Search NASA⌕ Search

SEARCH · Search NASA

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Driving Down HB-LED Costs. Implementation of Process Simulation Tools and Temperature Control Methods of High Yield MOCVD Growth

The overall objective of this multi-faceted program is to develop epitaxial growth systems that meet a goal of 75% (4X) cost reduction in the epitaxy phase of HB-LED manufacture. A 75% reduction in yielded epitaxy cost is necessary in order to achieve the cost goals for widespread penetration of HB-LED's into back-lighting units (BLU) for LCD panels and ultimately for solid-state lighting (SSL). To do this, the program will address significant improvements in overall equipment Cost of Ownership, or CoO. CoO is a model that includes all costs associated with the epitaxy portion of production. These aspects include cost of yield, capital cost, operational costs, and maintenance costs. We divide the program into three phases where later phases will incorporate the gains of prior phases. Phase one activities are enabling technologies. In collaboration with Sandia National Laboratories we develop a Fluent-compatible chemistry predictive model and a set of mid-infrared and near-ultraviolet pyrometer monitoring tools. Where previously the modeling of the reactor dynamics were studied within FLUENT alone, here, FLUENT and Chemkin are integrated into a comprehensive model of fluid dynamics and the most advanced transport equations developed for Chemkin. Specifically, the Chemkin model offered the key reaction terms for gas-phase nucleation, a key consideration in the optimization of the MOCVD process. This new predictive model is used to design new MOCVD reactors with optimized growth conditions and the newly developed pyrometers are used monitor and control the MOCVD process temperature to within 0.5°C run-to-run and within each wafer. This portion of the grant is in collaboration with partners at Sandia National Laboratories. Phase two activities are continuous improvement projects which extend the current reactor platform along the lines of improved operational efficiency, improved systems control for throughput, and carrier modifications for increased yield. Programmatically, improvements made in Phase I are applied to developments of Phase II when applicable. Phase three is the culmination of the individual tasks from both phases one and two applied to proposed production platforms. We selectively combine previously demonstrated tasks and other options to develop a high-volume production-worthy MOCVD system demonstrating >3x throughput, 1.3x capital efficiency, and 0.7x cost of ownership. In a parallel demonstration we validate the concept of an improved, larger deposition system which utilizes the predictive modeling of chemistry-based flow analysis and extensions of the improvements demonstrated on the current platforms. This validation includes the build and testing of a prototype version of the hardware and demonstration of 69% reduction in the cost of ownership. Also, in this phase we present a stand-alone project to develop a high-temperature system which improves source efficiency by 30% while concurrently increasing growth rate by 1.3x. The material quality is held to the same material quality specifications of our existing baseline processes. The merits of other line item tasks in phase three are discussed for inclusion on next-generation platforms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), has been supporting, and continues to support, the Petroleum Technology Research Centre (PTRC) Aquistore project. This support has been in the form of geologic characterization, involvement in the Science and Engineering Research Committee (SERC), involvement in public outreach, developing geologic models and running predictive simulations on the expected injection program at the site. The Aquistore project is part of the world’s first commercial postcombustion carbon capture, utilization, and storage project from a coal-fired power-generating facility, the SaskPower Boundary Dam, located in Saskatchewan, Canada, and will be acting as a storage site for a portion of the captured CO 2 from the Boundary Dam power plant. The Aquistore site includes one injection well and a 152-meter offset observation well. Both wells were drilled and completed in the Deadwood and Black Island Formations. At the time of this report, injection at the Aquistore site is anticipated to begin in late 2014. To better understand the storage implications of injecting carbon dioxide (CO 2 ) at the Aquistore site, the EERC has constructed P10, P50, and P90 geologic model realizations and run three new predictive simulation scenarios on each realization. These models and simulations were constructed to better understand both operational and geologic uncertainties that may exist at the Aquistore site. The geologic model realizations and simulations are an update to those completed in the original report entitled “Geologic Modeling and Simulation Report for the Aquistore Project,” Deliverable D93, approved in March 2014. In this update, the same fine-scale model extent of the 34-square-kilometer PTRC 3-D seismic survey area, with higher structural resolution, was continually used for the uncertainty analysis. A low (P10), mid (P50), and high volumetric (P90) case for the amount of pore volume accessible to store the potential injected CO 2 was ranked based on certain deviation variations of model-building parameters, including effective porosity and net-to-gross reservoir, in six sand units of the study area. Three cases with various injection rate and period schemes were simulated based on uncertainty models P10, P50, and P90.

54 ENVIRONMENTAL SCIENCES↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Thermal Spray, Redox Stable, Ceramic Anode for Metal Supported SOFC

In this program, GE global research and GE fuel cells in Malta conducted thermal spray optimization experiments, initially focusing on a well-established ceramic anode formulation, lanthanum strontium titanate combined with gadolinium doped ceria. Powder engineering work was conducted both internally and with vendors to develop repeatable, stable, and flowable thermal spray feedstocks. Agglomerate sintering was conducted in the last phase of the project, building on earlier program work, and was used to increase run stability during the longer scaled up runs for the 410 cm 2 cells. Further powder engineering would be needed to fully design a powder ready for full scale manufacturing. During preliminary work on the LST-GDC electrodes, GE demonstrated 100 cm 2 stacks enduring multiple redox cycles with limited impact. Another key finding on the project was the identification of process conditions for two component ceramic anode thermal spray without the formation of phase impurities which were present in all early work on the program. GE global research and West Virginia University screened a large number of ceramic anode formulations, focused on identifying materials with ideal materials properties for use in SOFC anodes. In addition, synthetic scaling research was conducted to increase powder synthesis batch size several orders of magnitude during the course of project work. West Virginia University was able to show button cells using two component ceramic anodes which produced > 890 mW/cm 2 and even a single component SOFC button demonstrating > 1 W/cm 2 performance. These button cell tests show the great potential of these redox stable materials. Down-selected ceramic anode formulations were combined with the optimized thermal spray process methods to first demonstrate multiple groups of 100 cm 2 SOFC stacks able to achieve the power density goals for the project. GE research also quickly investigated the performance of a subset of these formulations on long term degradation tests and assessed their performance on simulated natural gas reformate. In the final phase of the program, scaling activities were employed to translate from the 100cm2 process up to 410 cm 2 . Two large format 10-cell stack tests were completed, and one of these stacks produced 0.987 kW which is one of the highest power demonstrations of ceramic anode, metal support, SOFC technology known to GE. These ceramic anode stacks had been produced with all other materials in the stack held constant, demonstrating the flexibility of the thermal spray process in scaling to very large electrode size.

30 DIRECT ENERGY CONVERSION↗

HEP Science Network Requirements--Final Report

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity is more complex than network engineering for intra-US connectivity. This is because transoceanic circuits have lower reliability and longer repair times when compared with land-based circuits. Therefore, trans-Atlantic connectivity requires greater deployed bandwidth and diversity to ensure reliability and service continuity of the user-level required data transfer rates. (4) Trans-Atlantic traffic load and patterns must be monitored, and projections adjusted if necessary. There is currently a shutdown planned for the LHC in 2012 that may affect projections of trans-Atlantic bandwidth requirements. (5) There is a significant need for network tuning and troubleshooting during the establishment of new LHC Tier-2 and Tier-3 facilities. ESnet will work with the HEP community to help new sites effectively use the network. (6) SLAC is building the CCD camera for the LSST. This project will require significant bandwidth (up to 30Gbps) to NCSA over the next few years. (7) The accelerator modeling program at SLAC could require the movement of 1PB simulation data sets from the Leadership Computing Facilities at Argonne and Oak Ridge to SLAC. The data sets would need to be moved overnight, and moving 1PB in eight hours requires more than 300Gbps of throughput. This requirement is dependent on the deployment of analysis capabilities at SLAC, and is about five years away. (8) It is difficult to achieve high data transfer throughput to sites in China. Projects that need to transfer data in or out of China are encouraged to deploy test and measurement infrastructure (e.g. perfSONAR) and allow time for performance tuning.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutian Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.

16 TIDAL AND WAVE POWER↗

LENS: Learning Enabled Network Synthesis

RTRC and UMD have developed novel machine learning based methods under the ARPA-E DIFFERENTIATE program for rapid acceleration of hypothesis generation in complex architecture design spaces involving both discrete choices of component inclusion and interconnection and continuous parametric decisions. The project named Learning Enabled Network Synthesis (LENS) further demonstrated the developed methods on challenging electrical power converter design problems by identifying the most suitable circuit topologies and simultaneously selecting the most appropriate components to achieve optimized design of power converter with improved performances. We demonstrated that LENS could enable exploration of very large design space of circuit topologies and components by addressing the limitations of conventional design process in non-linear, high switching speed, multi-dimensional power converter design and optimization. The key innovation developed in LENS is the seamless integration of statistical learning and logical reasoning techniques and building on the individual strengths of these techniques for rapid hypothesis discovery. The main component of LENS comprises of: 1) Graph Reasoning Engine (GRE) to enforce composition rules that rapidly reject all discrete architectures that are composed incorrectly and generates an adaptive database of feasible designs which can be used by ML modules, 2) Graph Generative Learning module which is a deep neural network based generative model for graph architectures which can enable design space exploration beyond the dataset generated by the GRE, 3) Graph Reduced Order Model (ROM) for graph domains for accelerating computation of output metrics, and 4) Active learning and Rule Discovery module for sample efficient learning and extracting logical rules from the learned ML models which will be integrated in the GRE to enhance the filtering effectiveness. LENS approach can be applied to any design domains where designs can be represented as multi-attribute graphs. The LENS team integrated the various technical innovations listed above into an optimization pipeline and exercised the optimization pipeline on the converter design problem. The LENS project demonstrated that the developed AI/ML technologies can be used to generate novel converter circuits >45x faster than experts on chosen use-cases. This can enable faster design space exploration and identification of new designs which are not considered by experts due to the increasing design space complexity. This has significant potential impact on the public and energy needs of the country. It is currently estimated that 30% of all electrical powers generated passes through power converters. The future estimate is that 80% of all power generated would be passing through converters. LENS fills a critical gap in this space since by accelerating the design process the designers would be able to generate more efficient converters which can lead to significant energy savings for the country.

42 ENGINEERING↗

Building America Best Practices Series - Volume 15: 40% Whole-House Energy Savings in the Hot-Humid Climate

This best practices guide is the 15th in a series of guides for builders produced by PNNL for the U.S. Department of Energy’s Building America program. This guide book is a resource to help builders design and construct homes that are among the most energy-efficient available, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. With the measures described in this guide, builders in the hot-humid climate can build homes that have whole-house energy savings of 40% over the Building America benchmark with no added overall costs for consumers. The best practices described in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. Building America builders have found they can build homes that meet these aggressive energy-efficiency goals at no net increased costs to the homeowners. Currently, Building America homes achieve energy savings of 40% greater than the Building America benchmark home (a home built to mid-1990s building practices roughly equivalent to the 1993 Model Energy Code). The recommendations in this document meet or exceed the requirements of the 2009 IECC and 2009 IRC and those requirements are highlighted in the text. Requirements of the 2012 IECC and 2012 IRC are also noted in text and tables throughout the guide. This document will be distributed via the DOE Building America website: www.buildingamerica.gov.

Building America↗

DEM and MELT In-Can Vitrification Process for Fukushima Daiichi Water Treatment Secondary Waste - 20034

Fukushima Daiichi Nuclear Power Station was severely damaged by a tsunami induced by the earthquake on March 11, 2011. A large amount of water treatment secondary waste has been generated from the purification work of contaminated water that consists of the water flowing into the reactor building. The Mid and Long-Term Road map specifies that solid waste at Fukushima Daiichi Nuclear Power Station should be stored safely and reasonably according to its characteristics. In order to meet this goal, a versatile treatment solution is needed, and the In-Can vitrification seems to be a suitable solution. The DEM and MELT In-Can vitrification process is being developed and qualified in France to treat waste arising from decommissioning and dismantling operations. This qualification is carried out through the consortium of the DEM and MELT project coordinated by CEA which gathers Orano, ECM technologies and Andra. The DEM and MELT In-Can vitrification process is a robust, simple and versatile in situ vitrification process. It is designed for high or intermediate level waste and is compact enough to be implemented in an existing facility or close to the waste to be treated. It is developed to treat liquid and solid waste, to produce a small amount of secondary waste and to minimize investment and operating costs. The DEM and MELT In-Can vitrification process is also developed with a modular design in order to be adapted to nuclear operators needs and requirements. The In-Can melting process has already been developed and fully qualified by the CEA for Alpha liquid waste and can be rated TRL 7 for this scope. The In-Can vitrification technology is considered as a qualified solution that could be applied for the treatment of waste resulting from the D and D work in Fukushima Daiichi Nuclear Power Station. The feasibility evaluation of the DEM and MELT In-Can vitrification process for Fukushima Daiichi water treatment secondary waste is a project led by Orano, CEA and ANADEC. This R and D project is performed by the funds from the Ministry of Economy, Trade and Industry as The Subsidy Program 'Project of Decommissioning and Contaminated Water Management'. This paper presents the first results of this feasibility evaluation, from the scenarios and glass formulation definition to the industrial implementation feasibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated development of Zr-containing new generation ferritic steels for advanced nuclear reactors

The mission of the Nuclear Energy Enabling Technologies (NEET) program is to develop crosscutting technologies for nuclear energy applications. Advanced structural materials with superior performance at elevated temperatures are always desired for nuclear reactors, which can improve reactor economics, safety margins, and design flexibility. They benefit not only new reactors, including advanced light water reactors (LWRs) and fast reactors such as the sodium-cooled fast reactor (SFR) that is primarily designed for management of high-level wastes, but also life extension of the existing fleet when component exchange is needed. Developing and utilizing the modern materials science tools (experimental, theoretical, and computational tools) is an important path to more efficient alloy development and process optimization. The ultimate goal of this project is, with the aid of computational modeling tools, to accelerate the development of Zr-bearing ferritic alloys that can be fabricated using conventional steelmaking methods. The new alloys are expected to have superior high-temperature creep performance and excellent radiation resistance as compared to Grade 91. The designed alloys were fabricated using arc-melting and drop-casting, followed by hot rolling and conventional heat treatments. Comprehensive experimental studies have been conducted on the developed alloys to evaluate their hardness, tensile properties, creep resistance, Charpy impact toughness, and aging resistance, as well as resistance to proton and heavy ion (Fe 2+ ) irradiation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Open Radiation Monitoring: Histogram Builder Module Design

The Open Radiation Monitoring Project seeks to develop and demonstrate a modular radiation detection architecture designed specifically for use in arms control treaty verification (ACTV) applications that will facilitate rapid development of trusted systems to meet the needs of potential future treaties. A modular architecture can be used to reduce more complex systems to a series of single purpose building blocks, thereby facilitating equipment inspection and in turn building trust in the equipment by all treaty parties. Furthermore, a modular architecture can be used to control data flow within the measurement system, reducing the risk of "hidden switches" and constraining the amount of sensitive information that could potentially be inadvertently leaked. This report details the first revision of a prototype circuit that will convert analog pulses directly into a histogrammed data set for further processing. The circuit was designed with both spectroscopy and multiplicity analysis in mind but can, in principle, be used to reduce any raw data stream into a histogram. The number of output channels is limited, and the histogram bin ranges are user configurable to allow for non-uniform and discontinuous bins, which makes it possible to restrict the information being passed down stream if desired. Pulse processing relies entirely on analog circuitry and non- programmable logic, which enables operation without the need for a central processor or other programmable control unit. The circuit remains untested under the Open Radiation Monitoring project due to the closure of the sponsoring program. However, further development and testing is scheduled to take place in support of a purpose-built trusted verification system development effort known as COGNIZANT, which demonstrates the potential benefit of developing a suite of modular trusted system components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Building America Best Practices Series - Volume 16: 40% Whole-House Energy Savings in the Mixed-Humid Climate

This best practices guide is the 16th in a series of guides for builders produced by PNNL for the U.S. Department of Energy’s Building America program. This guide book is a resource to help builders design and construct homes that are among the most energy-efficient available, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. With the measures described in this guide, builders in the mixed-humid climate can build homes that have whole-house energy savings of 40% over the Building America benchmark with no added overall costs for consumers. The best practices described in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. Building America builders have found they can build homes that meet these aggressive energy-efficiency goals at no net increased costs to the homeowners. Currently, Building America homes achieve energy savings of 40% greater than the Building America benchmark home (a home built to mid-1990s building practices roughly equivalent to the 1993 Model Energy Code). The recommendations in this document meet or exceed the requirements of the 2009 IECC and 2009 IRC and those requirements are highlighted in the text. Requirements of the 2012 IECC and 2012 IRC are also noted in text and tables throughout the guide. This document will be distributed via the DOE Building America website: www.buildingamerica.gov.

Building America↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensor Recommendations for Long Term Monitoring of the F-Area Seepage Basins

In mid-2018, a new paradigm for long-term monitoring was developed after of decade of applied research projects funded by the Department of Energy’s office of Environmental Management Technology Development program. The program at SRNL was focused on transitioning complex environmental waste sites from active to passive remediations strategies. A key result of these studies was that the use of enhanced attenuation approaches at radiologically contaminated sites will result in the creation of secondary source areas in the subsurface that will require monitoring for decades. Alternative monitoring approaches are being developed and tested at the Savannah River Site’s F-Area Hazardous Waste Management Facility, the new paradigm provides innovative solutions that will significantly lower costs of monitoring through the coupling of data collection, machine learning and deterministic groundwater modeling. The foundation of this approach is a well-optimized network of sensors for measuring hydrogeochemical master variables that control, and therefore act as indicators of groundwater contaminant transport. By monitoring changes in the controlling master variables over time arising from geological and environmental shifts, predictive modelling can assist with identifying new strategies for ensuring regulatory requirements are met if trends toward conditions for potential remobilization of attenuated contaminants are detected. In this report, we evaluated commercially available single parameter sensor platforms (e.g., temperature/depth) and configurable multi-parameter sensor platforms (e.g., pH, oxidation-reduction potential, temperature, depth, dissolved oxygen, and conductivity). Each was scored using an optimization function based on how well the system supports the proposed long-term monitoring paradigm, in general, and the site-specific conditions at F-Area, in particular. Several viable sensor systems were identified. Of these, a combined platform including the In-Situ Aqua TROLL 500 multi-parameter sensor platform and the In-Situ temperature/depth sensor had the highest rating and was identified as the most suitable candidate for installation and monitoring of the master variables and potentiometric surface that control groundwater contaminant plumes emanating from the F-Area Seepage Basins. The discussion of recommended potential deployment locations builds upon recommendations made by Denham et al (2019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Northeast Clean Energy Application Center

From October 1, 2009 through September 30, 2013 (“contract period”), the Northeast Clean Energy Application Center (“NE-CEAC”) worked in New York and New England (Connecticut, Rhode Island, Vermont, Massachusetts, New Hampshire, and Maine) to create a more robust market for the deployment of clean energy technologies (CETs) including combined heat and power (CHP), district energy systems (DES), and waste heat recovery (WHR) systems through the provision of technical assistance, education and outreach, and strategic market analysis and support for decision-makers. CHP, DES, and WHR can help reduce greenhouse gas emissions, reduce electrical and thermal energy costs, and provide more reliable energy for users throughout the United States. The NE-CEAC’s efforts in the provision of technical assistance, education and outreach, and strategic market analysis and support for decision-makers helped advance the market for CETs in the Northeast thereby helping the region move towards the following outcomes: Reduction of greenhouse gas emissions and criteria pollutants; Improvements in energy efficiency resulting in lower costs of doing business; Productivity gains in industry and efficiency gains in buildings; Lower regional energy costs; Strengthened energy security; Enhanced consumer choice; Reduced price risks for end-users; and Economic development effects keeping more jobs and more income in our regional economy Over the contract period, NE-CEAC provided technical assistance to approximately 56 different potential end-users that were interested in CHP and other CETs for their facility or facilities. Of these 56 potential end-users, five new CHP projects totaling over 60 MW of install capacity became operational during the contract period. The NE-CEAC helped host numerous target market workshops, trainings, and webinars; and NE-CEAC staff delivered presentations at many other workshops and conferences. In total, over 60 different workshops, conferences, webinars, and presentation were hosted or delivered during the contract period. The NE-CEAC also produced publically available educational materials such as CHP project profiles. Finally, the NE-CEAC worked closely with the relevant state agencies involved with CHP development. In New York, the NE-CEAC played an important role in securing and maintaining funding for CHP incentive programs administered by the New York State Energy Research Development Authority. NE-CEAC was also involved in the NYC Mayor's Office DG Collaborative. The NECEAC was also named a strategic resource for the Connecticut Department of Energy and Environmental Protection’s innovative Microgrid Pilot Program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Severe Accident Analysis Engine Using Approximate Reasoning

In hypothetical severe accident scenarios, nuclear power plant safety is challenged by core degradation and release of fission products. To aid the plant operator and technical support center staff, research has been performed to develop understanding of severe accident phenomenology, assessing their risk and devise measures to mitigate accident consequences (Sehgal, 2011). Nuclear power plant accidents involve highly complex physical and chemical interactions, a large number of safety related systems, and emergency operating procedures (EOP) and severe accident management guidelines (SAMG). Large number of factors with uncertainty and stress can overwhelm the operators. The overall objective of the present research is to develop a methodology and tools that an operator can use to predict severe accident progression and make effective decisions to arrest and manage the accident under large uncertainties. Towards this goal, this study examines a novel approach that brings to bear a combined use of techniques in artificial intelligence (Russel and Norvig, 2010), including Bayesian Network (BN), Answer Set Programming (ASP) and Fuzzy Inference (FI) to achieve faster-than-real-time, yet sufficiently accurate analysis of severe accident progression. Bayesian network (BN) is a type of probabilistic graphical models that can be used to represent knowledge and conditional dependencies about an uncertain realm. It is useful for capturing the causal relationships in a complex system. It also allows prediction via Bayesian inference (Kelly and Smith, 2012). It is composed of nodes and edges, which express random variables and probabilistic relationships between the nodes, respectively. This relationship, given by conditional probability is calculated using stochastic methods. The BN is used in several systems for analysis and management of accident risk; e.g. (Knochenhauer and Frid, 2010). In those systems, the nodes or so-called 'effective factors' are presumably known within the network by system descriptions in SAMGs. There are two steps to configure the BN, namely (i) identifying compositions within the network and (ii) defining conditional dependency between nodes. The first step is performed following the spirit of ASP (Baral, 2003) using Prolog (Wielemaker, 2005). Knowledge representation is used to build databases required for processing by ASP. Knowledge representation is defined as the expression of knowledge in a way that is understandable to both human and computers. Originally knowledge indicates data, information and facts. To focus, knowledge should be formed to achieve a goal. In a severe accident, key physics and safety related components status are defined according to a failure mode. The conditional dependencies between nodes are generated by approximate reasoning using Fuzzy inference (Zadeh, 1995). Fuzzy logic is a multiple-valued logic to treat ambiguous features such as linguistic description. It indicates possibility, which is distinguished from probability. Fuzzy set consists of linguistic variables according to the fixed rule. In other words, even uncertain states could be expressed as not binary logic, but as many-value logic by rule-based technology. Fuzzy control system is comprised of Fuzzy inference engine that is performed based on the 'If-Then Rule'. The 'If-Then Rule' is of the following form. If Y1 is B11 and Y2 is B12 then Z is C1. If Y1 is B21 and Y2 is B22 then Z is C2. Y1 and Y2 are inputs, which indicate conditional variables. Z indicates decision-making and both B and C are linguistic variables. With this rule-based technique, the approximate reasoning can be realized by Fuzzy inference. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗