Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

SLS Flight Software Testing: Using a Modified Agile Software Testing Approach

NASA's Space Launch System (SLS) is an advanced launch vehicle for a new era of exploration beyond earth's orbit (BEO). The world's most powerful rocket, SLS, will launch crews of up to four astronauts in the agency's Orion spacecraft on missions to explore multiple deep-space destinations. Boeing is developing the SLS core stage, including the avionics that will control vehicle during flight. The core stage will be built at NASA's Michoud Assembly Facility (MAF) in New Orleans, LA using state-of-the-art manufacturing equipment. At the same time, the rocket's avionics computer software is being developed here at Marshall Space Flight Center in Huntsville, AL. At Marshall, the Flight and Ground Software division provides comprehensive engineering expertise for development of flight and ground software. Within that division, the Software Systems Engineering Branch's test and verification (T&V) team uses an agile test approach in testing and verification of software. The agile software test method opens the door for regular short sprint release cycles. The idea or basic premise behind the concept of agile software development and testing is that it is iterative and developed incrementally. Agile testing has an iterative development methodology where requirements and solutions evolve through collaboration between cross-functional teams. With testing and development done incrementally, this allows for increased features and enhanced value for releases. This value can be seen throughout the T&V team processes that are documented in various work instructions within the branch. The T&V team produces procedural test results at a higher rate, resolves issues found in software with designers at an earlier stage versus at a later release, and team members gain increased knowledge of the system architecture by interfacing with designers. SLS Flight Software teams want to continue uncovering better ways of developing software in an efficient and project beneficial manner. Through agile testing, there has been increased value through individuals and interactions over processes and tools, improved customer collaboration, and improved responsiveness to changes through controlled planning. The presentation will describe agile testing methodology as taken with the SLS FSW Test and Verification team at Marshall Space Flight Center.

Bolton, Albanie T.↗

Advancement of Entry System Modeling to Support Exploration of Giant Planets

This paper describes NASA’s efforts to advance entry system modeling and simulation capabilities to support future exploration of Giant planets. The Giant planets are key destinations of interest to the planetary science community for their potential to provide insight into the formation and evolution of our Solar System, as well as extrasolar planetary systems. To date, the Galileo atmospheric probe is the only purpose-built entry probe to a Giant planet. Post-flight analysis of Galileo’s performance showed that there was significant recession of the thermal protection system (TPS), well beyond what was anticipated on the flank, and this was due in part to insufficiently accurate capability for estimating the flight environment and TPS response. While Galileo ultimately survived its flight, the example serves to highlight the great challenge of designing successful missions for environments that are poorly understood or where models have not yet been validated. An important means to reduce mission risks is the incorporation of physics-based modeling with well-quantified uncertainties. The emphasis on physics-based modeling – in contrast to empirically-driven models – is motivated by the fact that it is impossible to completely replicate entry environments through ground tests and, therefore, extrapolation to the flight environment is required. Basing analysis in fundamental physics removes the bias of ground test limitations, though one must then be careful to properly characterize model inputs, simplifying assumptions, and the limits wherein the model is valid. NASA’s Entry Systems Modeling (ESM) Project is tasked with investigating such considerations for planetary science missions across the Solar System, and in recent years has begun to do so for Giant planets. The most distinctive features of the Giant planets, from an entry system perspective, are the atmospheres composed primarily of hydrogen and helium. The entry velocities of proposed missions are generally very large and can therefore be expected to result in significant convective and radiative heating generated by the vehicle’s shock layer. Yet thermochemical behavior of the hydrogen-helium system is not well understood under such conditions. The ESM project is leading efforts to develop accurate thermochemical databases based on state-of-the-art measurements in the Electric Arc Shock Tube and detailed computational chemistry. The large heat fluxes anticipated by missions has driven interest in new TPS materials, in particular woven materials, which may be enabling but have never been flown before. Consequently, multiscale models are in development to describe properties and performance of the materials from micro- to system-scale. The goal is to not only provide accurate thermal response but also to inform thermostructural reliability predictions for extreme entries. Additionally, new computational models have been developed to evaluate performance of non-destructive evaluation techniques which are vital to establishing acceptance of systems to be free of manufacturing faults like material cracking, voids, and debonding. Finally, in the area of guidance and control, aerocapture has been shown conceptually to provide a number of mission benefits, including reducing transit time and increasing payload fraction. The ESM project is building a launch-to-landing trajectory simulation capability to enable detailed studies of aerocapture maneuvers in the context of Giant planets missions. The final presentation and paper will describe each of these topics in detail, including discussion of specific gaps and the technical approach to solving them. In addition, the final paper will briefly discuss ongoing coordination between ESM project work and an ESA-funded technology development activity comprised of validation testing in the Oxford T6, IRS PWK and IST ESTHER tunnels, as well as state-to-state modeling of the shock layer to better represent non-Boltzmann energy distributions leading to non-equilibrium radiation.

Entry systems↗

Materials and processes for shuttle engine, external tank, and solid rocket booster

The Shuttle flight system is composed of the Orbiter, an External Tank (ET) that contains the ascent propellant to be used by the Space Shuttle Main Engines (SSME), and two Solid Rocket Boosters (SRB). The ET is expended on each launch; the Orbiter and SRB's are reusable. It is the requirement for reuse which poses the exciting new materials and processes challenges in the development of the Space Shuttle. A brief description of the Space Shuttle and the mission profile is given. The Shuttle configuration is then described with emphasis on the SSME, ET, and SRB. The materials selection, tracking, and control system used to assure reliability and to minimize cost are described, and salient features and challenges in materials and processes associated with the SSME, ET, and SRB are subsequently discussed.

Schwinghamer, R. J.↗

Apollo Soyuz test project press kit: USA-USSR

The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.

Source record↗

Design synthesis of the SEPS

This paper summarizes the most current configuration of the Solar Electric Propulsion Stage (SEPS) design resulting from the synthesis of key tradeoff analyses. The baseline SEPS is a 21-kW propulsion-power vehicle using the Shuttle/Interim Upper Stage (IUS) launch vehicle for planetary and geosynchronous missions. The trade analyses supporting the baseline configuration include ion thruster array pattern, solar array stowage concepts, and number of thrusters and power processors (PP). In addition, an integrated thermal control and structural system was optimized and designed to meet flight loads and dynamics requirements. Payload provisions, mercury propellant refueling, and design compatibility of the SEPS and Shuttle/IUS are presented.

Horio, S. P.↗

NASA's technology plans - Will technology be ready when we are

Recent low NASA science and technology budgets impacted unfavorably on trade balances of aerospace products and lags in several technological areas impinged on other areas already in application which could not be exploited or did not achieve desired performance levels. NASA has formed a Civil Space Technology Initiative, for 1988 start, to foster research on safe and efficient access to space, earth orbiting operations, and science support technologies. R&D programs for fully reusable launch systems, aerobraking concepts, and a multi-arm, highly autonomous capability for space-based remote assembly, repair and servicing of space vehicles are described. Regarding science, emphasis will be placed on large flexible structures and the associated control programs, sensors and data handling and analysis equipment and programs. Finally, technologies common to human activities in regions beyond the Space Station are to be explored in the second phase of the NASA initiative, Pathfinder.

Colladay, Raymond S.↗

Design considerations of PSR moderate focus-mission structure

A supporting space-frame has been designed for the segmented panels, secondary reflector, control system, and interface hardware of a near-term Precision Segmented Reflector (PSR) telescope. In addition to meeting areal mass density, vibration frequency, thermal expansion, positioning accuracy, and interface attachment design goals, the PSR structure must withstand Atlas launch loads. Analyses have been conducted of the optical pointing-related structural performance of the Moderate Focus Mission Structure (MFMS), with a view to both mechanical and thermal disturbance analyses; the results indicate that the dynamic responses of the MFMS optical mirrors, due to the chopping disturbance of the secondary reflector about its center-of-mass, are within maintenance sensor requirements.

Shih, Choon-Foo↗

Packet utilisation definitions for the ESA XMM mission

XMM, ESA's X-Ray Multi-Mirror satellite, due for launch at the end of 1999 will be the first ESA scientific spacecraft to implement the ESA packet telecommand and telemetry standards and will be the first ESOC-controlled science mission to take advantage of the new flight control system infrastructure development (based on object-oriented design and distributed-system architecture) due for deployment in 1995. The implementation of the packet standards is well defined at packet transport level. However, the standard relevant to the application level (the ESA Packet Utilization Standard) covers a wide range of on-board 'services' applicable in varying degrees to the needs of XMM. In defining which parts of the ESA PUS to implement, the XMM project first considered the mission objectives and the derived operations concept and went on to identify a minimum set of packet definitions compatible with these aspects. This paper sets the scene as above and then describes the services needed for XMM and the telecommand and telemetry packet types necessary to support each service.

Nye, H. R.↗

Temperature-Controlled Clamping and Releasing Mechanism

A report describes the development of a mechanism that automatically clamps upon warming and releases upon cooling between temperature limits of approx. =180 K and approx. =293 K. The mechanism satisfied a need specific to a program that involved repeated excursions of a spectrometer between a room-temperature atmospheric environment and a cryogenic vacuum testing environment. The mechanism was also to be utilized in the intended application of the spectrometer, in which the spectrometer would be clamped for protection during launch of a spacecraft and released in the cold of outer space to allow it to assume its nominal configuration for scientific observations. The mechanism is passive in the sense that its operation does not depend on a control system and does not require any power other than that incidental to heating and cooling. The clamping and releasing action is effected by bolt-preloaded stacks of shape-memory-alloy (SMA) cylinders. In designing this mechanism, as in designing other, similar SMA mechanisms, it was necessary to account for the complex interplay among thermal expansion, elastic and inelastic deformation under load, and SMA thermomechanical properties.

Rosing, David↗

Progress in Operational Analysis of Launch Vehicles in Nonstationary Flight

This paper presents recent results in an ongoing effort to understand and develop techniques to process launch vehicle data, which is extremely challenging for modal parameter identification. The primary source of difficulty is due to the nonstationary nature of the situation. The system is changing, the environment is not steady, and there is an active control system operating. Hence, the primary tool for producing clean operational results (significant data lengths and data averaging) is not available to the user. This work reported herein uses a correlation-based two step operational modal analysis approach to process the relevant data sets for understanding and development of processes. A significant drawback for such processing of short time histories is a series of beating phenomena due to the inability to average out random modal excitations. A recursive correlation process coupled to a new convergence metric (designed to mitigate the beating phenomena) is the object of this study. It has been found in limited studies that this process creates clean modal frequency estimates but numerically alters the damping.

James, George↗

Integrated Ground Operations Demonstration for Responsive Space Access

Integrated Ground Operations Demonstration Units (IGODU) project developed to mature, integrate and demonstrate advancements in cryogenics, system health management and command and control technologies. Two Distinct Testing Environments: a) GODU Integrated Refrigeration and Storage - GODU LH2; b) GODU Autonomous Control - GODU LO2. Scope: I. GODU LH2: a) Investigate alternative storage and distribution architecture for future cryogenic propellant operations. b) Demonstrate advanced cryogenic propellant handling operations (liquefaction, storage and distribution) of normal boiling point and sub-cooled cryogenic propellants. II. GODU L02: a) Develop and demonstrate advanced control and health management technologies and techniques to autonomously control cryogenic propellant servicing operations. b) Investigate modern COTS hardware and control systems in an effort to reduce the "standing army" of engineers associated with maintaining and operating ground systems through the use of health management and autonomous control technologies. Goals: a) Raise Technology Readiness Levels (TRL) and Integration Readiness Levels (IRL) of several key technology development areas. b) Reduce operations lifecycle costs of future test programs and launch complexes. c) Demonstrate technologies for future exploration beyond low earth orbit. d) Serve as test environments for extraterrestrial surface operations.

Johnson, Robert G.↗

More Than A SketchUp

This 2014 summer internship assignment at John F. Kennedy Space Center (K.S.C) was conducted with the National Aeronautics and Space Administration (NASA) Engineering and Technology (NE) group in support of the Control and Data Systems Division (NE-C) within the Test, Operations & Support Software Engineering Branch (NE-C2). The primary focus of this project was to assist Branch Chief Laurie B. Griffin, to support NASA's Small Payload Launch Integrated Testing Services (SPLITS) mission, by mastering the capabilities of 3-D modeling software called SketchUp. I used SketchUp to create a virtual environment for different laboratories of the NE-00 Division. My mission was to have these models uploaded into a K.S.C Partnerships Website and be used as a visual aid to viewers who browsed the site. The leads of this project were Kay L. Craig, Business and Industry Specialist (AD-A) and Steven E. Cain, (FA-C). I teamed with fellow intern Tait Sorenson of the Flight Structures and Thermal Protection Systems Branch (NE-M5) and met with many K.S.C lab managers willing to display their lab's structure and capabilities. The information collected during these lab tours was vital to the building of the K.S.C Partnerships Website. To accomplish this goal Sorenson and I later teamed with fellow Marketing intern Marlee Pereda-Ramos, of the Spaceport Planning Office In Center Planning And Development (AD-A) Along with Ramos, Tait and I toured an array of laboratories and got first hand exposure to their functions and capabilities.

Trimble Corporation↗

FPGA Reliability and Failure Rate Analysis for Launch and Space Vehicles Environments

Field Programmable Gate Arrays (FPGAs) integrated circuits (IC) are one of the key electronic components in today's sophisticated launch and space vehicle complex avionic systems, largely due to their superb reprogrammable and reconfigurable capabilities combined with relatively low non-recurring engineering costs (NRE) and short design cycle. Consequently, FPGAs are prevalent ICs in communication protocols and control signal commands. This paper will demonstrate guidelines to estimate FPGA failure rates for ascent and in space operations. The guidelines will account for hardware and radiation-induced failures, as well as Bayesian updates to failure rates. The hardware contribution of the approach accounts for physical failures of the FPGA IC. The radiation portion will expand on FPGA susceptibility to different space radiation environments.

Al Hassan, Mohammad↗

Super Strypi Navigation, Guidance & Control (NGC) v. Release 04

The Super Strypi Navigation, Guidance & Control Software is a real-time implementation of the navigation, guidance and control algorithms designed to deliver a payload to a desired orbit for the rail launched Super Strypi launch vehicle. The software contains all flight control algorithms required from pre-launch until orbital insertion. The flight sequencer module calls the NG&C functions at the appropriate times of flight. Additional functionality includes all the low level drivers and I/O for communicating to other systems within the launch vehicle and to the ground support equipment. The software is designed such that changes to the launch location and desired orbit can be changed without recompiling the code.

Anderson, Mark A.↗

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk Assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless of whether the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the National Aeronautics and Space Administration (NASA) PRA and present a future dynamic option for software and PRA. Space Launch Vehicle software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data. Software uncertainty will also be discussed. It is determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Steven D. Novack↗

Performance of Whipple Shields at Impact Velocities above 9 km/s

Whipple shields were first proposed as a means of protecting spacecraft from the impact of micrometeoroids in 1947 [1] and are currently in use as micrometeoroid and orbital debris shields on modern spacecraft. In the intervening years, the function of the thin bumper used to shatter or melt threatening particles has been augmented and enhanced by the use of various types and configurations of intermediate layers of various materials. All shield designs serve to minimize the threat of a spall failure or perforation of the main wall of the spacecraft as a result of the impact of the fragments. With increasing use of Whipple shields, various ballistic limit equations (BLEs) for guiding the design and estimating the performance of shield systems have been developed. Perhaps the best known and most used are the "new" modified Cour-Palais (Christiansen) equations [2]. These equations address the three phases of impact: (1) ballistic (<3 km/s), where the projectile is moving too slowly to fragment and essentially penetrates as an intact projectile; (2) shatter (3 to 7 km/s), where the projectile fragments at impact and forms an expanding cloud of debris fragments; and (3) melt/vaporization (>7 km/s), where the projectile melts or vaporizes at impact. The performance of Whipple shields and the adequacy of the BLEs have been examined for the first two phases using the results of impact tests obtained from two-stage, light-gas gun test firings. Shield performance and the adequacy of the BLEs has not been evaluated in the melt/vaporization phase until now because of the limitations of launchers used to accelerate projectiles with controlled properties to velocities above 7.5 km/s. A three-stage, light-gas gun, developed at the University of Dayton Research Institute (UDRI) [3], is capable of launching small, aluminum spheres to velocities above 9 km/s. This launcher was used to evaluate the ballistic performance of two Whipple shield systems, various thermal protection system materials, and other spacecraft-related materials to the impact of 1.6-mm- to 2.6-mm-diameter, 2017-T4 aluminum spheres at impact velocities ranging from 8.91 km/s to 9.28 km/s. Test results, details of the shield systems, and nominal ballistic limits for the two Whipple shields are shown in Figures 1 and 2.

Christiansen, Eric L.↗

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗