Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Road Map for Development of Crystal-Tolerant High Level Waste Glasses

The U.S. Department of Energy (DOE) is building a Tank Waste Treatment and Immobilization Plant (WTP) at the Hanford Site in Washington to remediate 55 million gallons of radioactive waste that is being temporarily stored in 177 underground tanks. Efforts are being made to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. This road map guides the research and development for formulation and processing of crystal-tolerant glasses, identifying near- and long-term activities that need to be completed over the period from 2014 to 2019. The primary objective is to maximize waste loading for Hanford waste glasses without jeopardizing melter operation by crystal accumulation in the melter or melter discharge riser. The potential applicability to the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) will also be addressed in this road map. The planned research described in this road map is motivated by the potential for substantial economic benefits (significant reductions in glass volumes) that will be realized if the current constraints (T 1% for WTP and T L for DWPF) are approached in an appropriate and technically defensible manner for defense waste and current melter designs. The basis of this alternative approach is an empirical model predicting the crystal accumulation in the WTP glass discharge riser and melter bottom as a function of glass composition, time, and temperature. When coupled with an associated operating limit (e.g., the maximum tolerable thickness of an accumulated layer of crystals), this model could then be integrated into the process control algorithms to formulate crystal-tolerant high-level waste (HLW) glasses targeting high waste loadings while still meeting process related limits and melter lifetime expectancies. The modeling effort will be an iterative process, where model form and a broader range of conditions, e.g., glass composition and temperature, will evolve as additional data on crystal accumulation are gathered. Model validation steps will be included to guide the development process and ensure the value of the effort (i.e., increased waste loading and waste throughput). A summary of the stages of the road map for developing the crystal-tolerant glass approach, their estimated durations, and deliverables is provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Portal and Repository for Information on Marine Renewable Energy (PRIMRE)

The Marine Renewable Energy (MRE) industry is in the early stages of development corresponding to low technology readiness levels (TRLs) where the ability of the MRE community (developers, researchers, academics, stakeholders, investors, and regulators) to work together to share knowledge, experience, and lessons learned is critical to the advancement of the entire MRE industry. Through collaboration on solving common problems, the MRE community has the potential to reduce cost and accelerate technology development. Currently, the US Department of Energy (US DOE) Water Power Technologies Office (WPTO) is addressing the challenge of storing, curating, and accessing MRE information by sponsoring development of MRE databases and information portals such as Tethys (https://tethys.pnnl.gov), OpenEI (https://openei.org), the MHK Data Repository (MHKDR, https://mhkdr.openei.org/), and a searchable MRE code catalog and open source code repository (MHKiT, currently under development), to name a few. These sites host scientific papers, news articles, reports, databases, open source codes, and stakeholder engagement information, but they are only a step towards facilitating global discovery and use. In short, there is an abundance of information available online, however it is located on many disparate sites and repositories that make the discovery of those data and information difficult. A DOE national laboratory team from the National Renewable Energy Laboratory (NREL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (Sandia) is addressing the issues of data discoverability, shared knowledge, and interconnection of existing MRE databases and information portals. To meet the needs of the MRE community, as identified through multiple community outreach and engagement events, and described in this paper, the multi-lab team has developed an implementation plan for PRIMRE, the Portal and Repository for Information on Marine Renewable Energy. PRIMRE will provide broad access to information on engineering and technologies, resource characterization, device performance, and environmental effects of MRE projects. PRIMRE will facilitate the commercial development of the MRE industry by increasing the accessibility and discoverability of this information, integrating the databases and information portals described in this paper, and developing standards and guidelines. Providing consistent, easy access to information can help reduce duplication of effort and enable the MRE community to learn from past failures and build upon the successes of others to innovate and advance the commercialization of MRE technologies.

16 TIDAL AND WAVE POWER↗

Next Generation Metallic Iron Nodule Technology in Electric Arc Steelmaking - Phase II

The current trend in the steel industry is a gradual decline in conventional steelmaking from taconite pellets in blast furnaces, and an increasing number of alternative processes using metallic scrap iron, pig iron and metallized iron ore products. Currently, iron ores from Minnesota and Michigan are pelletized and shipped to the lower Great Lakes ports as blast furnace feed. The existing transportation system and infrastructure is geared to handling these bulk materials. In order to expand the opportunities for the existing iron ore mines beyond their blast furnace customer base, a new material is needed to satisfy the needs of the emerging steel industry while utilizing the existing infrastructure and materials handling. A recent commercial installation employing Kobe Steel’s ITmk3 process, was installed in Northeastern Minnesota. The basic process uses a moving hearth furnace to directly reduce iron oxides to metallic iron from a mixture of iron ore, coals and additives. The resulting products can be shipped using the existing infrastructure for use in various steelmaking processes. The technology reportedly saves energy by 30% over the current integrated steelmaking process and reduces emissions by more than 40%. A similar large-scale pilot plant campaign is also currently in progress using JFE Steel’s Hi-QIP process in Japan. The objective of this proposal is to build upon and improve the technology demonstrated by Kobe Steel and JFE, by further reducing cost, improving quality and creating added incentive for commercial development. This project expands previous research conducted at the University of Minnesota Duluth’s Natural Resources Research Institute and that reported by Kobe and JFE Steel. Three major issues have been identified and are addressed in this project for producing high-quality nodular reduced iron (NRI) at low cost: (1) reduce the processing temperature, (2) control the furnace gas atmosphere over the NRI, and (3) effectively use sub-bituminous coal as a reductant. From over 4000 laboratory tube and box furnace tests, it was established that the correct combination of additives, fluxes, and reductant while controlling the concentration of CO and CO2 in the furnace atmosphere (a) lowers the operating temperature, (b) decreases the use of reductant coal (c) generates less micro nodules of iron, and (d) promotes desulphurization. The laboratory scale work was subsequently verified on 12.2 m (40 ft) long pilot scale furnace. High quality NRI could be produced on a routine basis using the pilot furnace facility with energy provided from oxy-gas or oxy-coal burner technologies. Specific strategies were developed to allow the use of sub-bituminous coals both as a hearth material and as part of the reaction mixture. Computational Fluid Dynamics (CFD) modeling was used to study the overall carbothermic reduction and smelting process. The movement of the furnace gas on a pilot hearth furnace and larger simulated furnaces and various means of controlling the gas atmosphere were evaluated. Various atmosphere control methods were identified and tested during the course of the investigation. Based on the results, the appropriate modifications to the furnace were made and tested at the pilot scale. A series of reduction and smelting tests were conducted to verify the utility of the processing conditions. During this phase, the overall energy use characteristics, raw materials, alternative fuels, and the overall economics predicted for full scale implementation were analyzed. The results indicate that it should be possible to lower reaction temperatures while simultaneously producing low sulfur, high carbon NRI if the right mix chemistry and atmosphere are employed. Recommendations for moving the technology to the next stage of commercialization are presented.

Carbon↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Update on the Lithium-Ion Cell Low-Earth-Orbit Verification Test Program

A Lithium-Ion Cell Low-Earth-Orbit Verification Test Program is being conducted by NASA Glenn Research Center to assess the performance of lithium-ion (Li-ion) cells over a wide range of low-Earth-orbit (LEO) conditions. The data generated will be used to build an empirical model for Li-ion batteries. The goal of the modeling will be to develop a tool to predict the performance and cycle life of Li-ion batteries operating at a specified set of mission conditions. Using this tool, mission planners will be able to design operation points of the battery system while factoring in mission requirements and the expected life and performance of the batteries. Test conditions for the program were selected via a statistical design of experiments to span a range of feasible operational conditions for LEO aerospace applications. The variables under evaluation are temperature, depth-of-discharge (DOD), and end-of-charge voltage (EOCV). The baseline matrix was formed by generating combinations from a set of three values for each variable. Temperature values are 10 C, 20 C and 30 C. Depth-of-discharge values are 20%, 30% and 40%. EOCV values are 3.85 V, 3.95 V, and 4.05 V. Test conditions for individual cells may vary slightly from the baseline test matrix depending upon the cell manufacturer s recommended operating conditions. Cells from each vendor are being evaluated at each of ten sets of test conditions. Cells from four cell manufacturers are undergoing life cycle tests. Life cycling on the first sets of cells began in September 2004. These cells consist of Saft 40 ampere-hour (Ah) cells and Lith ion 30 Ah cells. These cells have achieved over 10,000 cycles each, equivalent to about 20 months in LEO. In the past year, the test program has expanded to include the evaluation of Mine Safety Appliances (MSA) 50 Ah cells and ABSL battery modules. The MSA cells will begin life cycling in October 2006. The ABSL battery modules consist of commercial Sony hard carbon 18650 lithium-ion cells configured in series and parallel combinations to create nominal 14.4 volt, 3 Ah packs (4s-2p). These modules have accumulated approximately 3000 cycles. Results on the performance of the cells and modules will be presented in this paper. The life prediction and performance model for Li-ion cells in LEO will be built by analyzing the data statistically and performing regression analysis. Cells are being cycled to failure so that differences in performance trends that occur at different stages in the life of the cell can be observed and accurately modeled. Cell testing is being performed at the Naval Surface Warfare Center in Crane, IN.

Reid, Concha M.↗

A widely adaptable habitat construction system utilizing space resources

This study suggests that the cost of providing accommodations for various manned activities in space may be reduced by the extensive use of resources that are commonly found throughout the solar system. Several concepts are proposed for converting these resources into simple products with many uses. Concrete is already being considered as a possible moonbase material. Manufacturing equipment should be as small and simple as possible, which leads to the idea of molding it into miniature modules that can be produced and assembled in large numbers to create any conceivable shape. Automated equipment could build up complex structures by laying down layer after layer in a process resembling stereolithography. These tiny concrete blocks handle compression loads and provide a barrier to harmful radiation. They are joined by a web of tension members that could be made of wire or fiber-reinforced plastic. The finished structure becomes air-tight with the addition of a flexible liner. Wire can be made from the iron modules found in lunar soil. In addition to its structural role, a relatively simple apparatus can bend and weld it into countless products like chairs and shelving that would otherwise need to be supplied from Earth. Wire woven into a loose blanket could be an effective micrometeoroid shield, tiny wire compression beams could be assembled into larger beams which in turn form larger beams to create very large space-frame structures. A technology developed with lunar materials could be applied to the moons of Mars or the asteroids. To illustrate its usefulness several designs for free-flying habitats are presented. They begin with a minimal self-contained living unit called the Cubicle. It may be multiplied into clusters called Condos. These are shown in a rotating tether configuration that provides a substitute for gravity. The miniature block proposal is compared with an alternate design based on larger triangular components and a tetrahedral geometry. The overall concept may be expanded to envision city-sized self-sufficient environments where humans could confortably live their entire lives. One such proposal is the Hive. It is configured around a unique sunlight collection system that could provide all its energy needs and that could be scaled up to compensate for the reduced solar intensity at greater distances from the sun. Its outer perimeter consists of a cylindrical section mated to two conical end walls that taper inwards toward a small aperture at the center of rotation. Light collected by two huge mirrors of unusual design enters the aperture and is redirected to the inside of the cylinder. The conical end walls are shielded from direct sunlight and are designed to radiate heat into space. They are lined with air ducts that passively recirculate the atmosphere while extracting moisture by condensation. Although there is no immediate demand for spacecraft on this scale, their consideration can influence even the earliest stages of the development process.

Wykes, Harry B.↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

CarbonSAFE Phase I: Integrated CCS Pre-Feasibility – Northwest Gulf of Mexico (Final Research Performance Progress Report)

Offshore storage achieves two major objectives for the US commercial large scale CCS deployment: 1. Adding large capacity to serve local regional, and potentially broader objectives 2. Lowering risk by providing storage with one public owner, away from population, with no conflict with water resources and reduced concern about induced seismicity. A high-concentration CO 2 source was identified as the top candidate for the project and going forward with the CarbonSAFE Phase II proposal. The top-rated source is the NET Power facility in Houston (La Porte), Texas. A manuscript based on analysis of results from the two-stage survey conducted in eight selected Texas counties was submitted to the International Journal of Greenhouse Gas Control on August 21, 2018. A primary confining interval (seal) is associated with MFS9 (biochronozone Amphistegina B) which can reach a thickness of up to 250 m. However, the Amphistegina B confining interval thins considerably in the onshore direction. Consequently, the most suitable portion of the Miocene section for future CO 2 sequestration in the study area is considered to be the offshore area where Amphistegina B is thickest. Based on three models for capacity assessment, the study proposes a base case for the High Island 10-L Field in which 9 wells operated for 12 years each completed into 4 zones will emplace a total of 150MMT of CO 2 with wells placed in the water leg where all the plume will slowly migrate into the structural trap is feasible in terms of geology and engineering. The 10-L Field was assessed in more detail than other examined oil and gas fields in the study area in order to look at some specifics about how initial future CCS projects might be accomplished in the favorable GoM of the US region and expand the sites to a larger set to experiment with matching all the possible sources to sinks. The 10-L site is large enough to accept CO 2 from multiple sinks; the expanded sinks are estimated to be large enough to accept all the CO 2 from the region plus some from outside the region. A number of uncertainties were identified. The largest and most consequential uncertainty is the cost of offshore pipelines in the study setting, which impacts the conditions where CO 2 transport would be by ship versus the cases where pipeline would be preferred. Ships are preferred for small volumes and short durations; pipelines for larger volumes and long duration. Additional work is needed to advance the maturity of multiple sinks available, to continue outreach to industries and the public, and to develop realistic source opportunities. The study demonstrates that industrial source clusters connected to a transport hub delivering CO 2 to a nearby storage complex is the most cost-effective and improved way to de-carbonize industrial activities, particularly, in an expected low-carbon and increasing carbon price environmental. The feasibility of the new business models should be based on the best use of the existing infrastructure and strategically build on new supporting infrastructure to drive down the costs of large-scale CCS deployment. Assessing the pre-feasibility of the commercial implementation of a CCS cluster and hub in the GoM energy ecosystem, our study links these elements successfully through an optimized combination (minimum cost) of CO 2 sources on land with offshore storage. Offshore storage achieves two major objectives for the US commercial large scale CCS deployment: 1. Adding large capacity to serve local regional, and potentially broader objectives 2. Lowering risk by providing storage with one public owner, away from population, with no conflict with water resources and reduced concern about induced seismicity.

54 ENVIRONMENTAL SCIENCES↗

Intermediate-Term Thermal Aging Effect Evaluation for Grade 92 and 316L at The LWR Relevant Temperature

Life extension of the existing nuclear reactors imposes accumulated damages, such as higher fluences and longer period of corrosion, to structural materials, which would result in significant challenges to the traditional reactor materials such as type 304 and 316 stainless steels. Advanced alloys with superior radiation resistance will increase safety margins, design flexibility, and economics for not only the life extension of the existing fleet but also new builds with advanced reactor designs. The Electric Power Research Institute (EPRI) teamed up with Department of Energy (DOE) on the Advanced Radiation Resistant Materials (ARRM) program, aiming to develop and test degradation resistant alloys from current commercial alloy specifications by 2021 to a new advanced alloy with superior degradation resistance in light water reactor (LWR)-relevant environments by 2024. Based on a comprehensive microstructure and property screening performed in Phase-1 of the ARRM program, a total of five alloys, together with 316L and X-750 as references, were down-selected for Phase-2 neutron irradiation studies. Because thermal aging could exert a synergistic effect on neutron irradiation due to the low neutron damage rate on the order of 10 –7 displacements per atom per second (dpa/s), Grade 92 (one of the five down-selected alloys) and two heats of 316L were selected in this task to study the effect of aging at 350°C for 12.5–12.7 kh on microstructure and mechanical properties. The aging time is approximately corresponding to 5 dpa neutron irradiation, which can be served as a reference for the 5-dpa-irradiated samples of the alloys to help understand the independent neutron damage influence on microstructure and mechanical properties. Optical microscopy and scanning electron microscopy were used for microstructural characterization. Hardness, tensile, Charpy impact toughness, and fracture toughness in the ductile regime of the aged samples were examined. The aging of Grade 92 led to the formation of many Laves phase in sizes of ~100–200 nm and resulted in some reduction in hardness and yield/ultimate tensile strength with some increases in uniform and total plastic elongations, which may have helped the enhancement of Charpy impact toughness, e.g., ~4 J increase in upper-shelf energy and 20.5°C reduction in ductile-brittle transition temperature compared with the unaged condition. The fracture toughness of the aged Grade 92 showed decent toughness of ~303 MPa√m (K Jq ) with ~87 tearing modulus at 22°C, which reduced to ~241 MPa√m (~20% reduction) with ~75 tearing modulus at 300°C. The two heats of 316L are differentiated by their amounts of δ-ferrite, i.e., ~1 vol% in heat T1103 and ~4 vol% in heat N5B8. The two heats of 316L were subjected to 15% cold work (CW) as this condition is often used in nuclear reactors to help trapping radiation-induced defects and thus postpone the steady state swelling stage. The aging did not result in any noticeable microstructure changes, except for possible segregations at grain boundaries that need to be further investigated. The aging resulted in slight reduction in hardness of 316L-T1103 and slight increase in hardness of 316L-N5B8, which is consistent with their tensile testing results. The 15%CW might have introduced some inhomogeneity, resulting in large standard deviations in hardness, which were reduced after the aging. The aged 316L followed the same trend as the unaged condition for the strength and elongation results from the tensile testing. Minimum elongations appeared within ~300–600°C, above which the elongations seem to increase. Unlike the negligible or minor changes in microstructure, hardness and tensile results of the two heats of 316L, their fracture toughness showed noticeable difference. The aged 316L-T1103 showed good toughness of ~350 MPa√m with ~80 tearing modulus at 22°C, which reduced to ~271 MPa√m (~23% reduction) with ~83 tearing modulus at 300°C. In contrast, the aged 316L-N5B8 showed lower toughness of ~244 MPa√m with ~53 tearing modulus at 22°C, which reduced to ~180 MPa√m (~26% reduction) with ~31 tearing modulus at 300°C. The preliminary results indicate that the presence of high volume of δ-ferrite would noticeable impair fracture toughness although it may not influence hardness and tensile properties.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Acidification in the U.S. Southeast: Causes, Potential Consequences and the Role of the Southeast Ocean and Coastal Acidification Network

Coastal acidification in southeastern U.S. estuaries and coastal waters is influenced by biological activity, run-off from the land, and increasing carbon dioxide in the atmosphere. Acidification can negatively impact coastal resources such as shellfish, finfish, and coral reefs, and the communities that rely on them. Organismal responses for species located in the U.S. Southeast document large negative impacts of acidification, especially in larval stages. For example, the toxicity of pesticides increases under acidified conditions and the combination of acidification and low oxygen has profoundly negative influences on genes regulating oxygen consumption. In corals, the rate of calcification decreases with acidification and processes such as wound recovery, reproduction, and recruitment are negatively impacted. Minimizing the changes in global ocean chemistry will ultimately depend on the reduction of carbon dioxide emissions, but adaptation to these changes and mitigation of the local stressors that exacerbate global acidification can be addressed locally. The evolution of our knowledge of acidification, from basic understanding of the problem to the emergence of applied research and monitoring, has been facilitated by the development of regional Coastal Acidification Networks (CANs) across the United States. This synthesis is a product of the Southeast Coastal and Ocean Acidification Network (SOCAN). SOCAN was established to better understand acidification in the coastal waters of the U.S. Southeast and to foster communication among scientists, resource managers, businesses, and governments in the region. Here we review acidification issues in the U.S. Southeast, including the regional mechanisms of acidification and their potential impacts on biological resources and coastal communities. We recommend research and monitoring priorities and discuss the role SOCAN has in advancing acidification research and mitigation of and adaptation to these changes.

54 ENVIRONMENTAL SCIENCES↗

Assessing I 2 S-LWR economic competitiveness using systematic differential capital cost evaluation methodology

One of the major factors impeding nuclear power plant (NPP) construction is their economics. In this study, a systematic differential economics evaluation approach was developed through the use of the Code of Accounts guidelines to assess the costs of nuclear power plants. The methodology, entirely based on publicly available data, may serve as a template to evaluate direct costs for reactors of any size and design at any stage of developments. In particular, this approach was used to assess the costs of the Integral Inherently Safe Light Water Reactor (I 2 S-LWR). The I 2 S-LWR is a design concept of a large (~1000 MWe) light water reactor. One of its key design features promoting inherent safety is implementation of an integral primary circuit configuration, which however necessitates a compact design of the core and primary circuit components. Through the methodology here presented, a representative loop PWR design was taken as a reference and the differential cost was estimated for each individual account based on the design difference, or similarity. Cost scaling techniques were applied to the accounts representing systems that differ from the ones of the reference PWR. Cost estimating techniques were used to evaluate cost of innovative components that are not part of standard PWR designs. By evaluating the cost difference of the I 2 S-LWR from the standard PWR, rather than the absolute cost, the uncertainty in the estimate is reduced. A similar approach was used by ORNL to estimate the cost of a Fluoride-salt High-temperature Reactor (FHR). A traditional four-loop PWR plant with a core thermal power of 3417 MWth (1144 MWe) was selected as the reference. Costs for that plant were prepared in 1978 by the Department of Energy (DOE) Energy Economics Data Base (EEDB), averaging actual cost incurred in the construction of several nuclear power plants (NPP), itemized with a great level of detail according to the Code of Accounts. This best estimate costs are denoted PWR12-BE. For each account, the cost of equipment, site labor and site material is provided. Industry experts at Westinghouse Electric Company performed a “sanity check” of the cost items, adjusting the cost of several items to match the current market and supply chain data. The detailed cost assessment of I 2 S-LWR was performed, systematically analyzing cost for each account, and applying the differential economics approach. First, Relative importance of each account, i.e., its contribution to the total cost was established, to help focus analysis on the most significant contributors. Moreover, the accounts describing components that are different than that of the PWR12-BE were identified. The integral configuration of the reactor has important implications on the cost of the reactor plant equipment (accounts 22x). Turbine generator equipment (Accounts 23x) is not believed to be much different than that of the reference design. I 2 S-LWR structures (Accounts 21x) mainly differ from that of a standard LWR as several buildings (containment building, shield building, annex building, waste processing building, fuel storage building) are integrated into a single building (nuclear island). Yardwork has a higher cost for the I 2 S-LWR, as the NI is partially below grade. On the other hand, due to its compact Nuclear Island footprint, I 2 S-LWR facilitates (and includes in its reference version) the use of seismic isolators, which contribute to reducing the direct cost. The total capital investment cost (TCIC), on the $/kW basis, of I 2 S-LWR is 5.84% lower than that of PWR12-BE, in spite of the lower power output of I 2 S-LWR. However, for the Western US (0.7 g), benefits of the seismic isolation are more pronounced, and the I 2 S-LWR total capital investment cost is 13.02% lower than that of PWR12-BE. If the I 2 S-LWR is compared to a PWR10-BE (traditional loop design, but scaled to the same power level as I 2 S-LWR), the savings are even higher, in the range 11.12%–17.89%. The analysis indicates that I 2 S-LWR has potential to offer an economically attractive design, with TCIC lower than that of a nuclear power plant based on a traditional loop PWR design. In other words, I 2 S-LWR design offers significantly enhanced safety, while at the same time improving economics. The differential economics approach developed in this paper can be used in identifying changes in cost of key components in order to improve the economics of a nuclear reactor design. The method can also help compare the economics of advanced Generation IV reactors and innovative water-cooled SMR (Small Modular Reactors) with respect to standard LWR technologies. In summary, the differential economics approach and can be used as a tool capable of helping stakeholder decisions.

Economic↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

B Flavour Tagging with Artificial Neural Networks for the CDF II Experiment

One of the central questions arising from human curiosity has always been what matter is ultimately made of, with the idea of some kind of elementary building-block dating back to the ancient greek philosophers. Scientific activities of multiple generations have contributed to the current best knowledge about this question, the Standard Model of particle physics. According to it, the world around us is composed of a small number of stable elementary particles: Electrons and two different kinds of quarks, called up and down quarks. Quarks are never observed as free particles, but only as bound states of a quark-antiquark pair (mesons) or of three quarks (baryons), summarized as hadrons. Protons and Neutrons, the constituents forming the nuclei of all chemical elements, are baryons made of up and down quarks. The electron and the electron neutrino - a nearly massless particle without electric charge - belong to a group called leptons. These two quarks and two leptons represent the first generation of elementary particles. There are two other generations of particles, which seem to have similar properties as the first generation except for higher masses, so there are six quarks and six leptons altogether. They were around in large amounts shortly after the beginning of the universe, but today they are only produced in high energetic particle collisions. Properties of particles are described by quantum numbers, for example charge or spin. For every type of particle, a corresponding antiparticle exists with the sign of all charges swapped, but similar properties otherwise. The Standard Model is a very successful theory, describing the properties of all known particles and the interactions between them. Many of its aspects have been tested in various experiments at very high precision. Although none of these experimental tests has shown a significant deviation from the corresponding Standard Model prediction, the theory can not be complete yet: Cosmological aspects like gravity, dark matter and dark energy are not described, and open questions remain in the sector of neutrino masses and neutrino oscillations. Also no answer has been given to the question of matter-antimatter asymmetry observed in the contemporary universe. Assuming that the Big Bang created equal amounts of matter and antimatter, there must be effects where nature treats matter and antimatter somehow different. This can happen through a mechanism called CP violation, which has been observed within the Standard Model, but not in the necessary order of magnitude. For all these reasons, the search for New Physics - theories beyond the Standard Model - is one of the main objectives of modern particle physics. In this global effort, flavour physics is the field of transitions between the different types of quarks, called quark flavours, wherein the examination of B meson oscillations and the search for CP violation in B{sub s}{sup 0} meson decays set the stage for the work presented in this thesis.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Spatial and dose–response analysis of fibrotic lung changes after stereotactic body radiation therapy

Purpose: Stereotactic body radiation therapy (SBRT) is becoming the standard of care for early stage nonoperable lung cancers. Accurate dose–response modeling is challenging for SBRT because of the decreased number of clinical toxicity events. As a surrogate for a clinical toxicity endpoint, studies have proposed to use radiographic changes in follow up computed tomography (CT) scans to evaluate lung SBRT normal tissue effects. The purpose of the current study was to use local fibrotic lung regions to spatially and dosimetrically evaluate lung changes in patients that underwent SBRT.Methods: Forty seven SBRT patients treated at our institution from 2003 to 2009 were used for the current study. Our patient cohort had a total of 148 follow up CT scans ranging from 3 to 48 months post-therapy. Post-treatment scans were binned into intervals of 3, 6, 12, 18, 24, 30, and 36 months after the completion of treatment. Deformable image registration was used to align the follow up CT scans with the pretreatment CT and dose distribution. Areas of visible fibrotic changes were contoured. The centroid of each gross tumor volume (GTV) and contoured fibrosis volume was calculated and the fibrosis volume location and movement (magnitude and direction) relative to the GTV and 30 Gy isodose centroid were analyzed. To perform a dose–response analysis, each voxel in the fibrosis volume was sorted into 10 Gy dose bins and the average CT number value for each dose bin was calculated. Dose–response curves were generated by plotting the CT number as a function of dose bin and time posttherapy.Results: Both fibrosis and GTV centroids were concentrated in the upper third of the lung. The average radial movement of fibrosis centroids relative to the GTV centroids was 2.6 cm with movement greater than 5 cm occurring in 11% of patients. Evaluating dose–response curves revealed an overall trend of increasing CT number as a function of dose. The authors observed a CT number plateau at doses ranging from 30 to 50 Gy for the 3, 6, and 12 months posttherapy time points. There was no evident plateau for the dose–response curves generated using data from the 18, 24, 30, and 36 months posttherapy time points.Conclusions: Regions of local fibrotic lung changes in patients that underwent SBRT were evaluated spatially and dosimetrically. The authors found that the average fibrosis movement was 2.6 cm with movement greater than 5 cm possible. Evaluating dose–response curves revealed an overall trend of increasing CT number as a function of dose. Furthermore, our dose–response data also suggest that one of the possible explanations of the CT number plateau effect may be the time posttherapy of the acquired data. Understanding normal tissue dose–response is important for reducing toxicity after SBRT, especially in cases where larger tumors are treated. The methods presented in the current work build on prior quantitative studies and further enhance the understanding of normal lung dose–response after SBRT.

61 RADIATION PROTECTION AND DOSIMETRY↗