Progress in Defining the UK Highly Active Storage Tanks POCO Strategy - 16134

In the UK Highly Active (HA) waste is stored in stainless steel tanks prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made in recent years towards the reduction in the volume of HA Liquor (HAL) stored in these tanks and a number of the tanks are now operating at heel levels. As a result, a strategy is being developed to carry out Post Operational Clean Out (POCO) of some tanks while reprocessing operations continue, thus enabling accelerated and more cost effective clean-up of these HA facilities. This paper, and subsequent conference presentation, will highlight some of the key aspects of this strategy, including a description of the challenges and progress made so far to help facilitate the clean-up mission without having a detrimental effect on ongoing reprocessing operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Compliance Strategy For Recovery-Driven Underground Ventilation System Changes - 16355

The Waste Isolation Pilot Plant (WIPP) facility is managed and operated by Nuclear Waste Partnership LLC (NWP) for the U.S Department of Energy (DOE). On February 14, 2014, a radiological event occurred in the WIPP facility underground repository, which resulted in the release of transuranic isotopes contaminating a portion of the underground primarily along the ventilation path from Panel 7, the location of the incident. The release was initially detected by an underground continuous air monitor (CAM) which caused an automatic switch of the ventilation system to filtration mode and ventilation was directed through high-efficiency particulate air (HEPA) filtration banks located in the surface exhaust building. When the HEPA filtration was engaged, the underground normal ventilation was reduced from 425,000 standard cubic feet per minute (scfm) to 60,000 scfm. Since the event, all exhaust air is filtered through HEPA filters at 60,000 scfm to minimize the possibility of exposure to workers, the public and the environment. Ventilation of fresh air to the WIPP underground is a primary limitation to performing underground recovery activities; therefore, recovery-driven ventilation changes are needed. The safe recovery of the WIPP facility and resumption of normal waste emplacement activities require an increase in ventilation capacity to be accomplished in three phases: 1) Interim Ventilation System, 2) Supplemental Ventilation System and 3) Permanent Ventilation System. Each phase adds increased air flow to the underground and allows for underground activities to be performed concurrently. The regulatory strategy for ventilation recovery focuses on ensuring that needed changes to the WIPP facility are protective of human health and the environment. Recovery-driven ventilation changes are implemented using the procedures, processes, and regulations that are required by the two primary regulatory agencies for the WIPP facility: the U.S. Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED) as well as DOE requirements. Regulatory compliance is being achieved for the three ventilation phases to restore underground ventilation by providing the regulators and stakeholders opportunities for involvement during the design and development processes. A strategy for a tiered NMED permitting process and a plan for developing required EPA documentation are under consideration. The Project's objective is to resume normal waste emplacement activities with safety, protection of the public, the worker and the environment as the highest priorities. Important elements of ensuring that WIPP facility recovery and future waste emplacement activities occur as planned are transparency and communication with the regulatory community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

'Top 10' Facility Decommissioning Risks and Mitigation Strategies to Prevent Them - 16487

Decommissioning represents a set of risks that differ from facility design and construction, operations, or maintenance. An informal poll was taken querying experienced facility decommissioning project and program managers in government and private business sectors about top decommissioning risks. The poll considered experience in nuclear, fossil fuel, and oil and gas projects in Canada, the United States, the United Kingdom, and Australia. A classic risk assessment process was performed, where the likelihood and consequence(s) of impacts, typical or most commonly used controls, and the most effective mitigation strategies for various risks were identified. The risks that polled with the highest rankings were identified as the 'Top 10' decommissioning risks. Roger VanScoy stated 'Knowing our risks provides opportunities to manage and improve our chances of success.' The purpose of this effort was to identify and share the 'Top 10' decommissioning risks with those in the nuclear, fossil fuel, and oil and gas industry to help anticipate and manage those risks more effectively, avoid or reduce the potential consequences of the risks, and improve the chances of project success. Douglas Adams said: 'Human beings, who are almost unique in having the ability to learn from the experience of others, are also remarkable for their apparent disinclination to do so'. The information provided shares experiences, knowledge, and effective mitigation strategies from those with successful decommissioning experience so that others can learn and avoid the adverse consequences of risks inherent with decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology for Waste Forecasting and Informing an Integrated Waste Strategy at CNL - 18055

CNL is Canada's premier nuclear science and technology organization. CNL is a world leader in developing peaceful and innovative applications from nuclear technology through its expertise in physics, metallurgy, chemistry, biology and engineering. CNL is responsible for managing wastes from various locations across Canada. As a result of this work, legacy wastes have been generated and ongoing operations will continue to generate wastes. In order to identify gaps and ensure that paths are available to manage wastes, a waste forecast was developed. The waste forecast is intended to inform corporate strategy based on the volume of waste generated and into the future. One of the key pieces of output has been an estimate on the variability for forecasted volumes of wastes. Various sources of information were analyzed to provide a high-level summary. Many inputs were considered due to the various locations of waste generation, continuing operations, capital construction, decommissioning activities, and environmental remediation activities. In order to allow a holistic view, all waste streams were considered, including conventional industrial wastes to high-level wastes. The resulting output has mainly been used in identifying potential gaps in future storage requirements and disposition routes. It allows for the identification of the magnitude and the timing, if a gap is present. This information becomes a critical dataset to an Integrated Waste Strategy. Critical decisions regarding waste management can then be prioritized and scheduled. As the waste forecast is a living document, the existing information currently captured represents a baseline. To ensure quality management, future changes are to be documented through a change control process. Such changes can be from actual data or from updates to estimates through characterization, etc. As time progresses, comparisons between actual waste volumes versus forecasted volumes can then be used to further refine predictions on future waste generation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploiting Knowledge of Technetium in the Subsurface to Develop Remediation Strategies - 18223

Technetium-99 (Tc) contamination remains a major environmental problem at legacy nuclear reprocessing sites, such as the Hanford Site in south-central Washington State, where the total inventory of released Tc is estimated at 700 curies (Ci). The environmental risk associated with Tc is due to its long half-life (213,000 years) and the high mobility of the oxidized anionic pertechnetate species (Tc(VII)O{sub 4}{sup -}). Thus, there is a critical need to resolve scientific and technical issues underpinning the ability to safely, cost-effectively, and efficiently remediate Tc-contaminated vadose zone sediments and groundwater. Developing enhanced attenuation strategies for released Tc that reduce contaminant migration, while mitigating risk to human health and the environment, requires characterization of any retardation processes and Tc mass flux. The current conceptual model for Tc transport in the vadose zone assumes that Tc is predominantly present in its oxidized form as TcO{sub 4}{sup -}, which is highly soluble and mobile. However, under certain conditions, Tc can become entrained in solid phases. Tc-containing mineral phases from sediment cores extracted from various Hanford waste disposal sites were characterized to determine Tc present in vadose zone sediments as (i) TcO{sub 4} - that remains in water films associated with fine-grained sediments; (ii) Tc co-precipitated with other lanthanides in phosphate mineral phases; and (iii) Tc present as TcO{sub 2}.nH{sub 2}O in localized reducing zones. These results will be used to develop improved long-term Tc remediation strategies that are most likely to succeed during field application, through stimulation of conditions that enhance Tc attenuation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Media Relations Strategies in a Post-Information Age - 18452

Many organizations that deal with radioactive materials reluctantly engage in media relations and social media. This paper explores the drivers behind the dramatic coverage of clean-up activities nearest to large media markets. Interviews and media analysis reveal how companies and government actors responded to aggressive media investigations. Insights from professional journalists demonstrate the significance of Freedom of Information Act (FOIA) requests and computer assisted reporting on past and future coverage. Coverage of Hanford and Santa Susana Field Laboratory set the stage for creative engagement strategies developed to support public interest in clean-up efforts. Industrial and engineering firms, particularly small to mid-sized subcontractors, often place less priority on media and public relations. However, recent examples demonstrate that organizations that deal with scientific risk must evolve. Firms that acknowledge changing media trends update their communication strategies in ways that improve public trust and understanding. It's easy to understand why many organizations resist communicating when public concerns arise. Legal issues and contract restrictions may limit communications. The return on investment may seem low. Understanding exposure and hazard requires perspective, context and accuracy. Reporters and citizens also have better access to primary sources. Computer assisted reporting (CAR) and the dramatic rise of requests under the Freedom of Information Act (FOIA) lay bare details of the inner workings of complex situations, often without context. Examples from FOIA requests and challenges filed in the U.S. district courts, are described to help project administrators understand the points of view that can take shape on government projects from filings and disclosures. The range of benefits and risks of ongoing interaction with reporters provides a framework for assessing the right level of effort. For remediation efforts near large media markets, the influence of effective communication is magnified. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Chromium Plume at LANL - From Conceptual Site Model to Development of Complex Remediation Strategies - 18682

A hexavalent chromium plume is present in deep groundwater beneath Los Alamos National Laboratory (LANL or the Laboratory). The plume originated from releases of potassium dichromate from cooling towers from 1956 - 1972. Estimates are that up to 72,000 kg of chromium was released during that period. Data from surface water-balance studies, core-hole and groundwater characterization, geomorphic investigations and geology and geophysics provide the basis for an evolved conceptual model that chromium initially traveled rapidly via an effluent-supported stream for several kilometers, then infiltrated through a stratigraphically complex 275-300 meters thick vadose zone and eventually into a deep (regional) aquifer that is the water supply for the Laboratory and surrounding municipality. The travel time from the release point to the regional aquifer is estimated at 5-10 years based on modeling and contaminant tracers. Monitoring data from two-screen wells and piezometers within the regional aquifer, and data derived from stratified sampling conducted during sonic coring and from analysis of sonic core indicate that the chromium contamination occurs within the upper 23 meters of the highly stratified regional aquifer. Different geologic units at the water table and structural dip of depositional bedding appear to have little effect on chromium migration and plume shape and thickness which instead appear to be a manifestation of multiple breakthrough locations, interconnectedness of preferential hydraulic strata, and a negligible vertical gradient. Recent monitoring data indicate that the down-gradient plume edge (as defined by the New Mexico groundwater standard of 50 μg/L) may be advancing near the Laboratory's boundary with a neighboring Indian reservation. The Laboratory is addressing the increasing concentrations with a regulatory-driven interim measure that uses hydraulic control to manage plume migration. The interim measure involves limited-duration (2-3 years) pumping, treatment, and injection to rapidly establish and maintain the 50 μg/L plume edge within the Laboratory boundary while a final remediation strategy is developed and approved by the State regulator. A final remediation strategy will depend heavily on the ability to cost-effectively access the deep aquifer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Execution Strategy Analysis (ESA) Origin Sites Readiness Model - 19073

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The DOE Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management System (IWMS) program is developing an Execution Strategy Analysis (ESA) Origin Sites Readiness Model using the Goldsim{sup TM} software application to provide information on potential future approaches for removing SNF and HLW from origin sites such as commercial nuclear power plant sites. The purpose of this ESA model is to apply integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. The ESA Origin Sites Readiness Model is a dynamic simulation modeling capability. It is developed for use in the analysis and comparison of potential future implementation strategies associated with an integrated nuclear waste management program. The model is designed to be independent of the destination of the SNF or HLW so the results from the Origin Sites Readiness Model are equally applicable to a wide range of scenarios involving shipments to generic destinations in an integrated waste management system. The model explicitly takes significant assumptions, uncertainties, and risks into account. Currently, the ESA Origin Sites Readiness Model includes 14 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Vermont Yankee, La Crosse, Big Rock Point, Zion, Kewaunee, Fort Calhoun, Trojan, Rancho Seco, Humboldt Bay, San Onofre, and Crystal River) and is designed to be modular so that other sites can be added in the future. The model also includes multiple transportation modes (heavy haul truck, rail, and barge), activities related to the acquisition of transportation assets such as railcars and transportation casks, and site-specific considerations of on-site and near-site transportation infrastructure. The model was developed using the ESA process with Subject Matter Experts (SME); it incorporates uncertainty and risks and provides a structured, systematic methodology for evaluating potential SNF campaign scenarios. The model also complements other system-level logistics tools being developed by SFWD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A GIS-Based Suitability Analysis of a Phytomanagment Strategy for TCE in Groundwater and Soil Niagara Falls Storage Site, New York - 19385

The large number of complexly contaminated sites throughout the nation has propagated the application of phytoremedial techniques in a wide array of environmental remediation strategies. The use and breeding of vegetation for the in-situ treatment of environmental media (soil, groundwater, sediment) contaminated with organic or inorganic contaminants has shown to provide a low-cost alternative to conventional means of remediating contaminated sites (e.g., groundwater extraction, chemical oxidation or reduction, bioremediation, excavation, etc.). One impediment to effective phytoremediation is the selection of proper plant-species, which is complicated due to the many variables that are required for plant-species viability (i.e. range of soil pH, annual precipitation values, depth to groundwater table, etc.). This study employed the use of a Geographic Information Systems (GIS) to first define the spatial extent of contaminated media (soil and groundwater) at a project site and then support an effective means to optimize phytoremediative techniques to manage these impacts prior to final remediation. Spatial analyses and analytical calculations were coupled to determine an optimal plant species and spacing to maximize the effectiveness of a phytomanagement plan. The incorporation of fuzzy membership functions and fuzzy overlay provide an innovative method to help select the optimal plant-species for phytomanagement planning. Fuzzy membership functions were used to represent the plant growth requirements and provided an intuitive method to represent the uncertainty associated with plant-growth requirements. The fuzzy overlay function then employed a raster-based suitability analysis that together provided decision makers with a scientific solution to optimally design a phytomanagement strategy for site-related volatile organic compound (VOC) impacts. The Niagara Falls Storage Site (NFSS) VOC-impacted groundwater is contained in clayey glacial sediments, which commonly are technically impractical to remediate. Prior on-site studies show that native poplar (cottonwood variants) preferentially translocate or phytoextract the VOCs from the site soils and thus provide a proven mechanism to manage the multi-media impacts. Consequently, the Army Corps of Engineers Buffalo District evaluated phytoremediative approaches as a passive tool to manage the VOCs during the project life cycle prior to final remediation. The fuzzy membership functions and fuzzy overlay modeling of candidate species narrowed the selection to an optimal species and subsequent transpiration modeling estimated the plant spacing for the overall phytomanagement plan. The method employed for this study is easy applied to other phytoremediative and phytomanagement actions derived from hazardous waste decision making. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of ELAP and mitigation strategies in Maanshan PWR with PCTRAN

On March 11, 2011, the Fukushima Daiichi Nuclear Power Plant, owned by Tokyo Electric Power Company, encountered a beyond design basis earthquake/tsunami and the flood crippled the on-site emergency power and electric transmission systems. The ELAP (Extended Loss of Alternating Current Power) and LUHS (Loss of Ultimate Heat Sink) events severely damaged the core cooling systems and the safety functions of the containment. As a result, three reactor cores were damaged. Also, the cooling capability of nuclear spent fuel pools was lost due to loss of AC and DC power. Existing Station Blackout (SBO) analyses have demonstrated that even with leakage from Reactor Coolant Pump (RCP) seals, the core could maintain coolable only when heat transfer exists between primary loop and secondary loop. Depend on the availability of DC power in different plant designs, the SBO coping times were shown to be 4 to 16 hours. According to INPO event report, it is necessary to analyze the consequences if current coping times are extended with increased core water inventory loss from pump seals. In an ELAP scenario, all active system including Emergency Core Cooling System (ECCS) and motor driven AFW were out of power supply, results in degradation of core cooling capability. Moreover, the fuel exposed risk would increase due to continuously Reactor Coolant System (RCS) inventory loss through pump seals. Therefore, mitigation strategy must be applied prior to core uncovering to prevent its damage and assure plant safety. This research utilized a fast running NPP safety simulation code, PCTRAN, to assess reactor performances in the situations of ELAP of Maanshan PWR. Also, the sensitivity study of injection flow rates and effectiveness of mitigation strategy were demonstrated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An analysis of various solution strategies and perturbations on inputs of the reactor shielding problem - 25584

Previous work focused on the use of automated variance reduction parameters for use in a fixed source reactor shielding problem to solve for ex-core particle transport results. The current work assesses that strategy in light of a fully-coupled Monte Carlo problem run as a critical system with parallel processing and the use of moderate variance reduction parameters set manually. The results from the two strategies compare well. Also, results are compared between the MCNP, Virtual Environment for Reactor Applications (VERA) and Shift computer codes. Shift and VERA deliver similar results and compare well to MCNP. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strategies and Good Practices to Support Robust Stakeholder Engagement in Multi-Sector Energy Transition Planning

This document discusses strategies and good practices to facilitate diverse stakeholder engagement and inclusive decision-making within the context of complex energy system modernization studies and multi-sector energy transition planning, drawing upon the knowledge and expertise of numerous USAID, NREL, and other DOE laboratory practitioners with international and domestic energy planning experience. Examples of multi-sector energy transition analyses from the United States are included in this document to draw out relevant lessons learned and experience for the USAID-NREL Partnership - strategies and good practices will be updated over time as new insights emerge through collaboration with international partners and stakeholders. Considerations included within this document can also be used to support stakeholder engagement at the sector level (e.g., for power, transport, buildings), in addition to integrated approaches.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating↗

Adaptive Computing and Multi-Fidelity Strategies for Control, Design and Scale-Up of Renewable Energy Applications

We describe our ongoing research in adaptive computing and multi-fidelity modeling strategies. Our goal is to use a combination of low- and high-fidelity simulation models to enable computationally efficient optimization and uncertainty quantification. We develop optimization formulations that take into account the compute resources currently available, which act as a constraint with regards to the fidelity level simulation we can run while maximizing information gain. These strategies are being implemented into a software framework with a generalized API allowing its application to a broad range of applications, from power grid stability and buildings control to material synthesis and biofuels processing. We will discuss a few examples from these applications that can benefit from this approach, especially when considering challenges arising in scaling up experiments and simulations.

adaptive computing↗

INL High-Performance and Sustainable Building Strategy

High-performance buildings are reliable, cost effective, and sustainable structures that minimize energy and water use, reduce solid waste and pollutant emissions, and limit the depletion of natural resources. High-performance buildings also provide a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) is the nation’s premier nuclear energy research laboratory, the physical infrastructure requires continual updating and repurposing to help accomplish that mission. INL’s infrastructure must incorporate high-performance sustainable design features to be fiscally responsible and reflect an image of innovation to the public and prospective employees. INL is a large consumer of energy with annual energy costs exceeding $16M. This High-Performance and Sustainable Building Strategy will help engineering and construction project teams design sustainable facilities, reduce life cycle operating costs, and support the INL net-zero plan while providing INL employees with a safe and healthy working environment. With these goals in mind, the recommendations described in this document are intended to form INL’s foundation for sustainable and high-performance building standards. This strategy incorporates the latest federal and Department of Energy (DOE) orders and directives, including DOE Order 436.1A, “Departmental Sustainability,” the DOE Sustainability Plan (SP), the INL Site Sustainability Plan (SSP), and Code of Federal Regulations (CFR). This document identifies the requirements of the “Guiding Principles for Sustainable Federal Buildings” (Guiding Principles) and briefly highlights the Leadership in Energy and Environmental Design (LEED) Gold certification. LEED Gold certification can be used to meet many of the requirements of the Guiding Principles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Webinar: Strategies for Recruiting, Hiring and Retaining Military Talent: A Toolkit for Solar Industry Employers

SEIA and IREC’s recently published toolkit is intended to support solar employers with resources, strategies, and best practices to recruit, hire, and retain military connected talent across all levels and sectors of the solar workforce. This free webinar focuses on the key strategies – beginning with the business case for companies to invest in military connected talent through successful onboarding and retention.