Search NASA⌕ Search

SEARCH · Search NASA

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Bovine lactoferrin reverses programming of epithelial-to-mesenchymal transition to mesenchymal-to-epithelial transition in oral squamous cell carcinoma

Highlights: • bLF reverses EMT phenotype to MET in OSCC cells. • bLF enhances E-cadherin expression and suppresses vimentin in OSCC cells. • bLF inhibits TWIST through ERK pathway to gain E-cadherin. Epithelial-to-mesenchymal transition (EMT) is a biological process of invasion and metastasis in cancers, including in oral squamous cell carcinoma (OSCC). However, an effective anticancer drug that directly targets EMT has not yet been discovered. Therefore, we aimed to investigate the repressive effects of bovine lactoferrin (bLF) on EMT to achieve mesenchymal-to-epithelial transition (MET) in OSCC. OSCC cell lines, HOC313 (EMT-induced) and SCCVII (without EMT induction), were treated with bLF. The effects of bLF on EMT in OSCC were identified histologically by haematoxylin and eosin staining and observed morphologically and immunohistochemically using an anti-E-cadherin antibody. Expression levels of E-cadherin and vimentin were investigated using RT-PCR and western blotting. Immuno-expression of E-cadherin was examined in vivo in tumour tissues of C3H/HeN mice, transplanted with SCCVII cells, with or without bLF administration. We found that bLF changed the spindle-like mesenchymal cells to cuboidal-like epithelial cells and enhanced the affinity of membrane-bound E-cadherin in HOC313 cells. The transformation of EMT-MET in HOC313 cells was confirmed by the upregulation of E-cadherin and suppression of vimentin. Moreover, bLF suppressed TWIST expression through downregulation of ERK1/2 phosphorylation. Additionally, the inhibition tumour cell infiltration and increase in E-cadherin expression were observed in xenografts of the mice orally administered with bLF. Thus, based on the results from in vitro and in vivo studies, we concluded that bLF caused the restoration of epithelial properties through MET. Importantly, this finding is novel and is the first report indicating that bLF inhibited EMT and induced MET in OSCC, suggesting that bLF may provide a novel therapeutic strategy in OSCC.

60 APPLIED LIFE SCIENCES↗

Comparison of Vehicle Efficiency Technology Attributes and Synergy Estimates

Analyzing the future fuel economy of light-duty vehicles (LDVs) requires detailed knowledge of the vehicle technologies available to improve LDV fuel economy. The National Highway Transportation Safety Administration (NHTSA) has been relying on technology data from a 2001 National Academy of Sciences (NAS) study (NAS 2001) on corporate average fuel economy (CAFE) standards, but the technologyparameters were updated in the new proposed rulemaking (EPA and NHTSA 2009) to set CAFE and greenhouse gas standards for the 2011 to 2016 period. The update is based largely on an Environmental Protection Agency (EPA) analysis of technology attributes augmented by NHTSA data and contractor staff assessments. These technology cost and performance data were documented in the Draft Joint TechnicalSupport Document (TSD) issued by EPA and NHTSA in September 2009 (EPA/NHTSA 2009). For these tasks, the Energy and Environmental Analysis (EEA) division of ICF International (ICF) examined each technology and technology package in the Draft TSD and assessed their costs and performance potential based on U.S. Department of Energy (DOE) program assessments. ICF also assessed the technologies?other relevant attributes based on data from actual production vehicles and from recently published technical articles in engineering journals. ICF examined technology synergy issues through an ICF in-house model that uses a discrete parameter approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nevada National Security Site Environmental Report 2011 Summary

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada National Security Site (NNSS). NNSA/NSO prepares the Nevada National Security Site Environmental Report (NNSSER) to provide the public an understanding of the environmental monitoring and compliance activities that are conducted on the NNSS to protect the public and the environment from radiation hazards and from nonradiological impacts. The NNSSER is a comprehensive report of environmental activities performed at the NNSS and offsite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. This summary provides an abbreviated and more readable version of the NNSSER. It does not contain detailed descriptions or presentations of monitoring designs, data collection methods, data tables, the NNSS environment, or all environmental program activities performed throughout the year. The NNSS is currently the nation's unique site for ongoing national security-related missions and high-risk operations. The NNSS is located about 65 miles northwest of Las Vegas. The approximately 1,360-square-mile site is one of the largest restricted access areas in the United States. It is surrounded by federal installations with strictly controlled access, as well as by lands that are open to public entry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proceedings of the Nuclear Data Roadmapping and Enhancement Workshop (NDREW) for Nonproliferation

On January 23–25, 2018 in Washington, DC, the National Nuclear Security Administration (NNSA) Office of Defense Nuclear Nonproliferation (DNN) Research and Development (NA-22) supported the three-day Nuclear Data Roadmapping and Enhancement Workshop (NDREW) to enable nonproliferation missions. The goal was to assemble users and producers of nuclear data to provide input to identify nuclear data needs, suggest solutions to address these needs, and rank potential solutions with regard to mission impact. The workshop was organized into 12 discussion sessions which were bookended by introductory and concluding presentations. Eight discussion topics were defined by specific nuclear reaction or data types, while the other four covered infrastructure, benchmarks, uncertainties, and code development needs. Over 110 attendees represented national laboratories, universities, and headquarters, as well as international collaborators and industry representatives. Based on survey results and other feedback, attendees found the workshop valuable since it initiated a new conversation between programs and provided collaborative opportunities across stakeholder groups such as data users and experimentalists/evaluators. The proceedings presented herein summarize the content of the workshop, provide session notes and important highlights, and documents recommendations from the attendees.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

U.S. Government Accountability Office Report

In January 2003, the administration announced a 5-year, $1.2 billion Hydrogen Fuel Initiative to perform research, development, and demonstration (R&D) for developing hydrogen fuel cells for use as a substitute for gasoline engines. Led by the Department of Energy (DOE), the initiative's goal is to develop the technologies by 2015 that will enable U.S. industry to make hydrogen-powered cars available to consumers by 2020. GAO examines the extent to which DOE has (1) made progress in meeting the initiative's targets, (2) worked with industry to set and meet targets, and (3) worked with other federal agencies to develop and demonstrate hydrogen technologies. GAO reviewed DOE's hydrogen R&D plans, attended DOE's annual review of each R&D project, and interviewed DOE managers, industry executives, and independent experts. The most recent report on the status of this program can be found at this website.

GAO report fuel cells↗

The Low-Level Radioactive Waste Management Office: Thirty Years of Experience in Canada - 13308

This paper reviews thirty years of progress by the Low-Level Radioactive Waste Management Office (LLRWMO) in developing and implementing low-level radioactive waste (LLRW) remediation projects and environmentally safe co-existence strategies. It reports on the present status and the future of the national historic waste program in Canada. There are over two million cubic metres of historic LLRW in Canada. Historic LLRW is broadly defined as LLRW that was managed in the past in a manner that is no longer considered acceptable and for which the original owner cannot reasonably be held accountable. In many cases, the original owner can not be identified or no longer exists. The LLRWMO was established in 1982 as Canada's agent to carry out the responsibilities of the federal government for the management of historic LLRW. The LLRWMO is operated by Atomic Energy of Canada Limited (AECL) through a cost-recovery agreement with Natural Resources Canada (NRCan), the federal department that provides the funding and establishes national policy for radioactive waste management in Canada. The LLRWMO expertise includes project managers, environmental remediation specialists, radiation surveyors, communications staff and administrative support staff. The LLRWMO in providing all aspects of project oversight and implementation contracts additional resources supplementing core staff capacity as project/program demands require. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2nd International Joint Topical Meeting on Emergency Preparedness and Response and Robotic and Remote Systems

It is desirable for the Department of Energy/National Nuclear Security Administration emergency preparedness and response community to have available every resource to enhance its capabilities for assessing the health effects of environmental agents. Such resources will aid DOE/NNSA in achieving its goal of protecting the health and safety of workers, the public, and environment in event of the release of radiological, chemical, or biological agents into the environment. Studies are reported in this paper where composite data analyses were done for the chemicals included in DOE's Protective Action Criteria (PACs) database. PACs define the concentration of airborne chemicals at which protective actions are required. They are used by DOE/NNSA in developing Emergency Preparedness Procedures and for Operational Emergencies. Data analyses were conducted to discern structure-activity relationship patterns among PAC chemicals by assigned classification schemes based on the 30 accepted categories used by the EPA Gene-Tox Program. PAC chemicals were scored according to their frequency of distribution, severity of toxicity index, and structural classification. These studies yielded results that could be helpful in assessing the toxicity of new chemicals. It is suggested that provisions be made to include chemical structural information in the PAC database.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Comparison of Vehicle Efficiency Technology Attributes and Synergy Estimates

Analyzing the future fuel economy of light-duty vehicles (LDVs) requires detailed knowledge of the vehicle technologies available to improve LDV fuel economy. The National Highway Transportation Safety Administration (NHTSA) has been relying on technology data from a 2001 National Academy of Sciences (NAS) study (NAS 2001) on corporate average fuel economy (CAFE) standards, but the technology parameters were updated in the new proposed rulemaking (EPA and NHTSA 2009) to set CAFE and greenhouse gas standards for the 2011 to 2016 period. The update is based largely on an Environmental Protection Agency (EPA) analysis of technology attributes augmented by NHTSA data and contractor staff assessments. These technology cost and performance data were documented in the Draft Joint Technical Support Document (TSD) issued by EPA and NHTSA in September 2009 (EPA/NHTSA 2009). For these tasks, the Energy and Environmental Analysis (EEA) division of ICF International (ICF) examined each technology and technology package in the Draft TSD and assessed their costs and performance potential based on U.S. Department of Energy (DOE) program assessments. ICF also assessed the technologies, other relevant attributes based on data from actual production vehicles, and recently published technical articles in engineering journals. ICF examined technology synergy issues through an ICF in-house model that uses a discrete parameter approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

30 DIRECT ENERGY CONVERSION↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

arra, doe, recovery act,clean cities, alternative ↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rapid PD-L1 detection in tumors with PET using a highly specific peptide

Molecular imaging can report on the status of the tumor immune microenvironment and guide immunotherapeutic strategies to enhance the efficacy of immune modulation therapies. Imaging agents that can rapidly report on targets of immunomodulatory therapies are few. The programmed death ligand 1 (PD-L1) is an immune checkpoint protein over-expressed in several cancers and contributes to tumor immune suppression. Tumor PD-L1 expression is indicative of tumor response to PD-1 and PD-L1 targeted therapies. Herein, we report a highly specific peptide-based positron emission tomography (PET) imaging agent for PD-L1. We assessed the binding modes of the peptide WL12 to PD-L1 by docking studies, developed a copper-64 labeled WL12 ([{sup 64}Cu]WL12), and performed its evaluation in vitro, and in vivo by PET imaging, biodistribution and blocking studies. Our results show that [{sup 64}Cu]WL12 can be used to detect tumor PD-L1 expression specifically and soon after injection of the radiotracer, to fit within the standard clinical workflow of imaging within 60 min of administration. - Highlights: • A highly specific PD-L1 binding peptide, WL12, was developed as a PET imaging agent. • [{sup 64}Cu]WL12 demonstrates specific binding to PD-L1 in vitro and in vivo. • [{sup 64}Cu]WL12-PET allows PD-L1 detection in cancers within 60 min of administration. • WL12 binding interactions with PD-L1 overlaps with that of PD-1.

60 APPLIED LIFE SCIENCES↗

Core Analysis E-Reports Produced for the Southwest Regional Partnership on Carbon Sequestration for Wells 13-10A, 13-14, and 32-8 of the Farnsworth Unit, Texas

The submission is three electronic reports (e-reports) produced by Terra Tek, a former Schlumberger company, for and under the oversight of the Southwest Regional Partnership on Carbon Sequestration (SWP). The SWP designed and implemented a coring and core analysis program in conjunction with the previous field operator Chaparral Energy, L.L.C. The main SWP contacts who oversaw the coring and core analysis program, including geologic core descriptions and sample selection for testing by the Terra Tek, are listed below in the Authors section. The three reports are for Wells 13-10A, 13-14, and 32-8 of the Farnsworth Unit, TX, a site of the SWP's CO2 storage and enhanced oil recovery project. The e-reports include many data types that are not listed in full detail here, but may include: geomechanical, geochemical, and petrophysical measurements; white light and UV core photos; spectral gamma logs on the core; and Heterogeneous Rock Analysis logs. Fracture core review reports are included for Wells 13-14 and 32-8. The three e-reports each have many subfolders with the various types of data in spreadsheets, pdfs, image files, or other formats. The main e-reports for each well are listed by the well name. The sub-folder “E-Report” for each well has a Report.html file, which, when opened, will have hyperlinks to the various data sets and information. The files in the zipped folder will need to be extracted for the Report.html files to work properly. These authors thank Joseph Hall, a geologist formerly of Chaparral Energy, L.L.C., for assistance in designing the coring program, his geologic expertise of the Farnsworth Unit, and his assistance with characterizing the core. Christopher Gillespie, of Terra Tek at the time, managed the myriad geomechanical, geochemical, and petrophysical measurements provided by Terra Tek for this project. The core from which the samples were collected for this project are housed at the Subsurface Data and Core Libraries of the New Mexico Bureau of Geology and Mineral Resources, Socorro, New Mexico, USA. Funding for this project is provided by the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) through the Southwest Regional Partnership on Carbon Sequestration (SWP) under Award No. DE-FC26-05NT42591. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. These e-reports describe objective technical results and analysis. Any subjective views or opinions that might be expressed in the reports do not necessarily represent the views of the US Department of Energy or the United States Government.

Caprock↗

Institutional impediments to using alternative water sources in thermoelectric power plants.

This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Obtaining adequate water supplies for cooling and other operations at a reasonable cost is a key factor in siting new and maintaining existing thermoelectric power plant operations. One way to reduce freshwater consumption is to use alternative water sources such as reclaimed (or recycled) water, mine pool water, and other nontraditional sources. The use of these alternative sources can pose institutional challenges that can cause schedule delays, increase costs, or even require plants to abandon their plans to use alternative sources. This report identifies and describes a variety of institutional challenges experienced by power plant owners and operators across the country, and for many of these challenges it identifies potential mitigating approaches. The information comes from publically available sources and from conversations with power plant owners/operators familiar with using alternative sources. Institutional challenges identified in this investigation include, but are not limited to, the following: (1) Institutional actions and decisions that are beyond the control of the power plant. Such actions can include changes in local administrative policies that can affect the use of reclaimed water, inaccurate growth projections regarding the amount of water that will be available when needed, and agency workloads and other priorities that can cause delays in the permitting and approval processes. (2) Developing, cultivating, and maintaining institutional relationships with the purveyor(s) of the alternative water source, typically a municipal wastewater treatment plant (WWTP), and with the local political organizations that can influence decisions regarding the use of the alternative source. Often a plan to use reclaimed water will work only if local politics and power plant goals converge. Even then, lengthy negotiations are often needed for the plans to come to fruition. (3) Regulatory requirements for planning and developing associated infrastructure such as pipelines, storage facilities, and back-up supplies that can require numerous approvals, permits, and public participation, all of which can create delays and increased costs. (4) Permitting requirements that may be difficult to meet, such as load-based discharge limits for wastewater or air emissions limitations for particulate matter (which will be in the mist of cooling towers that use reclaimed water high in dissolved solids). (5) Finding discharge options for cooling tower blowdown of reclaimed water that are acceptable to permitting authorities. Constituents in this wastewater can limit options for discharge. For example, discharge to rivers requires National Pollutant Discharge Elimination System (NPDES) permits whose limits may be difficult to meet, and underground injection can be limited because many potential injection sites have already been claimed for disposal of produced waters from oil and gas wells or waters associated with gas shale extraction. (6) Potential liabilities associated with using alternative sources. A power plant can be liable for damages associated with leaks from reclaimed water conveyance systems or storage areas, or with mine water that has been contaminated by unscrupulous drillers that is subsequently discharged by the power plant. (7) Community concerns that include, but are not limited to, increased saltwater drift on farmers fields; the possibility that the reclaimed water will contaminate local drinking water aquifers; determining the 'best' use of WWTP effluent; and potential health concerns associated with emissions from the cooling towers that use recycled water. (8) Interveners that raise public concerns about the potential for emissions of emerging pollutants of concern to cause health or environmental problems. Mitigating solutions range from proactive communications with the local communities (which can be implemented by the power plants) to technical solutions, such as developing means to reduce the concentrations of total dissolved solids (TDS) and other contaminants in cooling water to maintain plant efficiency and while meeting discharge limits. These kinds of solutions may be appropriate for DOE research and development (R&D) funding.

03 NATURAL GAS↗

A Path to Operating System and Runtime Support for Extreme Scale Tools

In this project, we cast distributed resource access as operations on files in a global name space and developed a common, scalable solution for group operations on distributed processes and files. The resulting solution enables tool and middleware developers to quickly create new scalable software or easily improve the scalability of existing software. The cornerstone of the project was the design of a new programming idiom called group file operations that eliminates iterative behavior when a single process must apply the same set of file operations to a group of related files. To demonstrate our novel and scalable ideas for group file operations and global name space composition, we developed a group file system called TBON-FS that leverages a tree-based overlay network (TBON), specifically MRNet, for logarithmic communication and distributed data aggregation. We also developed proc++, a new synthetic file system co-designed for use in scalable group file operations. Over the course of the project, we evaluated the utility and performance of group file operations, global name space composition, TBON-FS, and proc++ in three case studies. The first study focused on the ease in using group file operations and TBON-FS to quickly develop several new scalable tools for distributed system administration and monitoring. The second study evaluated the integration of group file operation and TBON-FS within the Ganglia Distributed Monitoring System to improve its scalability for clusters. The final study involved the integration of group file operations, TBON-FS, and proc++ within TotalView, the widely-used parallel debugger. For this project, the work of the Oak Ridge National Laboratory (ORNL) team occurred primarily in two directions: bringing the MRNet tree-based overlay network (TBON) implementation to the Cray XT platform, and investigating techniques for predicting the performance of MRNet topologies on such systems. Rogue Wave Software (RWS), formerly TotalView Technologies Inc., worked with the University ofWisconsin (UW) team on the design and prototyping of a scalable version of the TotalView debugger. RWS assisted UW with their "proc++" design effort. RWS assisted UW with strategy for integrating proc++ into TotalView.

97 MATHEMATICS AND COMPUTING↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the tracking of inventories against total limits that would affect the results and conclusions of the performance assessment. Waste receipts to date and projected waste receipts through Fiscal Year 2012 are both greater than the inventory assessed in the performance assessment and composite analysis. The waste forms disposed of to the landfill are different from the waste form (compacted soil) assessed in the performance assessment. The leak detection system and groundwater monitoring results indicate the landfill has not leaked. The results of the performance assessment/composite analysis are valid (i.e., there is still a reasonable expectation of meeting performance objectives) but the new information indicates less conservatism in the results than previously believed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗