Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Initial Testing of Mediated Electrochemical Oxidation for Inclusion in the Plutonium-238 Production Program

Oak Ridge National Laboratory is currently restarting the United States’ capability to produce kilogram quantities of 238Pu annually for space power applications. This involves the purification of 238Pu from neutron-irradiated 237Np targets and conversion to heat-source plutonium oxide product for shipment to Los Alamos National Laboratory. Dissolution of the plutonium oxide product material is required to obtain an isotopic assay and impurity analysis of the product material. In addition, any off-specification product will need to be dissolved for re-purification. An electrochemical method that produces highly oxidizing ions in solution is currently being investigated as a rapid method for dissolving these plutonium oxide samples.

Myhre, Kristian↗

SCANAIR-BISON BENCHMARK ON CIP0-1 RIA TEST

In the frame of their research programs on fuel safety, the French “Institut de Radioprotection et de Sûreté Nucléaire” (IRSN) and the Idaho National Laboratory (INL) have developed respectively SCANAIR and BISON codes to describe the thermo-mechanical behavior of irradiated fuel rods during Reactivity Initiated Accidents (RIA) in LWR. A RIA, characterized by a very rapid increase of reactivity and power in some rods of the reactor, can be schematically represented in two main phases. First, the energy deposition leads to a rapid rise of the fuel temperature which induces thermal swelling of the fuel pellets. During this phase, the Pellet Clad Mechanical Interaction (PCMI) leads to clad deformation and potentially to failure depending on fuel enthalpy increase and on the level of clad embrittlement. After the PCMI phase, the increase of clad temperature can lead to the boiling crisis of the water surrounding the rod. During the film boiling phase, the clad to coolant heat transfer becomes very low and the clad can reach high temperature (>700°C). Depending on the internal gas pressure, the ductile clad can undergo large deformation and possible failure. The RIA codes have to predict properly these two phases of the transient in order to be used, in particular, to assess current fuel safety criteria but also to be able to predict the behavior of upcoming fuel (such as accident tolerant fuel). In this paper, codes computation comparison against experimental data obtained on CIP0-1 test is done for the first phase of the transient, the PCMI phase, in order to point out the strengths and weaknesses of the codes. The CIP0-1 experiment was performed with UO2 high burnup fuel in the CABRI sodium loop facility, at 280°C and low pressure (~3 bars) without boiling crisis and no failure of the fuel rod. The initial state of the rod calculated by irradiation codes are compared with measurements before the transient. Then global rod thermal behavior during the CIP0-1 test is assessed with the sodium coolant temperature measurements. The rod mechanical behavior is analyzed with the fuel and clad elongation and the clad residual hoop strain. Finally comparison of the fission gas behavior between codes is performed and compared to the measurements of the fission gas released in the experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integration of the SSPM and STAGE with the MPACT Virtual Facility Distributed Test Bed.

The Material Protection Accounting and Control Technologies (MPACT) program within DOE NE is working toward a 2020 milestone to demonstrate a Virtual Facility Distributed Test Bed. The goal of the Virtual Test Bed is to link all MPACT modeling tools, technology development, and experimental work to create a Safeguards and Security by Design capability for fuel cycle facilities. The Separation and Safeguards Performance Model (SSPM) forms the core safeguards analysis tool, and the Scenario Toolkit and Generation Environment (STAGE) code forms the core physical security tool. These models are used to design and analyze safeguards and security systems and generate performance metrics. Work over the past year has focused on how these models will integrate with the other capabilities in the MPACT program and specific model changes to enable more streamlined integration in the future. This report describes the model changes and plans for how the models will be used more collaboratively. The Virtual Facility is not designed to integrate all capabilities into one master code, but rather to maintain stand-alone capabilities that communicate results between codes more effectively.

36 MATERIALS SCIENCE↗

SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing factors for poorer results, when using more stringent evaluation criteria. Funding from Cancer Care Ontario is acknowledged.

60 APPLIED LIFE SCIENCES↗

Conceptual Design, Implementation and Commissioning of Data Acquisition and Control System for Negative Ion Source at IPR

Negative ion Experimental facility has been setup at IPR. The facility consists of a RF based negative ion source (ROBIN)--procured under a license agreement with IPP Garching, as a replica of BATMAN, presently operating in IPP, 100 kW 1 MHz RF generators and a set of low and high voltage power supplies, vacuum system and diagnostics. 35 keV 10A H- beam is expected from this setup. Automated successful operation of the system requires an advanced, rugged, time proven and flexible control system. Further the data generated in the experimental phase needs to be acquired, monitored and analyzed to verify and judge the system performance. In the present test bed, this is done using a combination of PLC based control system and a PXI based data acquisition system. The control system consists of three different Siemens PLC systems viz. (1) S-7 400 PLC as a Master Control, (2) S-7 300 PLC for Vacuum system control and (3) C-7 PLC for RF generator control. Master control PLC directly controls all the subsystems except the Vacuum system and RF generator. The Vacuum system and RF generator have their own dedicated PLCs (S-7 300 and C-7 respectively). Further, these two PLC systems work as a slave for the Master control PLC system. Communication between PLC S-7 400, S-7 300 and central control room computer is done through Industrial Ethernet (IE). Control program and GUI are developed in Siemens Step-7 PLC programming software and Wincc SCADA software, respectively. There are approximately 150 analog and 200 digital control and monitoring signals required to perform complete closed loop control of the system. Since the source floats at high potential ({approx}35 kV); a combination of galvanic and fiber optic isolation has been implemented. PXI based Data Acquisition system (DAS) is a combination of PXI RT (Real time) system, front end signal conditioning electronics, host system and DAQ program. All the acquisition signals coming from various sub-systems are connected and acquired by the PXI RT system, through only fiber optics link for signal conditioning, electrical isolation and better noise immunity. Real time and Host application programs are developed in LabVIEW and the data shall be stored with a facility of online display of selected parameters. Mathematical calculations and report generation will take place at the end of each beam shot. The paper describes in detail about the design approach, implementation strategy, program development, commissioning and operational test result of ROBIN through a data acquisition and control system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

High Temperature Additive Architectures for 65% Efficiency (Final Report)

GE Power (GEP) proposed a development program that targets advanced high temperature additive components that contribute towards the DOE’s goal for advanced gas turbines that are capable of 65%, or greater, efficiency in combined cycle application. GEP proposed to leverage state-of-the-art additive manufacturing to develop novel and innovative component airfoil and end wall architectures that provide cooling flow savings while maintaining the component durability expected in today’s gas turbines. The objective of this program was to develop advanced component designs and architectures enabled by additive manufacturing, and the materials systems and additive manufacturing technology required for these designs. This Phase I program leveraged existing design and analysis knowledge and techniques for additive materials and methods and utilized extensive analytical evaluations to develop and refine designs for advanced turbine hot gas path (HGP) components. The design will be the basis for development and testing in a potential Phase II program. The goal of this Phase I program was to establish a feasible conceptual design for advanced additive turbine hot section components along with a technology maturation plan involving testing to address risk areas and needed validation. It was approached through two primary elements: 1) conceptual design and analysis of wall architectures, advanced airfoil cooling concepts, and advanced system-level concepts, and 2) investigation of additive modalities and associated materials systems. The Phase I program has concluded with the down-select of a primary design concept for a potential Phase II program.

36 MATERIALS SCIENCE↗

Evaluation of Cavity Collapse and Surface Crater Formation at the Norbo Underground Nuclear Test in U8c, Nevada Nuclear Security Site, and the Impact on Stability of the Ground Surface

Lawrence Livermore National Laboratory (LLNL) Containment Program performed a review of nuclear test-related data for the Norbo underground nuclear test in U8c to assist in evaluating this legacy site as a test bed for application technologies for use in On-Site Inspections (OSI) under the Comprehensive Nuclear Test Ban Treaty. This request is similar to one made for the Salut site in U8c (Pawloski, 2012b). Review of the Norbo site is complicated because the test first exhibited subsurface collapse, which was not unusual, but it then collapsed to the surface over one year later, which was unusual. Of particular interest is the stability of the ground surface above the Norbo detonation point. Proposed methods for on-site verification include radiological signatures, artifacts from nuclear testing activities, and imaging to identify alteration to the subsurface hydrogeology due to the nuclear detonation. Aviva Sussman from the Los Alamos National Laboratory (LANL) has also proposed work at this site. Both proposals require physical access at or near the ground surface of specific underground nuclear test locations at the Nevada Nuclear Security Site (NNSS), formerly the Nevada Test Site (NTS), and focus on possible activities such as visual observation, multispectral measurements, and shallow and deep geophysical surveys.

58 GEOSCIENCES↗

Acceptance Test Data for the AGR-5/6/7 Irradiation Test Fuel Composite Defective IPyC Fraction and Pyrocarbon Anisotropy

Coated particle composite J52R-16-98005 was produced by Babcock and Wilcox Technologies (BWXT) as fuel for the Advanced Gas Reactor Fuel Development and Qualification (AGR) Program’s AGR-5/6/7 irradiation test in the Idaho National Laboratory (INL) Advanced Test Reactor (ATR). This composite was comprised of four coated particle fuel batches J52O-16-93165B (26%), 93168B (26%), 93169B (24%), and 93170B (24%), chosen based on the Quality Control (QC) data acquired for each individual candidate AGR-5/6/7 batch. Each batch was coated in a 150-mm-diameter production-scale fluidized-bed chemical vapor deposition (CVD) furnace. Tristructural isotropic (TRISO) coatings were deposited on 425-μm-nominal-diameter spherical kernels from BWXT Lot J52R-16-69317 containing a mixture of 15.5%-enriched uranium carbide and uranium oxide (UCO). The TRISO coatings consisted of four consecutive CVD layers: a ~50% dense carbon buffer layer with 100-μm-nominal thickness, a dense inner pyrolytic carbon (IPyC) layer with 40-μm-nominal thickness, a silicon carbide (SiC) layer with 35-μm-nominal thickness, and a dense outer pyrolytic carbon (OPyC) layer with 40-μm-nominal thickness. The TRISO-coated particle batches were sieved to upgrade the particles by removing over-sized and under-sized material, and the upgraded batches were designated by appending the letter A to the end of the batch number (e.g., 93165A). Secondary upgrading by sieving was performed on the A-designated batches to remove particles with missing or very-thin buffer layers that were identified during previous analysis of the individual batches for defective IPyC, as reported in the acceptance test data report for the AGR-5/6/7 production batches [Hunn et al. 2017]. The additionally-upgraded batches were designated by appending the letter B to the end of the batch number (e.g., 93165B).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Low Cost Hydrogen Production Platform

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost models assume a natural gas cost of $5/MMBtu (HHV). Praxair has, in Phases I and II of this program, shown that significant improvements in cost, plant layout, system integration and overall system optimization are achievable. Phase III of the program, submitted in January 2007, was to focus on demonstrating both the technical feasibility and economic viability of the design developed in Phases I and II through a full-scale prototype design, construction, installation, analysis and operation at a hydrogen fueling station. Due to funding limitations, Phase III of the program was not approved by the DOE.

08 HYDROGEN↗

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING↗

Radiation-Hardened, High-Speed Parallel VCSEL Links for High-Energy Physics

Vega Wave Systems, Inc. has been awarded a Small Business Innovative Research (SBIR) Phase II proposal to the U.S. Department of Energy entitled “Radiation-Hardened, High-Speed Parallel VCSEL Links For High-Energy Physics.” The technology proposed under this program is a significant advance (up to 4x) in data rate over current optical link technologies under development. Fermilab supports the technology developed under this proposal as a radiation-hardened, cost-effective solution for optical links for the high-speed data communications in High-Energy Physics and agrees to provide consulting and test engineering in support of this program. Fermilab staff will provide consulting services along with high speed testing of modules before and after radiation testing.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A random onset model for degradation of high-reliability systems

Both the U. S. Department of Defense (DoD) and Department of Energy (DOE) maintain weapons stockpiles: items like bullets, missiles and bombs that have already been produced and are being stored until needed. Ideally, these stockpiles maintain high reliability over time. To assess reliability, a surveillance program is implemented, where units are periodically removed from the stockpile and tested. The most definitive tests typically destroy the weapons so a given unit is tested only once. Surveillance managers need to decide how many units should be tested, how often they should be tested, what tests should be done, and how the resulting data are used to estimate the stockpile's current and future reliability. These issues are particularly critical from a planning perspective: given what has already been observed and our understanding of the mechanisms of stockpile aging, what is an appropriate and cost-effective surveillance program? Surveillance programs are costly, broad, and deep, especially in the DOE, where the US nuclear weapons surveillance program must 'ensure, through various tests, that the reliability of nuclear weapons is maintained' in the absence of full-system testing (General Accounting Office, 1996). The DOE program consists primarily of three types of tests: nonnuclear flight tests, that involve the actual dropping or launching of a weapon from which the nuclear components have been removed; and nonnuclear and nuclear systems laboratory tests, which detect defects due to aging, manufacturing, and design of the nonnuclear and nuclear portions of the weapons. Fully integrated analysis of the suite of nuclear weapons surveillance data is an ongoing area of research (Wilson et al., 2007). This paper introduces a simple model that captures high-level features of stockpile reliability over time and can be used to answer broad policy questions about surveillance programs. Our intention is to provide a framework that generates tractable answers that integrate expert knowledge and high-level summaries of surveillance data to allow decision-making about appropriate trade-offs between the cost of data and the precision of stockpile reliability estimates.

97 MATHEMATICS AND COMPUTING↗

Interlaboratory Evaluation of in Vitro Cytotoxicity and Inflammatory Responses to Engineered Nanomaterials: The NIEHS Nano GO Consortium

Background: Differences in interlaboratory research protocols contribute to the conflicting data in the literature regarding engineered nanomaterial (ENM) bioactivity. Objectives: Grantees of a National Institute of Health Sciences (NIEHS)-funded consortium program performed two phases of in vitro testing with selected ENMs in an effort to identify and minimize sources of variability. Methods: Consortium program participants (CPPs) conducted ENM bioactivity evaluations on zinc oxide (ZnO), three forms of titanium dioxide (TiO2), and three forms of multiwalled carbon nanotubes (MWCNTs). In addition, CPPs performed bioassays using three mammalian cell lines (BEAS-2B, RLE-6TN, and THP-1) selected in order to cover two different species (rat and human), two different lung epithelial cells (alveolar type II and bronchial epithelial cells), and two different cell types (epithelial cells and macrophages). CPPs also measured cytotoxicity in all cell types while measuring inflammasome activation [interleukin-1β (IL-1β) release] using only THP-1 cells. Results: The overall in vitro toxicity profiles of ENM were as follows: ZnO was cytotoxic to all cell types at ≥ 50 μ g/mL, but did not induce IL-1β. TiO2 was not cytotoxic except for the nanobelt form, which was cytotoxic and induced significant IL-1β production in THP-1 cells. MWCNTs did not produce cytotoxicity, but stimulated lower levels of IL-1β production in THP-1 cells, with the original MWCNT producing the most IL-1β. Conclusions: The results provide justification for the inclusion of mechanism-linked bioactivity assays along with traditional cytotoxicity assays for in vitro screening. In addition, the results suggest that conducting studies with multiple relevant cell types to avoid false-negative outcomes is critical for accurate evaluation of ENM bioactivity.

cell viability↗

DOE/DHS Industrial Control System Cyber Security Programs: A Model for Use in Nuclear Facility Safeguards and Security

Many critical infrastructure sectors have been investigating cyber security issues for several years especially with the help of two primary government programs. The U.S. Department of Energy (DOE) National SCADA Test Bed and the U.S. Department of Homeland Security (DHS) Control Systems Security Program have both implemented activities aimed at securing the industrial control systems that operate the North American electric grid along with several other critical infrastructure sectors (ICS). These programs have spent the last seven years working with industry including asset owners, educational institutions, standards and regulating bodies, and control system vendors. The programs common mission is to provide outreach, identification of cyber vulnerabilities to ICS and mitigation strategies to enhance security postures. The success of these programs indicates that a similar approach can be successfully translated into other sectors including nuclear operations, safeguards, and security. The industry regulating bodies have included cyber security requirements and, in some cases, have incorporated sets of standards with penalties for non-compliance such as the North American Electric Reliability Corporation Critical Infrastructure Protection standards. These DOE and DHS programs that address security improvements by both suppliers and end users provide an excellent model for nuclear facility personnel concerned with safeguards and security cyber vulnerabilities and countermeasures. It is not a stretch to imagine complete surreptitious collapse of protection against the removal of nuclear material or even initiation of a criticality event as witnessed at Three Mile Island or Chernobyl in a nuclear ICS inadequately protected against the cyber threat.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Test Reactor Experiment Safety Analysis

This presentation contains general information about the Advanced Test Reactor experiment safety analysis program. Accidents and dose consequence are discussed in general terms. Pictures of ATR facilities and experiments are included. In cases where experiments are shown, identification numbers have been removed. Department of Energy limits on dose consequence are provided. These limits are found in many non-CUI documents and a derived from publicly available sources. A summary of the presentation content is as follows: -Define Experiment Safety Analysis -Discuss what we are protecting and the applicable limits -Show how safety analysis fits into the experiment process -Explore the scope of experiment activities and associated accidents -Present how we categorize accidents and establish accident frequencies -Identify how controls are implemented and process improvements

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗