Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

Digital avionics - The best is yet to come

The history and background of digital avionics and the possibilities for the future are reviewed. There are payoffs in many areas from digital avionics; however, the ultimate benefits are increased mission effectiveness and lower costs. Two major U.S. Air Force avionics programs designed to increase mission effectiveness are reviewed. Major barriers to the expanded use of digital avionics in civil transports as a means to lower operating costs are examined. The paper also examines lightning effects, architectures, optical components, displays, and voice-interactive control, which are current research areas that promise to yield significant advances for digital avionics systems.

Spitzer, C. R.↗

Facility Activation and Characterization for IPD Workhorse Preburner and Oxidizer Turbopump Hot-Fire Testing at NASA Stennis Space Center

The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.

Sass, J. P.↗

Facility Activation and Characterization for IPD Oxidizer Turbopump Cold-Flow Testing at NASA Stennis Space Center

The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) cold-flow test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in November 2001. A total of 11 IPD OTP cold-flow tests were completed. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and the cold-flow testing of the IPD OTP. In addition, some of the facility challenges encountered during the test project are addressed.

Sass, J. P.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Designing a Better Spacecraft: Assessing Flight Operability of Human Rated Spacecraft

The design of a human rated spacecraft is a complex and costly process requiring the integrated assessment of many individual criteria. Historically, it has been difficult to include in that integrated assessment the design s full impact on the flight operations community and its costs. The unique "operability requirements" have not been well understood, nor has there been a well-defined set of criteria for assessing operability. As a result, flight operations organizations and program managers are often faced with difficult and costly operations phase implementations. In response, the Mission Operations Directorate at NASA s Lyndon B. Johnson Space Center has established a formal technique to evaluate and communicate the operational characteristics of spacecraft system designs for the Constellation Program. This process is not intended to replace or replicate other critical assessments such as risk, reliability and safety assessments. Instead, this new technique adds to the assessment toolset a means to address the concerns and potential cost drivers that are unique to the operational phase of a program and the flight operations community. This paper describes the implementation and application of this "Spacecraft Flight Operability Assessment Scale" in supporting vehicle design efforts. The six key factors of flight operability are defined, with guiding principles and goals stated for each factor. A standardized rating technique provides feedback that is useful to both the operations and program management communities. Sample assessments of legacy spacecraft, including the Space Shuttle and International Space Station systems, are provided to provide real world examples of this technique s application.

Crocker, Alan R.↗

Maintainability Program Requirements for Space Systems

This document is established to provide common general requirements for all NASA programs to: design maintainability into all systems where maintenance is a factor in system operation and mission success; and ensure that maintainability characteristics are developed through the systems engineering process. These requirements are not new. Design for ease of maintenance and minimization of repair time have always been fundamental requirements of the systems engineering process. However, new or reusable orbital manned and in-flight maintainable unmanned space systems demand special emphasis on maintainability, and this document has been prepared to meet that need. Maintainability requirements on many NASA programs differ in phasing and task emphasis from requirements promulgated by other Government agencies. This difference is due to the research and development nature of NASA programs where quantities produced are generally small; therefore, the depth of logistics support typical of many programs is generally not warranted. The cost of excessive maintenance is very high due to the logistics problems associated with the space environment. The ability to provide timely maintenance often involves safety considerations for manned space flight applications. This document represents a basic set of requirements that will achieve a design for maintenance. These requirements are directed primarily at manned and unmanned orbital space systems. To be effective, maintainability requirements should be tailored to meet specific NASA program and project needs and constraints. NASA activities shall invoke the requirements of this document consistent with program planning in procurements or on inhouse development efforts.

Source record↗

Apollo/Skylab suit program-management systems study, volume 1

A management systems study for future spacesuit programs was conducted to assess past suit program requirements and management systems in addition to new and modified systems in order to identify the most cost effective methods for use during future spacesuit programs. The effort and its findings concerned the development and production of all hardware ranging from crew protective gear to total launch vehicles.

Mcniff, M.↗

Life-cycle costs of high-performance cells

A life cycle cost analysis of high efficiency cells was presented. Although high efficiency cells produce more power, they also cost more to make and are more susceptible to array hot-spot heating. Three different computer analysis programs were used: SAMICS (solar array manufacturing industry costing standards), PVARRAY (an array failure mode/degradation simulator), and LCP (lifetime cost and performance). The high efficiency cell modules were found to be more economical in this study, but parallel redundancy is recommended.

Daniel, R.↗

Precision Casting via Advanced Simulation and Manufacturing

A two-year program was conducted to develop and commercially implement selected casting manufacturing technologies to enable significant reductions in the costs of castings, increase the complexity and dimensional accuracy of castings, and reduce the development times for delivery of high quality castings. The industry-led R&D project was cost shared with NASA's Aerospace Industry Technology Program (AITP). The Rocketdyne Division of Boeing North American, Inc. served as the team lead with participation from Lockheed Martin, Ford Motor Company, Howmet Corporation, PCC Airfoils, General Electric, UES, Inc., University of Alabama, Auburn University, Robinson, Inc., Aracor, and NASA-LeRC. The technical effort was organized into four distinct tasks. The accomplishments reported herein. Task 1.0 developed advanced simulation technology for core molding. Ford headed up this task. On this program, a specialized core machine was designed and built. Task 2.0 focused on intelligent process control for precision core molding. Howmet led this effort. The primary focus of these experimental efforts was to characterize the process parameters that have a strong impact on dimensional control issues of injection molded cores during their fabrication. Task 3.0 developed and applied rapid prototyping to produce near net shape castings. Rocketdyne was responsible for this task. CAD files were generated using reverse engineering, rapid prototype patterns were fabricated using SLS and SLA, and castings produced and evaluated. Task 4.0 was aimed at developing technology transfer. Rocketdyne coordinated this task. Casting related technology, explored and evaluated in the first three tasks of this program, was implemented into manufacturing processes.

Source record↗

NASA Project Constellation Systems Engineering Approach

NASA's Office of Exploration Systems (OExS) is organized to empower the Vision for Space Exploration with transportation systems that result in achievable, affordable, and sustainable human and robotic journeys to the Moon, Mars, and beyond. In the process of delivering these capabilities, the systems engineering function is key to implementing policies, managing mission requirements, and ensuring technical integration and verification of hardware and support systems in a timely, cost-effective manner. The OExS Development Programs Division includes three main areas: (1) human and robotic technology, (2) Project Prometheus for nuclear propulsion development, and (3) Constellation Systems for space transportation systems development, including a Crew Exploration Vehicle (CEV). Constellation Systems include Earth-to-orbit, in-space, and surface transportation systems; maintenance and science instrumentation; and robotic investigators and assistants. In parallel with development of the CEV, robotic explorers will serve as trailblazers to reduce the risk and costs of future human operations on the Moon, as well as missions to other destinations, including Mars. Additional information is included in the original extended abstract.

Dumbacher, Daniel L.↗

The ubiquitous solar electric propulsion stage

Mission analyses indicate there are several near-term interplanetary missions that cannot be performed with any degree of sophistication without electric propulsion. Cost and performance benefits are suggested when this same technology is included in the Shuttle-based earth-orbital transportation system. Specific earth-orbital payload programs gain from increased weight allowances, decreased costs through simplification, and reduced numbers of spacecraft due to on-orbit servicing. More ambitious mission planners looking toward space industrialization will find uses ranging from GSO debris clearance to a versatile support element for a multipurpose manned space station.

Austin, R. E.↗

The application of remote sensing to resource management and environmental quality programs in Kansas

The activities of the Kansas Applied Remote Sensing (KARS) Program during the period April 1, 1982 through Marsh 31, 1983 are described. The most important work revolved around the Kansas Interagency Task Force on Applied Remote Sensing and its efforts to establish an operational service oriented remote sensing program in Kansas state government. Concomitant with this work was the upgrading of KARS capabilities to process data for state agencies through the vehicle of a low cost digital data processing system. The KARS Program continued to take an active role in irrigation mapping. KARS is now integrating data acquired through analysis of LANDSAT into geographic information systems designed for evaluating groundwater resources. KARS also continues to work at the national level on the national inventory of state natural resources information systems.

Barr, B. G.↗

SolSmart Technical Assistance Provider (Final Technical Report)

The SolSmart program was established in late 2015 to “establish a prominent national recognition and technical assistance program for local governments that will signal to installers and the public that a community is receptive to solar businesses and has established a supportive solar market environment. This, in turn, will reduce market barriers and lower soft costs, thus contributing to SunShot goals. The program will also assist communities who are just beginning to improve their solar markets.” By March 31, 2022 (the grant end date), the SolSmart Team designated 460 communities, more than 50% more than the initial program objective of 300 communities. The designated communities represent 42 states, the District of Columbia, the U.S. Virgin Islands, and Puerto Rico. The SolSmart team developed and revised criteria representing best practices for local governments; recruited, trained, evaluated, and mentored communities to incorporate these best practices; and disseminated resources about solar and solar-related technologies as well as the newest best practices on a regular basis. 98% of local government officials who participated in the program said that SolSmart increased their knowledge of solar energy. The SolSmart program had both real and perceived tangible impacts on barriers to solar adoption in designated communities. Significantly, the time to permit a solar installation decreased by 7.5 days on average. This reduced the soft costs for both the solar installer (and therefore the customer) and the local government. The result is that solar installations in SolSmart communities increased by 17% per month compared with similar non-SolSmart communities. Larger and wealthier communities were more likely to pursue SolSmart designation and earn more points within SolSmart. As a result, IREC/TSF developed strategies to reach underserved communities and created new resources to help them more easily achieve designation, as described below. In the last year of the Award, 44% of designated communities were underserved, compared with 31% in the earlier years of the program. DOE issued two awards for SolSmart: the SolSmart Technical Assistance Provider (TAP), led by The Solar Foundation (TSF) which has since merged with the Interstate Renewable Energy Council (IREC), and the Designation Program Administrator (DPA), led by the International City/County Management Association (ICMA). IREC was lead for the TAP project and, until the time of TSF/IREC merger, was a subrecipient on the DPA project. These two projects were interdependent; one could not exist without the other. While this report will focus on the work performed by the TAP, it will be impossible to speak of this without talking about the successes, impacts, and benefits of the overall SolSmart program.

14 SOLAR ENERGY↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

LSSA (Low-cost Silicon Solar Array) project

The Photovoltaic Conversion Program was established to find methods of economically generating enough electrical power to meet future requirements. Activities and progress in the following areas are discussed: silicon-refinement processes; silicon-sheet-growth techniques; encapsulants; manufacturing of off-the-shelf solar arrays; and procurement of semistandardized solar arrays.

Source record↗

SEATSAT programs option analysis

A preliminary analysis of the costs of SEASAT follow-on options is presented. All the options assume the existence of SEASAT-A as currently defined in the SEASAT Economic Assessment. It is assumed that each option will continue through the year 2000 and approach operational system status in the 1983-1986 period, depending upon the sensor package selected. The launch vehicle assumed through 1983 is the Atlas Agena. After 1983, it is assumed SEASAT-A will switch to the use of the Space Shuttle. All cost estimates are 1976 dollars for fiscal year cost accounting, with no inflation rate included.

Luckl, L.↗

Low Angle Silicon Sheet Growth. Large Area Silicon Sheet Task Low Cost Solar Array Project

The results of a program to demonstrate the feasibility of a low angle silicon ribbon growth process are described. Twenty-six experimental runs were performed. Ribbons were grown at pull rates from 5 to 68 cm/min. Ribbon lengths up to 74 cm were grown while widths varied from 5 to 25 mm. Thicknesses varied from 0.6 to 2.5 mm, with typical values of about 1 mm.