Search NASA⌕ Search

SEARCH · Search NASA

Results for “LABORATORIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Radioactive Waste Characterization Strategies; Comparisons Between AK/PK, Dose to Curie Modeling, Gamma Spectroscopy, and Laboratory Analysis Methods- 12194

In the coming fiscal years of potentially declining budgets, Department of Energy facilities such as the Los Alamos National Laboratory (LANL) will be looking to reduce the cost of radioactive waste characterization, management, and disposal processes. At the core of this cost reduction process will be choosing the most cost effective, efficient, and accurate methods of radioactive waste characterization. Central to every radioactive waste management program is an effective and accurate waste characterization program. Choosing between methods can determine what is classified as low level radioactive waste (LLRW), transuranic waste (TRU), waste that can be disposed of under an Authorized Release Limit (ARL), industrial waste, and waste that can be disposed of in municipal landfills. The cost benefits of an accurate radioactive waste characterization program cannot be overstated. In addition, inaccurate radioactive waste characterization of radioactive waste can result in the incorrect classification of radioactive waste leading to higher disposal costs, Department of Transportation (DOT) violations, Notice of Violations (NOVs) from Federal and State regulatory agencies, waste rejection from disposal facilities, loss of operational capabilities, and loss of disposal options. Any one of these events could result in the program that mischaracterized the waste losing its ability to perform it primary operational mission. Generators that produce radioactive waste have four characterization strategies at their disposal: - Acceptable Knowledge/Process Knowledge (AK/PK); - Indirect characterization using a software application or other dose to curie methodologies; - Non-Destructive Analysis (NDA) tools such as gamma spectroscopy; - Direct sampling (e.g. grab samples or Surface Contaminated Object smears) and laboratory analytical; Each method has specific advantages and disadvantages. This paper will evaluate each method detailing those advantages and disadvantages including; - Cost benefit analysis (basic materials costs, overall program operations costs, man-hours per sample analyzed, etc.); - Radiation Exposure As Low As Reasonably Achievable (ALARA) program considerations; - Industrial Health and Safety risks; - Overall Analytical Confidence Level. The concepts in this paper apply to any organization with significant radioactive waste characterization and management activities working to within budget constraints and seeking to optimize their waste characterization strategies while reducing analytical costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade and Certification of the Los Alamos National Laboratory SHENC 2011 - 12270

Nondestructive assay measurements of Transuranic (TRU) waste at Los Alamos National Laboratory (LANL) required the addition of a standard waste box (SWB) assay system. A Super High Efficiency Neutron Counter (SHENC) located at Hanford was identified to be relocated to LANL. After careful evaluation of waste streams at LANL, it was determined that the current configuration of the SHENC was not sufficient to quantify certain waste streams. At LANL, there is still a large amount of waste that needs to be retrieved and repackaged within SWB's to meet agreements with the State of New Mexico. Prior to relocating the SHENC, the only assay systems available were High Efficiency Neutron Counters having only a 55-gallon drum capacity. Further analyses indicated that the SHENC system should be capable of quantitative gamma measurements that are to be linked, and combined, with the neutron measurements. The SHENC system was therefore augmented with a new high-resolution gamma spectroscopy system using BE5030 detectors and upgraded gamma electronics. The neutron side of the system was also upgraded with an advanced shift register (JSR-15), an improved Programmable Logic Controller and NDA-2000 software. This report will include calibration of both the neutron and gamma modalities of the SHENC system and how the modality results are combined to produce a single assay result. Preliminary performance results will be discussed based on both mock and real waste measurements. Discussions will also include a complete description of the adjustable parameters as well as the calibration plan, techniques and validations including calibration confirmation based on the Waste Isolation Pilot Plant Waste Acceptance Criteria (WIPP-WAC). The SHENC was successfully upgraded to efficiently measure the complex waste streams at Los Alamos National Laboratory. A new PLC was successfully added to the system for Add-A-Source control. A new shift register was added to the SHENC (JSR-15) which provides more flexibility if replacement is required. The addition of the density based calibration on the gamma modality of the system increases the effectiveness of the SHENC for high alpha-n producing waste. Upgrading the system to new software also helped to standardize the program at Los Alamos. Only one new procedure was initiated for the integration of the SHENC. Add-A-Source measurements were effectively integrated with the system based on the confirmation results and positive results during two Department of Energy Performance Demonstration Program Box Cycles. Total measurement uncertainty estimates were completed for both the gamma modality and the neutron modality of the system. The SHENC was reviewed by both the Department of Energy and the Environmental Protection Agency in 2011. The certification letter for the SHENC was issued on November 16, 2011. With the certification letter issued to the Central Characterization Project the SHENC can perform waste measurements on SWB's at Los Alamos for shipment to WIPP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Laboratory for nuclear characterization on D and D sites

The nuclear measurement is use in many phases of dismantling and cleanup site. Particularly the results of radiologic characterization are used to create or to optimize the deconstruction scenarios of nuclear plants and to reduce the nuclear waste volume. This type of analyses is made on samples collected in concerned installations. To realize those analyses, samples are send in laboratory what has a great impact on the planning and cost of dismantling. That's the reason why MSIS Assistance (AREVA D and S) devises Mobile Laboratory, which permits to realize nuclear measurement in situ. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

HEPA Filter Waste Management at Select Department of Energy National Laboratories - 17022

High Efficiency Particulate Air (HEPA) filters are routinely used to filter exhaust air at Department of Energy (DOE) National Laboratory facilities that work with radioactive materials. While the HEPA filter configurations are fairly standardized (such as metal framed with glass micro-fiber media), the range and concentrations of radioactive and potentially other hazardous materials in the used filters presents for a variety of characterization approaches as well as challenges. This paper will summarize, compare and contrast the current HEPA filter waste management experience at a selection of DOE National Laboratories. Topic areas to be explored include process knowledge collection, characterization methods, characterization results, waste packaging and disposition pathways, and problems and success stories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Streamlining and Transparently Automating Complex Waste Determinations at Los Alamos National Laboratory - 17286

Environmental programs at Los Alamos National Laboratory (LANL) generate a large amount of sampling activities that can result in waste that needs to be characterized and properly disposed. Since 2011, sampling results are managed in the cloud-based Environmental Information Management (EIM) database, which contains over 16 million current and historical data records. In many cases, the database's analytical records are used to characterize and dispose waste from environmental operations. Three factors contribute to streamlining of the waste disposition operations: (1) if possible, use of the existing analytical data for waste characterization to avoid additional laboratory analysis; (2) reduction in time spent on data evaluation for various waste acceptance criteria; and (3) choice of the proper and least expensive disposal alternative. Use of the existing analytical data, when allowed by law, creates some paradoxical problems: when chemical analysis is requested with the purpose of characterizing waste, it creates only 100 to 400 analytical records. However, use of exiting analytical data at LANL may lead to evaluation of tens of thousands of analytical records, with many records for each single analyte. This occurs because data were collected for environmental characterization and not waste characterization. To streamline data analysis for waste disposition using existing data, LANL has created a Waste Data Summary (WDS) module in the site's EIM database. Recognizing that waste determination is performed by groups outside the environmental program at LANL, the WDS allows for logically guided data selection for a specific waste determination (solids, liquids, radiological, etc.) and reduces potentially thousands of rows of data into simple formatted data reports that are easy to comprehend and process. This allows the waste evaluators to review data using multiple approaches to make their own determination on the most appropriate disposal method. There are four basic principles of WDS operation: (1) The highest detected analytical result is evaluated for the selected samples (or the lowest undetected result if there are no detected results); (2) All approved disposal pathways are evaluated; (3) Any failures of the Waste Acceptance Criteria are visibly highlighted to focus the attention of the evaluator; and (4) The decision of the disposal path is left to the trained waste evaluator (WDS does not choose or suggest any disposal paths). The summary results are presented as the set of short data reports. These reports can be divided into two groups: general comparison reports and disposal pathway specific forms. The general comparison forms show all Resource Conservation and Recovery Act (RCRA) analytes with pass/fail evaluation and with preference for toxicity characteristic leaching procedure (TCLP) results (or 20x rule) for solid samples, the potential RCRA hazard codes assignment for detected analytes, and all rad results. The detected chemical and radioactivity results are compared to the background values and to Soil Screening and Soil Action limits (SSL/SAL limits). Disposal pathway specific forms follow Waste Acceptance Criteria requirements for all disposal pathways available at LANL. The programming of the WDS tries to maximize existing data by analyte substitutions (like using gross alpha for necessary alpha emitting isotopes) or by making calculations when analytical results do not agree with legal requirements (like total chlordane in the RCRA regulations, which is most often analyzed and reported as individual isomers). All forms may be annotated by the waste evaluator to provide additional information to support decision making. Upon final decision of a disposal path, the complete dataset used in the evaluation and the WDS forms with annotations is 'frozen' as an un-editable PDF export to document the data used in the waste disposal determination. The streamlined process results in less work for waste evaluators and reduces overall labor and analytical costs. By comparison, a full review of a 10,000 record parent dataset may take a waste evaluator over a week to review, whereas with the WDS module, the task can be accomplished in less than one hour with clear, reproducible results. These results can be reviewed and checked at any time by quality assurance personnel, thus ensuring transparency in the decision making process. LANL believes this approach has broad applicability to other sites where waste determination is based on review of existing data collected for more generalized environmental purposes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An underground laboratory in the context of salt disposal research - 15549

Evaluating the basis of need for an underground research laboratory for salt science and engineering is imperative because of the significant commitment of time and money involved. Decades of salt repository studies, numerous experiments, and sophisticated modeling capabilities underpin the scientific database that supports safe disposal of nuclear waste in salt. The safety case for disposal of non-heat-generating waste such as transuranic waste interred at the Waste Isolation Pilot Plant is robust, with the only long-term releases to the environment projected to be by way of human intrusion. The scientific evidence also favors safe disposal of heat-generating waste. Technical evaluations for disposal of heat-generating waste in salt experienced a rather long hiatus in the United States subsequent to certification of the Waste Isolation Pilot Plant and issuance of the Nuclear Waste Policy Act Amendment that ended salt disposal research for the civilian program. Similar salt repository research in Germany was delayed by a ten-year moratorium that ended in 2010. In collaboration with German peers, the United States Department of Energy has reviewed and evaluated thermally driven processes in salt disposal and identified key technical areas in which to prioritize resources. The goal for disposal research in salt is to provide sufficient technical information to license a repository successfully. The necessity or utility of a salt underground laboratory is to be evaluated in the context of an overall research agenda that supports a license application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategies for Decommissioning the Fuel Storage and Reprocessing Complex at Chalk River Laboratories - 16183

For over 60 years, Canadian Nuclear Laboratories (CNL), previously Atomic Energy of Canada Limited (AECL), has been a world leader in developing peaceful and innovative applications from nuclear technology. Resulting from these years of nuclear research there are legacy liabilities consisting of outdated and unused research facilities and buildings, a wide variety of buried and stored wastes, and affected lands. In 2006, the Government of Canada established the Nuclear Legacy Liabilities Program (NLLP) to safely and cost-effectively eliminate, to the extent practicable, the nuclear legacy liabilities. The National Research Experimental (NRX) fuel rod storage and handling facility, as well as two dedicated fuel reprocessing facilities at the Chalk River Laboratories (CRL) known as the Building 200 (B200) Complex, are examples of these legacy liabilities. It is planned to remove these facilities as part of a logical progression of activities to reduce CNL's liabilities under the NLLP and to prepare the property for the physical redevelopment of the CRL site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Underground Research Laboratory (1980-2014) - 16274

In 1980, Canada initiated a long-term, comprehensive research and development program of geologic characterization and large-scale in situ geotechnical experiments in a subsurface facility, the Underground Research Laboratory (URL). The URL was excavated specifically to evaluate the concept of permanent disposal of used CANDU{sup R} nuclear reactor fuel in a deep geological repository (DGR) constructed in Canadian Shield granite. Key phases of the URL included siting, detailed site characterization and monitoring, construction, operation, decommissioning, and closure. Much collaborative research with international organizations was undertaken at the URL and continues, even after the closure of the facility, through the ongoing Enhanced Sealing Project (ESP). The ESP monitors the engineered performance of a full-scale composite shaft seal that was emplaced during URL closure to permanently seal the main URL access shaft across a sub-horizontal hydraulically active fracture zone. Currently the ESP is jointly funded by Canadian Nuclear Laboratories (CNL) (Canada), Posiva (Finland), and Andra (France), and monitoring is planned to continue until the end of 2016. Decades of programmatic experience at the URL have shown that knowledge continuity is integral to supporting the development of a safe geological disposal facility for high level nuclear waste. This paper outlines the history of the URL and describes some technical lessons learned from its 30-plus years of construction, operation, and closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermo-Hydraulic-Mechanical Modelling of the Full-Scale Emplacement (FE) Experiment at the Mont Terri Rock Laboratory - 16490

The Full-Scale Emplacement Experiment at the Mont Terri underground research laboratory is a heater test carried out in a gallery constructed in Opalinus Clay. The aim of the experiment is both to develop emplacement procedures for radioactive waste canisters and their surrounding backfill as well as understanding the thermo-hydro-mechanical effects of disposing of radioactive waste on the engineering materials and the host rock. Coupled thermo-hydro-mechanical models have been used to aid planning of the locations of sensors, to inform decisions on the schedule for turning on the heaters as well as to make predictions of the temperatures and water pressures in the bentonite and the Opalinus Clay. The FE Experiment was preceded by a number of other experiments at the Mont Terri laboratory at smaller scales, but with similar materials, which provided crucial input to the models and gave confidence in the general process understanding. Blind predictions were made prior to turning on the heaters, of the temperature and relative humidity in the bentonite surrounding the heaters. The comparison between the blind predictions and early data from the experiment show that knowledge gained from smaller scale experiments on similar materials has enabled good blind predictions to be made and gives confidence that temperature in the experiment is unlikely to rise to a level that could damage the sensors. It also demonstrates that the thermal properties of the disposal system are understood well enough to produce reliable estimates of temperature in the backfill. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From the Cesium Pond Soil Shipping Campaign at Whiteshell Laboratories - 18206

Whiteshell Laboratories (WL), located in Manitoba, Canada is the first major decommissioning project of a nuclear research establishment in Canada. With the focus now active remediation to return the site to green state, the majority of legacy radioactive waste and waste generated from decommissioning and demolition of nuclear facilities must be transported off site to Chalk River Laboratories (CRL), located in Ontario, Canada. No large radioactive waste shipment campaigns have been undertaken by WL until now. A newly established Waste Management Program specifically designed to support the WL Closure Project has executed its first major shipping campaign of radioactive material, making approximately one hundred shipments and reducing WL's total volume of low-level radioactive waste to transport by seven percent. The shipped waste was approximately 1800 m{sup 3} (2600 metric tons) of known Cs-137 contaminated soil material generated from the excavation of an Experimental Cesium Pond Project designed to study the distribution of dose received by organisms living at the mud-water interface from Cs-137 contamination. This paper outlines the cost benefit analysis undertaken to determine the most cost effective method for transporting the radioactively contaminated soil to CRL, storage challenges experienced by both WL and CRL, the selection of the most appropriate waste package, training of shippers, and the continual optimization of increasing the number of generated waste packages and the number of waste packages shipped and accepted at CRL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing Natural Attenuation of Cr(VI) in a Chromium Plume at Los Alamos National Laboratory - 18594

Characterization of natural attenuation of hexavalent (Cr(VI)) on aquifer sediments within the Cr plume at Los Alamos National Laboratory has been conducted to (1) refine conceptual and numerical models of chromium fate and transport, (2) evaluate the long-term stability of Cr(III)/Cr(VI) in the complex groundwater system along flow paths from the source to the regional aquifer, and (3) evaluate and develop options for successful remediation. The naturally high chromium abundance in aquifer sediments at Los Alamos pose an unique challenge for characterization of chromium reduction, making conventional approaches such as uptake tests and advanced spectroscopic measurements ineffective in identifying relatively small amounts of anthropogenic Cr(VI) in the sediments. To address this challenge and as complimentary to these conventional methods, sequential leaching tests were conducted on core hole sediments obtained from sonic drilled cores taken from both contaminated and non-contaminated horizons among two mineralogically distinct formations (Puye formation and Miocene Pumiceous Unit) within the Cr plume. A series of three and coherent sequential leaching steps were conducted: 1) an alkaline leach to determine the amount of Cr(VI) sorbed on the sediments. 2) a weak acid leach (using 0.01 M and 0.1 M HNO{sub 3}) to determine the amount of anthropogenic chromium (Cr(III) and Cr(VI)) on aquifer sediment surfaces, and 3) a strong acid leach (using 2 M HNO{sub 3}) to characterize the amount of releasable Cr(III) from aquifer minerals. Additionally we tested the efficiency and detection limit of sequential leaching on bentonite, which consists mainly of smectite, used in drill muds and laboratory-grade biotite spiked with known concentrations of Cr(VI). Smectite and biotite are two phases considered to be potentially important host minerals in aquifer sediments within the plume. Thus, by comparing contaminated and uncontaminated sediment leachate results of chromium and other major and trace elements, the signature and quantity of anthropogenic Cr(VI) can be derived. Our results from the weak acid leaching test indicate that the method detection limit for Cr 'uptake' was about 1 μg/g for biotite and about 0.5 μg/g for bentonite. Our results also indicate that all samples taken from known contaminated horizons in comparison to non-contaminated ones within the Puye formation showed no statistical difference in the amount of Cr leached indicative of its insignificant Cr(VI) attenuation capacity. The amount of excess Cr leached from the magnetic fraction of the contaminated Miocene Pumiceous samples was about 2 μg/g of sediment. Considering that the magnetic fraction was about 11% by mass of the bulk sample, the excess amount of Cr leached from the bulk material would be about 0.2 μg/g of sediment, suggesting the potential for some Cr(VI) attenuation capacity in the Miocene pumice unit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Depth of the Biologically Active Zone in Terrestrial Habitats at the Chalk River Laboratories Site: Implications for Contaminated Site Assessment and Ecological Risk Assessment - 19272

Plants, soil invertebrates and burrowing mammals penetrate the soil layer to varying depths. As Canadian Nuclear Laboratories (CNL) assesses risks and remediates soils contaminated with radioactive and other hazardous wastes at the Chalk River Laboratories (CRL) site, a site-specific characterization of the biologically active zone is required to help to identify the relevant depth in soil for exposure assessment of ecological receptors. A defined biologically active zone is also required to determine the depth to which remedial actions should be taken to protect the environment, help prioritize locations for remediation efforts based on ecological risk and avoid unnecessary cleanup efforts. By taking advantage of the abundance of information on contaminant locations and depths, biodiversity, and hydrogeology available for the well-studied CRL site, it is possible to produce a site-specific estimation of the biologically active zone in CRL upland soils. A literature review was conducted to determine rooting and burrowing depths for vascular plants, soil invertebrates and burrowing mammals documented to be present (or potentially present) on the CRL site. This literature review was supplemented with field surveys to fill data gaps in our understanding of species composition (e.g., soil invertebrates and plant understory). Overall, we found that there was significant variability in maximum rooting/burrowing depths among plant, mammal and invertebrate species present on the CRL site. The majority of biological activity occurs in the top 0.5 m of soil. However, about 19% of burrowing or rooting receptors present at CRL may be in contact with soils up to 1 m depth, 9% of receptors present may be in contact with soils up to 2 m depth, and only about 2% of receptors may be in contact with soils up to 3 m depth. It is highly unlikely that any ecological receptor present at CRL is in direct contact with soils deeper than about 3.6 m. Further site-specific results pertaining to burrowing and rooting depths estimated for the CRL site will be presented, and these results will be compared to generic/default 'depth of biologically-active layer' guidelines recommended by various agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modern Integrated Decommissioning at Chalk River Laboratories - 19401

Canadian Nuclear Laboratories (CNL), formerly Atomic Energy of Canada Limited (AECL) is Canada's premier nuclear science and technology (S and T) organization in Canada. Over the next decade, CNL will be transforming its many different sites through the revitalization of essential site infrastructure, the decommissioning of aging infrastructure and a significant investment in new, world-class science facilities. In particular, the main site for CNL resides at the Chalk River Laboratories (CRL), where the majority of parallel activities of revitalization and decommissioning will take place. In 2016, CRL started an ambitious ten year plan to decommission more than 120 buildings. In order to ensure this project remains on track and the ALARA (as low as reasonably achievable) principle is maintained, a strategy is required. This strategy is to focus on integrated activities, which meet/exceed international best practices, to ensure the work is carried out as efficiently as possible. Given the complexity of CRL operations and the legacy issues accumulated over 60 years of operation, CNL needed to adopt a modern and integrated approach to handle competing project priorities. As a starting point, achieving complete radiological characterization of many building structures is required. CNL engaged various vendors to modernize radiological surveys from paper records to electronic documentation, deploying modern survey tools such as data-logging instruments, gamma cameras, robotic surveying tools, and introducing tablets to improve the flow of information while workers are in the field. Once fully implemented, these improvements will ensure that quality information is readily available at all stages of decommissioning, which greatly reduces project schedules and results in important company savings. These techniques will ensure that, during planning, historic radiological survey data is easily searchable from the electronic documentation system. Any additional data required can be quickly and safety collected using robotic surveying tools in areas of higher radiation to reduce possible exposure to individuals. As decommissioning progresses, individuals in the field can use tablets, gamma cameras and data-logging instruments to accurately retrieve, collect and share data. As a result of these efforts, CNL is progressing towards becoming a leader in the field of decommissioning within Canada, applying modern techniques and best practices to reduce decommissioning project risk. Access to high quality information results in improved decommissioning plans, which will reduce the amount of rework and scheduling delays required and improve worker safety as the project is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗