Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Artificial gravity in space and in medical research

The history of manned space flight has repeatedly documented the fact that prolonged sojourn in space causes physiological deconditioning. Physiological deterioration has raised a legitimate concern about man's ability to adequately perform in the course of long missions and even the possibility of leading to circumstances threatening survival. One of the possible countermeasures of physiological deconditioning, theoretically more complete than others presently used since it affects all bodily systems, is artificial gravity. Space stations and spacecrafts can be equipped with artificial gravity, but is artificial gravity necessary? The term "necessary" must be qualified because a meaningful answer to the question depends entirely on further defining the purpose of space travel. If man intends to stay only temporarily in space, then he must keep himself in good physical condition so as to be able to return to earth or to land on any other planetary surface without undue exposure to major physiological problems resulting from transition through variable gravitational fields. Such a situation makes artificial gravity highly desirable, although perhaps not absolutely necessary in the case of relative short exposure to microgravity, but certainly necessary in interplanetary flight and planetary landings. If the intent is to remain indefinitely in space, to colonize space, then artificial gravity may not be necessary, but in this case the consequences of long term effects of adaptation to weightlessness will have to be weighed against the biological evolutionary outcomes that are to be expected. At the moment, plans for establishing permanent colonies in space seem still remote. More likely, the initial phase of exploration of the uncharted solar system will take place through successive, scope limited, research ventures ending with return to earth. This will require man to be ready to operate in gravitational fields of variable intensity. Equipping spacecrafts or space stations with some means of artificial gravity in this initial phase is, therefore, necessary without question. In a strict sense artificial gravity is conceived as a means of replacing natural gravity in space by the centripetal acceleration generated by some sort of rotating device. Rotating devices create an inertial force which has effects on bodies similar to those caused by terrestrial gravity, but artificial gravity by a rotation device is not the same as terrestrial gravity, as we shall see. Present research in artificial gravity for space exploration is projected in two main directions: artificial gravity for whole space stations and artificial gravity produced by short arm centrifuges designed for human use in space.

Case Reports↗

Simple SE Methods Deployed in Revitalizing the Nuclear Post- Irradiation Examination Capability for the Idaho National Laboratory

The “crown jewels” of nuclear energy research facilities (i.e., hot cells, analysis systems, and scientists) have been centered at the Idaho National Laboratory for over 40 years, but in recent years, emphasis and funding for nuclear fuel research and development have declined to adversely affect the readiness and effectiveness of research facilities and equipment. Conversely, the current national nuclear renaissance forces the need for immediate enhancements in facilities, equipment, capabilities, and staff for the post-irradiation examination (PIE) of nuclear fuel. PIE characterizes the “burn-up” and structural integrity of fuel elements and defines the effectiveness of new fuels/alloys in search for optimum fuel burn-up and alloys for current and next generation nuclear reactors. This paper details how a team of system engineers adapted simple system engineering tools and techniques for a customer unfamiliar with the power and effectiveness of system engineering, to achieve project success.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Synopsis of Ion Propulsion Development Projects in the United States: SERT 1 to Deep Space I

The historical background and characteristics of the experimental flights of ion propulsion systems and the major ground-based technology demonstrations were reviewed. The results of the first successful ion engine flight in 1964, SERT I which demonstrated ion beam neutralization, are discussed along with the extended operation of SERT II starting in 1970. These results together with the technology employed on the early cesium engine flights. the Applications Technology Satellite (ATS) series, and the ground-test demonstrations, have provided the evolutionary path for the development of xenon ion thruster component technologies, control systems, and power circuit implementations. In the 1997-1999 period, the communication satellite flights using ion engine systems and the Deep Space I flight confirmed that these auxiliary and primary propulsion systems have advanced to a high-level of flight-readiness.

Sovey, James S.↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗

Distortion Representation of Forecast Errors for Model Skill Assessment and Objective Analysis

We proposed a novel characterization of errors for numerical weather predictions. A general distortion representation allows for the displacement and amplification or bias correction of forecast anomalies. Characterizing and decomposing forecast error in this way has several important applications, including the model assessment application and the objective analysis application. In this project, we have focused on the assessment application, restricted to a realistic but univariate 2-dimensional situation. Specifically, we study the forecast errors of the sea level pressure (SLP), the 500 hPa geopotential height, and the 315 K potential vorticity fields for forecasts of the short and medium range. The forecasts are generated by the Goddard Earth Observing System (GEOS) data assimilation system with and without ERS-1 scatterometer data. A great deal of novel work has been accomplished under the current contract. In broad terms, we have developed and tested an efficient algorithm for determining distortions. The algorithm and constraints are now ready for application to larger data sets to be used to determine the statistics of the distortion as outlined above, and to be applied in data analysis by using GEOS water vapor imagery to correct short-term forecast errors.

Hoffman, Ross N.↗

QuEST: Qualifying Environmentally Sustainable Technologies

TEERM focuses its validation efforts on technologies that have shown promise in laboratory testing, but lack testing under realistic or field environment. Mature technologies have advantages over those that are still in the developmental stage such as being more likely to be transitioned into a working environment. One way TEERM begins to evaluate the suitability of technologies is through Technology Readiness Levels (TRLs). TRLs are a systematic metric/measurement system that supports assessments of the maturity of a particular technology and the consistent comparison of maturity between different types of technology. TEERM generally works on demonstrating/validating alternatives that fall within TRLs 5-9. In instances where a mature technology does not exist for a particular Agency application, TEERM works with technology development groups and programs such as NASA's Innovative Partnerships Program (IPP). The IPP's purpose is to identify and document available technologies in light of NASA's needs, evaluate and prioritize those technologies, and reach out to find new partners. All TEERM projects involve multiple partners. Partnering reduces duplication of effort that otherwise might occur if individuals worked their problems alone. Partnering also helps reduce individual contributors' shares of the total cost of technology validation. Through collaboration and financial commitment from project stakeholders and third-party sources, it is possible to fully fund expensive demonstration/validation efforts.

Brown, Christina↗

Tunable Diode Laser Sensors to Monitor Temperature and Gas Composition in High-Temperature Coal Gasifiers

The integrated gasification combined cycle (IGCC) when combined with carbon capture and storage can be one of the cleanest methods of extracting energy from coal. Control of coal and biomass gasification processes to accommodate the changing character of input-fuel streams is required for practical implementation of integrated gasification combined-cycle (IGCC) technologies. Therefore a fast time-response sensor is needed for real-time monitoring of the composition and ideally the heating value of the synthesis gas (here called syngas) as it exits the gasifier. The goal of this project was the design, construction, and demonstration an in situ laserabsorption sensor to monitor multiple species in the syngas output from practical-scale coal gasifiers. This project investigated the hypothesis of using laser absorption sensing in particulateladen syngas. Absorption transitions were selected with design rules to optimize signal strength while minimizing interference from other species. Successful in situ measurements in the dusty, high-pressure syngas flow were enabled by Stanford’s normalized and scanned wavelength modulation strategy. A prototype sensor for CO, CH4, CO2, and H2O was refined with experiments conducted in the laboratory at Stanford University, a pilot-scale at the University of Utah, and an engineering-scale gasifier at DoE’s National Center for Carbon Capture with the demonstration of a prototype sensor with technical readiness level 6 in the 2014 measurement campaign.

01 COAL, LIGNITE, AND PEAT↗

Nanoporous Materials Genome Center Final Technical Report

Nanoporous materials (NPMs), including zeolites/zeotypes, metal-organic frameworks (MOFs), covalent organic frameworks, polymers with intrinsic microporosity, and molecular cages, possess enormous potential in diverse areas relevant to the DOE Office of Science Basic Energy Sciences (BES) mission and objectives. The Nanoporous Materials Genome Center (NMGC) has developed exascale-ready software, computational/theoretical chemistry methods, and data-driven science approaches that enable (i) the de-novo design of functional NPMs for chemical separation and catalysis tasks of increasing complexity, (ii) the discovery of the most promising functional NPMs from databases of synthesized and hypothetical adsorbent structures and the optimization of process conditions for specific applications, and (iii) the microscopic-level understanding of the fundamental interactions underlying the function of NPMs including hierarchical architectures, composite materials, responsive frameworks that may undergo phase transitions or post-synthetic modifications, and materials containing defects, partial disorder, or interfaces. A pivotal part of the NMGC project has been a tight collaboration between leading experimental groups for synthesis and characterization of NPMs and of computational groups that allowed for iterative feedback. The NMGC project has resulted in the publication of more than 290 research and review articles including more than 60 publications in high-impact journals and more than 15 journal covers. NMGC publications have already received more than 20,000 citations (with more than 3,000 citations per year in 2021, 2022, and 2023) and contribute to an h-index of more than 72. The NMGC award has supported collaborative research involving 28 research groups and contributed to the training of more than 40 postdocs, more than 60 graduate students, and more than 20 undergraduate students with broad expertise in data-driven science approaches, computational chemistry methods, and high-performance computing, in addition to the skills to thrive in an integrated experimental and computational research environment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗

FASTSAT a Mini-Satellite Mission...A Way Ahead

The Fast Affordable Science and Technology Spacecraft (FASTSAT) is a mini-satellite weighing less than 150 kg. FASTSAT was developed as government-industry collaborative research and development flight project targeting rapid access to space to provide an alternative, low cost platform for a variety of scientific, research, and technology payloads. The initial spacecraft was designed to carry six instruments and launch as a secondary rideshare payload. This design approach greatly reduced overall mission costs while maximizing the on-board payload accommodations. FASTSAT was designed from the ground up to meet a challenging short schedule using modular components with a flexible, configurable layout to enable a broad range of payloads at a lower cost and shorter timeline than scaling down a more complex spacecraft. The integrated spacecraft along with its payloads were readied for launch 15 months from authority to proceed. As an ESPA-class spacecraft, FASTSAT is compatible with many different launch vehicles, including Minotaur I, Minotaur IV, Delta IV, Atlas V, Pegasus, Falcon 1/1e, and Falcon 9. These vehicles offer an array of options for launch sites and provide for a variety of rideshare possibilities.

Boudreaux, Mark↗

Ion Propulsion Development Projects in US: Space Electric Rocket Test I to Deep Space 1

The historical background and characteristics of the experimental flights of ion propulsion systems and the major ground-based technology demonstrations are reviewed. The results of the first successful ion engine flight in 1964, Space Electric Rocket Test (SERT) I, which demonstrated ion beam neutralization, are discussed along with the extended operation of SERT II starting in 1970. These results together with the technologies employed on the early cesium engine flights, the applications technology satellite series, and the ground-test demonstrations, have provided the evolutionary path for the development of xenon ion thruster component technologies, control systems, and power circuit implementations. In the 1997-1999 period, the communication satellite flights using ion engine systems and the Deep Space 1 flight confirmed that these auxiliary and primary propulsion systems have advanced to a high level of flight readiness.

Sovey, James S.↗

Hydrogen Education for a Decarbonized Global Economy (H 2 EDGE) (Final Technical Report)

The energy sector is undergoing rapid growth and transformation, creating urgent demand for a skilled workforce to support emerging technologies and resilient systems. Hydrogen is an emerging solution for “hard to abate” sectors, including heavy industry and transportation that also provides optionality for the electric system and enables long‑duration energy storage. As hydrogen scales from traditional industrial uses to new applications, success depends on knowledgeable engineers, technicians, planners, and operators safely deploying hydrogen technologies across the full value chain: production, delivery, storage, and end use. The H 2 EDGE initiative, funded by the U.S. Department of Energy’s Hydrogen and Fuel Cell Technologies Office from 2020 to 2025, was launched to prepare people for careers hydrogen and related technologies. Through its interactive approach, H 2 EDGE equipped stakeholders with knowledge and tools to build a reliable and sustainable energy future together. H 2 EDGE built a national network of academic and industry partners to deliver modular training, share open-access curricula, and engage diverse talent pipelines. The program leveraged EPRI’s extensive industry membership and expanded on the train-the-trainer model of the GridEd program to connect educators, employers, and community organizations across all regions of the U.S. New methods were introduced to more systematically map hydrogen competencies and assess curricula using traditional and AI-assisted approaches. Outcomes included delivery of professional short courses, developing university curriculum, sponsoring faculty and student projects, and engaging stakeholders through workshops, site tours, and webinars.

08 HYDROGEN↗

Analysis of Flash Lidar Field Test Data for Safe Lunar Landing

In May 2008, the Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project conducted a helicopter field test of a commercial flash lidar to assess its applicability to safe lunar landing. The helicopter flew several flights, which covered a variety of slant ranges and viewing angles, over man-made and natural lunar-like terrains. The collected data were analyzed to assess the performance of the sensor and the performance of two algorithms: Hazard Detection (HD) and Hazard Relative Navigation (HRN). The collected flash lidar data were also used to validate a high fidelity flash lidar software model used in ALHAT Monte Carlo simulations. The field test results, combined with prior simulation results, advanced the technology readiness level of the HD algorithm to TRL 5 and the HRN algorithm to TRL 4.

hazard relative navigation↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Carbon Composite Overwrap Pressure Vessels Fabricated Using Ionic Liquid Epoxies Project

The intent of the work proposed here is to ascertain the viability of ionic liquid (IL) epoxy based carbon fiber composites for use as storage tanks at cryogenic temperatures. This IL epoxy has been specifically developed to address composite cryogenic tank challenges associated with achieving NASA's in-space propulsion and exploration goals. Our initial work showed that an unadulterated ionic liquid (IL) carbon-fiber composite exhibited improved properties over an optimized commercial product at cryogenic temperatures. Subsequent investigative work has significantly improved the IL epoxy and our first carbon-fiber Composite Overwrap Pressure Vessel (COPV) was successfully fabricated. Here additional COPVs, using a further improved IL epoxy, will be fabricated and pressure tested at cryogenic temperatures with the results rigorously analyzed. Investigation of the IL composite for lower pressure liner-less cryogenic tank applications will also be initiated. It is expected that the current Technology Readiness Level (TRL) will be raised from about TRL 3 to TRL 5 where unambiguous predictions for subsequent development/testing can be made.

Grugel, Richard↗

NCAR Contribution to A U.S. National Multi-Model Ensemble (NMME) ISI Prediction System

NCAR brought the latest version of the Community Earth System Model (version 1, CESM1) into the mix of models in the NMME effort. This new version uses our newest atmospheric model CAM5 and produces a coupled climate and ENSO that are generally as good or better than those of the Community Climate System Model version 4 (CCSM4). Compared to CCSM4, the new coupled model has a superior climate response with respect to low clouds in both the subtropical stratus regimes and the Arctic. However, CESM1 has been run to date using a prognostic aerosol model that more than doubles its computational cost. We are currently evaluating a version of the new model using prescribed aerosols and expect it will be ready for integrations in summer 2012. Because of this NCAR has not been able to complete the hindcast integrations using the NCAR loosely-coupled ensemble Kalman filter assimilation method nor has it contributed to the current (Stage I) NMME operational utilization. The expectation is that this model will be included in the NMME in late 2012 or early 2013. The initialization method will utilize the Ensemble Kalman Filter Assimilation methods developed at NCAR using the Data Assimilation Research Testbed (DART) in conjunction with Jeff Anderson’s team in CISL. This methodology has been used in our decadal prediction contributions to CMIP5. During the course of this project, NCAR has setup and performed all the needed hindcast and forecast simulations and provide the requested fields to our collaborators. In addition, NCAR researchers have participated fully in research themes (i) and (ii). Specifically, i) we have begun to evaluate and optimize our system in hindcast mode, focusing on the optimal number of ensemble members, methodologies to recalibrate individual dynamical models, and accessing our forecasts across multiple time scales, i.e., beyond two weeks, and ii) we have begun investigation of the role of different ocean initial conditions in seasonal forecasts. The completion of the calibration hindcasts for Seasonal to Interannual (SI) predictions and the maintenance of the data archive associated with the NCAR portion of this effort has been the responsibility of the Project Scientist I (Alicia Karspeck) that was partially supported on this project.

54 ENVIRONMENTAL SCIENCES↗

Plug-In Hybrid Medium-Duty Truck Demonstration and Evaluation

The Plug-In Hybrid Medium-Duty Truck Demonstration and Evaluation Program was sponsored by the United States Department of Energy (DOE) using American Recovery and Reinvestment Act of 2009 (ARRA) funding. The purpose of the program is to develop a path to migrate plug-in hybrid electric vehicle (PHEV) technology to medium-duty vehicles by demonstrating and evaluating vehicles in diverse applications. The program also provided three production-ready PHEV systems—Odyne Systems, Inc. (Odyne) Class 6 to 8 trucks, VIA Motors, Inc. (VIA) half-ton pickup trucks, and VIA three-quarter-ton vans. The vehicles were designed, developed, validated, produced, and deployed. Data were gathered and tests were run to understand the performance improvements, allow cost reductions, and provide future design changes. A smart charging system was developed and produced during the program. The partnerships for funding included the DOE; the California Energy Commission (CEC); the South Coast Air Quality Management District (SCAQMD); the Electric Power Research Institute (EPRI); Odyne; VIA; Southern California Edison; and utility and municipal industry participants. The reference project numbers are DOE FOA-28 award number EE0002549 and SCAQMD contract number 10659.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Materials Development under NASA’s Hybrid Thermally Efficient Core (HyTEC) Project

The Hybrid Thermally Efficient Core (HyTEC) project aims to develop small core turbofan engine technologies that will enable fuel burn reductions, additional use of electric airplane systems through power extraction, and to advance engine operability and compatibility with sustainable aviation fuels. As such, a portfolio of technologies that contribute to raising the pressure, temperature and efficiency of turbofan engine cores needs developed. Included in HyTEC’s technology portfolio to enable these advancements are enhanced combustor liner materials and higher temperature capable turbine blades and vanes manufactured using ceramic matrix composites (CMCs) and environmental barrier coatings (EBCs). These technologies are being developed and tested in laboratory-scale relevant environments to advance the technology readiness level (TRL) to 4 or 5, before moving into an engine core demonstrator to raise the TRL to 6. A new natural gas/oxygen burner rig facility will be used to simulate turbine engine relevant environments at the laboratory/coupon scale. In addition, improvements to enable sub-element, and more complex component testing in NASA Glenn’s combustor facility (CE-5) will be presented.

Ceramic Matrix Composites (CMCs)↗