Search NASA⌕ Search

SEARCH · Search NASA

Results for “Uncertainty analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Uncertainty Measurement for Trace Element Analysis of Uranium and Plutonium Samples by Inductively Coupled Plasma-Atomic Emission Spectrometry (ICP-AES) and Inductively Coupled Plasma-Mass Spectrometry (ICP-MS)

The measurement uncertainty estimation associated with trace element analysis of impurities in U and Pu was evaluated using the Guide to the Expression of Uncertainty Measurement (GUM). I this evaluation the uncertainty sources were identified and standard uncertainties for the components were categorized as either Type A or B. The combined standard uncertainty was calculated and a coverage factor k = 2 was applied to obtain the expanded uncertainty, U. The ICP-AES and ICP-MS methods used were developed for the multi-element analysis of U and Pu samples. A typical analytical run consists of standards, process blanks, samples, matrix spiked samples, post digestion spiked samples and independent calibration verification standards. The uncertainty estimation was performed on U and Pu samples that have been analyzed previously as part of the U and Pu Sample Exchange Programs. Control chart results and data from the U and Pu metal exchange programs were combined with the GUM into a concentration dependent estimate of the expanded uncertainty. Comparison of trace element uncertainties obtained using this model was compared to those obtained for trace element results as part of the Exchange programs. This process was completed for all trace elements that were determined to be above the detection limit for the U and Pu samples.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SCALE/Sampler Sensitivity Indices

The Sampler sequence of the SCALE code system for random sampling–based uncertainty analyses has recently been extended by including a sensitivity analysis. In uncertainty analyses with respect to uncertainties in the nuclear data, the determination of two multiple correlation coefficients—R2 and SPC2—allows for the identification of nuclide reactions that are significantly contributing to the investigated output uncertainty. Individual nuclide reactions are ranked by importance, allowing suggestions for additional measurements and evaluations to significantly reduce the observed output uncertainty. A brief description of the theory is provided herein, followed by application of this analysis to a sodium-cooled fast reactor pin cell.

Bostelmann, Rike↗

The Uncertainty in the Local Seismic Response Analysis

In the present paper is shown the influence on the local seismic response analysis exerted by considering dispersion and uncertainty in the seismic input as well as in the dynamic properties of soils. In a first attempt a 1D numerical model is developed accounting for both the aleatory nature of the input motion and the stochastic variability of the dynamic properties of soils. The seismic input is introduced in a non-conventional way through a power spectral density, for which an elastic response spectrum, derived--for instance--by a conventional seismic hazard analysis, is required with an appropriate level of reliability. The uncertainty in the geotechnical properties of soils are instead investigated through a well known simulation technique (Monte Carlo method) for the construction of statistical ensembles. The result of a conventional local seismic response analysis given by a deterministic elastic response spectrum is replaced, in our approach, by a set of statistical elastic response spectra, each one characterized by an appropriate level of probability to be reached or exceeded. The analyses have been carried out for a well documented real case-study. Lastly, we anticipate a 2D numerical analysis to investigate also the spatial variability of soil's properties.

58 GEOSCIENCES↗

Nuclear Data Uncertainty Quantification for Adjoint-Weighted Quantities via XGPT in Monte Carlo Codes

The Total Monte Carlo method (TMC) is an innovative approach to nuclear data uncertainty propagation. In TMC, a large number of independent ENDF files are randomly generated starting from nuclear models parameters and their uncertainties. These files are then processed with NJOY or similar codes to produce a set of formatted continuous-energy cross sections (i.e., ACE files), and independent Monte Carlo neutron transport simulations are run with these different ACE files as input. Finally the distributions of the considered response functions are obtained directly from the results of the Monte Carlo runs. Despite several improvements of the TMC method, this approach is often considered an inefficient way of propagating nuclear data uncertainties, as it requires several computationally expensive Monte Carlo runs. Covariance-based methods present important advantages for several applications, especially when different sources of uncertainties are to be investigated. For this reason, sensitivity analysis and uncertainty quantification capabilities are being implemented in several Monte Carlo neutron transport codes. On the other hand, the fact that no artificial multi-group covariance matrices are required and that higher moments of the responses distributions can be easily obtained, are definite advantages of the TMC method. In an effort to overcome the limitations of both approaches, a new method, called eXtended Generalized Perturbation Theory (XGPT) is under development. When performing nuclear data uncertainty propagation, such XGPT approach does not require generating discretized (i.e., multigroup) covariance matrices, and allows to estimate higher moments of the response probability distributions, via linear perturbation theory. One of the promising applications of the XGPT method involves its adoption in conjunction with the Proper Orthogonal Decomposition (POD) of nuclear data, to build a Reduced Order Model (ROM) for the approximation of thousands of independent TMC results in a single criticality source simulation. In the present work, this approach is employed for the first time to evaluate the impact of uncertainty in nuclear data on adjoint-weighted quantities. The method has been implemented in an extended version of the Serpent-2.1.24 Monte Carlo code and is demonstrated on two fast spectrum benchmarks, focusing on {sup 208}Pb nuclear data. A new method for propagating nuclear data uncertainties in criticality source Monte Carlo simulations has been developed. This eXtended Generalized Perturbation Theory (XGPT) approach allows to accurately reproduce reference Total Monte Carlo (TMC) uncertainty estimates in a single criticality source simulation. The present work aims to demonstrate that the proposed method can quantify nuclear data uncertainty based on adjoint-weighted quantities. The XGPT approach was applied to evaluate the impact of {sup 208}Pb nuclear data uncertainties on the effective prompt neutron lifetime (l{sub eff}) in two fast spectrum systems. The obtained XGPT results show a good agreement with the reference TMC results, obtained from independent Monte Carlo runs with {sup 208}Pb nuclear data from random TENDL-2013 evaluations. The XGPT method, implemented in a extended version of the Serpent Monte Carlo code and adopted along with the Proper Orthogonal Decomposition (POD) of the nuclear data, is able to provide an accurate reduced order model to approximate thousands TMC results within a single run, ensuring a large saving in computational requirements. The effect of {sup 208}Pb nuclear data uncertainties appears to be rather large. This is consistent with previous studies that adopted the same input random evaluations data from TENDL. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Quantification of margins and uncertainty for risk-informed decision analysis.

QMU stands for 'Quantification of Margins and Uncertainties'. QMU is a basic framework for consistency in integrating simulation, data, and/or subject matter expertise to provide input into a risk-informed decision-making process. QMU is being applied to a wide range of NNSA stockpile issues, from performance to safety. The implementation of QMU varies with lab and application focus. The Advanced Simulation and Computing (ASC) Program develops validated computational simulation tools to be applied in the context of QMU. QMU provides input into a risk-informed decision making process. The completeness aspect of QMU can benefit from the structured methodology and discipline of quantitative risk assessment (QRA)/probabilistic risk assessment (PRA). In characterizing uncertainties it is important to pay attention to the distinction between those arising from incomplete knowledge ('epistemic' or systematic), and those arising from device-to-device variation ('aleatory' or random). The national security labs should investigate the utility of a probability of frequency (PoF) approach in presenting uncertainties in the stockpile. A QMU methodology is connected if the interactions between failure modes are included. The design labs should continue to focus attention on quantifying uncertainties that arise from epistemic uncertainties such as poorly-modeled phenomena, numerical errors, coding errors, and systematic uncertainties in experiment. The NNSA and design labs should ensure that the certification plan for any RRW is supported by strong, timely peer review and by an ongoing, transparent QMU-based documentation and analysis in order to permit a confidence level necessary for eventual certification.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Effect of Measurement vs. Counting Errors on Parameters' Covariance in Neutron Tomography Analysis

We present here a method that estimates the relative effect of the counting uncertainty and of the instrument uncertainty on that of the parameters in a parametric model for neutron time of flight. The final result, obtained independently of calculation of the parameter values from measured data, presents explicitly the ratio of the two uncertainties in terms of the choice, settings, and placement of the detector and the oscilloscope. Consequently, the method can serve as a tool in planning a measurement setup.

fusion↗

Transient uncertainty quantification and Global Sensitivity Analysis of the open-source Molten Chloride Reactor Experiment (MCRE) using GP-PCA surrogate models

Uncertainties in the thermophysical properties of molten salts impact both the steady-state and transient behavior of Molten Salt Reactors (MSRs). In this work, we aim to quantify the influence of such uncertainties on the transient operation of the Molten Chloride Reactor Experiment (MCRE), utilizing the open-source specifications provided for this reactor. Seven representative transient scenarios are considered. For each scenario, we evaluate the impact of thermophysical property uncertainties on four key multiphysics model output variables of interest (VoIs): maximum power density, maximum fuel temperature, maximum reflector temperature, and average fuel velocity magnitude. In addition, we perform a Global Sensitivity Analysis (GSA) by computing Sobol’ indices for the uncertain input parameters to determine their contribution to the variability of each VoI. Conducting GSA is computationally intensive due to the large number of required evaluations of the high-fidelity multiphysics model. To mitigate this cost, we develop a surrogate modeling framework that combines Gaussian Process (GP) regression with Principal Component Analysis (PCA), enabling efficient sample generation for the GSA. Our results show that for energy-related VoIs, thermal conductivity is the dominant contributor to uncertainty. In contrast, for flow-related VoIs, density and dynamic viscosity are the primary sources of uncertainty. The specific heat of the fuel salt was found to play a secondary role in the transient analyses.

42 - ENGINEERING↗

Planck intermediate results: XVII. Emission of dust in the diffuse interstellar medium from the far-infrared to microwave frequencies

The dust-Hi correlation is used to characterize the emission properties of dust in the diffuse interstellar medium (ISM) from far infrared wavelengths to microwave frequencies. The field of this encompasses the part of the southern sky best suited to study the cosmic infrared and microwave backgrounds. We cross-correlate sky maps from Planck , the Wilkinson Microwave Anisotropy Probe ( WMAP ), and the diffuse infrared background experiment ( DIRBE ), at 17 frequencies from 23 to 3000 GHz, with the Parkes survey of the 21 cm line emission of neutral atomic hydrogen, over a contiguous area of 7500 deg 2 centred on the southern Galactic pole. We present a general methodology to study the dust-Hi correlation over the sky, including simulations to quantify uncertainties. Our analysis yields four specific results. (1) We map the temperature, submillimetre emissivity, and opacity of the dust per H-atom. The dust temperature is observed to be anti-correlated with the dust emissivity and opacity. We interpret this result as evidence of dust evolution within the diffuse ISM. The mean dust opacity is measured to be (7.1 ± 0.6) × 10 -27 cm 2 H -1 × (v/353 GHz) 1.53 ± 0.03 for 100 ≤ v ≤ 353 GHz. This is a reference value to estimate hydrogen column densities from dust emission at submillimetre and millimetre wavelengths. (2) We map the spectral index β mm of dust emission at millimetre wavelengths (defined here as v ≤ 353 GHz), and find it to be remarkably constant at β mm = 1.51 ± 0.13. We compare it with the far infrared spectral index β FIR derived from greybody fits at higher frequencies, and find a systematic difference, β mm -β FIR = -0.15, which suggests that the dust spectral energy distribution (SED) flattens at v ≤ 353 GHz. (3) We present spectral fits of the microwave emission correlated with Hi from 23 to 353 GHz, which separate dust and anomalous microwave emission (AME). We show that the flattening of the dust SED can be accounted for with an additional component with a blackbody spectrum. This additional component, which accounts for (26 ± 6)% of the dust emission at 100GHz, could represent magnetic dipole emission. Alternatively, it could account for an increasing contribution of carbon dust, or a flattening of the emissivity of amorphous silicates, at millimetre wavelengths. These interpretations make different predictions for the dust polarization SED. (4) We analyse the residuals of the dust-Hi correlation. We identify a Galactic contribution to these residuals, which we model with variations of the dust emissivity on angular scales smaller than that of our correlation analysis. This model of the residuals is used to quantify uncertainties of the CIB power spectrum in a companion Planck paper.

79 ASTRONOMY AND ASTROPHYSICS↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples, volume 1

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 2: Software documentation

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes, These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 3: Structure and listing of programs

An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

Moore, N. R.↗

Lessons from Climate Modeling on the Design and Use of Ensembles for Crop Modeling

Working with ensembles of crop models is a recent but important development in crop modeling which promises to lead to better uncertainty estimates for model projections and predictions, better predictions using the ensemble mean or median, and closer collaboration within the modeling community. There are numerous open questions about the best way to create and analyze such ensembles. Much can be learned from the field of climate modeling, given its much longer experience with ensembles. We draw on that experience to identify questions and make propositions that should help make ensemble modeling with crop models more rigorous and informative. The propositions include defining criteria for acceptance of models in a crop MME, exploring criteria for evaluating the degree of relatedness of models in a MME, studying the effect of number of models in the ensemble, development of a statistical model of model sampling, creation of a repository for MME results, studies of possible differential weighting of models in an ensemble, creation of single model ensembles based on sampling from the uncertainty distribution of parameter values or inputs specifically oriented toward uncertainty estimation, the creation of super ensembles that sample more than one source of uncertainty, the analysis of super ensemble results to obtain information on total uncertainty and the separate contributions of different sources of uncertainty and finally further investigation of the use of the multi-model mean or median as a predictor.

Model ensembles↗

Uncertainty quantification in MELCOR Safety analysis of ARIES reactor designs

MELCOR-TMAP is a combined thermal-hydraulics and tritium tracking code developed to simulate severe accident scenarios in fission and fusion power plants. Here, we demonstrate the results of MELCOR-TMAP analyses on historical ARIES program reference designs. By coupling MELCOR-TMAP with the open source RAVEN probabilistic risk analysis framework’s Bayesian UQ capabilities, we also demonstrate key uncertainties in material properties with the highest impact on tritium inventory and plant risk.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Uncertainty quantification and global sensitivity analysis of the Los Alamos sea ice model

Changes in the high-latitude climate system have the potential to affect global climate through feedbacks with the atmosphere and connections with midlatitudes. Sea ice and climate models used to understand these changes have uncertainties that need to be characterized and quantified. We present a quantitative way to assess uncertainty in complex computer models, which is a new approach in the analysis of sea ice models. We characterize parametric uncertainty in the Los Alamos sea ice model (CICE) in a standalone configuration and quantify the sensitivity of sea ice area, extent, and volume with respect to uncertainty in 39 individual model parameters. Unlike common sensitivity analyses conducted in previous studies where parameters are varied one at a time, this study uses a global variance-based approach in which Sobol' sequences are used to efficiently sample the full 39-dimensional parameter space. We implement a fast emulator of the sea ice model whose predictions of sea ice extent, area, and volume are used to compute the Sobol' sensitivity indices of the 39 parameters. Main effects and interactions among the most influential parameters are also estimated by a nonparametric regression technique based on generalized additive models. A ranking based on the sensitivity indices indicates that model predictions are most sensitive to snow parameters such as snow conductivity and grain size, and the drainage of melt ponds. Lastly, it is recommended that research be prioritized toward more accurately determining these most influential parameter values by observational studies or by improving parameterizations in the sea ice model.

54 ENVIRONMENTAL SCIENCES↗

A Passive System Reliability Analysis for a Station Blackout

The latest iterations of advanced reactor designs have included increased reliance on passive safety systems to maintain plant integrity during unplanned sequences. While these systems are advantageous in reducing the reliance on human intervention and availability of power, the phenomenological foundations on which these systems are built require a novel approach to a reliability assessment. Passive systems possess the unique ability to fail functionally without failing physically, a result of their explicit dependency on existing boundary conditions that drive their operating mode and capacity. Argonne National Laboratory is performing ongoing analyses that demonstrate various methodologies for the characterization of passive system reliability within a probabilistic framework. Two reliability analysis techniques are utilized in this work. The first approach, the Reliability Method for Passive Systems, provides a mechanistic technique employing deterministic models and conventional static event trees. The second approach, a simulation-based technique, utilizes discrete dynamic event trees to treat time- dependent phenomena during scenario evolution. For this demonstration analysis, both reliability assessment techniques are used to analyze an extended station blackout in a pool-type sodium fast reactor (SFR) coupled with a reactor cavity cooling system (RCCS). This work demonstrates the entire process of a passive system reliability analysis, including identification of important parameters and failure metrics, treatment of uncertainties and analysis of results.

Brunett, Acacia↗

Uncertainty Quantification Techniques of SCALE/TSUNAMI

The Standardized Computer Analysis for Licensing Evaluation (SCALE) code system developed at Oak Ridge National Laboratory (ORNL) includes Tools for Sensitivity and Uncertainty Analysis Methodology Implementation (TSUNAMI). The TSUNAMI code suite can quantify the predicted change in system responses, such as k eff , reactivity differences, or ratios of fluxes or reaction rates, due to changes in the energy-dependent, nuclide-reaction-specific cross-section data. Where uncertainties in the neutron cross-section data are available, the sensitivity of the system to the cross-section data can be applied to propagate the uncertainties in the cross-section data to an uncertainty in the system response. Uncertainty quantification is useful for identifying potential sources of computational biases and highlighting parameters important to code validation. Traditional validation techniques often examine one or more average physical parameters to characterize a system and identify applicable benchmark experiments. However, with TSUNAMI correlation coefficients are developed by propagating the uncertainties in neutron cross-section data to uncertainties in the computed responses for experiments and safety applications through sensitivity coefficients. The bias in the experiments, as a function of their correlation coefficient with the intended application, is extrapolated to predict the bias and bias uncertainty in the application through trending analysis or generalized linear least squares techniques, often referred to as 'data adjustment.' Even with advanced tools to identify benchmark experiments, analysts occasionally find that the application models include some feature or material for which adequately similar benchmark experiments do not exist to support validation. For example, a criticality safety analyst may want to take credit for the presence of fission products in spent nuclear fuel. In such cases, analysts sometimes rely on 'expert judgment' to select an additional administrative margin to account for gap in the validation data or to conclude that the impact on the calculated bias and bias uncertainty is negligible. As a result of advances in computer programs and the evolution of cross-section covariance data, analysts can use the sensitivity and uncertainty analysis tools in the TSUNAMI codes to estimate the potential impact on the application-specific bias and bias uncertainty resulting from nuclides not represented in available benchmark experiments. This paper presents the application of methods described in a companion paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An EPGPT-based approach for uncertainty quantification

Generalized Perturbation Theory (GPT) has been widely used by many scientific disciplines to perform sensitivity analysis and uncertainty quantification. This manuscript employs recent developments in GPT theory, collectively referred to as Exact-to-Precision Generalized Perturbation Theory (EPGPT), to enable uncertainty quantification for computationally challenging models, e.g. nonlinear models associated with many input parameters and many output responses and with general non-Gaussian parameters distributions. The core difference between EPGPT and existing GPT is in the way the problem is formulated. GPT formulates an adjoint problem that is dependent on the response of interest. It tries to capture via the adjoint solution the relationship between the response of interest and the constraints on the state variations. EPGPT recasts the problem in terms of a smaller set of what is referred to as the 'active' responses which are solely dependent on the physics model and the boundary and initial conditions rather than on the responses of interest. The objective of this work is to apply an EPGPT methodology to propagate cross-sections variations in typical reactor design calculations. The goal is to illustrate its use and the associated impact for situations where the typical Gaussian assumption for parameters uncertainties is not valid and when nonlinear behavior must be considered. To allow this demonstration, exaggerated variations will be employed to stimulate nonlinear behavior in simple prototypical neutronics models. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗