Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

A fail safe laser activated switch used as an emergency control link at the Langley Vortex Research Facility

A fail safe light activated switch was used as an emergency control link at the Langley Vortex Research Facility. In this facility aircraft models were towed through a still air test chamber by a gasoline powered vehicle which was launched from one end of a 427-meter track and attained velocities to 31 m/sec in the test chamber. A 5 mW HeNe laser with a mechanical copper provided a connecting link with the moving tow vehicle on which a silicon photodiode receiver with a specially designed amplifier provided a fail safe switching action. This system provided an emergency means of stopping the vehicle by turning off the laser to interrupt the power to the vehicle ignition and brake release systems.

Kassel, P. C., Jr.↗

Power turbine dynamics - An evaluation of a shear-mounted elastomeric damper

As an alternative to the more conventional squeeze-film bearing damper designs, a Viton-70 shear-mounted, elastomeric damper was built and tested in a T-55 power turbine high-speed balancing rig. This application demonstrated, for the first time, the feasibility of using elastomers as the primary rotor damping source in production turbine engine hardware. The shear-mounted damper design was selected because of its compatibility with actual gas turbine engine radial space constraints, its accommodation of both the radial and axial thrust loads present in gas turbine engines, and its capability of controlled axial preload. Test results showed that the Viton-70 elastomeric damper operated successfully and provided excellent control of both synchronous and nonsynchronous vibrations through all phases of testing to the maximum rotor speed of 1676 rad/s (16,000 rpm). Excellent correlation between the predicted and experienced critical speeds, mode shapes, and log decrements for the power turbine rotor and elastomer damper assembly was also achieved.

Zorzi, E. S.↗

Electrical characterization of a Space Station Freedom alpha utility transfer assembly

Electrical testing of a utility transfer assembly (UTA) developmental unit performed from January 22 through February 25, 1992 at the NASA Lewis Research Center using the power management and distribution dc test bed. The dc resistance and steady state temperatures recorded are evidence of the UTA's high electrical transfer efficiency. The impedance test results suggest the total inductance of a UTA crossing pair is substantially higher than originally specified in the Space Station Electrical Power System Architectural Control Document.

Yenni, Edward J.↗

Advanced Thermal Simulator Testing: Thermal Analysis and Test Results

Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a SNAP derivative reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

Bragg-Sitton, Shannon M.↗

Solar power satellite 50 kW VKS-7773 cw klystron evaluation

A test program for evaluating the electrical characteristics of a cw, 50 kW power output klystron at 2.45 GHz is described. The tube tested was an 8-cavity klystron, the VKS-7773 which had been in storage for seven years. Tests included preliminary testing of the tube, cold tests of microwave components, tests of the electromagnet, and first and second hot tests of the tube. During the second hot test, the tuner in the fifth cavity went down to air, preventing any further testing. Cause of failure is not known, and recommendations are to repair and modify the tube, then proceed with testing as before to meet program objectives.

Larue, A. D.↗

High-voltage space-plasma interactions measured on the PASP Plus test arrays

The Photovoltaic Array Space Power Plus Diagnostics (PASP Plus) experiment was developed by the Air Force's Phillips Laboratory with support from NASA's Lewis Research Center. It was launched on the Advanced Photovoltaic and Electronics EXperiments (APEX) satellite on August 3, 1994 into a 70 degree inclination, 363 km by 2550 km elliptical orbit. This orbit allows the investigation of space plasma effects on high-voltage operation (leakage current at positive voltages and arcing at negative voltages) in the perigee region. PASP Plus is testing twelve solar arrays. There are four planar Si arrays: an old standard type (used as a reference), the large-cell Space Station Freedom (SSF) array, a thin 'APSA' array, and an amorphous Si array. Next are three GaAs on Ge planar arrays and three new material planar arrays, including InP and two multijunction types. Finally, there are two concentrator arrays: a reflective-focusing Mini-Cassegrainian and a Fresnel-lens focusing Mini-Dome. PASP Plus's diagnostic sensors include: Langmuir probe to measure plasma density, an electrostatic analyzer (ESA) to measure the 30 eV to 30 KeV electron/ion spectra and determine vehicle negative potential during positive biasing, and a transient pulse monitor (TPM) to characterize the arcs that occur during the negative biasing. Through positive biasing of its test arrays, PASP Plus investigated the snapover phenomenon, which took place over the range of +100 to +300 V. It was found that array configurations where the interconnects are shielded from the space plasma (i.e., the concentrators or arrays with 'wrap-through' connectors) have lower leakage current. The concentrators exhibited negligible leakage current over the whole range up to +500 V. In the case of two similar GaAs on Ge arrays, the one with 'wrap-through' connectors had lower leakage current than the one with conventional interconnects. Through negative biasing, PASP Plus investigated the arcing rates of its test arrays. The standard Si array, with its old construction (exposed rough-surface interconnects), arced significantly over a wide voltage and plasma-density range. The other arrays arced at very low rates, mostly at voltages greater than -350 V and plasma densities near or greater than 10(exp 5)/cm(exp -3). AS expected according to theory, arcing was more prevalent when array temperatures were cold (based on biasing in eclipse).

Guidice, Donald A.↗

Development of the Saturn Space Vehicle

The Saturn launch vehicle program has become a major element in our national space effort within little more than 3 years. At the beginning of the program, in 1958, various Saturn configurations were planned to lift instrumented payloads of 20,000 to 40,000 lb. into Earth orbit. As research and development progressed, it became apparent that the vehicle design approach had far more potential than anticipated that it was, in fact, a breakthrough into a new class of heavy launch vehicles. Thus, within the space of a few years, it was possible to consider even more advanced missions. In addition to placing multiton payloads in orbit, we can seriously conceive sending over 90,000 lb. of instruments on escape missions, using advanced Saturn-class vehicles. With these vehicles, we plan to accomplish lunar reconnaissance and manned lunar landings scheduled for the latter part of this decade. Likewise, these vehicles will permit flight tests of advanced nuclear power plants and stages.

SATURN LAUNCH VEHICLE↗

Advanced transmitter development

Testing of high voltage power supply and linear exciter for Mariner transmitter noise amplitude modulation

SILICON CONTROL RECTIFIER /SCR/↗

Fan V/STOL aircraft

Aerodynamic characteristics and test data of fan powered V/STOL aircraft

Mc Kinney, M. O.↗