Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The Jet Propulsion Laboratory Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team. The Architecture Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. In these studies, Concept Maturity Levels are used to group methods. These levels include idea generation and capture (Concept Maturity Level 1), initial feasibility assessment (Concept Maturity Level 2), and trade space exploration (Concept Maturity Level 3). Methods used for exploring the science objectives, feasibility, and scope will be described including the use of a new technique for understanding the most compelling science, called a Science Return Diagram. In the process of developing the Science Return Diagram, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid toward developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions, and reveal the mission concept's most compelling science. This article will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.

science↗

Robots and Robots and More

Over the course of this year I worked on several projects across different departments, from physical robots at Swamp Works, to automated robots running functional tests on launch critical Graphical User Interfaces (GUIs). My overarching project this year was designing a new automated testing framework. It began with becoming familiar with the existing automated testing framework, which used image matching to perform programmatic GUI testing. After writing a few dozen tests with the existing framework, I was able to identify the strengths and weaknesses of the system and begin the search for another tool to replace it. I ended up selecting an open source library, which I modified to fit both National Aeronautics and Space Administration (NASA) requirements and those of the specific Computer Software Configuration Item (CSCI) I worked on. After the new framework was feature-rich enough to meet the team requirements, I helped roll out the changes, managed the transition to the new framework, and directed continuing automation work in regards to the library. The result was a comprehensive new way of efficiently testing the GUI that was robust enough to handle small changes to the GUI itself. Additionally, for approximately six weeks I worked on rebuilding, repairing, and updating the software of four "Swarmie" robots for a NASA event. By the close of the six weeks, the four robots were operational and had improved obstacle detection software that solved a faulty stop signal issue that the robots were experiencing.

Siegel, Alex↗

System and Method for Providing a Climate Data Analytic Services Application Programming Interface

A system, method and computer-readable storage devices for providing a climate data analytic services application programming interface. The system includes a programming library that enables client device software to invoke the capabilities of a climate data analytics system through requests to various services supported by the climate data analytics system, and also includes a client-side communications interface that enables the programming library's methods to interact with a climate data analytics system's server interface to obtain access to the capabilities of the system. In one implementation, the programming library is implemented in the Python programming language. The programming library can include basic utilities that call a single, server-side method implemented by one of the various services supported by the climate data analytics system, and extended utilities that call a series of basic utilities and/or other extended utilities that have been placed under programmatic control in order to create client-side convenience methods and workflows.

Schnase, John L.↗

NASA's Space Launch System: Progress Toward Unmatched Exploration Capability

The Space Launch System (SLS) Program delivered the first element of the exploration-class rocket and completed manufacturing of all major structural elements in 2017. The Program continues component integration and testing in 2018 in preparation for the inaugural launch of NASA's new deep space exploration system in fiscal year 2020. SLS represents a new strategic national capability designed for the most challenging human and robotic exploration and is engineered for overall mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2018 and 2019.

Honeycutt, John↗

Payload Sensitivities for Human Mars Exploration Transportation Systems

NASA is continuing to investigate mission and transportation system alternatives to support human exploration of Mars. Several publications over the last few years have outlined, in detail, the baseline reference architectures under consideration. These alternatives include SEP-Chemical Hybrid Propulsion Systems, oxygen/methane propulsion stages, and nuclear thermal propulsion systems. Studies to date have focused on identifying mission architectures that leverage these different transportation options to best support a Mars mission within the context of overarching guidelines and constraints. The focus on identifying "closed" reference mission architectures for these transportation options is a key first step in comparing alternatives and supporting the development of technology investment strategies. Architecture closure implies that the architecture identified provides a viable solution which meets all constraints and closely aligns with guidelines. If a viable architecture cannot be identified for a given transportation option, there is no need to continue investigating that option. However, at this early stage of architecture development, metrics of comparison should look beyond how these architectures perform relative to the baseline reference mission. Architectural robustness, or an insensitivity to requirements drift, should also be considered in any comparison of architectures. At this early stage of design, mission requirements have the potential to change as more definition is provided and more analyses are completed. Particularly in relation to the mass of transported elements, including Mars landers and crew habitat, it is recognized that as designs for these elements mature there exists the potential for mass growth. Selection of an architecture alternative carries with it programmatic risks and relative sensitivity to mass growth can provide insight into a particular architecture option's risk of being unable to complete its mission without significant redesign as more element definition is provided. This paper outlines the current understanding of the sensitivity

Percy, Thomas K.↗

Assessing Alternatives in the Systems Engineering Process: Case Study of an Earth Observing Satellite Concept

Defining design alternatives constitutes one of the critical initial steps of the systems engineering process. Once these design alternatives have been identified, assessing which alternatives best satisfy the project’s objectives can prove to be challenging when dealing with complex decision frameworks. Complex systems often involve the participation of different interest groups, who have different value systems and are focused on distinct aspects of the project. For example, design alternatives might be assessed predominantly for their technical merit by one group of stakeholders, while a different group might be more inclined to assess the design alternatives primarily based on programmatic values. MESCAL (Monitoring the Evolving State of Clouds and Aerosol Layers) is an ongoing NASA / CNES (Centre National d’Etudes Spatiales) joint study for an active remote sensing Earth observing satellite. Several design alternatives have been identified and the assessment of these alternatives requires consideration of a variety of factors. This paper presents the approach that was used to support a global assessment of the MESCAL design alternatives. A mapping of the interactions between mission, instrument, and science requirements was modeled to support the assessment of the trade space. In addition, a set of metrics was developed to structure the assessment that was conducted. Finally, this paper also discusses the general applicability of these metrics to other science mission concepts in the formulation phase.

Ivanco, Marie L.↗

CRICKET: Cryogenic Reservoir Inventory by Cost-Effective Kinetically Enhanced Technology

NASA PROGRAMMATIC CHALLENGE: Locate hidden water ice in the darkest, coldest places on the moon using dozens of simple, autonomous robots. CONCEPTUAL SOLUTION: Use multiple small, autonomous bots to search for hidden water ice in permanently shadowed regions of the surface of the moon. Bots will locate and tag hidden water ice for follow up missions.Technical Basis for proposed solution: use of emerging and maturing technologies - MEMS, Cubesats, Sensor nets, integrated devices – will minimize cost risk and maximize return. Benefits: Cricket will enable human exploration through in-situ resource utilization: Cricket will demonstrate a distributed constellation to achieve a key NASA goal of novel uses of commercially available technologies. Cricket will reignite public interest in lunar exploration through a sustained human, and robotic, presence on the moon. Technical Approach: The cricket constellation has three members: the "queen"; the "hive" and the "cricket" foragers. The queen transports the hive an its crickets to the moon. The hive lands on the surface and disperses the crickets (there may be more than one species of cricket). The crickets then use the hive as a communications and recharging hub. Each cricket hosts algorithms that allow it to explore its surroundings and monitor its power state - something like a lunar Roomba - and return for recharging. If they are lost due to power or surface condition problems, replacements can carry out the hive tasks. The two most successful types of bio-inspired algorithms (BIAs) are evolutionary algorithms and swarm-based algorithms which are inspired by the natural evolution and collective behavior in animals.The evolution of the idea is summarized in Table 1 and Figure 1. NIAC context: This system integrates key elements from other NIAC efforts; it uses them and extends them into a meaningful whole

Cryogenics↗

In Space Assembled Telescope (ISAT) Study Preliminary Findings

“When is it advantageous to assemble telescopes in space rather than deploying them from launch vehicle fairings”? This question forms the crux of the objectives of a NASA study we have been conducting in collaboration with colleagues from different NASA centers, industry and academia. In this study, we have engaged a broad cross section of experts from the various fields of optics engineering, that is, telescope design and instrument design, structure and thermal engineering, robotics, launch system engineering, orbital mechanics, integration and testing, astrophysics, and NASA programmatics among others. Initial efforts began with a quick review of the current state of art of the component technologies that contribute towards an in-space assembled telescope. Then, leveraging the collective expertise of the diverse group of experts, we formulated a reference telescope design and attempted to develop a baseline approach to modularize the telescope into components amenable for robotic assembly. The group identified different trades associated with modularization and also developed a set of criteria to discern between the different options as revealed by the trades. Based on the modularization of the telescope, we will assess the impact of various launch vehicles, orbits for assembly and operation, robotic systems and operational approaches, and other related variables. From this, a concept to assemble the reference telescope in space from modular components will be developed. Based on this concept, and definition of the modules, we will develop a mission lifecycle plan for an assembled telescope over different phases of preliminary design, detailed design, assembly-test-and-integration, and in space operations. The mission lifecycle plan will be used to evaluate cost and risk implications of in-space assembly toward answering our fundamental question of the advantages, if any, of assembling a telescope in space as compared to self-deployment. In this paper, we summarize the objectives of the study, a review of the status of the underlying component technologies, a description of the methodology, including three different multi-day technical interchange meetings (TIMs), summary of findings from the TIMs and other related activities. In addition, a detailed description of the various factors that impact in-space assembly, their interplay and criteria for discerning among them, a preliminary description of the life cycle plan, including the test and integration plan, and initial observations on cost and risk implications will be included in the paper.

Mukherjee, Rudranarayan↗

NASA Goddard Thermal Technology Overview 2019

This presentation summarizes the current plans and efforts at NASA/Goddard to develop new thermal control technology for anticipated future missions. It will also address some of the programmatic developments currently underway at NASA, especially with respect to the NASA Technology Development Program and will highlight some of the latest flight project activities at GSFC. While funding for basic technology development is still scarce, significant efforts are being made in direct support of flight programs. New technology development continues to be driven by the needs of future missions, and applications of these technologies to current Goddard programs will be addressed. Many of these technologies also have broad applicability to DOD, DOE, and commercial programs. Partnerships have been developed with the Air Force, Navy, and various universities to promote technology development. Technology development activities supported by the internal research and development (IRAD) program, the Small Business Innovative Research (SBIR) program, and other technology development programs are reviewed in this presentation. Specific technologies addressed include; micro-channel heat transfer, latest developments of electro-hydro-dynamically pumped systems, Atomic Layer Deposition (ALD), thermal control coatings, and various other research activities.

Butler, Dan↗

Modern Modal Testing: A Cautionary Tale

Over the past 50 years, great advances have been achieved in both analytical modal analysis (i.e. finite element models and analysis) and experimental modal analysis (i.e. modal testing) in aerospace and other fields. With the advent of more powerful computers, higher performance instrumentation and data acquisition systems, and powerful linear modal extraction tools, analysts and test engineers have a breadth and depth of technical resources only dreamed of by our predecessors. However, some observed recent trends indicate that hard lessons learned are being forgotten or ignored, and possibly fundamental concepts are not being understood. These trends have the potential of leading to the degradation of the quality of and confidence in both analytical and test results. These trends are a making of our own doing, and directly related to having ever more powerful computers, programmatic budgetary pressures to limit analysis and testing, and technical capital loss due to the retirement of the senior component of a bimodal workforce. This paper endeavors to highlight some of the most important lessons learned, common pitfalls to hopefully avoid, and potential steps that may be taken to help reverse this trend.

bimodal workforce↗

Performance Management: Should We Manage to a Single Data Point? A NASA/Goddard Space Flight Center Perspective

With today's changing environment, meeting project commitments can be challenging. The Flight Projects Directorate at NASA's Goddard Space Flight Center (GSFC) has a portfolio of over 60 missions in various stages of the space flight life cycle. Numerous methods and approaches are used to monitor and track project performance and utilization of tools can provide valuable information to help manage missions. However, challenges can arise when these approaches are viewed as the sole data point for assessing the project status. At GSFC, performance management metric-based tools have provided insightful information for evaluating the programmatic health of space projects. These tools have provided the awareness and foresight desired to effectively manage and meet commitments, which is tremendously beneficial on the road to achieving mission success.

Peters, Wanda↗

High-Resolution, Lightweight, and Low-cost X-Ray Optics for the Lynx Observatory

We describe an approach to build an x-ray mirror assembly that can meet Lynx’s requirements of high-angular resolution, large effective area, light weight, short production schedule, and low-production cost. Adopting a modular hierarchy, the assembly is composed of 37,492 mirror segments, each of which measures ∼100 mm × 100 mm × 0.5 mm. These segments are integrated into 611 modules, which are individually tested and qualified to meet both science performance and spaceflight environment requirements before they in turn are integrated into 12 metashells. The 12 metashells are then integrated to form the mirror assembly. This approach combines the latest precision polishing technology and the monocrystalline silicon material to fabricate the thin and lightweight mirror segments. Because of the use of commercially available equipment and material and because of its highly modular and hierarchical building-up process, this approach is highly amenable to automation and mass production to maximize production throughput and to minimize production schedule and cost. As of fall 2018, the basic elements of this approach, including substrate fabrication, coating, alignment, and bonding, have been validated by the successful building and testing of single-pair mirror modules. In the next few years, the many steps of the approach will be refined and perfected by repeatedly building and testing mirror modules containing progressively more mirror segments to fully meet science performance, spaceflight environments, as well as programmatic requirements of the Lynx mission and other proposed missions, such as AXIS.

Zhang, William W.↗

Understanding Community Needs and Desires

This panel exchange is focused on the Integration Test phase within the development lifecycle with special emphasis and dedicated discussion on integration and testing of complex systems. Layout and scheduling of integration tasks come from the verification of interface and performance requirements. However, planning for integration activities of complex systems is inherently different from traditional systems engineering integration planning activities. Decisions about the systems under development have to consider not only the technical and programmatic viewpoints but also the political, societal, operational, and economic viewpoints. Definition of performance measures, found intrinsic in the plan, with trans-disciplinary implications will be discussed. A scenario of integration of UAS in the NAS will be used as a benchmark of current views and lifecycle challenges.

Murphy, James R.↗

Modern Modal Testing: A Cautionary Tale IMAC XXVII

Over the past 50 years, great advances have been achieved in both analytical modal analysis (i.e. finite element models and analysis) and experimental modal analysis (i.e. modal testing) in aerospace and other fields. With the advent of more powerful computers, higher performance instrumentation and data acquisition systems, and powerful linear modal extraction tools, analysts and test engineers have a breadth and depth of technical resources only dreamed of by our predecessors. However, some observed recent trends indicate that hard lessons learned are being forgotten or ignored, and possibly fundamental concepts are not being understood. These trends have the potential of leading to the degradation of the quality of and confidence in both analytical and test results. These trends are a making of our own doing, and directly related to having ever more powerful computers, programmatic budgetary pressures to limit analysis and testing, and technical capital loss due to the retirement of the senior component of a bimodal workforce. This paper endeavors to highlight some of the most important lessons learned, common pitfalls to hopefully avoid, and potential steps that may be taken to help reverse this trend.

bimodal workforce↗

The IOAG Recommendations on Spacecraft Emergency Cross Support

In 2014, the Inter-agency Operations Advisory Group (IOAG) chartered a multi-agency team effort to study how to best handle spacecraft emergency as part of cross support among network assets. The original intent is to put in place for the first time a process and guidelines to make emergency support as part of a permanent cross-support capability between space agencies. From the perspective of space communications service providers, a few key issues, common to all agencies, concerning the Spacecraft Emergency Cross Support (SECS) have been explored. They are: context of emergency support, provision of emergency support under a cross-support agreement, provision of emergency support with no cross-support agreement, legal and liability issues, response time, support priority, services provided, sustaining emergency support capabilities, and charge for the support. The positions of the various participating agencies with respect to these issues have been collected, analyzed, and finally harmonized to form the recommended IOAG positions. A central challenge most communications service providers are facing is that since the spacecraft emergency is an unplanned critical event, it typically requires fast response to the emergency call, hence lacking an international standard process for the operational interfaces seems to exacerbate the difficulty in providing SECS. For reducing the response time, i.e. from the time of accepting a request for SECS to the readiness for support, it is recommended that a “cross-support emergency system” be established by IOAG member agencies. Along with it, the IOAG core services, just-in-time ground communications line, cross support service management (CSSM), and standard operations procedures (SOP) for operational interfaces form the basic foundation of the “cross support emergency system”. Of the above, new to the cross support conducted thus far in the IOAG community is the concept of the SOP specifically for the interfaces between the service provider and service user during the SECS. Use cases, salient features, and definition of the key operational activities/tasks relevant to the interfaces are addressed by the effort. Underpinning such a system is the availability of the RF license granted by the local authority, at national and/or regional level, for a given ground station to communicate with and track the spacecraft in emergency mode at the uplink and downlink frequencies assigned to that spacecraft. That means it is critical for the IOAG member agencies to obtain a priori all-band licenses (for the entire X-band or S-band) for some, if not all, of their ground stations that are most capable of or likely to provide SECS. It is also recommended that certain prior arrangements be made with the relevant local licensing authorities for a process that will allow expedited authorization to transmit/receive signals to/from the declared spacecraft over the declared ground stations specifically and solely for the emergency case. Our analysis of the SECS has also uncovered a few fundamental programmatic issues. Recognizing any IOAG positions reached on these issues do not necessarily lead to any binding authority, it is recommended that they, along with those key attributes of the cross support emergency system, be explicitly stated as multi-agency guidelines to guide the implementation and provision of the SECS. The paper will present the results of the working group on Spacecraft Emergency Cross Support and, in particular, its findings, products and recommendations. It will also identify the next steps of this work that may include the production of some international standards as an extension of this work, or the process to make this emergency system usable by other spacecraft operators beyond the space agencies.

Tai, Wallace S.↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team (A-Team). The A-Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an ATeam study. In these studies, Concept Maturity Levels (CML) are used to group methods. These levels include idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for exploring the science objectives, feasibility, and scope will be described including use of a new technique for understanding the most compelling science, called a Science Return Diagram (SRD). In the process of developing the SRD, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid towards developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions and reveal the mission concept’s most compelling science. This paper will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.In June of 2011 a new collaborative engineering approach forearly concept formulation began in the JPL InnovationFoundry [1], six months later becoming the “A-Team” [2].Responding to a need for exploring mission architecturelevel trades [3], the A-Team precedes Team X [4,5] in asequence of concurrent engineering teams at JPL that can beused to mature a concept from a “cocktail napkin” level ideato a complete mission point design. The A-Team efficientlyexplores the science, implementation, and programmatictrade space in early concept formulation. Small, facilitatedgroups of experts generate innovative ideas, quantitativelyassess feasibility, and discover key sensitivities in the tradespace through collaborative analysis and use of advancedmethods and tools. The A-Team process builds off theexperience within JPL and other recent approaches to earlyconcept formulation [6] including best practices of the JPLInnovation Foundry, Project Systems Engineering &Formulation Section, Team Eureka and the Rapid MissionArchitecture Team[7].The A-Team is a focal point for innovative formulationapproaches and people within JPL. It relies on a largebackground of study resources, creative thinkers and “greybeard” scrutinizers, advanced tools, and subject matterexperts with both breadth and depth in experience andexpertise that are all available at JPL. The A-Team isdesigned to be a rapid and efficient process takingapproximately 6 weeks (the entire process can be as short asjust a few days or as long as up to three months) and costingthe equivalent of a work-month of a full-time employee orless. Studies begin with detailed planning and client reviewfollowed by study sessions, analysis work, and reporting.The staffing on each study is customized to the study goalsand objectives, and it is addressed early in the A-Teamprocess. Sessions are generally half-day or whole-day eventsand conducted over a series of days with focused agendas thatare moderated by a trained facilitator. Preliminary results andknowledge capture are available within hours of each session,and a final report is generally available two weeks later.One of the biggest challenges facing early conceptdevelopment is understanding the gradient in science returnversus various available mission scenarios and payload options. Often times, major areas of scientific inquiry havealready been prioritized by science groups, including throughthe National Research Council’s Decadal Studies inAstronomy, Planetary, and Earth Science. Yet science teamscontinue to struggle, especially in competitive missionsolicitations, to capture the right amount of scope that’sachievable within the cost constraints of the opportunity.Often the desire to completely and comprehensively study ascience area in just one mission (after all, true missionopportunities are rare) drives teams to take on too much,providing requirements that are unachievable within theresources of the opportunity without inducing unacceptableimplementation risk. Alternatively, science teams can seekto reduce risk by using an established instrument, but havenot thought through the traceability and key aspects of thescience question to justify its use. Both scenarios lead to badassumptions at the beginning of the concept development thatcan then ripple through implementation option choices,potentially preventing what would have been a good scienceinvestigation from being selected.The purpose of this paper is first to provide some additionalbackground and summary of the A-Team process, tools,people, and facilities. We then focus on the A-Teammethodology for overcoming the barriers of defining thescience scope well at the early concept development stage.This includes understanding the science story andtraceability, and then examining the gradient in science returnversus key characteristics of observables, developing theright payload and mission requirement specification throughexamining the science and implementation trade space.

Ziemer, John K.↗

Architecture Modeling on the Europa Project

In 2015 NASA chartered a partnership between the Jet Propulsion Laboratory (JPL) and the Johns Hopkins Applied Physics Laboratory (APL) to begin planning a mission to study the Jovian moon Europa. The project has adopted a Model-Based Systems Engineering (MBSE) approach to its architecting process since its early formulation, developing certain modeling practices and tools as needed, with the expectation that this process would result in a more consistent and verifiable architecture than with a more traditional document-based approach. A sound architecture is essential to provide the rationale for requirements on the system design, and to define the trade space of acceptable design points within which technical and programmatic concerns as well as project objectives can be addressed. This paper provides an overview of the framework used by the Europa project to describe the mission architecture and discusses how a system model was instrumental in providing a single-source-of-truth for this description. Several key modeling patterns to represent the architecture are presented, along with audit methods to ensure the consistency and the correctness of the model. Finally, the benefits and challenges of using a model-based approach to generate traditional requirements documents and other gate products are assessed.

Dubos, Gregory F.↗

History of NASA's Determination of Offgassed Products (Test 7)

NASA's Determination of Offgassed Products (Test 7) from materials and assembled articles for spaceflight has evolved since the Apollo program for over 50 years to meet various habitable spacecraft nonmetallic programmatic requirements. Now mandated by NASA STD-6016A, Standard Materials and Processes Requirements for Spacecraft, all nonmetallic materials used in habitable flight compartments, with the exception of ceramics, metal oxides, inorganic glasses, and materials used in sealed containers, must meet the offgassing requirements in NASA-STD-6001B Test 7. This manuscript presents the history of Test 7, beginning with the Apollo spacecraft nonmetallic materials selection guidelines and test requirements in 1967, in which tests were performed in mostly oxygen atmospheres. It progresses through Skylab, Space Shuttle, International Space Station nonmetals testing, and acceptance requirements with milder test environments. This review of the history of Test 7 presents the reader with a perspective on the development and changes undergone since inception to the present. Related NASA standard tests (some now former, discontinued, combined, or supplemental) including Test 6, Odor Assessment, Test 16, Determination of Offgassed Products from Assembled Articles, and Test 12, Total Spacecraft Cabin Offgassing, are discussed in context

Greene, Benjamin↗