Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

MRSR: Rationale for a Mars Rover/Sample Return mission

The Solar System Exploration Committee of the NASA Advisory Council has recommended that a Mars Rover/Sample Return mission be launched before the year 2000. The recommendation is consistent with the science objectives as outlined by the National Academy of Sciences committees on Planetary and Lunar Exploration, and Planetary Biology and Chemical Evolution. Interest has also focused on Mars Rover/Sample Return (MRSR) missions, because of their crucial role as precursors for human exploration. As a result of this consensus among the advisory groups, a study of an MRSR mission began early in 1987. The study has the following goals: (1) to assess the technical feasibility of the mission; (2) to converge on two or three options for the general architecture of the mission; (3) to determine what new technologies need to be developed in order to implement the mission; (4) to define the different options sufficiently well that preliminary cost estimates can be made; and (5) to better define the science requirements. This chapter briefly describes Mars Rover/Sample Return missions that were examined in the late 1980s. These missions generally include a large (1000 kg) rover and return of over 5 kg of sample.

Carr, Michael H.↗

What is a system? NASA's phased project description

NASA phase A and B projects are addressed. The Phase A study is the preliminary analysis of a space concept. These concepts could have come from a pre-Phase A study or from other sources within or external to NASA. The majority of concepts that are studied at MSFC are assigned by NASA Headquarters and funded accordingly. The overall program schedule depicts important milestones that establish the start and finish dates of each study phase, including design, development, launch, and operations. The Phase B of the project consists of the refinement of preliminary requirements, cost estimates, schedules and risk assessments prior to starting final design and development. The goal of a concept definition activity is to determine the best and most feasible concept(s) that will satisfy the mission and science requirements.

Source record↗

High-speed transpacific passenger flight

The design task of high-speed passenger flight across the Pacific Ocean was addressed by four design teams of eight students each. Two teams examined hypersonic flight (Mach greater than 5) and two teams studied supersonic flight (Mach = 3). The specific task of the aircraft was to transport at least 250 passengers 6500 nautical miles while operating from airport runways of 15,000 feet. Four design concepts evolved; the supersonic designs--one a variable-sweep oblique wing and the other a cranked-arrow wing--use conventional turbine engines and liquid hydrocarbon fuels. The two hypersonic configurations, one with a variable-sweep wing and the other with a fixed, swept-wing planform, employ methane fueled, variable-cycle turbojet/ramjet propulsion systems. Both supersonic aircraft weigh less than 700,000 lbs at takeoff, while the variable-geometry hypersonic airplane is the heaviest at 1,100,000 lbs and weighs 170,000 lbs more than the fixed-wing hypersonic design. All the conceptual designs are shown to perform the transport mission, although development and operating cost estimates favor the supersonic designs over the hypersonic configurations.

Source record↗

Issues in NASA program and project management

This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Low Power Ground-Based Laser Illumination for Electric Propulsion Applications

A preliminary evaluation of low power, ground-based laser powered electric propulsion systems is presented. A review of available and near-term laser, photovoltaic, and adaptive optic systems indicates that approximately 5-kW of ground-based laser power can be delivered at an equivalent one-sun intensity to an orbit of approximately 2000 km. Laser illumination at the proper wavelength can double photovoltaic array conversion efficiencies compared to efficiencies obtained with solar illumination at the same intensity, allowing a reduction in array mass. The reduced array mass allows extra propellant to be carried with no penalty in total spacecraft mass. The extra propellant mass can extend the satellite life in orbit, allowing additional revenue to be generated. A trade study using realistic cost estimates and conservative ground station viewing capability was performed to estimate the number of communication satellites which must be illuminated to make a proliferated system of laser ground stations economically attractive. The required number of satellites is typically below that of proposed communication satellite constellations, indicating that low power ground-based laser beaming may be commercially viable. However, near-term advances in low specific mass solar arrays and high energy density batteries for LEO applications would render the ground-based laser system impracticable.

Lapointe, Michael R.↗

Minuteman 2 launched small satellite

The goal of LEOSat Industries' Spring 1994 project was to design a small satellite that has a strong technology demonstration or scientific justification and incorporates a high level of student involvement. The satellite is to be launched into low earth orbit by the converted Minuteman 2 satellite launcher designed by Minotaur Designs, Inc. in 1993. The launch vehicle shroud was modified to a height of 90 inches, a diameter of 48 inches at the bottom and 35 inches at the top for a total volume of 85 cubic feet. The maximum allowable mass of the payload is about 1100 lb., depending on the launch site, orbit altitude, and inclination. The satellite designed by LEOSat Industries is TerraSat, a remote-sensing satellite that will provide information for use in space-based earth studies. It will consist of infrared and ultraviolet/visible sensors similar to the SDI-developed sensors being tested on Clementine. The sensors will be mounted on the Defense Systems, Inc. Standard Satellite-1 spacecraft bus. LEOSat has planned for two satellites orbiting the Earth with trajectories similar to that of LANDSAT 5. The semi-major axis is 7080 kilometers, the eccentricity is 0, and the inclination is 98.2 degrees. The estimated mass of TerraSat is 145 kilograms and the estimated volume is 1.8 cubic meters. The estimated cost of TerraSat is $13.7 million. The projected length of time from assembly of the sensors to launch of the spacecraft is 13 months.

Chan, Sunny↗

Stratospheric Observatory For Infrared Astronomy (SOFIA). Phase A: System concept description

Infrared astronomers have made significant discoveries using the NASA/Ames Research Center C-141 Kuiper airborne Observatory (KAO) with its 0.91-meter telescope. The need for a 3-meter class airborne observatory has been established to improve astronomy data gathering capability. The new system envisioned by NASA and the international community of astronomers will be known as the Stratospheric Observatory for Infrared Astronomy (SOFIA). The platform of choice for SOFIA is a modified Boeing 747SP. SOFIA is viewed as a logical progression from the KAO. Potentially, a 3-meter telescope operating at the altitude achievable by the 747SP aircraft can be 11 times more sensitive than the KAO, can have 3.3 times better angular resolution, and will allow observations of compact sources in a volume of space up to 36 times that of the KAO. The KAO has enabled detection of about 15 percent of the far infrared IRAS survey point-sources; SOFIA should be able to detect them all. This document presents the results of in-house ARC and contracted concept definition studies for SOFIA. Using the ARC-based Kuiper Airborne Observatory as a basis for both SOFIA design and operations concepts, the SOFIA system concept has been developed with a view toward demonstrating mission and technical feasibility, and preparing preliminary cost estimates. The reference concept developed is not intended to represent final design, and should be treated accordingly. The most important products of this study, other than demonstration of system feasibility, are the understanding of system trade-offs and the development of confidence in the technology base that exists to move forward with a program leading to implementation of the Stratospheric Observatory for Infrared Astronomy (SOFIA).

Source record↗

Issues in NASA program and project management

This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract: Technical Results - Volume 2

The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

Source record↗

Renaissance: A revolutionary approach for providing low-cost ground data systems

The NASA is changing its attention from large missions to a greater number of smaller missions with reduced development schedules and budgets. In relation to this, the Renaissance Mission Operations and Data Systems Directorate systems engineering process is presented. The aim of the Renaissance approach is to improve system performance, reduce cost and schedules and meet specific customer needs. The approach includes: the early involvement of the users to define the mission requirements and system architectures; the streamlining of management processes; the development of a flexible cost estimation capability, and the ability to insert technology. Renaissance-based systems demonstrate significant reuse of commercial off-the-shelf building blocks in an integrated system architecture.

Butler, Madeline J.↗

Reduction of Aircraft Cruise Drag By Using Boundary Layer Heating To Minimize Fuselage Skin Friction

The data reduction and results of the F-15B Flight Test Fixture experiment conducted at NASA Dryden are discussed. In addition, the feasibility of using the Orbital Sciences L-1011 was studied and a cost estimate prepared. Initial discussions have begun with Edwards Flight Research to explore the possibility of using their T-39 aircraft for the second flight experiment.

Kramer, Brian R.↗

Rain Fade Compensation for Ka-Band Communications Satellites

This report provides a review and evaluation of rain fade measurement and compensation techniques for Ka-band satellite systems. This report includes a description of and cost estimates for performing three rain fade measurement and compensation experiments. The first experiment deals with rain fade measurement techniques while the second one covers the rain fade compensation techniques. The third experiment addresses a feedback flow control technique for the ABR service (for ATM-based traffic). The following conclusions were observed in this report; a sufficient system signal margin should be allocated for all carriers in a network, that is a fixed clear-sky margin should be typically in the range of 4-5 dB and should be more like 15 dB in the up link for moderate and heavy rain zones; to obtain a higher system margin it is desirable to combine the uplink power control technique with the technique that implements the source information rate and FEC code rate changes resulting in a 4-5 dB increase in the dynamic part of the system margin. The experiments would assess the feasibility of the fade measurements and compensation techniques, and ABR feedback control technique.

Mitchell, W. Carl↗

Cost and Economics for Advanced Launch Vehicles

Market sensitivity and weight-based cost estimating relationships are key drivers in determining the financial viability of advanced space launch vehicle designs. Due to decreasing space transportation budgets and increasing foreign competition, it has become essential for financial assessments of prospective launch vehicles to be performed during the conceptual design phase. As part of this financial assessment, it is imperative to understand the relationship between market volatility, the uncertainty of weight estimates, and the economic viability of an advanced space launch vehicle program. This paper reports the results of a study that evaluated the economic risk inherent in market variability and the uncertainty of developing weight estimates for an advanced space launch vehicle program. The purpose of this study was to determine the sensitivity of a business case for advanced space flight design with respect to the changing nature of market conditions and the complexity of determining accurate weight estimations during the conceptual design phase. The expected uncertainty associated with these two factors drives the economic risk of the overall program. The study incorporates Monte Carlo simulation techniques to determine the probability of attaining specific levels of economic performance when the market and weight parameters are allowed to vary. This structured approach toward uncertainties allows for the assessment of risks associated with a launch vehicle program's economic performance. This results in the determination of the value of the additional risk placed on the project by these two factors.

Whitfield, Jeff↗

Technology Demonstrator for Direct Polishing of a 50cm C/SiC Ultra Light Mirror

The NRSU portion of the contract was completed on schedule and within acceptable limits of the estimated cost. The lapping of the substrate started on schedule, and completed ahead of schedule. The polishing of the substrate was begun ahead of schedule, and was completed approximately one month ahead of schedule. It is our opinion that the substrate meets the requirements of "diffraction limited performance at 2 microns" over the measured 16 in. area. The final photos suggest that there may be edge roll-off beyond the 16 in. diameter. However, we cannot quantify this. It is our opinion that this material is suitable for use in lightweight optics as long as cladding of some type is used (Silicon, SiC, Sol-Gel, etc), as the bare material itself is too "porous" to obtain a high quality finish. We feel that this part was at the low limit of structural integrity required to mechanically polish to this level of figure requirement. Any lesser structural integrity would require some form of "non contact" figuring.

Scribner, Ken↗

System Risk Balancing Profiles: Software Component

The Software QA / V&V guide will be reviewed and updated based on feedback from NASA organizations and others with a vested interest in this area. Hardware, EEE Parts, Reliability, and Systems Safety are a sample of the future guides that will be developed. Cost Estimates, Lessons Learned, Probability of Failure and PACTS (Prevention, Avoidance, Control or Test) are needed to provide a more complete risk management strategy. This approach to risk management is designed to help balance the resources and program content for risk reduction for NASA's changing environment.

Kelly, John C.↗

Mapping the Distribution of Wildfire Fuels Using AVIRIS in the Santa Monica Mountains

Catastrophic wildfires, such as the 1990 Painted Cave Fire in Santa Barbara or Oakland fire of 1991, attest to the destructive potential of fire in the wildland/urban interface. For example, during the Painted Cave Fire, 673 structures were consumed over a period of only six hours at an estimated cost of 250 million dollars (Gomes et al., 1993). One of the primary sources of fuels is chaparral, which consists of plant species that are adapted to frequent fires and may actually promote its ignition and spread of through volatile organic compounds in foliage. As one of the most widely distributed plant communities in Southern California, and one of the most common vegetation types along the wildland urban interface, chaparral represents one of the greatest sources of wildfire hazard in the region. An ongoing NASA funded research project was initiated in 1994 to study the potential of AVIRIS for mapping wildfire fuel properties in Southern California chaparral. The project was initiated in the Santa Monica Mountains, an east-west trending range in western Los Angeles County that has experienced extremely high fire frequencies over the past 70 years. The Santa Monica Mountains were selected because they exemplify many of the problems facing the southwest, forming a complex mosaic of land ownership intermixed with a diversity of chaparral age classes and fuel loads. Furthermore, the area has a wide diversity of chaparral community types and a rich background in supporting geographic information including fire history, soils and topography. Recent fires in the Santa Monica Mountains, including several in 1993 and the Calabasas fire of 1996 attest to the active fire regime present in the area. The long term objectives of this project are to improve existing maps of wildland fuel properties in the area, link AVIRIS derived products to fuel models under development for the region, then predict fire hazard through models that simulate fire spread. In this paper, we describe the AVIRIS derived products we are developing to map wildland fuels.

Roberts, Dar↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

Monell, Donald W.↗

Wrong Signs in Regression Coefficients

When using parametric cost estimation, it is important to note the possibility of the regression coefficients having the wrong sign. A wrong sign is defined as a sign on the regression coefficient opposite to the researcher's intuition and experience. Some possible causes for the wrong sign discussed in this paper are a small range of x's, leverage points, missing variables, multicollinearity, and computational error. Additionally, techniques for determining the cause of the wrong sign are given.

McGee, Holly↗