We performed several trials, unfortunately, however, the mass of Pt deposited on the gauze was very small to detect, and this approach turns to be not successful. As the second approach, we utilize CO{sub 2} soluble Pt precursor, CODMe{sub 2}Pt purchased from Sigma-Aldrich Co. and H{sub 2} gas as reducing agent, which could be completely mixed with SC-CO{sub 2}. This system was well-known for Pt particle formation by auto-catalytic growth. The second approach was aiming at increasing Pt amount deposited in the gauze. This approach was successful in increasing Pt amount, but the Pt particle size also increased to be more than 50 nm, which was not suitable for catalyst. Finally, we synthesized the catalyst by the following procedure: firstly, a reducing agent of NaBH{sub 4} was deposited on the nano-textured hydrophobic layer on the gauze. This step was realized by forming reversed micelles of aqueous NaBH{sub 4} solution using a surfactant AOT and a co-surfactant 2,2,3,3,4,4,5,5,-octafluoro-1-pentanol (F-pentanol) in SC-CO{sub 2}. This system of surfactant combination of AOT and F-pentanol has been found to work successfully in recent studies. In the second step, the gauze was contacted with CODMe{sub 2}Pt dissolved in SC-CO{sub 2} to synthesize seeds of Pt particles for the auto-catalytic reaction proceeding by CODMe{sub 2}Pt with hydrogen. The seeds were formed by the reaction between deposited NaBH{sub 4} and CODMe{sub 2}Pt in SC-CO{sub 2}. The physical characterization of this catalyst was performed by SEM-EDS. By this procedure, the Pt hydrophobic catalyst where Pt nanoparticle of 10 nm in diameter was locally deposited in the nano-textured layer was successfully prepared. Hydrophobicity after the chemical Pt deposition was tested by measurement of water absorbed on the gauze and the catalyst performance was evaluated by {sup 1}H{sup 2}H formation through the scrambling reaction from {sup 1}H{sub 2} and {sup 2}H{sub 2} and the reaction was successfully observed. We demonstrated a new hydrophobic catalyst preparation using SC-CO{sub 2} effectively. We can conclude that the approach of creating Pt nanoparticles in SC-CO{sub 2} and depositing them in the super-hydrophobic structure on the metal surface is useful for synthesizing hydrophilic catalysts for the hydrogen isotope separation.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Pneumothorax Complicating Coaxial and Non-coaxial CT-Guided Lung Biopsy: Comparative Analysis of Determining Risk Factors and Management of Pneumothorax in a Retrospective Review of 650 Patients

PurposeTo assess the scope and determining risk factors related to the development of pneumothorax throughout CT-guided biopsy of pulmonary lesions in coaxial and non-coaxial techniques and the outcome of its management.Materials and MethodsThe study included CT-guided percutaneous lung biopsies in 650 consecutive patients (407 males, 243 females; mean age 54.6 years, SD 5.2) from November 2008 to June 2013 in a retrospective design. Patients were classified according to lung biopsy technique into coaxial group (318 lesions) and non-coaxial group (332 lesions). Exclusion criteria for biopsy were lesions <5 mm in diameter, uncorrectable coagulopathy, positive-pressure ventilation, severe respiratory compromise, pulmonary arterial hypertension, or refusal of the procedure. Risk factors related to the occurrence of pneumothorax were classified into: (a) Technical risk factors, (b) patient-related risk factors, and (c) lesion-associated risk factors. Radiological assessments were performed by two radiologists in consensus. Mann–Whitney U test and Fisher’s exact tests were used for statistical analysis. p values <0.05 were considered statistically significant.ResultsThe incidence of pneumothorax complicating CT-guided lung biopsy was less in the non-coaxial group (23.2 %, 77 out of 332) than the coaxial group (27 %, 86 out of 318). However, the difference in incidence between both groups was statistically insignificant (p = 0.14). Significant risk factors for the development of pneumothorax in both groups were emphysema (p < 0.001 in both groups), traversing a fissure with the biopsy needle (p value 0.005 in non-coaxial group and 0.001 in coaxial group), small lesion, less than 2 cm in diameter (p value of 0.02 in both groups), location of the lesion in the basal or mid sections of the lung (p = 0.003 and <0.001 in non-coaxial and coaxial groups, respectively), and increased needle track path within the lung tissue of more than 2.5 cm (p = 0.01 in both groups). The incidence of pneumothorax in the non-coaxial group was significantly correlated to the number of specimens obtained (p = 0.006). This factor was statistically insignificant in the coaxial group (p = 0.45). The biopsy yield was more diagnostic and conclusive in the coaxial group in comparison to the non-coaxial group (p = 0.008). Simultaneous incidence of pneumothorax and pulmonary hemorrhage was 27.3 % (21/77) in non-coaxial group and in 30.2 % (26/86) in coaxial group. Conservative management was sufficient for treatment of 91 out of 101 patients of pneumothorax in both groups (90.1 %). Manual evacuation of pneumothorax was efficient in 44/51 patients (86.3 %) in both groups and intercostal chest tube was applied after failure of manual evacuation (7 patients: 13.7 %), from which one patient developed a persistent air leakage necessitating pleurodesis.ConclusionPneumothorax complicating CT-guided core biopsy of pulmonary lesions, showed the insignificant difference between coaxial and non-coaxial techniques. However, both techniques have the same significant risk factors including small and basal lesions, increased lesion’s depth from pleural surface, and increased length of aerated lung parenchyma crossed by biopsy needle and passing through pulmonary fissures in the needle tract.

62 RADIOLOGY AND NUCLEAR MEDICINE↗