Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Prototype Testing of Encapsulated Phase Change Material Thermal Energy Storage (EPCM-TES) for Concentrated Solar Power

In the present study, experimental investigations were conducted on encapsulated phase-change material (EPCM) capsules from Terrafore Technologies. Several aspects of the EPCM capsules were evaluated, including shell fracture stress under compression and melting/solidification performance. The stress testing was conducted with the Instron universal test system, and the melting/solidification testing was conducted in Argonne National Laboratory’s high-temperature thermal energy storage test system. Results on the EPCM fracture stress, the melting/solidification characteristics of the EPCM capsules, the temperature repeatability under similar test conditions, and the heat balance for melting/solidification processes are presented in this report.

14 SOLAR ENERGY↗

CyPhyR: a cyber‐physical analysis tool for measuring and enabling resiliency in microgrids

This study presents a tool to study the cyber‐physical resiliency (CyPhyR) of critical energy infrastructure system, in particular the effect of cyber attacks on the microgrid's resiliency. The developed tool enables measuring resiliency using data from cyber and physical systems and suggests control decisions for resilient planning and operation of the microgrid. The microgrid resiliency is formulated based on graph theory based indices and cyber‐power system characteristics. A Common Vulnerability Scoring System based metric called the Cyber Asset Impact Potential is developed and used in the planning phase, and another metric, Cyber Impact Severity is introduced to study the system performance in the operational phase. The information from these two phases is provided to the operator to make informed and proactive decisions to ensure the resilient operation of the microgrid. The performance of the developed tool has been tested using comprehensive real‐time cyber‐power testbed for a Consortium for Electric Reliability Technology Solutions microgrid test system.

Venkataramanan, Venkatesh↗

Primordial power spectrum from Planck

Using modified Richardson-Lucy algorithm we reconstruct the primordial power spectrum (PPS) from Planck Cosmic Microwave Background (CMB) temperature anisotropy data. In our analysis we use different combinations of angular power spectra from Planck to reconstruct the shape of the primordial power spectrum and locate possible features. Performing an extensive error analysis we found the dip near ℓ ∼ 750–850 represents the most prominent feature in the data. Feature near ℓ ∼ 1800–2000 is detectable with high confidence only in 217 GHz spectrum and is apparently consequence of a small systematic as described in the revised Planck 2013 papers. Fixing the background cosmological parameters and the foreground nuisance parameters to their best fit baseline values, we report that the best fit power law primordial power spectrum is consistent with the reconstructed form of the PPS at 2σ C.L. of the estimated errors (apart from the local features mentioned above). As a consistency test, we found the reconstructed primordial power spectrum from Planck temperature data can also substantially improve the fit to WMAP-9 angular power spectrum data (with respect to power-law form of the PPS) allowing an overall amplitude shift of ∼ 2.5%. In this context low-ℓ and 100 GHz spectrum from Planck which have proper overlap in the multipole range with WMAP data found to be completely consistent with WMAP-9 (allowing amplitude shift). As another important result of our analysis we do report the evidence of gravitational lensing through the reconstruction analysis. Finally we present two smooth form of the PPS containing only the important features. These smooth forms of PPS can provide significant improvements in fitting the data (with respect to the power law PPS) and can be helpful to give hints for inflationary model building.

79 ASTRONOMY AND ASTROPHYSICS↗

Testing Instrument Extremes in the TREAT Facility

TREAT is a transient power-shaping reactor whose primary mission is to enhance safety performance by testing nuclear fuels and materials under thermodynamic and neutronic conditions ranging from off-normal to extreme. Transient testing of nuclear fuels is analogous to car crash testing, in that the dramatic changes commonly seen when comparing the test specimens' initial and final state points necessitate in-situ measuring in order to interpret and understand the evolution of the experiment. TREAT’s experiment design strategy utilizes a highly reconfigurable and accessible reactor core that affords flexibility when installing experiment devices, thanks to the lack of a primary coolant boundary and the inclusion of multiple access points in the reactor bioshield. Within the experiment devices, the test specimens (which are integrated with their test environments), desired instrumentation diagnostics, and safety considerations are all contained in a single engineered package. The experiments encompass various types of environments (e.g., water, sodium, and gas at temperature and pressure), as well as a range of control options (e.g., static or flowing coolants). The experimental conditions are uniquely representative of advanced reactors, providing challenges to sensor performance but also affording a unique opportunity for development and qualification of sensors suited to these environments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Visualizing Electrical Power Systems as Flow Fields

We describe a method for visualizing data flows on large networks. We transform data flow on fixed networks into a vector field, which can be directly visualized using scientific flow visualization techniques. We evaluated the method on power flowing through two transmission power networks: a small, regional, IEEE test system (RTS-96) and a large national-scale system (the Eastern Interconnection). For the larger and more complex transmission system, the method illustrates features of the power flow that are not accessible when visualizing the power transmission with traditional network visualization techniques.

97 MATHEMATICS AND COMPUTING↗

Development of Performance Validation Tool for the NPCS for APR1400

Availability of nuclear power plant is highly dependent on the quality of major control systems including NSSS Control Systems. It has been experienced that a small flaw hidden among the control functions resulted in large operational transient or even reactor trip. The proactive quality control of these systems is not easy because of the dynamical characteristics of control algorithms. In a stand-alone or open loop state, it is not possible to perform integral system tests because they need control loads to form an appropriate closed control loop. In the construction plant, Power Ascension Test (PAT) is the first chance to witness the overall performance of the control systems. Because the PAT is the last activity of plant construction schedule, the cost of corrective actions is very high if any functional defect is found in this stage. To minimize risk caused by late detection of control system defects, we developed a validation tool as a proactive test device for the NSSS Process Control System (NPCS) for the SKN Unit 3 which is the first APR1400 plant in Korea. In this paper, the features of the dynamic performance test tool, test methodology, and the test results are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enabling the Electrification of Offshore Activities – Co-Demonstration of Next-Generation Autonomous Offshore Power System and Resident, Uncrewed Mobile and Static Assets at PacWave Wave Energy Test Site

Oceans cover two-thirds of the earth's surface and form the world's biggest and best – yet largely untapped – battery. Ocean waves have more energy density than other renewables, including wind, solar, and biomass, and have the potential to supply 4x the world's annual energy consumption (Masterson, 2022; Zic, 2020). In addition to the impact wave energy can have on decarbonizing and diversifying the electric grid, it offers a significant value proposition in the emerging blue economy sector (LiVecchi et al, 2019). The blue economy consists of industries operating offshore, including shipping, oil and gas, defense and security, aquaculture, and research. These industries require bringing people and energy on site to perform daily work, but current energy costs in the blue economy are extremely high. Here, the prevailing processes are complex, including shore dependencies and fuel transportation logistics. Few alternatives for reliable power generation exist, with the most prominent being high cost and high carbon emissions diesel generation. Because of this lack of affordable, reliable power, the trends of electrification, digitization, and automation that have led to substantial innovation and improvements in the terrestrial economy over the last two decades are slow to come to the blue economy.

16 TIDAL AND WAVE POWER↗

Synchronous Wind: Evaluating the Grid Impact of Inverterless Grid-Forming Wind Power Plants

Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators has attracted substantial attention in power systems research; however, the limited over-current capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. This paper develops the generic model of synchronous wind power generators, also known as Type-5 wind turbines, for power system integration studies. The Type-5 wind turbine interfaces with the electric grid through a synchronous generator; hence, its operation and consequent grid impacts are similar to a conventional power plant. Based on the developed model, a Type-5 wind power plant is integrated into the IEEE 14-bus test bed to evaluate its control and operation with a bulk power system. Finally, the stability properties of Type-5 wind turbine generators are compared with Type-3 wind turbines in GFM control mode through impedance characterization.

grid strength↗

Experimental Validation of an Explicit Power-Flow Primary Control in Microgrids

The existing approaches to control electrical grids combine frequency and voltage controls at different time-scales. When applied in microgrids with stochastic distributed generation, grid quality of service problems may occur, such as under- or overvoltages as well as congestion of lines and transformers. The COMMELEC framework proposes to solve this compelling issue by performing explicit control of power flows with two novel strategies: 1) a common abstract model is used by resources to advertise their state in real time to a grid agent; and 2) subsystems can be aggregated into virtual devices that hide their internal complexity in order to ensure scalability. While the framework has already been published in the literature, in this paper, we present the first experimental validation of a practicable explicit power-flow primary control applied in a real-scale test-bed microgrid. We demonstrate how an explicit power-flow control solves the active and reactive power sharing problem in real time, easily allowing the microgrid to be dispatchable in real time (i.e., it is able to participate in energy markets) and capable of providing frequency support, while always maintaining quality of service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scaling laws in jet classification

We demonstrate the emergence of scaling laws in the benchmark top versus QCD jet classification problem in collider physics. Six distinct physically-motivated classifiers exhibit power-law scaling of the binary cross-entropy test loss as a function of training set size, with distinct power law indices. This result highlights the importance of comparing classifiers as a function of dataset size rather than for a fixed training set, as the optimal classifier may change considerably as the dataset is scaled up. We speculate on the interpretation of our results in terms of previous models of scaling laws observed in natural language and image datasets.

Batson, Joshua↗

Final report on the MAGARC software consulting support contract (WFO No. 15904) for ITER magnet safety assessment

he ITER (not an acronym but Latin for "the Way”) International Organization (IO) is building a large-scale scientific experiment that is now under construction in Cadarache, France. The ITER Tokamak fusion reactor aims to demonstrate that it is possible to produce energy from fusion. The ITER’s power output goal is to deliver ten times the power it consumes. During its operational lifetime, ITER will test key technologies necessary for the next step: the demonstration fusion power plant that will prove that it is possible to capture fusion energy for commercial use. General information on the ITER project can be found at http://www.iter.org. The ITER reactor’s superconducting magnet systems create ~41GJ of stored magnetic field energy when fully energized. The consequences of such energy dissipating via electrical arcs under faulted conditions gives rise to safety concerns even though these fault events are extremely unlikely. As part of the ITER licensing procedure, and as a result of such safety concerns, this contract was established to benchmark a developing magnet safety analysis tool at Culham Centre for Fusion Energy against the MAGARC computer code. MAGARC was developed by the U.S. Idaho National Laboratory (INL) under the ITER Engineering Design Activity (EDA) Project and was applied to produce previous analyses, in order to support magnet fault and safety assessment for the ITER design description document. This contract report documents the completion of requested modifications to the MAGARC code by the ITER IO, a time-step size sensitivity analysis with MAGARC during an unmitigated quench event, a comparison of the modeling approaches taken in developing MAGARC and the CCFE analysis package, and the data required for the benchmarking activity for these codes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced Test Reactor Long-Term (20-Year) Operational Strategy

The Department of Energy Office of Nuclear Energy (DOE-NE) and the Naval Nuclear Propulsion Program (NNPP) have identified the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) as a critical need for continued thermal irradiation testing capability to support and advance U.S. commercial and naval nuclear power systems. The ATR is currently the only suitable test reactor operating in the world that can provide these capabilities at volume. ATR must, then, plan to operate for at least the next 20 years. As of the beginning of 2024, ATR has operated for 57 years, with many of the original reactor structures, systems, and components installed and operated for 60 years. Some ATR Complex and reactor support equipment that is currently in use was installed 75 years ago with the startup of the Materials Testing Reactor (MTR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Achieving high power factor and output power density in p-type half-Heuslers Nb 1-x Ti x FeSb

Significance Thermoelectric technology can boost energy consumption efficiency by converting some of the waste heat into useful electricity. Heat-to-power conversion efficiency optimization is mainly achieved by decreasing the thermal conductivity in many materials. In comparison, there has been much less success in increasing the power factor. We report successful power factor enhancement by improving the carrier mobility. Our successful approach could suggest methods to improve the power factor in other materials. Using our approach, the highest power factor reaches ∼106 μW⋅cm −1 ⋅K −2 at room temperature. Such a high power factor further yields a record output power density in a single-leg device tested between 293 K and 868 K, thus demonstrating the importance of high power factor for power generation applications.

36 MATERIALS SCIENCE↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Baseline Fracture Toughness and SCC Testing of Alloys X750 and XM-19 (Phase I)

The Advanced Test Reactor National Scientific User Facility (ATR NSUF) based at INL and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

Jackson, John H.↗

Large-Scale Adoption of Self Synchronized Universal Droop Controller-Based Inverters to Enable Ancillary Services for Different Modes of Distribution System Operations

This poster presents the results of using the self-synchronized universal droop controller to enable solar power to provide ancillary services so that the use of solar power can be increased. A 300-node system using the IEEE 123 bus test feeder are modeled on a real time power system simulator with the results presented.

Arce, Laura↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters: Preprint

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Cryogenic Carbon Capture Development (Final Report)

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The specific areas of work in this project are: Budget Period 1: 1) Selection of the most energy-efficient drying system for ambient-pressure flue gas. Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water; 2) Selection and demonstration of efficient solution to fouling due to dissolved CO 2 . SES has tested several commercial heat exchangers that purport to be able to handle fouling issues similar to those experienced in the contact liquid chiller. Replicated tests using the CCC ECL™ skid and dimpled brazed plate heat exchangers demonstrate that quick throttling of refrigerant combined with a burst of clean gas mitigate the fouling caused by CO 2 solubility in contact liquid with only minor increases in parasitic load. SES models indicate that parasitic load would increase by approximately 0.0125 GJ/tonne, an order of magnitude less than what was determined to be the maximum allowable additional parasitic load caused by this system; 3) Selection and demonstration of efficient and scalable solid–liquid separation system. The screw press technology met or exceeded the 70% solids loading benchmark during several test runs exceeding 24 hours on the CCC ECL™ skid. The average solids loading during the entire 50-hour run was 67%. The energy demand for this system is less than 0.1 GJ e /tonne of CO 2 processed; 4) Optimize design and demonstration of patented desublimating heat exchangers. We designed and built a hybrid spray tower that was tested over many hundreds of hours and a 50-hour continuous test run was completed capturing over 0.5 tonne CO 2 /day at >90% capture; (5) Plan for safe dilution of oxygen-depleted, cleaned flue-gas stream. The AERSCREEN simulator developed by the EPA modeled the dispersion of oxygen-depleted flue gas from the CCC process at a commercial plant. The results indicate that this plan effectively mitigates the flue gas hazards; (6) Simulation of and experimental work related to multi-pollutant capture. SES programmed an upgrade to its solid/vapor/liquid equilibrium (SVLE) algorithm. This enables simultaneous modeling of multiple pollutants (i.e., CO 2 , SO x , NO x , Hg, HCl). Budget Period 2; (7) Modify the CCC ECL™ skid for field testing and complete shakedown testing. The plans for modifying the CCC ECL™ skid were finalized and put into place. Shakedown testing of the updated CCC ECL™ skid occurred at SES using closed-loop mode (i.e., using a synthetic flue gas consisting of only N 2 and CO 2 ) and at the Hunter Power Plant using flue gas from the coal-fired boiler. Shakedown testing took longer than expected due to delays in receiving equipment and unexpected equipment performance in the field; (8) Operate the CCC ECL™ skid in the field. Longer testing of the CCC ECL™ skid occurred at the Hunter Power Plant. Multiple tests exceeding 35 hours were completed, with a total of over 600 hours of CO 2 capture completed using flue gas at the Hunter Power Plant with an average CO 2 capture rate of over 91% during those hours. Extensive notes and documentation were acquired informing improved methods for controls, startup, operation, and shut down; (9) Determine figures of merit and quantify process improvement. SES defined figures of merit for unit operation performance and overall CCC ECL™ process performance. All figures of merit were achieved or surpassed, except for 500 continuous hours of demonstration at the Hunter Power Plant; (10) Complete an Environmental Health and Safety Risk assessment by a third party. Tri-State completed an Environmental Health and Safety Risk assessment; (11) Update techno-economic analysis with third-party validation. The techno-economic analysis has been completed. It confirms the potential large reduction in energy and cost of the CCC process compared with leading alternatives and that the estimates and estimation techniques are reliable.

20 FOSSIL-FUELED POWER PLANTS↗