Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

FESTIV (Flexible Energy Scheduling Tool for Integrating Variable generation) [SWR-14-11]

Flexible Energy Scheduling Tool for Integrating Variable generation (FESTIV) is a tool that simulates the realistic representation of steady-state power system operations and scheduling performed by an independent system operator, regional transmission organization, or a vertically integrated regulated utility. The tool integrates security-constrained unit commitment (SCUC), security-constrained economic dispatch (SCED), and automatic generation control (AGC) into one model. These are the three modes of power system scheduling that are used to meet the changing net demand. Each of these submodels have different time characteristics and are used to meet the changing demand at different time resolutions and horizons. This allows multiple timescales to be studied where FESTIV accounts for intertemporal coupling between each submodel and the submodels themselves. It does this while having different objectives between the submodels; commitment of resources, dispatch and reserve commitment, and finally control.

Ela, Erik↗

NCC simulation model. Phase 2: Simulating the operations of the Network Control Center and NCC message manual

The network control center (NCC) provides scheduling, monitoring, and control of services to the NASA space network. The space network provides tracking and data acquisition services to many low-earth orbiting spacecraft. This report describes the second phase in the development of simulation models for the FCC. Phase one concentrated on the computer systems and interconnecting network.Phase two focuses on the implementation of the network message dialogs and the resources controlled by the NCC. Performance measures were developed along with selected indicators of the NCC's operational effectiveness.The NCC performance indicators were defined in terms of the following: (1) transfer rate, (2) network delay, (3) channel establishment time, (4) line turn around time, (5) availability, (6) reliability, (7) accuracy, (8) maintainability, and (9) security. An NCC internal and external message manual is appended to this report.

Benjamin, Norman M.↗

Mission simulation as an approach to develop requirements for automation in Advanced Life Support Systems

This paper examines mission simulation as an approach to develop requirements for automation and robotics for Advanced Life Support Systems (ALSS). The focus is on requirements and applications for command and control, control and monitoring, situation assessment and response, diagnosis and recovery, adaptive planning and scheduling, and other automation applications in addition to mechanized equipment and robotics applications to reduce the excessive human labor requirements to operate and maintain an ALSS. Based on principles of systems engineering, an approach is proposed to assess requirements for automation and robotics using mission simulation tools. First, the story of a simulated mission is defined in terms of processes with attendant types of resources needed, including options for use of automation and robotic systems. Next, systems dynamics models are used in simulation to reveal the implications for selected resource allocation schemes in terms of resources required to complete operational tasks. The simulations not only help establish ALSS design criteria, but also may offer guidance to ALSS research efforts by identifying gaps in knowledge about procedures and/or biophysical processes. Simulations of a planned one-year mission with 4 crewmembers in a Human Rated Test Facility are presented as an approach to evaluation of mission feasibility and definition of automation and robotics requirements.

NASA Discipline Number 61-10↗

Lunar Surface Systems Supportability Technology Development Roadmap

The Lunar Surface Systems Supportability Technology Development Roadmap is a guide for developing the technologies needed to enable the supportable, sustainable, and affordable exploration of the Moon and other destinations beyond Earth. Supportability is defined in terms of space maintenance, repair, and related logistics. This report considers the supportability lessons learned from NASA and the Department of Defense. Lunar Outpost supportability needs are summarized, and a supportability technology strategy is established to make the transition from high logistics dependence to logistics independence. This strategy will enable flight crews to act effectively to respond to problems and exploit opportunities in an environment of extreme resource scarcity and isolation. The supportability roadmap defines the general technology selection criteria. Technologies are organized into three categories: diagnostics, test, and verification; maintenance and repair; and scavenge and recycle. Furthermore, "embedded technologies" and "process technologies" are used to designate distinct technology types with different development cycles. The roadmap examines the current technology readiness level and lays out a four-phase incremental development schedule with selection decision gates. The supportability technology roadmap is intended to develop technologies with the widest possible capability and utility while minimizing the impact on crew time and training and remaining within the time and cost constraints of the program.

Oeftering, Richard C.↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argonne Leadership Computing Facility: 2021 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every one of its goals for calendar year (CY) 2021 as an advanced scientific computing center. In CY 2021, the ALCF operated its production resource, Theta, an Intel-based Cray XC40 system (11.7-petaflops) augmented with 24 NVIDIA DGX A100-based nodes (3.9-petaflops) that supports diverse workloads, integrating data analytics with artificial intelligence (AI) training and learning in a single platform. In 2021, we began deploying Polaris, our newest 40- petaflops system, and augmented this powerful testbed system with an additional 28 nodes to support the integration of real-time experiments and HPC resources. We also deployed our two largest storage systems yet, named Grand and Eagle, that will bring new services to our users and will power data-driven research for years to come. Last year, Theta delivered a total of 20.8 million node-hours to 16 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) projects and 7.2 million node-hours to ASCR Leadership Computing Challenge (ALCC) projects (32 awarded during the 2020–2021 ALCC year and 17 awarded during the 2021–2022 ALCC year), as well as substantial support to Director’s Discretionary (DD) projects (5.5 million node-hours). As Table ES.1 shows, Theta performed exceptionally well in terms of overall availability (95.1 percent), scheduled availability (99.4 percent), and utilization (98.1 percent; Table 2.1). As of the submission date of this document, ALCF’s user community has published 249 papers in high-quality, peer-reviewed journals and technical proceedings. At the 2021 International Conference for High Performance Computing, Networking, Storage and Analysis (SC’21), Argonne researchers won two HPCwire Readers’ Choice Awards and were part of a Gordon Bell Prize finalist team recognized for developing an AI-enabled, multi-resolution simulation framework for studying complex biomolecular machines. Their framework was used to observe the SARS-CoV-2 replication-transcription machinery in action, by directly integrating experimental data. ALCF also provided a comprehensive program of high-performance computing (HPC) support services to help our community make productive use of the facility’s diverse and growing collection of resources. We are now entering the exascale era, with exascale machines being planned for national laboratories across the country, including Aurora at Argonne National Laboratory (Argonne) in 2023. ALCF researchers have been leading and guiding numerous strategic activities that will push the boundaries of what’s possible in computational science and engineering and allow us to deliver science on day one.

97 MATHEMATICS AND COMPUTING↗

Peer-to-Peer Planning for Space Mission Control

Planning and scheduling for space operations entails the development of applications that embed intimate domain knowledge of distinct areas of mission control, while allowing for significant collaboration among them. The separation is useful because of differences in the planning problem, solution methods, and frequencies of replanning that arise in the different disciplines. For example, planning the activities of human spaceflight crews requires some reasoning about all spacecraft resources at timescales of minutes or seconds, and is subject to considerable volatility. Detailed power planning requires managing the complex interplay of power consumption and production, involves very different classes of constraints and preferences, but once plans are generated they are relatively stable.

Barreiro, Javier↗

Affordable Development and Demonstration of a Small NTR Engine and Stage: How Small is Big Enough?

In FY11, NASA formulated a plan for Nuclear Thermal Propulsion (NTP) development that included Foundational Technology Development followed by system-level Technology Demonstrations The ongoing NTP project, funded by NASAs Advanced Exploration Systems (AES) program, is focused on Foundational Technology Development and includes 5 key task activities:(1) Fuel element fabrication and non-nuclear validation testing of heritage fuel options;(2) Engine conceptual design;(3) Mission analysis and engine requirements definition;(4) Identification of affordable options for ground testing; and(5) Formulation of an affordable and sustainable NTP development program Performance parameters for Point of Departure designs for a small criticality-limited and full size 25 klbf-class engine were developed during FYs 13-14 using heritage fuel element designs for both RoverNERVA Graphite Composite (GC) and Ceramic Metal (Cermet) fuel forms To focus the fuel development effort and maximize use of its resources, the AES program decided, in FY14, that a leader-follower down selection between GC and cermet fuel was required An Independent Review Panel (IRP) was convened by NASA and tasked with reviewing the available fuel data and making a recommendation to NASA. In February 2015, the IRP recommended and the AES program endorsed GC as the leader fuel In FY14, a preliminary development schedule DDTE plan was produced by GRC, DOE industry for the AES program. Assumptions, considerations and key task activities are presented here Two small (7.5 and 16.5 klbf) engine sizes were considered for ground and flight technology demonstration within a 10-year timeframe; their ability to support future human exploration missions was also examined and a recommendation on a preferred size is provided.

spacecraft design↗

Using Flexible Execution, Replanning, and Model Parameter Updates to Address Environmental Uncertainty for a Planetary Lander

Planning in an unknown environment presents a number of challenges: incorrect world models, unpredictable variation in execution, and fixed depletable resources. Productivity in the face of these challenges requires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem with a depletable energy resource. Then, we propose a planning and execution framework that responds to feedback using three techniques: flexible execution, periodic replanning, and online parameter estimation and re-goaling. We demonstrate the efficacy of each of these techniques through simulation of a Europa Lander mission, showing higher utility achievement compared to simpler approaches, when presented with variation in energy consumption. We demonstrate that an approach to scheduling and execution that is grounded in decision theory and integrated planning and execution will be an enabling technology for future tightly-constrained planetary surface missions.

Chien, Steve↗

Building Energy Information Systems: User Case Studies

Measured energy performance data are essential to national efforts to improve building efficiency, as evidenced in recent benchmarking mandates, and in a growing body of work that indicates the value of permanent monitoring and energy information feedback. This paper presents case studies of energy information systems (EIS) at four enterprises and university campuses, focusing on the attained energy savings, and successes and challenges in technology use and integration. EIS are broadly defined as performance monitoring software, data acquisition hardware, and communication systems to store, analyze and display building energy information. Case investigations showed that the most common energy savings and instances of waste concerned scheduling errors, measurement and verification, and inefficient operations. Data quality is critical to effective EIS use, and is most challenging at the subsystem or component level, and with non-electric energy sources. Sophisticated prediction algorithms may not be well understood but can be applied quite effectively, and sites with custom benchmark models or metrics are more likely to perform analyses external to the EIS. Finally, resources and staffing were identified as a universal challenge, indicating a need to identify additional models of EIS use that extend beyond exclusive in-house use, to analysis services.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Concepts for design of an energy management system incorporating dispersed storage and generation

New forms of generation based on renewable resources must be managed as part of existing power systems in order to be utilized with maximum effectiveness. Many of these generators are by their very nature dispersed or small, so that they will be connected to the distribution part of the power system. This situation poses new questions of control and protection, and the intermittent nature of some of the energy sources poses problems of scheduling and dispatch. Under the assumption that the general objectives of energy management will remain unchanged, the impact of dispersed storage and generation on some of the specific functions of power system control and its hardware are discussed.

Kirkham, H.↗

Simulation of Etching in Chlorine Discharges Using an Integrated Feature Evolution-Plasma Model

To better utilize its vast collection of heterogeneous resources that are geographically distributed across the United States, NASA is constructing a computational grid called the Information Power Grid (IPG). This paper describes various tools and techniques that we are developing to measure and improve the performance of a broad class of NASA applications when run on the IPG. In particular, we are investigating the areas of grid benchmarking, grid monitoring, user-level application scheduling, and decentralized system-level scheduling.

Hwang, Helen H.↗

Affordable Development and Demonstration of a Small NTR Engine and Stage: A Preliminary NASA, DOE, and Industry Assessment

In FY11, NASA formulated a plan for Nuclear Thermal Propulsion (NTP) development that included Foundational Technology Development followed by system-level Technology Demonstrations. The ongoing NTP project, funded by NASA's Advanced Exploration Systems (AES) program, is focused on Foundational Technology Development and includes 5 key task activities: (1) Fuel element fabrication and non-nuclear validation testing of heritage fuel options; (2) Engine conceptual design; (3) Mission analysis and engine requirements definition; (4) Identification of affordable options for ground testing; and (5) Formulation of an affordable and sustainable NTP development program. Performance parameters for Point of Departure designs for a small criticality-limited and full size 25 klb (sub f) (kip, or 1000 pound-force)-class engine were developed during FYs 13-14 using heritage fuel element designs for both Rover NERVA (Nuclear Engine for Rocket Vehicle Applications) Graphite Composite (GC) and Ceramic Metal (Cermet) fuel forms. To focus the fuel development effort and maximize use of its resources, the AES program decided, in FY14, that a leader-follower down-selection between GC and cermet fuel was required. An Independent Review Panel (IRP) was convened by NASA and tasked with reviewing the available fuel data and making a recommendation to NASA. In February 2015, the IRP recommended and the AES program endorsed GC as the leader fuel In FY14, a preliminary development schedule DDTE (Design Development Test and Evaluation) plan was produced by GRC (Glenn Research Center), DOE (Department of Energy) and industry for the AES program. Assumptions, considerations and key task activities are presented here. At the direction of NASA HQ (32515), NASA and DOE are to work together to formulate a detailed development plan and schedule allowing the affordable development of a small (7.5-16.5 klbf) GC engine for possible flight technology demonstration (FTD) mission within a 10-year timeframe.

Lunar Flyby Mission↗

AUTOMATING GROUNDWATER SAMPLING AT HANFORD

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

54 ENVIRONMENTAL SCIENCES↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for RPS for Nuclear-Enabled Launches.

The use of radioisotope power systems (RPS) for nuclear-enabled NASA missions is a long-standing arrangement between DOE and NASA. The requirements for the power system come from NASA, while DOE performs the procurement, fueling, testing and delivery. Recent examples include Mars Science Laboratory and New Horizons. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule NASA has for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling, has always waited until the final selection of a mission. This timeline for a New Frontiers class mission leaves approximately 5-6 years from the time of final mission selection to the actual launch date. The number of RPS used for a Frontier class mission can be 1 to 3 units, i.e., the recent New Frontiers-2025 announcement of opportunity published in December 2016. If 1 or 2 units are needed for a specific mission, the timeline from the decision point to the launch date is a challenge, but doable. The activities taking place in this timeframe would include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires 3 RPS the logistics of accomplishing all activities during the 5-6 years is problematic. The challenge involves appropriate resourcing for plutonium production, heat source production and assembly/testing operations. Typically, the time between RPS-enabled missions involve staffing attrition and reduction at the heat source production and the assembly/testing facilities that can be down to 60-75 percent of peak staffing levels to reduce costs. The duration for increasing staffing in these areas, which includes hiring, nuclear workforce training and obtaining the appropriate security clearance is 2 years. Taking account for this 2 years and the 6 months prior to launch arrival of the RPS at Kennedy Space Center erodes too much of the 5-6 years to comfortably support the use of 3 RPS on a mission and doesn't leave much schedule margin for a 2 RPS unit mission. To provide better support for NASA nuclear-enabled missions a different approach was devised, constant rate production. This involves a higher level of base capability at Los Alamos National Laboratory (LANL), Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) to provide a stabilized work force. This will enable 10-15 heat sources to be produced annually at LANL, and subsequently shipped to the INL to be placed into a stable intermediate form that enables storage for up to several years that leads to quick production of general purpose heat source modules when a mission is selected. The up-front production of Pu-238 at ORNL is maintained so that there is material constantly in the pipeline. Production of key specialized components at ORNL is also maintained using this model. This allows for a reduction of risk to the nuclear-enabled missions, yet always having quantities of hardware available “on the shelf” to support production of RPS for NASA.

99 GENERAL AND MISCELLANEOUS↗

Communication network for decentralized remote tele-science during the Spacelab mission IML-2

The ESA communication network for decentralized remote telescience during the Spacelab mission IML-2, called Interconnection Ground Subnetwork (IGS), provided data, voice conferencing, video distribution/conferencing and high rate data services to 5 remote user centers in Europe. The combination of services allowed the experimenters to interact with their experiments as they would normally do from the Payload Operations Control Center (POCC) at MSFC. In addition, to enhance their science results, they were able to make use of reference facilities and computing resources in their home laboratory, which typically are not available in the POCC. Characteristics of the IML-2 communications implementation were the adaptation to the different user needs based on modular service capabilities of IGS and the cost optimization for the connectivity. This was achieved by using a combination of traditional leased lines, satellite based VSAT connectivity and N-ISDN according to the simulation and mission schedule for each remote site. The central management system of IGS allows minimization of staffing and the involvement of communications personnel at the remote sites. The successful operation of IGS for IML-2 as a precursor network for the Columbus Orbital Facility (COF) has proven the concept for communications to support the operation of the COF decentralized scenario.

Christ, Uwe↗

A Low Cost Spacecraft Architecture for Robotic Lunar Exploration Projects

A program of frequent, capable, but affordable lunar robotic missions prior to return of humans to the moon can contribute to the Vision for Space Exploration (VSE) NASA is tasked to execute. The Lunar Reconnaissance Orbiter (LRO) and its secondary payload are scheduled to orbit the moon, and impact it, respectively, in 2008. It is expected that the sequence of missions occurring for approximately the decade after 2008 will place an increasing emphasis on soft landed payloads. These missions are requited to explore intrinsic characteristics of the moon, such as hydrogen distribution in the regolith, and levitated dust, to demonstrate the ability to access and process in-situ resources, and to demonstrate functions critical to supporting human presence, such as automated precision navigation and landing. Additional factors governing the design of spacecraft to accomplish this diverse set of objectives are: operating within a relatively modest funding profile, the need tb visit multiple sites (both polar and equatorial) repeatedly, and to use the current generation of launch vehicles. In the US, this implies use of the Evolved Expendable Launch Vehicles, or EELVs, although this design philosophy may be extended to launch vehicles of other nations, as well. Many of these factors are seemingly inconsistent with each other. For example, the cost of a spacecraft usually increases with mass; therefore the desire to fly frequent, modestly priced spacecraft seems to imply small spacecraft (< 1 Mt, injected mass). On the other hand, the smallest of the EELVs will inject approx. 3 Mt. on a Trans Lunar Injection (TLI) trajectory md would therefore be wasteful or launching a single, small spacecraft. Increasing the technical capability of a spacecraft (such as autonomous navigation and soft landing) also usually increases cost. A strategy for spacecraft design that meets these conflicting requirements is presented. Taken together, spacecraft structure and propulsion subsystems constitute the majority of spacecraft mass; saving development and integration cost on these elements is critical to controlling cost. Therefore, a low cost, modular design for spacecraft structure and propulsion subsystems is presented which may be easily scaled up or down for either insertion into lunar orbit or braking for landing on the lunar surface. In order to effectively use the approx.3 Mt mass-to-TLI of the EELV, two low cost spacecraft will be manifested on the same launch. One spacecraft will be located on top of the other for launch and the two will have to be released in sequence in order to achieve all mission objectives. The two spacecraft could both be landers, both orbiters, or one lander and one orbiter. In order to achieve mass efficiency, the body of the spacecraft will serve the dual purposes of carrying launch loads and providing attachment points for all the spacecraft subsystems. In order to avoid unaffordable technology development costs, small liquid propulsion components and autonomous, scene-matching navigation cameras may be adapted from military missile programs in order to execute precision soft landings.

Lemke, Lawrence G.↗

Integrated Building Energy Systems Design Considering Storage Technologies

The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic, as well as environmental attraction of micro-generation systems (e.g., PV or fuel cells with or without CHP) and contribute to enhanced demand response. The interactions among PV, solar thermal, and storage systems can be complex, depending on the tariff structure, load profile, etc. In order to examine the impact of storage technologies on demand response and CO2 emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that can pursue two strategies as its objective function. These two strategies are minimization of its annual energy costs or of its CO2 emissions. The problem is solved for a given test year at representative customer sites, e.g., nursing homes, to obtain not only the optimal investment portfolio, but also the optimal hourly operating schedules for the selected technologies. This paper focuses on analysis of storage technologies in micro-generation optimization on a building level, with example applications in New York State and California. It shows results from a two-year research projectperformed for the U.S. Department of Energy and ongoing work. Contrary to established expectations, our results indicate that PV and electric storage adoption compete rather than supplement each other considering the tariff structure and costs of electricity supply. The work shows that high electricity tariffs during on-peak hours are a significant driver for the adoption of electric storage technologies. To satisfy the site's objective of minimizing energy costs, the batteries have to be charged by grid power during off-peak hours instead of PV during on-peak hours. In contrast, we also show a CO2 minimization strategy where the common assumption that batteries can be charged by PV can be fulfilled at extraordinarily high energy costs for the site.

25 ENERGY STORAGE↗