Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy conservation code”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,391 records · Page 78

CO2 MONITORING FOR DEMAND CONTROLLED VENTILATION IN COMMERCIAL BUILDINGS

Carbon dioxide (CO{sub 2}) sensors are often deployed in commercial buildings to obtain CO{sub 2} data that are used, in a process called demand-controlled ventilation, to automatically modulate rates of outdoor air ventilation. The objective is to keep ventilation rates at or above design specifications and code requirements and also to save energy by avoiding excessive ventilation rates. Demand controlled ventilation is most often used in spaces with highly variable and sometime dense occupancy. Reasonably accurate CO{sub 2} measurements are needed for successful demand controlled ventilation; however, prior research has suggested substantial measurement errors. Accordingly, this study evaluated: (a) the accuracy of 208 CO{sub 2} single-location sensors located in 34 commercial buildings, (b) the accuracy of four multi-location CO{sub 2} measurement systems that utilize tubing, valves, and pumps to measure at multiple locations with single CO{sub 2} sensors, and (c) the spatial variability of CO{sub 2} concentrations within meeting rooms. The field studies of the accuracy of single-location CO{sub 2} sensors included multi-concentration calibration checks of 90 sensors in which sensor accuracy was checked at multiple CO{sub 2} concentrations using primary standard calibration gases. From these evaluations, average errors were small, -26 ppm and -9 ppm at 760 and 1010 ppm, respectively; however, the averages of the absolute values of error were 118 ppm (16%) and 138 ppm (14%), at concentrations of 760 and 1010 ppm, respectively. The calibration data are generally well fit by a straight line as indicated by high values of R{sup 2}. The Title 24 standard specifies that sensor error must be certified as no greater than 75 ppm for a period of five years after sensor installation. At 1010 ppm, 40% of sensors had errors greater than {+-}75 ppm and 31% of sensors has errors greater than {+-}100 ppm. At 760 ppm, 47% of sensors had errors greater than {+-}75 ppm and 37% of sensors had errors greater than {+-}100 ppm. A significant fraction of sensors had errors substantially larger than 100 ppm. For example, at 1010 ppm, 19% of sensors had an error greater than 200 ppm and 13% of sensors had errors greater than 300 ppm. The field studies also included single-concentration calibration checks of 118 sensors at the concentrations encountered in the buildings, which were normally less than 500 ppm during the testing. For analyses, these data were combined with data from the calibration challenges at 510 ppm obtained during the multi-concentration calibration checks. For the resulting data set, the average error was 60 ppm and the average of the absolute value of error was 154 ppm. Statistical analyses indicated that there were statistically significant differences between the average accuracies of sensors from different manufacturers. Sensors with a 'single lamp single wavelength' design tended to have a statistically significantly smaller average error than sensors with other designs except for 'single lamp dual wavelength' sensors, which did not have a statistically significantly lower accuracy. Sensor age was not consistently a statistically significant predictor of error.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of an Integrated Residential Heating, Ventilation, Cooling, and Dehumidification System for Residences

The Need and the Opportunity Codes such as ASHRAE 90.2 and IECC, and programs such as Energy Star and Builders Challenge, are causing new homes to be built to higher performance standards. As a result sensible cooling loads in new homes are going down, but indoor air quality prerogatives are causing ventilation rates and moisture loads to increase in humid climates. Conventional air conditioners are unable to provide the low sensible heat ratios that are needed to efficiently cool and dehumidify homes since dehumidification potential is strongly correlated with cooling system operating hours. The project team saw an opportunity to develop a system that is at least as effective as a conventional air conditioner plus dehumidifier, removes moisture without increasing the sensible load, reduces equipment cost by integrating components, and simplifies installation. Project Overview Prime contractor Davis Energy Group led a team in developing an Integrated Heating, Ventilation, Cooling, and Dehumidification (I-HVCD) system under the DOE SBIR program. Phase I and II SBIR project activities ran from July 2003 through December 2007. Tasks included: (1) Mechanical Design and Prototyping; (2) Controls Development; (3) Laboratory and Field Testing; and (4) Commercialization Activities Technology Description. Key components of the prototype I-HVCD system include an evaporator coil assembly, return and outdoor air damper, and controls. These are used in conjunction with conventional components that include a variable speed air handler or furnace, and a two-stage condensing unit. I-HVCD controls enable the system to operate in three distinct cooling modes to respond to indoor temperature and relative humidity (RH) levels. When sensible cooling loads are high, the system operates similar to a conventional system but varies supply airflow in response to indoor RH. In the second mode airflow is further reduced, and the reheat coil adds heat to the supply air. In the third mode, the reheat coil adds additional heat to maintain the supply air temperature close to the return air temperature (100% latent cooling). Project Outcomes Key Phase II objectives were to develop a pre-production version of the system and to demonstrate its performance in an actual house. The system was first tested in the laboratory and subsequently underwent field-testing at a new house in Gainesville, Florida. Field testing began in 2006 with monitoring of a 'conventional best practices' system that included a two stage air conditioner and Energy Star dehumidifier. In September 2007, the I-HVCD components were installed for testing. Both systems maintained uniform indoor temperatures, but indoor RH control was considerably better with the I-HVCD system. The daily variation from average indoor humidity conditions was less than 2% for the I-HVCD vs. 5-7% for the base case system. Data showed that the energy use of the two systems was comparable. Preliminary installed cost estimates suggest that production costs for the current I-HVCD integrated design would likely be lower than for competing systems that include a high efficiency air conditioner, dehumidifier, and fresh air ventilation system. Project Benefits This project verified that the I-HVCD refrigeration compacts are compact (for easy installation and retrofit) and can be installed with air conditioning equipment from a variety of manufacturers. Project results confirmed that the system can provide precise indoor temperature and RH control under a variety of climate conditions. The I-HVCD integrated approach offers numerous benefits including integrated control, easier installation, and reduced equipment maintenance needs. Work completed under this project represents a significant step towards product commercialization. Improved indoor RH control and fresh air ventilation are system attributes that will become increasingly important in the years ahead as building envelopes improve and sensible cooling loads continue to fall. Technologies like I-HVCD will be instrumental in meeting goals set by Building America and other programs to reduce energy use while improving the indoor environment. Next Steps The following steps are needed to bring the product to commercialization: (1) Value engineering to reduce costs; (2) Addition of zoning capability to improve marketability; (3) Fabrication and testing of additional prototypes; and (4) Identification of a manufacturer. Initial efforts to interest large air conditioner manufacturers has shown some interest, but the preferred path to market may be to employ a boutique manufacturer that markets to HVAC contractors. Distribution of the results of this work will improve opportunities for attracting manufacturers. Additional funding is needed to prepare the product for this final step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of the Repeatability of the Delta Q Duct Leakage Testing TechniqueIncluding Investigation of Robust Analysis Techniques and Estimates of Weather Induced Uncertainty

The DeltaQ test is a method of estimating the air leakage from forced air duct systems. Developed primarily for residential and small commercial applications it uses the changes in blower door test results due to forced air system operation. Previous studies established the principles behind DeltaQ testing, but raised issues of precision of the test, particularly for leaky homes on windy days. Details of the measurement technique are available in an ASTM Standard (ASTM E1554-2007). In order to ease adoption of the test method, this study answers questions regarding the uncertainty due to changing weather during the test (particularly changes in wind speed) and the applicability to low leakage systems. The first question arises because the building envelope air flows and pressures used in the DeltaQ test are influenced by weather induced pressures. Variability in wind induced pressures rather than temperature difference induced pressures dominates this effect because the wind pressures change rapidly over the time period of a test. The second question needs to answered so that DeltaQ testing can be used in programs requiring or giving credit for tight ducts (e.g., California's Building Energy Code (CEC 2005)). DeltaQ modeling biases have been previously investigated in laboratory studies where there was no weather induced changes in envelope flows and pressures. Laboratory work by Andrews (2002) and Walker et al. (2004) found biases of about 0.5% of forced air system blower flow and individual test uncertainty of about 2% of forced air system blower flow. The laboratory tests were repeated by Walker and Dickerhoff (2006 and 2008) using a new ramping technique that continuously varied envelope pressures and air flows rather than taking data at pre-selected pressure stations (as used in ASTM E1554-2003 and other previous studies). The biases and individual test uncertainties for ramping were found to be very close (less than 0.5% of air handler flow) to those found in for the pressure station approach. Walker and Dickerhoff also included estimates of DeltaQ test repeatability based on the results of field tests where two houses were tested multiple times. The two houses were quite leaky (20-25 Air Changes per Hour at 50Pa (0.2 in. water) (ACH50)) and were located in the San Francisco Bay area. One house was tested on a calm day and the other on a very windy day. Results were also presented for two additional houses that were tested by other researchers in Minneapolis, MN and Madison, WI, that had very tight envelopes (1.8 and 2.5 ACH50). These tight houses had internal duct systems and were tested without operating the central blower--sometimes referred to as control tests. The standard deviations between the multiple tests for all four houses were found to be about 1% of the envelope air flow at 50 Pa (0.2 in. water) (Q50) that led to the suggestion of this as a rule of thumb for estimating DeltaQ uncertainty. Because DeltaQ is based on measuring envelope air flows it makes sense for uncertainty to scale with envelope leakage. However, these tests were on a limited data set and one of the objectives of the current study is to increase the number of tested houses. This study focuses on answering two questions: (1) What is the uncertainty associated with changes in weather (primarily wind) conditions during DeltaQ testing? (2) How can these uncertainties be reduced? The first question is addressing issues of repeatability. To study this five houses were tested as many times as possible over a day. Weather data was recorded on-site--including the local windspeed. The result from these five houses were combined with the two Bay Area homes from the previous studies. The variability of the tests (represented by the standard deviation) is the repeatability of the test method for that house under the prevailing weather conditions. Because the testing was performed over a day a wide range of wind speeds was achieved following typical diurnal variations of low wind in the early morning and greatest winds in the late afternoon/early evening. Typically about ten tests were performed in each house. To answer the second question, different data analysis techniques were investigated that looked at averaging techniques, elimination of outliers, limiting leak pressures, etc. in order to minimize the influence of changing wind conditions during the test. The objective was to find a reasonable compromise between test precision and robustness--because many of the changes to the analysis to make the test more robust limit its ability to examine wide ranges of pressures and leakage flows. A secondary goal of this study is to show that DeltaQ uncertainties are acceptable for testing low leakage systems. Therefore houses with low duct leakage were deliberately chosen to be tested.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗