Design Considerations for LTV HITL Testing of Pressurized Suited Crew on a Motion-Based Platform

The upcoming NASA Lunar Terrain Vehicle (LTV) will succeed the Apollo Lunar Roving Vehicle, performing both surface exploration and logistics transfer in NASA’s return to the Moon. Human-in-the-Loop (HITL) testing will play a key role in refining the design of the LTV, ensuring its usability and ability to accommodate the astronaut population. A motion-based platform and a lunar terrain and lighting model can simulate the conditions of the lunar south pole region. It can be used by NASA to conduct HITL testing in concert with HITL testing of the drivable Ground Reference Unit (GTU) concept vehicle. The dynamic motion of the platform combined with the mobility restrictions of pressurized suits could help improve NASA understanding of vehicle-suit-astronaut interfaces. NASA human factors practitioners have proposed multiple HITL test series to use the motion-based platform in conjunction with testing of the GTU in hopes that lessons learned can be applied to help select a commercial partner to develop the Artemis LTV.

LTV↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Reports: Final Comprehensive Performance Test Report, P/N: 1356006-1, S.N: 202/A2

This is the Performance Verification Report. the process specification establishes the requirements for the comprehensive performance test (CPT) and limited performance test (LPT) of the earth observing system advanced microwave sounding unit-A2 (EOS/AMSU-A2), referred to as the unit. The unit is defined on drawing 1356006.

Platt, R.↗

Galileo spacecraft system level environmental test results

Project Galileo, the United States' next planetary mission, will be launched by the Shuttle/Centaur in May 1986. The Galileo spacecraft consists of both a planetary Orbiter and an atmospheric Probe. The spacecraft was environmentally tested as a system in the fall and winter of 1984/1985 at the Jet Propulsion Laboratory. The protoflight qualification program consisted of vibration, acoustics, pyrotechnic shock, Electromagnetic Compatibility (EMC) and Solar Thermal Vacuum (STV) tests. This test program was accomplished on a large, complex, dual-spin spacecraft without the benefit of precursor spacecraft prototype tests. This paper discusses the objectives of these tests and the implementation, and summarizes the results.

Hoffman, A. R.↗

Field Test Report: Preliminary Aquifer Test Characterization Results for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design

This report examines the hydrologic test results for both local vertical profile characterization and large-scale hydrologic tests associated with a new extraction well (well 299-W15-225) that was constructed during FY2009 for inclusion within the future 200-West Area Groundwater Treatment System that is scheduled to go on-line at the end of FY2011. To facilitate the analysis of the large-scale hydrologic test performed at newly constructed extraction well 299-W15-225 (C7017; also referred to as EW-1 in some planning documents), the existing 200-ZP-1 interim pump-and-treat system was completely shut-down ~1 month before the performance of the large-scale hydrologic test. Specifically, this report 1) applies recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of hydrologic test and pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses for a preliminary determination of large-scale hydraulic properties, and 3) provides an assessment of the vertical distribution of hydraulic conductivity in the vicinity of newly constructed extraction well 299-W15-225. The hydrologic characterization approach presented in this report is expected to have universal application for meeting the characterization needs at other remedial action sites located within unconfined and confined aquifer systems.

54 ENVIRONMENTAL SCIENCES↗

Experimental results on plasma interactions with large surfaces at high voltages

Multikilowatt power levels for future payloads can be more efficiently generated using solar arrays operating in the kilovolt range. This implies that large areas of the array at high operating voltages will be exposed to the space plasma environment. The resulting interactions of these high voltage surfaces with space plasma environments can seriously impact the performance of the satellite system. The plasma-surface interaction phenomena were studied in tests performed in two separate vacuum chambers, a 4.6 m diameter by 19.2 long chamber and a 20 m diameter by 27.4 m long chamber. The generated plasma density was approximately 1x10 to the 4th power/cu cm. Ten solar array panels, each with areas of 1400 sq cm were used in the tests. Nine of the solar panels were tested as a composite unit in the form of a 3x3 solar panel matrix. The results from all the tests confirmed small sample tests results: insulators were found to enhance the plasma coupling current for high positive bias and arcing was found to occur at high negative bias.

Grier, N. T.↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies, LLC. The DQO process has been used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each Railroad Tracks CAS in CAU 539. The following text summarizes the SAFER activities that will support the closure of CAU 539: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect in situ dose measurements. • Collect environmental samples from designated target populations (e.g., lead bricks) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish no further action as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC is present at a CAS, NNES will consult NDEP to determine the path forward, then either: • Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or • Establish closure in place as the corrective action and implement the appropriate use restrictions.

54 ENVIRONMENTAL SCIENCES↗

Progress of the Mars Array Technology Experiment (MATE) on the 2001 Lander

NASA is planning missions to Mars every two years until 2010, these missions will rely on solar power. Sunlight on the surface of Mars is altered by airborne dust and fluctuates from day to day. The MATE flight experiment was designed to evaluate solar cell performance and will fly on the Mars 2001 surveyor Lander as part of the Mars In-Situ Propellant Production Precursor (MIP) package. MATE will measure several solar cell technologies and characterize the Martian environment's solar power. This will be done by measuring full IV curvers on solar cells, direct and global insolation, temperature, and spectral content. The lander is scheduled to launch in April 2001 and arrive on Mars in January of 2002. The site location has not been identified but will be near the equator, is a powered landing, and is baselined for 90 sols. The intent of this paper is to provide a brief overview of the MATE experiment and progress to date. The MATE Development Unit (DU) hardware has been built and has completed testing, work is beginning in the Qualification Unit which will start testing later this year, Flight Hardware is to be delivered next spring.

Scheiman, David A.↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 1958 Nuclear Test Moratorium

Against the backdrop of international concern about radioactive fallout, the United States, the Soviet Union, and Great Britain agreed to a moratorium on nuclear testing. Neither monitored nor enforceable, the moratorium was not much more than a gentleman’s agreement. Nonetheless, it proved remarkedly durable, beginning on October 31, 1958, and lasting until September 1961. After France began nuclear testing in 1960, followed by the shooting down of an American U-2 spy plane over Soviet air space, and a failed summit meeting of international leaders, the Soviet Union resumed testing. The United States followed shortly thereafter.

99 GENERAL AND MISCELLANEOUS↗

Field Evaluation of the Performance of the RTU Challenge Unit: Daikin Rebel

This report documents the testing of a state-of-art packaged rooftop unit (RTU) (HVAC) and a standard reference unit in the field and compares the seasonal efficiency of the two units.The goal of the RTU Challenge demonstration was to estimate the seasonal performance of the RTU Challenge unit and the annual savings that could be achieved by installing the challenge unit instead of an alternate standard unit. The demonstration took place at two grocery stores located in New Smyrna Beach and Port Orange, Florida. The Rebel unit was installed as a replacement of an existing unit in July 2013 at the New Smyrna Beach store. The reference unit was an existing rooftop unit in the Port Orange store that is about 6 years old. The reference unit had two compressors for staged cooling and a constant-speed supply fan. Both units had the same rated cooling capacity of 7.5 tons and served each store’s office spaces with similar footprints.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SDU7 Interior Liner Testing & Evaluation

The Saltstone Disposal Unit 7 (SDU7) project requested the Savannah River National Laboratory (SRNL), Materials Science & Engineering (MS&E) organization to evaluate an alternative bromobutyl liner and adhesives for potential use in SDU7 based on applicable ASTM testing standards. SRNL performed similar testing for the liner system used in SDU6. Bonded and non-bonded samples of the alternative liner (Blair Rubber Marflex™ RCHB60HT) were subjected to specific ASTM tests after immersion in two Saltstone leachate simulants, designated S1 and S2, for 1000 hours at 60 °C. Immersion exposures were performed at the Savannah River Ecology Laboratory (SREL). Post-immersion testing involved mechanical property and hardness testing of base material, lap-shear testing of bonded samples and rubber-to-concrete paver interrogation. The liner exhibited an approximate 40% drop in tensile strength and 25% drop in elongation at failure from baseline values after immersion, though final values are comparable to previous SDU6 liner values and are within liner manufacturer property ranges. Overall lap-shear strength behavior of the four adhesives showed a similar pattern, with short-term reduction and subsequent increase in peak load values. However, ranking of adhesives varied with the metric used for comparison. Two of the four adhesives tested (Normac 900 and REMA SC 4000) showed overall better behavior, collectively considering immersion performance, lap-shear data and bonded paver interrogation. Lap-shear samples bonded with the REMA adhesive showed the best combination of final retained bond strength, 6-week average bond strength and bond failure mode. Only one paver (REMA SC4000) was noted to have no defects after immersion. This document details the testing performed and provides conclusions and recommendations. The testing suggests that SDU liner performance is highly dependent upon seam integrity, which collectively depends on a combination of adhesive properties, installation workmanship and inspection/quality control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A miniature tactical Rb frequency standard

Work on an innovative design for miniature rubidium frequency standards has reached the pre-production demonstration stage at Litton Guidance and Control Systems. Pre-production units were built and tested under contract to the Rome Air Development Center of the U.S. Air Force Systems Command. The units, which are designed for use in tactical military applications, feature fast warm-up, low power consumption, and vibration insensitivity. The output stability under vibration is maintained without the need for external shock-mounts. The design objectives and test results are discussed.

Kwon, T. M.↗

Alstom's Chemical Looping Combustion Prototype for CO 2 Capture from Existing Pulverized Coal-Fired Power Plants

Alstom’s Limestone Chemical Looping (LCL™) process has the potential to capture CO 2 from new and existing coal-fired power plants while maintaining high plant power generation efficiency. This new power plant concept is based on a hybrid combustion- gasification process utilizing high temperature chemical and thermal looping technology. This process could also be potentially configured as a hybrid combustion-gasification process producing a syngas or hydrogen for various applications while also producing a separate stream of CO 2 for use or sequestration. The targets set for this technology is to capture over 90% of the total carbon in the coal at cost of electricity which is less than 20% greater than Conventional PC or CFB units. Previous work with bench scale test and a 65 kWt Process Development Unit Development (PDU) has validated the chemistry required for the chemical looping process and provided for the investigation of the solids transport mechanisms and design requirements. The objective of this project is to continue development of the combustion option of chemical looping (LCL-C™) by designing, building and testing a 3 MWt prototype facility. The prototype includes all of the equipment that is required to operate the chemical looping plant in a fully integrated manner with all major systems in service. Data from the design, construction, and testing will be used to characterize environmental performance, identify and address technical risks, reassess commercial plant economics, and develop design information for a demonstration plant planned to follow the proposed Prototype. A cold flow model of the prototype will be used to predict operating conditions for the prototype and help in operator training. Operation of the prototype will provide operator experience with this new technology and performance data of the LCL-C™ process, which will be applied to the commercial design and economics and plan for a future demonstration plant.

20 FOSSIL-FUELED POWER PLANTS↗

Addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (Rev. 0)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.

54 ENVIRONMENTAL SCIENCES↗

Addendum to Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada

This addendum to the CR for CAU 98, Frenchman Flat, NNSS, Nevada (compiled in DOE/EMNV, 2019) defines the long-term monitoring approach after a five-year evaluation of water sampling results, water-level measurements, and trends in water-level measurements. The approach was developed by Navarro and discussed in the report Corrective Action Unit 98: Frenchman Flat Five-Year Evaluation Nevada National Security Site, Nevada (DOE/EMNV, 2022), which was approved by NDEP. Sections 4.0 and 5.0 of the CR were rewritten to reflect the approach discussed in the five-year evaluation. Appendix C contains well construction diagrams that have been updated since the original CR was published. Appendix D contains updated Use Restriction (UR) forms and maps. NDEP requested an addendum instead of a complete revision to the Frenchman Flat CR so the history of the CR would not be lost.

54 ENVIRONMENTAL SCIENCES↗

Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.