Search NASA⌕ Search

SEARCH · Search NASA

Results for “Modularity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Conceptual Silicon Beta Cell Design

Silicon detectors have the potential to significantly improve the sensitivity limits for radioxenon detection. While silicon has beneficial attributes like improved energy resolution and memory effect, the sensitivity improvements will not occur without a properly designed beta cell that utilizes silicon detectors. This report details the key parameters that have been incorporated into the design of a silicon beta cell. Parameters that have the potential to change as a prototype silicon beta cell is developed and during the future commercialization process are also discussed. The design of the silicon beta cell has focused primarily on simulations and analytical models to optimize the mechanical properties. Additionally, a team of experts provided guidance and potential alternatives for the silicon detectors and electronics fabrication. A conceptual design for a silicon beta cell was completed, with an emphasis on the modularity of the system. The modularity allows for any potential changes that may be of interest during the prototyping phase or future spiral development to be implemented with minimal impact on the complete system. The impact of the silicon based beta cell is discussed in the conclusions, along with potential next steps. Mechanical design drawings for the beta cell could be used to manufacture a prototype beta cell and are available in an appendix document.

36 MATERIALS SCIENCE↗

NEAMS-IPL MOOSE Midyear Framework Activities

Multiphysics Object Oriented Simulation Environement (MOOSE) is a modular, pluggable framework for building complex simulations. The ability to add new objects with custom syntax is a core capability that makes MOOSE a powerful platform for coupling multiple applications together within a single environment. Documentation is not only a required component for a complete software quality assurance plan, but is critical to the overall success and wide-spread adoption of the platform by other researchers and institutions. Therefore, the notion of a modular, pluggable framework has been extended to the creation of documentation content. This report details the methodology for defining the NQA-1 compliant requirements in a manner that allows for the automatic generation of the Software Requirement Specification (SRS), Software Design Description (SDD), and Requirement Traceabiltity Matrix (RTM) from any repository revision.

97 MATHEMATICS AND COMPUTING↗

Advanced Compact X-ray Spectrometer with High Resolution and Efficiency

Under this Phase I SBIR Project, the Square One engineering team (in collaboration with a team of scientists from Brookhaven National Laboratory) designed, built, and tested a prototype Modular X-Ray Detection System. This Detection System was comprised of two primary subsystems, the Aiming Mechanism and the Optics Train. The Optics Train can be further subdivided into the following three components: the Collection Optic, the Discrimination Optic, and the Detection Unit. It is these three components that determine the modularity of the System. For example, the Collection Optic could accommodate either a polycapillary half lens or a Soller Slit. Similarly, the Detection Unit could accommodate either a Silicon Drift Diode (SDD) or some other diode. The Discrimination Optic can be included in the Optics Train, but is not necessary to the operation of the System.

99 GENERAL AND MISCELLANEOUS↗

Electrogenerative Reactors for Process Intensified Cogeneration of Power and Liquid Fuel from Shale Gas

With the abundance of natural gas and its primary components of methane, ethane and propane, there is the opportunity to convert these light alkanes to higher-value products. The growth in natural gas supply in the U.S. has increased substantially since the mid-2000s due to advances in horizontal drilling and hydraulic fracturing. As petroleum prices are volatile, natural gas resources are progressively attractive as alternative fuel sources. However, many of these shale gas wells are in regions of the U.S. that are remote and costly to transport to petrochemical and refining centers. In addition, much of this shale gas is “wet gas” that contains condensable amounts of ethane. While dedicated ethane gas pipelines have been built to get a small fraction of this gas to market, they are very capital intensive and compete for existing land use. As a result of this Phase I project, we developed a process to convert ethane to a transportable liquid fuel. This was achieved by implementing process intensification for this gas-to-liquids approach; we use novel eletrogenerative reactors in a two-step process rather than multi-step well-known technologies such as Fisher-Tropsch synthesis. These reactors borrow on well proven solid oxide fuel cell technology. Therefore, when produced in mass will be a very low-cost modular chemical reactor. This project demonstrated that EcoCatlaytic’s catalysts are highly selective towards ethylene and are compatible with anode materials. These integrated catalysts with the anode were able to maintain stable activity under ethane. Process simulations demonstrate an energy savings while producing gasoline and electricity for a modular system that produces 1,000 bbl/day gasoline. The system, not only produces gasoline, but also generates electricity which is a very valuable commodity in the remote shale gas facilities. This process could potentially allow remote natural gas producers to upgrade their feedstock to valuable gasoline on-site rather than flaring.

03 NATURAL GAS↗

DE-FE0031180 Final Report - LGFCS Prototype System Testing - R0

In the project, LGFCS assembled and tested its modular SOFC Power System that incorporates all critical technology improvements identified for its “product-like” demonstration. This product demonstrator is expected to meet customer and LGFCS performance expectations for operation, availability, durability and serviceability. The principal technology improvements are aimed at increasing the fuel cell power output and reducing the stack degradation rate. Improvements were also made for added system robustness and increased reliability. The objective of this program is to test a 250kWe thermally self-sustaining modular solid oxide fuel cell (SOFC) Power System for a minimum of 5,000 hours while advancing this commercial prototype product demonstrator to a Technical Readiness Level (TRL) 7. The SOFC system was tested on a site provided by Stark State College in North Canton, Ohio. System performance and degradation as well as cost estimates were compared to established SOFC Program performance metrics to assess progress. The major achievements were to assemble, and QA qualify 70 fuel cell strips for 12 integrated blocks into a fuel cell vessel and install it into a generator module with the fuel and power electronics modules on the test site. Performance to date included over 1800 hours on load at 250 KW-AC to the grid with a DC efficiency of 61% and AC efficiency of 55%. Power degradation was less than 0.4% per 1000 hours and NOx emissions met standards. The LGFCS SOFC Prototype System (GEN0) was demonstrated in an operational environment and therefore achieving Technical Readiness Level 7. The work presented here represents the efforts of all the employees of LG Fuel Cell Systems. Their dedication and hard work made GEN0 possible and successful.

03 NATURAL GAS↗

Conversion of Coal Wastes and Coal Plus Other Opportunity Fuel Mixtures, Such as Coal Plus Municipal Solids, to Produce Electricity and/or Liquid Fuels

For the foreseeable future, the Nation’s energy demand will continue to come largely from indigenous fossil energy resources and hydrocarbon fuels. Specifically waste coal plus other opportunity fuels need to be utilized as a feedstock to eliminate a waste stream and optimized to maximize energy yield and cleanly minimize pollutant emissions. Modular equipment is needed for installation in coal preparation locations, military installations, and research park facilities. Thermal decomposition of coal, biomass, and mixed solid waste (MSW) have been shown to reduce a waste stream while providing liquid and gaseous fuel products with low pollutant emissions. However, thermal decomposition processes have several challenges associated with preprocessing biomass and MSW, feeding and conveying material into the reactor, and post processing of syngas to remove undesirable products while upgrading to increase yield of high value products. Increasing total energy output from power plants by utilizing biomass and mixed wastes ultimately lowers energy costs, harmful environmental impacts of emissions, and has significant impacts on the energy security and sustainability of the U.S. economy. Entrained flow gasifiers (EFGs) produce very little CH4 and a wide range of H2/CO ratios (0.5–2.0) but are limited in their ability to effectively feed large biomass or MSW particles into the reactor. A solution to the feeding problems is to use pyrolysis torrefaction (PT) for conversion of waste materials to create a feedstock similar to coal and capable of grinding down and mixing with the coal feed. Mainstream experimentally explored reaction pathways for the conversion of coal waste plus municipal solids (CWPMS) and demonstrated a bench-scale reactor used for torrefaction of the municipal solid waste (MSW) to create a coal-like feed for blending with the coal waste. The material was processed in a pilot-scale EFG to determine product yield and emissions with CWPMS fuels, as well as the ash content and slagging properties of these feedstocks. The PT-EFG system was experimentally validated, where emissions and yield data were used to develop a high-fidelity process model and economic analysis. The following was accomplished in the Phase I: Determined optimal torrefaction process conditions for MSW and biomass through TGA; maximized heating value of fuel while maximizing final mass of torrefied product Demonstrated torrefaction of MSW and biomass feedstocks at 334°C, pulverized to uniform 74 µm particle size, and processed into coal-like feedstocks Demonstrated 8 lb/h pilot-scale EFG using MSW and biomass blends with waste coal; demonstrated 100% biomass in EFG Determined major effects of MSW torrefaction and co-gasifying high-ash coal waste-MSW blends have on pilot-scale EFG Demonstrated blending low-ash, low-sulfur torrefied biomass with high-ash waste bituminous and anthracite refuse coals generates a higher quality syngas compared to syngas from high-ash waste coals Demonstrated a high carbon conversion (> 99.5%) and syngas with 29.47% H2 content, and 0% CH4 content; greater water–gas shift occurs in EFG than predicted by equilibrium ASPEN Plus model Blended lower-ash, high-alkali biomass MSW to lower slag viscosities of the high-ash coal refuse sufficiently for better slag flow compared to feeding the high-ash coal Used low-sulfur biomass to greatly reduce the EFG syngas H2S concentrations and produce non-leachable slag and quench water with very little organic and trace metal contamination Developed a process model and TEA showing the modular PT EFG is cost competitive to existing power plants with the advantage of using low- or negative-value feedstocks such as waste coal stockpiles and non-landfilled MSW; providing a large incentive to implement an economical PT-EFG process

30 DIRECT ENERGY CONVERSION↗

LGFCS Prototype System Testing (Final Report)

In the project, LGFCS assembled and tested its modular SOFC Power System that incorporates all critical technology improvements identified for its “product-like” demonstration. This product demonstrator is expected to meet customer and LGFCS performance expectations for operation, availability, durability and serviceability. The principal technology improvements are aimed at increasing the fuel cell power output and reducing the stack degradation rate. Improvements were also made for added system robustness and increased reliability. The objective of this program is to test a 250kWe thermally self-sustaining modular solid oxide fuel cell (SOFC) Power System for a minimum of 5,000 hours while advancing this commercial prototype product demonstrator to a Technical Readiness Level (TRL) 7. The SOFC system was tested on a site provided by Stark State College in North Canton, Ohio. System performance and degradation as well as cost estimates were compared to established SOFC Program performance metrics to assess progress. The major achievements were to assemble, and QA qualify 70 fuel cell strips for 12 integrated blocks into a fuel cell vessel and install it into a generator module with the fuel and power electronics modules on the test site. Performance to date included over 1800 hours on load at 250 KWAC to the grid with a DC efficiency of 61% and AC efficiency of 55%. Power degradation was less than 0.4% per 1000 hours and NOx emissions met standards. The LGFCS SOFC Prototype System (GEN0) was demonstrated in an operational environment and therefore achieving Technical Readiness Level 7. The work presented here represents the efforts of all the employees of LG Fuel Cell Systems. Their dedication and hard work made GEN0 possible and successful.

03 NATURAL GAS↗

Exhaust runner soot diagnostic conceptual design for in-line time-resolved soot mass measurements

The Exhaust Runner Soot Diagnostic (ERSD) system is an in-line, time-resolved soot mass measurement system designed to allow rapid measurement of soot mass flux to detect and measure cyclic variability. The ERSD system design was generally split into two sections: conceptual mechanical design and measurement design—meaning the relevant calculations to demonstrate the feasibility of our planned measurement approach. For measurement design, the Beer-Lambert Law was the central focus for design justification. With measured values for the Filter Smoke Number (FSN) and a conversion to soot mass concentration, the required effective optical path length can be calculated for a desired light attenuation percentage. For mechanical design, the key constraints were space and modularity. The design must be placed into an existing mechanical setup with relative ease, as well as being modular enough to be implemented on other engines. The crux of the mechanical design was proper sealing and optical access, as both are crucial to the system's effectiveness. For proper sealing, extensive thermal expansion calculations were performed alongside O-ring design guides to produce the desired sealing and custom gland dimensions. For maximizing optical access, many iterations were modeled to provide full optical access while maintaining effective gas sealing.

02 PETROLEUM↗

Design and Development of a Custom Laser Powder Bed Fusion System

Additive manufacturing (AM) has gained great momentum both in industrial and research applications. Due to the ability to create custom and complex parts directly from a computer-aided design (CAD) file, AM is becoming a more reliable and efficient means to fabricate components. While being implemented throughout the aerospace, medical, automotive, and energy industries, the development of metal AM is still ongoing and presents many unique scientific challenges. For example, in laser powder bed fusion (PBF), intense localized heating of metal powder followed by rapid cooling leads to residual stresses and unique microstructures within a build. This may lead to cracking and a decrease in mechanical performance. In-situ diagnostics enable the laser-material interaction to be monitored as it occurs in order to optimize process parameters, and can be leveraged to develop tailored materials with specific microstructures that are more conducive for the complex thermal patterns encountered during laser PBF. Unfortunately, most commercial laser PBF machines are not suitable for research applications due to their large size, lack of diagnostics, and black box operation. A smaller system is better suited for using smaller quantities of powder to develop new tailored materials for AM, and a custom, modular design permits greater flexibility for incorporating in-situ diagnostics. Therefore, this project consisted of the design and construction of a custom, small scale, modular PBF system.

36 MATERIALS SCIENCE↗

Rocket Engine Test System for Development of Novel Propulsion Technologies

A 150 lb f thrust class, modular, bi-propellant, rocket engine/gas-generator and supporting test infrastructure has been developed in a cooperative effort between Sandia National Laboratories and the New Mexico Institute of Mining and Technology’s (NMIMT’s) Energetic Materials Research and Testing Center (EMRTC). This modular test engine design consists of a head end fuel-oxidizer injector, a spark ignition gaseous H 2 /O 2 torch igniter, combustion chamber and nozzle module. This robust design allows for rapid configuration changes as well as economical repair should hardware become damaged in testing. The engine interfaces with a permanently installed pressurizing system capable of delivering liquid nitrous oxide and a variety of liquid fuels for both rocket engine development and propellant performance evaluation. The regulated high pressure systems allow for delivery of liquefied gases above their saturation pressure as well as allowing for high pressure rocket engine/gas-generator operation. The facility test cell houses a 1 ton thrust capacity test stand leaving room for larger scale engine development.

36 MATERIALS SCIENCE↗

The PROPEL Hydro System (Final Report)

This paper summarizes research, development and outcome of a modular system for powering non-powered dams. There are approximately 77,000 non-powered dams in the US, a non-trivial fraction of which could be used to generate power. Development in this area has been slow because building projects costs too much and takes too long. The PROPEL-Hydro system combines modular components for the intake and foundation, an ai driven project design and evaluation tool, and a turbine optimized for performance on small and low head sites. Work included a combination of site evaluation, refinement of power electronics, value analysis supported by computational fluid mechanics and software development to support a project evaluation tool. The result is a reduction in installed cost/kW and resulting LCOE.

13 HYDRO ENERGY↗

Thermal Energy Storage Selection for Near Term Nuclear Integration

Thermal energy storage (TES) integration with existing and future light water reactors (LWRs) has the capability to increase the deployment options and uses for the large amounts of heat produced in nuclear reactor cores. The present method of exclusively producing electricity has become less economical with increases in renewable energy penetration leading to times of low or negative electricity prices. Some response to this new grid reality has been to begin load following nuclear reactors, an unideal choice due to the relatively small modular cost of producing nuclear energy compared to the revenue that could be received by using all of the heat produced. To support research in this area, Idaho National Laboratory (INL) has joined with Utah Associated Municipal Power Systems (UAMPS) on the Carbon Free Power Project (CFPP) to contract the Joint Use Modular Plant (JUMP). CFPP is planned to be a 12-module NuScale operating site built on INL property, with the first module dedicated to JUMP for research, development, and demonstration purposes. The JUMP module coming online around the beginning of fiscal year 2027 in the current project timeline. One primary goal of JUMP is to demonstrate TES integrated with an operating LWR in a real-world environment. TES integration will allow for the demonstration of nuclear power’s capability to participate in grid load following without reactor cycling, process heat integration, and electrical ancillary market opportunities. The goal of this research is to support both SMR deployment opportunities as well as support LWR retrofit capabilities. In a discussion limited to load following or energy arbitration, “charging” and “discharging” can be simply defined. TES charging refers to time when energy is removed from the nuclear reactor power conversion cycle and directed to be stored in the TES storage medium resulting in less available energy available for grid output. Discharging refers to the process of releasing energy stored in the TES medium and having an increase in grid. This paper quantifies energy storage technologies for use with nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Public Views on Nuclear Facility Siting and Radioactive Waste Management in the United States: Methodology and Response Reference Report for the 2017 Energy and Environment Survey

This report presents the questions and responses to a nationwide survey of U.S. residents taken May 2017. The focus of the 2017 survey is public perceptions on (1) nuclear energy and new nuclear technology, such as small modular reactors; (2) the risks and benefits of nuclear energy; (3) different options for managing spent nuclear fuel (SNF); and (4) the role of individuals, organizations and elected officials in locating SNF facilities. Highlights of survey results related to nuclear energy found the U.S. public (1) wants nuclear energy to continue to contribute 20% of total electrical power produced for the next 20 years; (2) is more supportive of adding new reactors at existing sites than at new sites; and (3) is more supportive of small modular reactors than traditional reactors. Highlights related to risks and benefits of nuclear energy include (1) the public believes that terrorist attacks are the greatest threat and that energy independence is the greatest benefit; (2) 56% of the public believes that nuclear power has both high benefit and high risk; (3) the 2011 accident at the Fukushima nuclear facility continues to negatively influence the perceived benefits and risks of nuclear energy except for those who perceive nuclear power as low risk and high benefit; (4) building new reactors is supported by those who perceive nuclear power as low risk and high benefit, and opposed by those who perceive it as high risk and low benefit. Highlights related to SNF management options include (1) support remains higher for permanent disposal than either consolidated interim storage or continued on-site storage; (2) support for private initiatives for interim storage in New Mexico and Texas are higher than generic storage and disposal options; (3) the general public is more likely to increase support if a majority of the local and state residents support an SNF facility. Highlights related to the role of individuals, organizations, and elected officials include (1) 54% of the public agrees that if an SNF facility is deemed safe by regulators, political considerations should not derail the location; (2) 47% of the US public agrees that non-governmental organizations should be able to provide input to locating an SNF facility; (3) 36% of the public believes that the federal government should lead siting of an SNF facility while 25% believes private companies should lead; (4) 81% of the public believes local residents and farmers/ranchers should have a say in the final decision on locating a SNF facility and 56% believe that they should have veto power; and (5) only 27% of the public believes the state governor should have a say and veto power.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

The Multiphysics on Advanced Platforms Project

In 2015, the Lawrence Livermore National Laboratory started development of next-generation multiphysics simulation capabilities for the National Nuclear Security Administration under the Advanced Technologies Development and Mitigation (ATDM) element of the Advanced Simulation and Computing program in collaboration with the Exascale Computing Project (ECP). A key driver for this effort across the NNSA tri-lab was the emergence of advanced high performance computing (HPC) architectures based on heterogeneous compute capabilities, including GPU based systems, as part of the national drive toward exascale computing platforms at multiple Department of Energy (DOE) facilities. Developing a multiphysics code capable of meeting the various simulation needs of the NNSA as defined by the current generation of integrated codes (or ICs), initially developed as part of the Accelerated Strategic Computing Initiative (ASCI) program beginning in 1996, and able to scale to the current 100 petaflop class pre-exascale systems, as well the forthcoming exaflop class computers, is a daunting challenge. To accomplish this ambitious goal, LLNL has embraced two key themes: use of high-order numerical methods and a modular approach to code development. The LLNL next generation effort is organized under the Multi-Physics on Advanced Platforms Project (MAPP). A foundational component of MAPP is the Axom computer science (CS) toolkit which provides infrastructure for the development of modular, performance portable, multi-physics application codes. MARBL is a next-generation application code built on the Axom base to address the modeling needs of the high energy density physics (HEDP) community for simulating high-explosive, magnetic or laser driven experiments such as inertial confinement fusion (ICF), pulsed-power magneto-hydrodynamics (MHD), equation of state (EOS) and material strength studies as part of the NNSA’s stockpile stewardship program (SSP).

97 MATHEMATICS AND COMPUTING↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ManiPIO - Manipulate Process I/O for Industrial Control Systems

The Manipulate Process Input/Output (IO) (ManiPIO) program allows users to develop custom scripts to execute Industrial Control System (ICS) manipulations. The driving development principles of ManiPIO are modularity and ease of use. Currently the program can utilize the Modbus TCP communication protocol, but its modular programming structure allows other protocols to be quickly and easily implemented. Additional functionality can be added to fit specific user needs, due to the usage of Python classes. The input configuration instructions are human readable and allow the user to create a complex series of control system manipulations.

97 MATHEMATICS AND COMPUTING↗