Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

PROBING REIONIZATION WITH INTENSITY MAPPING OF MOLECULAR AND FINE-STRUCTURE LINES

We propose observations of the molecular gas distribution during the era of reionization. At z{approx} 6-8, the {sup 12}CO(J = 1-0) line intensity results in a mean brightness temperature of about 0.5 {mu}K with an rms fluctuation of 0.1 {mu}K at 1-10 Mpc spatial scales, corresponding to 30 arcminute angular scales. This intensity fluctuations can be mapped with an interferometer, similar to existing and planned 21 cm background experiments, but operating at {approx}12-17 GHz. We discuss the feasibility of detecting the cross-correlation between H I and CO molecular gas since such a cross-correlation has the advantage that it will be independent of systematics and most foregrounds in each of the 21 cm and CO(1-0) line experiments. Additional instruments tuned to higher-order transitions of the CO molecule or an instrument operating with high spectral resolution at millimeter wavelengths targeting 158 {mu}m C II could further improve the reionization studies with molecular gas. The combined 21 cm and CO line observations has the potential to establish the relative distribution of gas in the intergalactic medium and molecular gas that are clumped in individual first-light galaxies that are closely connected to the formation of massive stars in these galaxies.

79 ASTRONOMY AND ASTROPHYSICS↗

Delivering real-time multi-modal materials analysis with enterprise beamlines

Contemporary advancements in low-cost automation and computation, reduced barrier to entry in developing artificial intelligence/machine learning (AI/ML), and increased ability to represent complex materials in digital form have led to a number of accelerated materials discovery platforms. However, many of these approaches operate with completely rigid vertical integration in an isolated feedback loop using limited modalities. In order to make a substantial impact on discovering new energy materials, AI-driven experiments must operate collaboratively with each other and researchers and over multiple measurement modalities. Herein, we describe the potential for an “internet of things” approach to self-driving enterprise beamlines that merges core information technologies, robotics, and multi-modal AI. The approach will enable full utility of light sources, collaborate effectively with other remote materials acceleration platforms, and help stride toward the world’s energy future.

36 MATERIALS SCIENCE↗

Effects of regenerator geometry on pulse tube refrigerator performance

This paper gives results of the cooling performance of a double-inlet pulse tube refrigerator using various regenerators. The same pulse tube was used for all the experiments and measured 4.76 mm in diameter and 46.2 mm in length. A commercial linear compressor with a swept volume of 4 cm3 was used in these experiments. The operating conditions were held constant at a mean pressure of 2.0 MPa and a frequency of 54 Hz. Using finite difference software called REGEN3.1, developed at NIST, and recent experiment results, we optimized a series of regenerators based on dimensions, materials and screen packing. The values used for calculating the thermal conduction through stacked screens by REGEN3.1 were based on recent experimental results from NIST. The regenerator tubes were designed using 316 stainless steel and titanium materials. The regenerator matrices investigated were 400-mesh and 500-mesh stainless steel screen. The valve settings for both orifices were adjusted to minimize the no-load temperature for all regenerators. A cooling capacity curve from 0 to 3 W was also determined. The performance of the pulse tube refrigerator using the different regenerators is discussed. The experimental results from the various regenerators are evaluated and compared with their corresponding numerically calculated coefficient of performance (COP) and regenerator design as determined by REGEN3.1.

NASA Discipline Life Sciences Technologies↗

Low-latency Science Exploration of Planetary Bodies: a Demonstration Using ISS in Support of Mars Human Exploration

We summarize a proposed experiment to use the International Space Station to formally examine the application and validation of low-latency telepresence for surface exploration from space as an alternative, precursor, or potentially as an adjunct to astronaut "boots on the ground." The approach is to develop and propose controlled experiments, which build upon previous field studies and which will assess the effects of different latencies (0 to 500 msec), task complexity, and alternate forms of feedback to the operator. These experiments serve as an example of a pathfinder for NASA's roadmap of missions to Mars with low-latency telerobotic exploration as a precursor to astronaut's landing on the surface to conduct geological tasks.

ISS in Support↗

World first in high level waste vitrification - A review of French vitrification industrial achievements

AREVA has more than 30 years experience in operating industrial HLW (High Level radioactive Waste) vitrification facilities (AVM - Marcoule Vitrification Facility, R7 and T7 facilities). This vitrification technology was based on borosilicate glasses and induction-heating. AVM was the world's first industrial HLW vitrification facility to operate in-line with a reprocessing plant. The glass formulation was adapted to commercial Light Water Reactor fission products solutions, including alkaline liquid waste concentrates as well as platinoid-rich clarification fines. The R7 and T7 facilities were designed on the basis of the industrial experience acquired in the AVM facility. The AVM vitrification process was implemented at a larger scale in order to operate the R7 and T7 facilities in-line with the UP2 and UP3 reprocessing plants. After more than 30 years of operation, outstanding record of operation has been established by the R7 and T7 facilities. The industrial startup of the CCIM (Cold Crucible Induction Melter) technology with enhanced glass formulation was possible thanks to the close cooperation between CEA and AREVA. CCIM is a water-cooled induction melter in which the glass frit and the waste are melted by direct high frequency induction. This technology allows the handling of highly corrosive solutions and high operating temperatures which permits new glass compositions and a higher glass production capacity. The CCIM technology has been implemented successfully at La Hague plant.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Intensity Frontier Studies with Heavy Quarks and Leptons (Final Report)

This report describes work on the Muon g-2 experiment accomplished by Prof. Breese Quinn's research group at the University of Mississippi. The DOE award supporting this work allowed the UM g-2 group to help maintain and operate the experiment, make significant contributions to the experiment's first published results on the muon anomalous magnetic moment, and lead and produce the experiments measurements to search for fundamental spacetime symmetries.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Automated space processing payloads study. Volume 2, book 2: Technical report, appendices A through E

Experiment hardware and operational requirements for space shuttle experiments are discussed along with payload and system concepts. Appendixes are included in which experiment data sheets, chamber environmental control and monitoring, method for collection and storage of electrophoretically-separated samples, preliminary thermal evaluation of electromagnetic levitation facilities L1, L2, and L3, and applicable industrial automation equipment are discussed.

Source record↗

Study of a tracking and data acquisition system for the 1990's. Volume 1: User community characteristics

Projected 1990's experiments; navigation requirements and potentials; communications requirements associated with space experiments; alternative forecast options; and operational impacts on experiments are covered. A baseline of plans for the TDAS User Community, including a set of generic experiments developed to supplement existing planning for the 1990's time frame is generated. It includes extensive summaries of collected data, and a bibliography. The data are representative of inputs obtained from NASA planning sources through September 1981.

Mccreary, T.↗

A learning controller for nonrepetitive robotic operation

A practical learning control system is described which is applicable to complex robotic and telerobotic systems involving multiple feedback sensors and multiple command variables. In the controller, the learning algorithm is used to learn to reproduce the nonlinear relationship between the sensor outputs and the system command variables over particular regions of the system state space, rather than learning the actuator commands required to perform a specific task. The learned information is used to predict the command signals required to produce desired changes in the sensor outputs. The desired sensor output changes may result from automatic trajectory planning or may be derived from interactive input from a human operator. The learning controller requires no a priori knowledge of the relationships between the sensor outputs and the command variables. The algorithm is well suited for real time implementation, requiring only fixed point addition and logical operations. The results of learning experiments using a General Electric P-5 manipulator interfaced to a VAX-11/730 computer are presented. These experiments involved interactive operator control, via joysticks, of the position and orientation of an object in the field of view of a video camera mounted on the end of the robot arm.

Miller, W. T., III↗

The Cooperative US/Ukrainian Experiment: An Overview

In this session, Session FA1, the discussion is focuses on the following topics: History of the Cooperative US/Ukrainian Experiment (CUE); The Collaborative Ukrainian Experiment, Science Overview; Double Fertilization of Inquiring Minds, Teachers and Students Investigating Plants in Space for the Collaborative Ukrainian Experiment; and Mission Operations for the Collaborative Ukrainian Experiment.

Source record↗

Longitudinal Beam Stability in the SUPER B-FACTORY

We give an overview of wake fields and impedances in a proposed Super B project, which is based on extremely low emittance beams colliding at a large angle with a crab waist transformation. Understanding the effects that wake fields have on the beam is critical for a successful machine operation. We use our combined experience from the operation of the SLAC B-factory and DA{Phi}NE {Phi}-factory to eliminate strong HOM sources and minimize the chamber impedance in the Super B design. Based on a detailed study of the wake fields in this design we have developed a quasi-Green's function for the entire ring that is used to study bunch lengthening and beam stability. In particular, we check the stability threshold using numerical solutions of the Fokker-Plank equation. We also make a comparison of numerical simulations with the bunch lengthening data in the B- factory.

43 PARTICLE ACCELERATORS↗

Biosatellite II mission

Biosatellite B was launched from Cape Kennedy, Florida, on a two-stage DELTA launch vehicle at 6:04 p.m. on 7 September, 1967. Approximately nine minutes later the 435 kg spacecraft biological laboratory was placed into a satisfactory 315 km near-circular earth orbit, successfully separated from the launch vehicle's second stage and was designated Biosatellite II. The scientific payload consisting of thirteen selected general biology and radiation experiments were subjected to planned, carefully controlled environmental conditions during 45 hours of earth-orbital flight. The decision was made to abbreviate the scheduled 3-day mission by approximately one day because of a threatening tropical storm in the recovery area, and a problem of communication with the spacecraft from the tracking stations. Highest priority was placed on recovery which was essential to obtain the scientific results on all the experiments. The operational phase of the mission came to a successful conclusion with the deorbit of the recovery capsule, deployment of the parachute system and air recovery by the United States Air Force. The 127 kg recovery capsule was returned to biology laboratories at Hickam Air Force Base, Hawaii, for disassembly and immediate inspection and analysis of the biological materials by the experimenters. It was evident immediately that the quality of the biology was excellent and this fact gave promise of a high return of scientific data. The environmental conditions provided to the experimental material in the spacecraft, provisions for experimental controls, and operational considerations are presented as they relate to interpretation of the experimental results.

Biosatellite 2 Project↗

Key results from the first plasma operation phase and outlook for future performance in Wendelstein 7-X

The first physics operation phase on the stellarator experiment Wendelstein 7-X was successfully completed in March 2016 after about 10 weeks of operation. Experiments in this phase were conducted with five graphite limiters as the primary plasma-facing components. Overall, the results were beyond the expectations published shortly before the start of operation [Sunn Pedersen et al., Nucl. Fusion 55, 126001 (2015)] both with respect to parameters reached and with respect to physics themes addressed. We report here on some of the most important plasma experiments that were conducted. The importance of electric fields on global confinement will be discussed, and the obtained results will be compared and contrasted with results from other devices, quantified in terms of the fusion triple product. Expected values for the triple product in future operation phases will also be described and put into a broader fusion perspective.

Physics↗

OSO-8 soft X-ray experiment (Wisconsin)

Information for operating and reducing data from the experiment which was designed to map low energy X-ray background emissions from 130 eV to 35 keV is presented. The detectors, counters, data system, and the gas system are discussed along with the functional operation of the subsystems. A command list indicating preconditions and resulting telemetry response for each command is included.

Source record↗

The SERTS-97 Rocket Experiment on Study Activity on the Sun: Flight 36.167-GS on 1997 November 18

This paper describes mainly the 1997 version of the Solar EUV Rocket Telescope and Spectrograph (SERTS-97), a scientific experiment that operated on NASA's suborbital rocket flight 36.167-GS. Its function was to study activity on the Sun and to provide a cross calibration for the CDS instrument on the SOHO satellite. The experiment was designed, built, and tested by the Solar Physics Branch of the Laboratory for Astronomy and Solar Physics at the Goddard Space Flight Center (GSFC). Other essential sections of the rocket were built under the management of the Sounding Rockets Program Office. These sections include the electronics, timers, IGN despin, the SPARCS pointing controls, the S-19 flight course correction section, the rocket motors, the telemetry, ORSA, and OGIVE.

Swartz, Marvin↗

Shock-Stationary Application of Pseudoshock Models During High-Amplitude Combustion-Driven Unsteadiness

The isolator pseudo-shock provides necessary compression within a dual-mode scramjet engine and buffers the engine system against unstart. Quasi-1D flux-conserved models are the state-of-the-art reduced-order model for optimization and online control of dual-mode scramjet engines. The stability and efficacy of this modeling approach is evaluated against data from a combustor-driven direct-connect experiment. The experiment exhibited strong combustor-driven unsteadiness that produced upstream propagating weak shocks into the isolator, interacting with the pseudo-shock. While this configuration resulted in unsteadiness that is atypical of standard operation, the experiment provided an opportunity to evaluate the modeling techniques in highly transient states. Such transients could occur during maneuvering or result from unexpected combustor events. A flexible quasi-1D formulation, the Fievet flux-conserved model is fit using Bayesian inference in the laboratory and shock-stationary reference frames. Model performance is analyzed using the Bayesian posteriors and model evaluations over the measured shock train speed range. It is concluded that to produce consistent isolator pressure profile estimates in this unsteady environment, the model must be implemented in a shock-stationary reference frame. Implementing this conclusion in model-based engine controllers may reduce needed unstart safety margins and increase maximum performance.

Bayesian↗

Requirements and Conceptual Design of Off-gas Systems for the Reprocessing of Metallic Fuels

An assessment has been conducted to determine how key regulations regarding volatile radionuclide emissions to the atmosphere may apply to the off-gas streams associated with electrochemical reprocessing. The scope of this assessment was based upon a generic electrochemical reprocessing scheme with a throughput rate of 200 MTIHM/y applied to metallic fuel discharged from a sodium fast reactor (SFR), but the findings are able to be translated to other advanced nuclear scenarios as merited. Air dispersion modeling was performed using the EPA CAP-88 model and evaluated the uncontrolled decontamination factors (DFs) that would be required to achieve regulatory compliance with the dose-based limits set forth by EPA regulation 40 CFR 190.10(a). These DFs were compared to those required by fuel cycle–based limits set forth by EPA regulation 40 CFR 190.10(b). Two theoretical sites with disparate climatological conditions were selected for air dispersion modeling (Idaho and Tennessee). The radionuclides modeled included 3 H, 85 Kr, 129 I, and selected alpha-emitting transuranic isotopes (referred to here as 239 Pu-TRU <1y ). It was found that the fuel cycle-based limits in 40 CFR 190.10(b) are most restrictive for 85 Kr and 239 Pu-TRU <1y , with DFs of 3 and 6.1E+09, respectively. The dose-based limit as derived from 40 CFR 190.10(a) could require mitigation of tritium in some scenarios, with an estimated DF of about 3 for the reference scenarios. The fuel cycle-based limit for 129 I resulted in a DF of about 240 for the reference scenario. The need for iodine mitigation based on dose to the public depended upon the physical form of iodine as either particulate or vapor-phase species. Emission of iodine from the facility as a vapor necessitated DFs of about 2 but emission as a particulate would require DFs >6,000 to meet thyroid dose-based limits. Effects of physical form on needed iodine mitigation are significant, but the understanding of speciation of iodine both during electrochemical reprocessing and after release to the atmosphere is limited. The electrochemical processing unit operations were evaluated to identify potential release points for the volatile radionuclides and to assess the potential for retention of the radionuclides within the process (thus decreasing the need for mitigation). Mitigation strategies for 3 H, 85 Kr, 129 I, and 239 Pu-TRU <1y were identified. In all cases, there are reasonably achievable pathways to regulatory compliance, although in some cases additional R&D is merited to verify the chemical speciation of these isotopes and to develop and demonstrate potential treatment technologies for this application. Whether or not additional off-gas controls (beyond common operations such as HEPA filtration and oxygen and moisture control) are needed for any of these regulated or volatile radionuclides depends on the (a) type of facility (NRC-regulated or DOE), (b) used fuel process rate, (c) used fuel burnup and composition, (d) speciation and retention of volatile radionuclides in the process and in the cell gas cleanup system, (e) site-specific parameters such as location, meteorology, stack height, and site boundaries, and (f) levels of conservatism and safety factors used in assessing compliance to air emissions regulations. Performance of this assessment revealed several areas where information is lacking or additional research is required in order to better determine if or what kinds of off-gas control might be needed. First, and most significantly, the understanding of the chemical speciation and physical form and partitioning of iodine during electrochemical processing operations is lacking and prevents the ability to accurately assess the potential iodine mitigation requirements. Future research in this area should be multifaceted and include thermodynamic modeling of iodine speciation in different process steps, experiments to quantify the kinetics of vapor-phase and melt-phase transitions, bench-scale experiments to determine the potential chemical and physical form of iodine emissions from the electrorefining process, and verification of iodine behavior with experiments utilizing operational facilities. Similarly, an improved understanding of iodine behavior in the environment after release from the facility stack will be required to refine dose estimations, as particulate and vapor-phase emissions result in significantly different doses to the MEI.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration of Load-Follow Operations with Standalone BISON through VERA

As part of the Consortium for Advanced Simulation of Light Water Reactors (CASL), the Virtual Environment for Reactor Applications (VERA) is being developed to provide high-fidelity multiphysics simulations of nuclear reactor cores. VERA contains a number of single physics packages that are coupled together. MPACT is the primary deterministic neutron transport solver, CTF provides thermal hydraulics solutions, and BISON - which is built off of the MOOSE framework - is used for fuel performance simulations. Over the past year, a standalone BISON capability has been developed using a one-way coupling between MPACT/CTF coupling calculations and BISON. This has allowed CASL contributors to gain insight into the fuel performance characteristics while a more tightly coupled methodology between MPACT, CTF, and BISON has been under development. The standalone capability has been used to simulate Watts Bar Unit 1 (WBN1) Cycles 1-3 and to screen for quantities of interest to pellet-clad interaction in Cycles 6-7. The simulation and screening results are presented here. CASL recently partnered with Exelon and the University of Illinois at Urbana Champaign (UIUC) to begin simulating some of Exelon's plants, with particular focus on load-follow operations. In such operations, the power output from the plant will vary based on the demand or anticipated demand at the time. For example, demand is much lower late at night than during the day when people are awake, so it operating the plant at lower power in the evenings could be advantageous. Historically, nuclear power generation has been among the cheapest sources of energy, so most plants in the United States have been operated at full power except for outages and various small scale events. However, in the current economic climate, priorities have changed. A number of questions arise when load-follow operations are considered, particularly with respect to VERA's tools and capabilities. Can the coupled neutronics and thermal hydraulics simulations with MPACT and CTF perform well without substantial convergence issues? Can BISON handle the somewhat rapid power changes present with load-follow? Will clad hoop stresses be alarmingly high as a result of these power changes? This work addresses these questions and demonstrates operations to assess feasibility and robustness before Exelon and UIUC proceed with their simulations using VERA. To demonstrate load-follow capability, two test problems were developed. The first is a single rod that experiences nominal operations during Cycle 1, and then it simulates 18 months of representative load-follow operations in Cycle 2. This single-rod case was used to test the robustness of MPACT, CTF, and BISON on a typical rod. The second problem is a quarter-core model based on WBN1, Cycle 3, with a single month of load-follow operations inserted into the middle of the cycle. This provides better understanding of the stresses to the clad during the numerous power changes. Sections of this article are adapted from the original, full technical report on this capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗