Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Internet Voice Distribution System (IVoDS) Utilization in Remote Payload Operations

Due to limited crew availability to support science and the large number of experiments to be operated simultaneously, telescience is key to a successful International Space Station (ISS) science program. Crew, operations personnel at NASA centers, and researchers at universities and companies around the world must work closely together to perform scientific experiments on-board ISS. NASA has initiated use of Voice over Internet Protocol (VoIP) to supplement the existing HVoDS mission voice communications system used by researchers. The Internet Voice Distribution System (IVoDS) connects researchers to mission support "loops" or conferences via Internet Protocol networks such as the high-speed Internet 2. Researchers use IVoDS software on personal computers to talk with operations personnel at NASA centers. IVoDS also has the capability, if authorized, to allow researchers to communicate with the ISS crew during experiment operations. NODS was developed by Marshall Space Flight Center with contractors A2 Technology, Inc. FVC, Lockheed- Martin, and VoIP Group. IVoDS is currently undergoing field-testing with full deployment for up to 50 simultaneous users expected in 2002. Research is currently being performed to take full advantage of the digital world - the Personal Computer and Internet Protocol networks - to qualitatively enhance communications among ISS operations personnel. In addition to the current voice capability, video and data-sharing capabilities are being investigated. Major obstacles being addressed include network bandwidth capacity and strict security requirements. Techniques being investigated to reduce and overcome these obstacles include emerging audio-video protocols and network technology including multicast and quality-of-service.

Best, Susan↗

TCL3 UTM (UAS Traffic Management) Flight Tests, Airspace Operations Laboratory (AOL) Report

The Technology Capability Level-3 (TCL3) flight tests were conducted at six different test sites located across the USA from March to May of 2018. The campaign resulted in over 830 data collection flights using 28 different aircraft and involving 20 flight crews. Flights not only varied in duration, but also in the environments and terrains over which they flew. The TCL3 tests highlighted four different types of tests: three tests focused on Communication, Navigation and Surveillance (CNS); six tests focused on Sense and Avoid (SAA) technologies; six tests focused on USS Data and Information Exchange (DAT); and five tests focused on exploring fundamental Concepts of the project (CON). This document presents data collected during the TCL3 tests that informed the operator’s experiences—the quality of the unmanned aerial system (UAS) Service Supplier (USS) information that the operator was provided with, the usefulness of this information, and the usability of the automation, both while airborne and on the ground. It is intended to complement the reports written by the test sites and the quantitative reports and presentations of the UAS Traffic Management (UTM) project. With the goal of instructing what the minimum information requirements and/or best practices might be in TCL3 operations, the driving enquiry was: How do you get the information you need, when you need it, to successfully fly a UAS in UTM airspace? This enquiry touches on two requirements for displays, which are to provide adequate situation awareness (SA) and to share information through a USS. The six test sites participating in the TCL3 tests flew a subset of the 20 tests (outlined above), with most sites working on a subset of each of the four types: Communications, Navigation and Surveillance (CNS); DAT; CON; and Sense and Avoid (SAA). The, mainly qualitative, data addressed in this report was collected by the AOL (Airspace Operations Laboratory) both on-site and remotely for each test. The data consists of the contents of end-of-day debriefs, end-of-day surveys, observer notes, and flight test information, all submitted as part of the Data Management Plan (DMP).

Martin, Lynne↗

Fermilab proton accelerator complex status and improvement plans

Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a n umber of fixed target experiments. Routine operation with a world-record 700kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as the result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power to 900 – 1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40-years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to >2.4MW after replacement of the existing 8 GeV Booster synchrotron. In this article we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades.

43 PARTICLE ACCELERATORS↗

Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations

Due to limited crew availability to support science and the large number of experiments to be operated simultaneously, telescience is key to a successful International Space Station (ISS) science program. Crew, operations personnel at NASA centers, and researchers at universities and companies around the world must work closely together to per orm scientific experiments on-board ISS. The deployment of reliable high-speed Internet Protocol (IP)-based networks promises to greatly enhance telescience capabilities. These networks are now being used to cost-effectively extend the reach of remote mission support systems. They reduce the need for dedicated leased lines and travel while improving distributed workgroup collaboration capabilities. NASA has initiated use of Voice over Internet Protocol (VoIP) to supplement the existing mission voice communications system used by researchers at their remote sites. The Internet Voice Distribution System (IVoDS) connects remote researchers to mission support "loopsll or conferences via NASA networks and Internet 2. Researchers use NODS software on personal computers to talk with operations personnel at NASA centers. IVoDS also has the ;capability, if authorized, to allow researchers to communicate with the ISS crew during experiment operations. NODS was developed by Marshall Space Flight Center with contractors & Technology, First Virtual Communications, Lockheed-Martin, and VoIP Group. NODS is currently undergoing field-testing with full deployment for up to 50 simultaneous users expected in 2002. Research is being performed in parallel with IVoDS deployment for a next-generation system to qualitatively enhance communications among ISS operations personnel. In addition to the current voice capability, video and data/application-sharing capabilities are being investigated. IVoDS technology is also being considered for mission support systems for programs such as Space Launch Initiative and Homeland Defense.

Chamberlain, jim↗

Accelerated Aging Experiments for Capacitor Health Monitoring and Prognostics

This paper discusses experimental setups for health monitoring and prognostics of electrolytic capacitors under nominal operation and accelerated aging conditions. Electrolytic capacitors have higher failure rates than other components in electronic systems like power drives, power converters etc. Our current work focuses on developing first-principles-based degradation models for electrolytic capacitors under varying electrical and thermal stress conditions. Prognostics and health management for electronic systems aims to predict the onset of faults, study causes for system degradation, and accurately compute remaining useful life. Accelerated life test methods are often used in prognostics research as a way to model multiple causes and assess the effects of the degradation process through time. It also allows for the identification and study of different failure mechanisms and their relationships under different operating conditions. Experiments are designed for aging of the capacitors such that the degradation pattern induced by the aging can be monitored and analyzed. Experimental setups and data collection methods are presented to demonstrate this approach.

Prognostics of Electronics↗

IRIS Mission Operations Director's Colloquium

Pursuing the Mysteries of the Sun: The Interface Region Imaging Spectrograph (IRIS) Mission. Flight controllers from the IRIS mission will present their individual experiences on IRIS from development through the first year of flight. This will begin with a discussion of the unique nature of IRISs mission and science, and how it fits into NASA's fleet of solar observatories. Next will be a discussion of the critical roles Ames contributed in the mission including spacecraft and flight software development, ground system development, and training for launch. This will be followed by experiences from launch, early operations, ongoing operations, and unusual operations experiences. The presentation will close with IRIS science imagery and questions.

Mission Operations↗

Integration of New Technology Considering the Trade-Offs Between Operational Benefits and Risks: A Case Study of Dynamic Line Rating

Electric grid operators are adept at handling complexity and uncertainty. However, with increasing introduction of renewable generation, distributed energy resources, and more frequent severe weather events, operators will experience new workload and challenging decision scenarios. Here, this paper quantifies risks and benefits from an operator's perspective of introducing weather based forecast Dynamic Line Ratings (DLR) using variable wind conditions in addition to ambient temperature to relieve transmission congestion and facilitating more offshore wind (OSW). A concept of operations (CONOPS) applied to a forecast DLR implementation and its integration with OSW is defined. A method for evaluating tradeoffs of derating to make the rating more conservative but decreasing the benefit was developed and applied to a case study for two existing overhead transmission lines on Long Island, New York. The CONOPS uses historical day-ahead and hour-ahead High Resolution Rapid Refresh weather forecasts and weather station data to support planning and real-time operations. The analysis determines the risk of downgrades in real-time operational rating compared to the forecast and quantifies the frequency and severity of last-minute downgrades. The risk is compared against the benefits in increased capacity to provide insights on the additional amount of uncertainty DLR and OSW will add to the operator's workload.

17 WIND ENERGY↗

Operation and Upgrades of the LCLS*

The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

Accelerators,ACCPHY, XFEL↗

Science Operation in Space: Lessons

This program (conceived by a group of veteran Shuttle astronauts) shows prospective experimenters how they can better design their experiments for operation onboard Shuttle flights. Shuttle astronauts Dunbar, Seddon, Hoffman, Cleave, Ross, and ChangDiaz also show how crews live and work in space.

Source record↗

Operational wind shear detection and warning - The 'CLAWS' experience at Denver and future objectives

An operational wind shear detection and warning experiment was conducted at Denver's Stapleton International Airport in summer 1984. Based on meteorological interpretation of scope displays from a Doppler weather radar, warnings were transmitted to the air traffic control tower via voice radio. Analyses of results indicated real skill in daily microburst forecasts and very short-term (less than 5-min) warnings. Wind shift advisories with 15-30 min forecasts, permitted more efficient runway reconfigurations. Potential fuel savings were estimated at $875,000/yr at Stapleton. The philosophy of future development toward an automated, operational system is discussed.

Mccarthy, John↗

Survey of timing/synchronization of operating wideband digital communications networks

In order to benefit from experience gained from the synchronization of operational wideband digital networks, a survey was made of three such systems: Data Transmission Company, Western Union Telegraph Company, and the Computer Communications Group of the Trans-Canada Telephone System. The focus of the survey was on deployment and operational experience from a practical (as opposed to theoretical) viewpoint. The objective was to provide a report on the results of deployment how the systems performed, and wherein the performance differed from that predicted or intended in the design. It also attempted to determine how the various system designers would use the benefit of hindsight if they could design those same systems today.

Mitchell, R. L.↗

Impact of radiation on electronics and opto-electronics

In this chapter we will present the results of the impact of radiation on electronics and opto-electronics for two of the LHC experiments during Run 1 and Run 2. ATLAS results are presented in Section 6.1; CMS in Section 6.2. In Section 6.3 we will present a comparison between the two experiments, highlighting operational guidelines and proposing solutions to build the electronics and opto-electronics of the future LHC experiments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Space station (modular) mission analysis. Volume 1: Mission analysis

The mission analysis on the modular space station considers experimental requirements and options characterized by low initial cost and incremental manning. Features that affect initial development and early operating costs are identified and their impacts on the program are assessed. Considered are the areas of experiment, mission, operations, information management, and long life and safety analyses.

Source record↗

Evidence Report: Risk of Performance Errors Due to Training Deficiencies

Substantial evidence supports the claim that inadequate training leads to performance errors. Barshi and Loukopoulos (2012) demonstrate that even a task as carefully developed and refined over many years as operating an aircraft can be significantly improved by a systematic analysis, followed by improved procedures and improved training (see also Loukopoulos, Dismukes, & Barshi, 2009a). Unfortunately, such a systematic analysis of training needs rarely occurs during the preliminary design phase, when modifications are most feasible. Training is often seen as a way to compensate for deficiencies in task and system design, which in turn increases the training load. As a result, task performance often suffers, and with it, the operators suffer and so does the mission. On the other hand, effective training can indeed compensate for such design deficiencies, and can even go beyond to compensate for failures of our imagination to anticipate all that might be needed when we send our crew members to go where no one else has gone before. Much of the research literature on training is motivated by current training practices aimed at current training needs. Although there is some experience with operations in extreme environments on Earth, there is no experience with long-duration space missions where crews must practice semi-autonomous operations, where ground support must accommodate significant communication delays, and where so little is known about the environment. Thus, we must develop robust methodologies and tools to prepare our crews for the unknown. The research necessary to support such an endeavor does not currently exist, but existing research does reveal general challenges that are relevant to long-duration, high-autonomy missions. The evidence presented here describes issues related to the risk of performance errors due to training deficiencies. Contributing factors regarding training deficiencies may pertain to organizational process and training programs for spaceflight, such as when training programs are inadequate or unavailable. Furthermore, failure to match between tasks on the one hand, and learning and memory abilities on the other hand is a contributing factor, especially when individuals' relative efficiency with which new information is acquired, and adjustments made in behavior or thinking, are inconsistent with mission demands. Thus, if training deficiencies are present, the likelihood of errors or of the inability to successfully complete a task increases. What's more, the overall risk to the crew, the vehicle, and the mission increases.

Barshi, Immanuel↗

Operational plans for life science payloads - From experiment selection through postflight reporting

Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

Mccollum, G. W.↗

Smooth Particle Hydrodynamics-based Wind Representation

As a result of the 2011 accident at the Fukushima Dai-ichi NPP and other operational NPP experience, there is an identified need to better characterize and evaluate the potential impacts of externally generated hazards on NPP safety. Due to the ubiquitous occurrence of high winds around the world and the possible extreme magnitude of the hazard that has been observed, the assessment of the impact of the high-winds hazard has been identified as an important activity by both NPP owner-operators and regulatory authorities. However, recent experience obtained from the conduct of high-winds risk assessments indicates that such activities have been both labor-intensive and expensive to perform. Additionally, the existing suite of methods and tools to conduct such assessments (which were developed decades ago) do not make use of modern computational architectures (e.g., parallel processing, object-oriented programming techniques, or simple user interfaces) or methods (e.g., efficient and robust numerical-solution schemes). As a result, the current suite of methods and tools will rapidly become obsolete. Physics-based 3D simulation methods can provide information to assist in the RISMC PRA methodology. This research is intended to determine what benefits SPH methods could bring to high-winds simulations for the purposes of assessing their potential impact on NPP safety. The initial investigation has determined that SPH can simulate key areas of high-wind events with reasonable accuracy, compared to other methods. Some problems, such as simulation voids, need to be addressed, but possible solutions have been identified and will be tested with continued work. This work also demonstrated that SPH simulations can provide a means for simulating debris movement; however, further investigations into the capability to determine the impact of high winds and the impacts of wind-driven debris that lead to SSC failures need to be done. SPH simulations alone would be limited in size and computation time. An advanced method of combing results from grid-based methods with SPH through a data-driven model is proposed. This method could allow for more accurate simulation of particle movement near rigid bodies even with larger SPH particle sizes. If successful, the data-driven model would eliminate the need for a SPH turbulence model and increase the simulation domain size. Continued research beyond the scope of this project will be needed in order to determine the viability of a data-driven model.

17 WIND ENERGY↗

The dumbest experiment in space

A simple conceptual experiment is used to illustrate (1) the fundamentals of performing an experiment, including the theoretical concept, the experiment design, the performance of the experiment, and the recording of observations; (2) the increasing challenges posed by performance of the same experiment in a location remote from the experimenter, such as additional planning and equipment and their associated cost increases; and (3) the significant growth of difficulties to be overcome when the simple experiment is performed in a highly restrictive environment, such as a spacecraft in orbit, with someone else remotely operating the experiment. It is shown that performing an experiment in the remote, hostile environment of space will pose difficulties equaling or exceeding those of the experiment itself, entailing mastery of a widening range of disciplines.

Prouty, C. R.↗

ACTS Battery and Solar Array Assembly On-Orbit Measured Performance

The Advanced Communications Technology Satellite (ACTS) is a NASA experimental communications satellite system designed to demonstrate on-orbit Ka-band communications and switching technologies that will be used by NASA and the commercial sector in the 21st century. The ACTS was launched on September 12, 1993, and has performed over 10 years of successful experimental operations. The purpose of this report is to describe the ACTS power subsystem and the ACTS solar array and battery assemblies located within the power subsystem and then to document on-orbit measured performance from launch to mission end on April 28, 2004. Solar array and battery performance data is presented, and respective conclusions are drawn. The total solar array power available to the spacecraft was measured each year at the same time, and battery voltage performance was measured twice per year at the same times during peak solar eclipse. At the highest spacecraft power demand, the ACTS uses approximately 1113 W of electrical power during the low-burstrate experiment to operate all six satellite subsystems. After 10 years of on-orbit operation, solar array available output power normal to the Sun measured 1508 W, which represents 395 W of excess margin. The ACTS batteries have successfully supported the ACTS experiment program for over 10 years and operated in excess of 900 charge and discharge cycles through 21 eclipse seasons.

Hilderman, Don R.↗