Search NASA⌕ Search

SEARCH · Search NASA

Results for “MEXICO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

A Life Cycle Analysis Perspective of CO2 Enhanced Oil Recovery

This work was presented at the North American Energy Ministers Trilateral CCUS Meeting in Mexico City, Mexico on April 12, 2016. The presentation covers the NETL model of CO2-EOR and an approach to managing the electricity co-product from the system. The GHG emissions of the system are highly dependent on the performance of the reservoir - how much oil is generated for a given amount of CO2, and by the GHG emissions of the source of CO2 relative to other sources of electricity.

Skone, Timothy J.↗

Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diversity and the citizens' advisory board: aligning disparate views for better results - 15469

The Northern New Mexico Citizens' Advisory Board (NNMCAB) is a group of -citizen experts,- i.e., experts on being citizens who take the time and focus their attention to grow more informed about nuclear science, nuclear waste remediation, and environmental monitoring issues. The Board digests complex information associated with these topics in light of the Los Alamos National Laboratory's (LANL) and Department of Energy's (DOE) activities in Northern New Mexico and discusses and conveys this information clearly to a diverse regional stakeholder population that includes a 400+ year old Hispanic culture, a 1,000+ year old Native American pueblo culture, a highly educated scientific and technical community of federal workers and their families, rural agricultural communities, creative/artistic communities, and political and peace activists. Our Board has either representation from each of these diverse New Mexican sectors or enjoys public comment from these sectors. Projects that involve such stakeholder-expert exchanges include remediation of an underground chromium plume, continued investigation and remediation associated with a radiation leak at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, the transport of Transuranic Waste off the Los Alamos 'Hill,- the ultimate disposition of -33 Shafts,- currently in place at Los Alamos National Laboratory, and the distilled voice of the citizen for continued and sufficient federal funding each year for responsible clean-up and monitoring of nuclear activities. Through the NNMCAB's communication venue of regular public meetings, mis-characterization is prevented, public input is incorporated into the official record, and recommendations to the DOE are promulgated. Scientific and technical experts join the bi-monthly NNMCAB meetings and monthly committee meetings to present and discuss current topics. The availability of these experts and their deeper reference materials is key to the interchange, as is the respectful and patient dialogue that exists between board members and the subject matter experts, both in the public forums and between meetings. Meetings are professionally organized and orchestrated to maximize the value of the experts' and board members' participation time. The professional format of the meetings ensures maximum learning and relationship-building which fosters effective channels for public dialogue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Storage and Radioactive Waste Disposal in the United States: A Law and Policy Analysis - 20302

While Congress plays political football, spent nuclear fuel continues to sit in de facto interim nuclear waste storage sites throughout the country. This ad hoc approach - if it can even be called an approach - to nuclear waste management is in no one's best interests, because of financial, safety, environmental, and national security concerns with the status quo. Senate leadership had asserted that an up-or-down vote on the Yucca Mountain Project would take place in September or October 2019, but that did not occur. Rather, a conference bill was agreed to, and it provided that, although the nuclear program should receive some funding, funding was not made available for centralized interim storage ('CIS') or the Yucca Mountain Project. The President's FY2021 Budget Request does not contain any proposed funding for the Yucca Mountain Project ('the Project'). This paper will discuss the implications of that process, both for the Project itself and for the U.S. nuclear waste program more generally. In order to provide context for the current situation, this paper will begin by chronicling the history of U.S. nuclear waste management, from the passage of the Nuclear Waste Policy Act of 1982 and to the present day. It will discuss the roles of the U.S. Department of Energy, the Nuclear Regulatory Commission, federal and state political delegations, and the nuclear energy industry. The paper will then identify key themes that can be expected to affect the future of nuclear waste management in the United States. For example, it will consider whether development of additional CIS facilities is a viable short- to medium-term solution. CIS facilities may relieve immediate pressure at decommissioned or soon-to-be-decommissioned nuclear power plants; but with that pressure partially alleviated, support for building a long-term repository may be reduced. It will also discuss opposition by the State of New Mexico and others to the proposed New Mexico CIS project, based not only on siting concerns but also whether it might become a de facto repository, and whether the State of Texas and others may also be opposed, for similar reasons, to the proposed CIS facility in Texas. Additionally, the paper will examine consent-based siting and its implications for Nevada and other states that are potential hosts for spent nuclear fuel storage and disposal facilities. Further, if the Project is not a politically viable solution, the paper will examine whether it is now time for serious consideration of an alternate location for a permanent repository, as well as consideration of other options entirely, such as deep geologic disposal. The paper will conclude by looking ahead to the 2020 elections. It will describe the positions of candidates (particularly Presidential candidates) on spent nuclear fuel storage and disposal options, without advocating for any particular candidate or political party. Perhaps in 2020, we will at least see a start to a solution to the seemingly intractable problem of nuclear waste management in the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AZTRAN and AZKIND verification with a BWR study case

The AZTLAN Platform project is a national initiative led by the National Institute of Nuclear Research which gather the main public institutions of higher education in Mexico: the National Polytechnic Institute, the National Autonomous University of Mexico and the Autonomous Metropolitan University. It consists in the development of a modeling platform for the analysis and design of nuclear reactors. This project aims to modernize, improve and integrate the neutronic, thermohydraulics and thermomechanical codes, developed in the national institutions, in a platform integrated and developed by Mexican experts. The development of AZTLAN Platform is divided technically into four working groups: neutronics, thermohydraulics, coupling and uncertainty analysis, and users group. The present work is the result of the activities of the Users Group focused on the follow-up, testing and use of the different codes (modules) being developed under the AZTLAN project; with the objective of providing feedback and to suggest development priorities to the team of developers, as well as to promote collaboration and synergy between the participating institutions. In particular, in this work, the AZTRAN and the AZKIND modules were verified and tested against the results of well-known codes of the nuclear industry for boiling water reactor (BWR) models. AZTRAN is a 3D transport code which solves numerically the multi-group time independent neutron transport equation in Cartesian geometry, based on the discrete ordinates (SN) method and the RTN-0 nodal scheme. AZKIND is a 3D diffusion code that solves numerically the time dependent neutron diffusion equations in Cartesian geometry, based on a Galerkin Finite Element Method using the RTN-0 polynomial nodal approximation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Verification of AZTRAN v1.2 code with a PWR-MOX benchmark problem

The AZTLAN platform project is an effort focused on developing a modeling Mexican platform to design and analyze nuclear reactors. It is a national initiative lead by the National Institute of Nuclear Research (ININ), in collaboration with the main Mexico's public universities: the National Polytechnic Institute (IPN), the National Autonomous University of Mexico (UNAM) and the Autonomous Metropolitan University (UAM). The AZTRAN code is a module of AZTLAN that solves the 3D neutron transport equation using the discrete ordinates (SN) method and the nodal scheme RTN-0 on steady state and Cartesian geometry. AZTRAN works with cross sections generated externally by other code. It provides a solution to the eigenvalue problem and determine the neutron distribution for a specific medium at desired conditions. On the other hand, it is important to mention that the Working Group 4 (users group) of AZTLAN platform is responsible of verify and validate the codes development, in order to give feedback to the group of developers: neutronics and thermal-hydraulics. In this work, the AZTRAN v1.2 performance was studied for a PWR-MOX lattice, using as example the Yamamoto's benchmark for LWR fuels, comparing AZTRAN v1.2 results again those obtained with the well-known neutronic code SERPENT-2 (v1.27), and some results from an article presented at PHYSOR-2002. Results from AZTRAN for a BWR fuel lattice is presented in a companion paper in this meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using RPS Policies to Grow the Solar Market in the United States

The market for photovoltaics in the United States remains small relative to the nation's solar resource potential. Nonetheless, annual grid-connected PV installations have grown from just 4 MW in 2000 to over 100 MW in 2006, fast enough to the catch the attention of the global solar industry. The state of California deserves much of the credit for this growth. The State's historical rebate programs resulted in roughly 75% of the nation's grid-connected PV additions from 2000 through 2006 being located in California, and the $3 billion California Solar Initiative will ensure that the State remains a mainstay of the US solar industry for years to come. But California is not the only market for solar in the US; other states have recently developed policies that may rival those of the western state in terms of future growth potential. In particular, 25 states, as well as Washington, D.C., have established renewables portfolio standards (RPS), sometimes called quota systems in Europe, requiring electricity suppliers in those states to source a minimum portion of their need from renewable electricity. (Because a national RPS is not yet in place, my focus here is on state policies). Under many of these state policies, solar is not expected to fare particularly well: PV installations simply cannot compete on cost or scale with large wind plants in the US, at least not yet. In response, an expanding list of states have established solar or distributed generation (DG) set-asides within their RPS policies, effectively requiring that some fraction of RPS-driven supply derive from solar energy. The popularity of set-asides for solar and/or DG has increased dramatically in recent years. Already, 11 states and D.C. have developed such RPS set-asides. These include states with outstanding solar resources, such as Nevada, Arizona, Colorado, and New Mexico, as well as areas where the solar resource is less robust, including North Carolina, Maryland, Pennsylvania, New Jersey, New York, New Hampshire, Delaware, and DC. Among those states with set-asides, two are restricted to PV applications, nine also allow solar-thermal electric to qualify, three allow solar heating and/or cooling to qualify, and three have broader renewable DG set-asides. The policies also differ in their targets and timeframes, whether projects must be located in-state, the application of cost caps, and the degree of oversight on how suppliers contract with solar projects. Only three of these states have more than two years of experience with solar or DG set-asides so far: Arizona, Nevada, and New Jersey. And yet, despite the embryonic stage of these policies, they have already begun to have a significant impact on the grid-connected PV market. From 2000-2006, 16% (or 48 MW) of grid-connected PV installations in the US occurred in states with such set-asides, a percentage that increases to 67% if one only considers PV additions outside of California. The importance of these programs is growing and will continue to expand. In fact, if one assumes (admittedly somewhat optimistically) that these policies will be fully achieved, then existing state solar or DG set-asides could result in 400 MW of solar capacity by 2010, 2,000 MW by 2015, and 6,500 MW by 2025. This equates to annual additions of roughly 100 MW through 2010, increasing to over 500 MW per year by 2015 and 700 MW per year by 2020. PV is not assured of all of this capacity, and will receive strong competition from solar-thermal electric facilities in the desert southwest. Nonetheless, set-asides in those states outside of the southwest will favor PV, and even some of the southwestern states have designed their RPS programs to ensure that PV fares well, relative to other forms of solar energy. Since 2000, Arizona and, more recently, New Jersey have represented the largest solar set-aside-driven PV markets. Even more-recent additions are coming from Colorado, Nevada, New York, and Pennsylvania. In the long-term, the largest markets for solar electricity are predicted to include New Jersey, Maryland, Arizona, and Pennsylvania. How do these states stack up against California, with a goal of 3,000 MW of new solar capacity by 2016? Though none of the states with solar set-asides are predicted to reach 3,000 MW of solar from their RPS policies alone, three are expected to exceed 1,000 MW (New Jersey, Maryland, and Arizona). And, if stated on a percentage-of-load basis, then the solar targets in New Mexico, Arizona, New Jersey, and Maryland all exceed California's goal. Of course, achieving these targets is not assured. States with solar set-asides have developed various types of cost caps, many of which may ultimately become binding, thereby limiting future solar growth. Penalties for lack of compliance may be insufficient. Finally, some states continue to struggle with how to encourage long-term contracting for solar generation, and to ensure continued rebate programs for smaller PV installations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Seismic fragility formulations for segmented buried pipeline systems including the impact of differential ground subsidence

Though Differential Ground Subsidence (DGS) impacts the seismic response of segmented buried pipelines augmenting their vulnerability, fragility formulations to estimate repair rates under such condition are not available in the literature. Physical models to estimate pipeline seismic damage considering other cases of permanent ground subsidence (e.g. faulting, tectonic uplift, liquefaction, and landslides) have been extensively reported, not being the case of DGS. The refinement of the study of two important phenomena in Mexico City - the 1985 Michoacan earthquake scenario and the sinking of the city due to ground subsidence - has contributed to the analysis of the interrelation of pipeline damage, ground motion intensity, and DGS; from the analysis of the 48-inch pipeline network of the Mexico City's Water System, fragility formulations for segmented buried pipeline systems for two DGS levels are proposed. The novel parameter PGV{sup 2}/PGA, being PGV peak ground velocity and PGA peak ground acceleration, has been used as seismic parameter in these formulations, since it has shown better correlation to pipeline damage than PGV alone according to previous studies. By comparing the proposed fragilities, it is concluded that a change in the DGS level (from Low-Medium to High) could increase the pipeline repair rates (number of repairs per kilometer) by factors ranging from 1.3 to 2.0; being the higher the seismic intensity the lower the factor.

36 MATERIALS SCIENCE↗

State Policies Provide Critical Support for Renewable Electricity

Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that they do so on an 'equivalent' or 'comparable' basis to conventional supply-side generation options. Many states also require that utilities include various types of risk analyses within their IRP. For example, utilities are often required to evaluate fuel price risk within their resource plan, which can reveal the value of renewables as a hedge against rising and volatile fuel prices. Of particular importance for supporting renewable energy is the increasingly common requirement that utilities evaluate the potential costs and risks associated with future greenhouse gas regulations. Virtually all of the major Western utilities that prepare IRPs incorporated future carbon dioxide regulations in their analyses of alternative resource strategies in their most recent resource plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rapid and Temporary Deployment of Fiber-Optic Arrays to Measure Surface Chemical Explosion Series with Distributed Acoustic Sensing

Rapid and temporary distributed acoustic sensing (DAS) deployments are crucial for accurately capturing the seismic wavefield following major events, such as earthquakes, or in anticipation of known events of interest, such as chemical explosions. We provide an overview of two DAS campaigns conducted in May and October 2024 to record the seismoacoustic waves generated by two series of surface chemical explosions in New Mexico, United States, involving 1- and 10-ton trinitrotoluene-equivalent charges. In both campaigns, we deployed approximately 2 km of fiber-optic cables in a dry riverbed, about 12 km east of the explosion sites. For the October campaign, seven geophones and two anemometers were collocated with the fiber. We describe the field deployments and present preliminary results from the recorded signals. Specifically, we cross analyze the data recorded in May and October, validate the DAS data with geophone measurements, and highlight the benefits of burying fibers to reduce wind noise and improve signal-to-noise ratios. This study demonstrates the potential of DAS to record the seismoacoustic waves generated by surface chemical explosions of varying sizes at distances of approximately 10 km from the source.

58 GEOSCIENCES↗

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage↗

Adaptation and Plasticity of Nannochloropsis sp. in Response to Seasonal and Geographic Climate Variation

Phytoplankton respond to their environment through genetic adaptation and plasticity to maintain fitness. This poses challenges when growing microalgae for industrial applications because, inherently, outdoor mass cultivation may lead to adaptations that alter desirable phenotypic traits and environmental niches. Here, we used common garden experiments to quantify the plasticity and adaptive responses to seasonal and geographic climate variation of Nannochloropsis, a microalga commonly used in biotechnology. An initially monoclonal strain was grown outdoors across four locations in Hawaii, Texas, California, and New Mexico. Following 17 and 22 months of cultivation outdoors, we collected samples during winter and summer, respectively, and we compared strains' growth from the four sites across temperature and light gradients in the laboratory. Despite hundreds of generations of exposure to divergent climates, with ~20°C and three-fold differences in daily light intensity, strains showed only minor differences in performance. Thermal performance varied more among seasons than sites, whereas light performance varied with both season and site. Our study indicates that Nannochloropsis exhibits broad plasticity in response to light and temperature, which may inhibit genetic adaptation in space or time. Highly variable field conditions, with daily and seasonal climate fluctuations, may favor plasticity and prevent the rapid adaptation often seen in laboratory studies of microorganisms in constant environments.

common garden experiment↗