Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Packaging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Limiting Surface Density Method Application to Large Arrays of Highly Heterogeneous Shipping Packages

This work represents the initial phase of an overall effort to reduce the analytical burdens and increase flexibility of the K-Area Complex which provides stewardship of special nuclear materials. A hand calculation method is being extended to apply to large arrays of highly heterogeneous shipping packages. This method has the potential to quickly determine the impact of perturbations on the array.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ultrasonic Washer–Dryer System for Space Habitats: Design Upgrades and Parabolic Flight Readiness

Clothing makes up nearly 25% of all non-food supplies sent to the International Space Station (ISS). To support sustainable human missions in deep space, NASA’s Life Support and Habitation Systems Focus Area looks to advance technologies to support and improve logistics. Our team is creating a compact ultrasonic clothing washer/dryer system that bypasses traditional limitations and is suitable for space. Thermal drying uses a lot of energy to evaporate water, while our ultrasonic drying method offers a quicker, more efficient alternative. It uses piezoelectric transducers to vibrate textiles at the micron scale, mechanically removing water as cold mist rather than evaporating it. This speeds up drying and reduces energy use, no matter the fabric makeup. This paper details recent upgrades to a full-scale ultrasonic washer–dryer system, readying it for parabolic flight testing. Improvements include an enhanced human–machine interface, better packaging, and optimized performance and control. We also present extensive pre-flight ground tests conducted to ensure reliability and identify potential risks. Collaborating with P&G, we report preliminary cleaning tests using various detergents. These results lay a crucial foundation for the laundry system designed specifically for space. By cutting clothing-related payload and waste by over 97%, this technology supports long-term human exploration missions on the ISS, the Moon, Mars, and beyond.

Ultrasonic↗

Ultrasonic Washer–Dryer System for Space Habitats: Design Upgrades and Parabolic Flight Readiness

Clothing makes up nearly 25% of all non-food supplies sent to the International Space Station (ISS). To support sustainable human missions in deep space, NASA’s Life Support and Habitation Systems Focus Area looks to advance technologies to support and improve logistics. Our team is creating a compact ultrasonic clothing washer/dryer system that bypasses traditional limitations and is suitable for space. Thermal drying uses a lot of energy to evaporate water, while our ultrasonic drying method offers a quicker, more efficient alternative. It uses piezoelectric transducers to vibrate textiles at the micron scale, mechanically removing water as cold mist rather than evaporating it. This speeds up drying and reduces energy use, no matter the fabric makeup. This paper details recent upgrades to a full-scale ultrasonic washer–dryer system, readying it for parabolic flight testing. Improvements include an enhanced human–machine interface, better packaging, and optimized performance and control. We also present extensive pre-flight ground tests conducted to ensure reliability and identify potential risks. Collaborating with P&G, we report preliminary cleaning tests using various detergents. These results lay a crucial foundation for the laundry system designed specifically for space. By cutting clothing-related payload and waste by over 97%, this technology supports long-term human exploration missions on the ISS, the Moon, Mars, and beyond.

Laundry↗

Fiscal Year 2009 Phased Construction Completion Report for EU Z2-36 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The purpose of this Phased Construction Completion Report (PCCR) is to present fiscal year (FY) 2009 results of Dynamic Verification Strategy (DVS) characterization activities for exposure unit (EU) Z2-36 in Zone 2 at the East Tennessee technology Park (ETTP). The ETTP is located in the northwest corner of the US Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee and encompasses approximately 5000 acres that have been subdivided into three zones--Zone 1 ({approx} 1400 acres), Zone 2 ({approx} 800 acres), and the Boundary Area ({approx} 2800 acres). Zone 2 comprises the highly industrial portion of ETTP and consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the DVS and data quality objectives (DQOs) presented in the Main Plant Group DQO Scoping Package (July 2006) and the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007a) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document EU Z2-36 DVS characterization results; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs, and (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. The Zone 2 ROD divided the area into 7 geographic areas and 44 EUs. To facilitate DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DqO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as EUs became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed in FY 2009 for EU Z2-36.

54 ENVIRONMENTAL SCIENCES↗

Chute Silo ILW Project Berkeley - 16649

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dewatering Innovations - 16381

The Liquid and Gaseous Waste Operations (LGWO) project, located at the Oak Ridge National Laboratory, handles wastewater from over 600 generators in 200 facilities. LGWO processes these waters, removing radioactive and chemical contaminants prior to discharge to the environment. Through these processes, LGWO generates various sludges that require dewatering prior to transportation. The original process was very inefficient. It involved placing PVC tubing in the bottom of a 90 ft{sup 3} box and sluicing the sludge into the box. Suction was then applied to the PVC tubes to remove water that would settle out of the material. The old process took several evolutions to drain/decant the liquids, which caused unnecessary worker radiation exposure. The moisture content was Near High Moisture content, which presented the possibility that liquids could be released during transport. Due to this fact, disposal costs were very high. Solutions for the 'Old' disposal process were to use liquid-rated Super Sacks, add additional Absorbent and then have the containers evaluated for liquid at TSDRF, prior to final disposal. This paper will describe the innovative packaging that was developed for the processing of these sludges, the ease with which the process was implemented, the versatility of the system and the cost savings associated with the new process. This system can be used in many other water treatment applications and erosion control. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Aging Tests of Vendor-Produced Blended Feed Simulant

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is procuring through Pacific Northwest National Laboratory (PNNL) a minimum of five 3,500 gallon batches of waste simulant for Phase 1 testing in the Pretreatment Engineering Platform (PEP). To make sure that the quality of the simulant is acceptable, the production method was scaled up starting from laboratory-prepared simulant through 15-gallon vendor prepared simulant and 250-gallon vendor prepared simulant before embarking on the production of the 3500-gallon simulant batch by the vendor. The 3500-gallon PEP simulant batches were packaged in 250-gallon high molecular weight polyethylene totes at NOAH Technologies. The simulant was stored in an environmentally controlled environment at NOAH Technologies within their warehouse before blending or shipping. For the 15-gallon, 250-gallon, and 3500-gallon batch 0, the simulant was shipped in ambient temperature trucks with shipment requiring nominally 3 days. The 3500-gallon batch 1 traveled in a 70-75°F temperature controlled truck. Typically the simulant was uploaded in a PEP receiving tank within 24-hours of receipt. The first uploading required longer with it stored outside. Physical and chemical characterization of the 250-gallon batch was necessary to determine the effect of aging on the simulant in transit from the vendor and in storage before its use in the PEP. Therefore, aging tests were conducted on the 250-gallon batch of the vendor-produced PEP blended feed simulant to identify and determine any changes to the physical characteristics of the simulant when in storage. The supernate was also chemically characterized. Four aging scenarios for the vendor-produced blended simulant were studied: 1) stored outside in a 250-gallon tote, 2) stored inside in a gallon plastic bottle, 3) stored inside in a well mixed 5-L tank, and 4) subject to extended temperature cycling under summer temperature conditions in a gallon plastic bottle. The following series of aging tests were conducted to accomplish these objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Hybrid Heavy Duty Diesel Power System for Off-Road Applications—Concept Validation

A multiyear power system R&D program was completed with the objective of developing an off-road hybrid heavy duty diesel engine with front end accessory drive-integrated energy storage. This system was validated to deliver 10.5–25.6% reduction in fuel consumption over current Tier 4 Final-based 18L diesel engines, over various off-road machine application cycles. The power system consisted of a downsized heavy-duty diesel 13L engine containing advanced combustion technologies, capable of elevated peak cylinder pressures and thermal efficiencies, thermal barrier coatings, exhaust waste heat recovery via SuperTurbo™ turbocompounding, and hybrid energy assisting and recovery through both mechanical and electrical systems. Following the concept definition, design, and analysis phases of the program, the final phase focused on building and validating the performance and efficiency in laboratory tests. While aspects of the system such as start/stop and reduced off-road cooling package energy losses were only analytically evaluated, the main 13L concept engine with full hybrid system was successfully built and tested in steady-state and in transient certification and real-world application cycles. Extensive simulations in Caterpillar's DYNASTY™ software environment utilized the validation test data to assess performance more fully and confidently over varied cycles and strategies. An average fuel consumption reduction of 17.9% was realized, and the majority (~13%) of the benefit stemmed from the core concept 13L engine. In conclusion, a total cost of ownership analysis provides context to commercial viability and where adoption focus should be placed.

33 ADVANCED PROPULSION SYSTEMS↗

Innovative Miniaturized Heat Pumps for Buildings: Modular Thermal Hub for Building Heating, Cooling and Water Heating

BEETIT Project: Georgia Tech is using innovative components and system design to develop a new type of absorption heat pump. Georgia Tech’s new heat pumps are energy efficient, use refrigerants that do not emit greenhouse gases, and can run on energy from combustion, waste heat, or solar energy. Georgia Tech is leveraging enhancements to heat and mass transfer technology possible in microscale passages and removing hurdles to the use of heat-activated heat pumps that have existed for more than a century. Use of microscale passages allows for miniaturization of systems that can be packed as monolithic full-system packages or discrete, distributed components enabling integration into a variety of residential and commercial buildings. Compared to conventional heat pumps, Georgia Tech’s design innovations will create an absorption heat pump that is much smaller, has higher energy efficiency, and can also be mass produced at a lower cost and assembly time.

ARPA-E↗

Finite Element Modeling of Spent Nuclear Fuel in Dry Storage under Seismic Excitation

Spent nuclear fuel (SNF) is currently stored at independent spent fuel storage installations (ISFSIs) at nuclear power plant sites across the US. The US Department of Energy (DOE) Spent Fuel and Waste Science and Technology (SFWST) program is currently working to understand the response of SNF during a seismic event. This investigation is part of a long-term effort by DOE to quantify the external mechanical loads on SNF. The SFWST program has recently completed campaigns evaluating SNF behavior during normal conditions of transport and in 30 cm package drop scenarios; both campaigns included a combination of testing and modeling. Likewise, the investigation into seismic response of SNF will include full-size shake table tests of a vertical storage overpack containing instrumented surrogate fuel assemblies, as well as pre- and post-test finite element modeling. This work focuses on the development of finite element models simulating the planned test configuration. The seismic response is calculated at two scales: at the package level, and at the fuel level. The package level model evaluates the behavior of the storage overpack and its contents in response to the ground motions of a representative earthquake. The motion of the package is input to the fuel level model, which consists of a detailed finite element model of a 17x17 or 16x16 pressurized water reactor (PWR) fuel assembly or of a 10x10 boiling water reactor (BWR) fuel assembly. The stress and strain on individual components such as fuel rods and guide tubes are extracted from this model. This work details the SNF response to various input ground motions, considering representative earthquakes in the Central and Eastern US under various site conditions. Also discussed is the development of a “reduced scope” finite element model of the SNF, which consists of a single fuel rod while retaining the dynamic response of the entire fuel assembly. This reduced scope model addresses the significant computational expense of modeling the SNF under long-duration input ground motions and facilitates simulating additional parameter variations of the model beyond the as-tested configuration. The modeling results provide important insight that will help to inform future testing and modeling efforts by the SFWST program to close the knowledge gap related to external loads on SNF.

Kadooka, Kevin↗

Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask - 16632

This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D and D). In addition, the substantial contribution of fissile material to the assemblies' inventory made the potential disposition pathways extremely challenging. As a result, these items became part of Argonne's legacy 'nuclear footprint', and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savannah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three 'one of a kind' shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Universal Waste Management System

A concept for a Universal Waste Management System (UWMS) has been developed based on the knowledge gained from over 50 years of space travel. It is being designed for Commercial Orbital Transportation Services (COTS) and Multi ]Purpose Crew Vehicle (MPCV) and is based upon the Extended Duration Orbiter (EDO) commode. The UMWS was modified to enhance crew interface and reduce volume and cost. The UWMS will stow waste in fecal canisters, similar to the EDO, and urine will be stowed in bags for in orbit change out. This allows the pretreated urine to be subsequently processed and recovered as drinking water. The new design combines two fans and a rotary phase separator on a common shaft to allow operation by a single motor. This change enhances packaging by reducing the volume associated with an extra motor, associated controller, harness, and supporting structure. The separator pumps urine to either a dual bag design for COTS vehicles or directly into a water reclamation system. The commode is supported by a concentric frame, enhancing its structural integrity while further reducing the volume from the previous design. The UWMS flight concept development effort is underway and an early output of the development will be a ground based UMWS prototype for manned testing. Referred to as the Gen 3 unit, this prototype will emulate the crew interface included in the UWMS and will offer a great deal of knowledge regarding the usability of the new design, allowing the design team the opportunity to modify the UWMS flight concept based on the manned testing.

Baccus, Shelley↗

Containment Analysis Capability of UNF-ST&DARDS

The Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) methodology to perform automated containment analyses for potential transportation packages based on canister loading map information is described in this paper, and its capability is illustrated with example results. The allowable leakage rate is calculated with the procedures provided in ANSI N14.5-2014 and NUREG/CR-6487, which were adapted for containment analysis of a transportation package containing fuel assemblies with different nuclear characteristics (e.g., initial enrichment, burnup, and cooling time) and clad integrity (intact or damaged). UNF-ST&DARDS applies different source term calculation methodologies for low-burnup fuel (LBF) (i.e., <45 GWd/tonne U) assemblies and high-burnup fuel (HBF) (i.e., ≥45 GWd/tonne U) assemblies. The LBF radionuclide activities are based on actual fuel assembly burnup, initial enrichment, and cooling time. Bounding radionuclide activities based on a fuel pellet burnup value of 65 GWd/tonne U and actual fuel assembly cooling time are used for HBF assemblies. The fraction of failed fuel rods and the release fractions for the contributors to releasable source terms recommended in NUREG-1617 are used in the containment analysis regardless of fuel assembly burnup. However, UNF-ST&DARDS supports different parameter values for LBF and HBF assemblies. Finally, the containment analysis methodology for as-loaded transportation packages is presented in detail, and the UNF-ST&DARDS containment analysis capability is illustrated with results for simulated transportation packages containing spent nuclear fuel canisters in dry storage at selected sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Storage and Transport Cask Data For Used Commercial Nuclear Fuel

This document is a compilation of publicly available information on spent/used nuclear fuel storage and transport casks in use in the United States as of the summer of 2013. As such, it is a functional update and extension of JAI-582, “Shipping and Storage Cask Data For Commercial Spent Nuclear Fuel,” originally published by JAI Corporation in March 2005. This report is intended to provide a convenient reference for those with interest in, or those engaged in the production, handling, storage, transport, and disposition of spent/used commercial nuclear fuel. Data for each cask is tabulated in a standardized table format to facilitate rapid access to key design and performance information, and to enable the document user to more rapidly conduct comparative analyses of cask design and performance parameters. Multiple-assembly “canisters,” and both canister-based and non-canistered packages are included in the main body of the report. Packages that have been used in the past, but which are no longer in active use in the U.S., are included in Appendix A.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Itegrated Test and Evaluation of a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removtal System (CDRA), Mechanical Compressor Engineering Development Unit (EDU), and Sabitier Engineering Development Unit (EDU)

Currently on the International Space Station s (ISS) U.S. Segment, carbon dioxide (CO2) scrubbed from the cabin by a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removal Assembly (CDRA) is vented overboard as a waste product. Likewise, the product hydrogen (H2) that will be generated by the Oxygen Generation Assembly (OGA) planned for installation will also be vented. A flight experiment has been proposed that will take the waste CO2 removed from the cabin, and via the catalytic Sabatier process, reduce it with waste H2 to generate water and methane. The water produced may provide cost and logistics savings for ISS by reducing the amount of water periodically re-supplied to orbit. To make this concept viable, a mechanical piston compressor and accumulator were developed for collecting and storing the CO2 from the CDRA. The compressor, accumulator and Sabatier system would be packaged together as one unit and referred to as the Carbon Dioxide Reduction Assembly (CRA). Testing was required to evaluate the performance of a 4BMS CDRA, compressor, accumulator, and Sabatier performance along with their operating rules when integrated together. This had been numerically modeled and simulated; however, testing was necessary to verify the results from the engineering analyses. Testing also allowed a better understanding of the practical inefficiencies and control issues involved in a fully integrated system versus the theoretical ideals in the model. This paper presents and discusses the results of an integrated engineering development unit test.

Knox, James C.↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

Dorman, Lane↗

Aspects of Assessment of Packages with Wood Filled Impact Limiters during Fire Tests - 17191

Packages for the transport of radioactive material are often equipped with impact limiters consisting of wood, encapsulated by steel sheets. These impact limiters shall ensure that the transport casks meet the mechanical and thermal IAEA regulatory test requirements. According to the accident conditions of transport it is mandatory to expose the specimens to a cumulative effect by mechanical and thermal impacts. The mechanical tests consist of a free drop from 9 m onto a flat unyielding target and a 1 m drop onto a puncture bar. After damage caused by mechanical test sequences the package has to withstand a severe fire scenario. Corresponding to the IAEA advisory material it is required that the impact attitudes for the 9 m drop test and for the puncture test have to be such as to produce maximum damage, taking into account the thermal test. Moreover, any damage, which would give rise to increased radiation or loss of containment or affect the confinement system after the thermal test, should be considered. During and following the thermal test, the specimen shall not be artificially cooled and any combustion of materials of the package shall be permitted to proceed naturally. Different works from the French Institute for Radiological Protection and Nuclear Safety (IRSN) and BAM show that additional energy supply from a pre-damaged impact limiter to the cask could occur. This effect should be considered within the safety assessment of the containment. Thermal effects at the closure system of the cask, which might result in an elevated activity release, have to be excluded. BAM conducted small scale tests with wood filled metal buckets showing continuing combustion processes during the cooling down phase. These test results are presented. As not much is known about smouldering processes in wood filled impact limiters, it is highly complex to define pre-damage of impact limiters, which are conservative, regarding the maximum damaging energy flow from the impact limiter to the containment system. More research has to be done to develop models to examine the effects of smouldering impact limiters on the containment of packages for the transport of radioactive material. Aspects of assessment and its difficulties are shown. BAM as a competent authority for the approval of transport casks for radioactive material in Germany operates the test facilities to examine the issue of mechanical damage, combustion and heat transfer for such kind of package systems. For this purpose, the knowledge from real drop tests with casks of a mass partly over 100 tons was transferred to a test application. A thermal test will take place with a wood filled test specimen with a diameter of about 2.3 meters. The aim is to understand the phenomena of smouldering under the consideration of relevant regulatory boundary conditions. The process of smouldering is described with regard to the requirements in the thermal assessment of safety of packages for the transport of radioactive material. Requirements concerning the pre-damage of packages for the maximum damage of impact limiters are discussed. Parameters influencing the smouldering process are identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗