Demonstrating a Market-Based Approach to the Reclamation of Mined Lands in West Virginia
This project demonstrated that developing environmental credits on private land—including abandoned mined lands—is dependent on a number of factors, some of them beyond the control of the project team. In this project, acid mine drainage (AMD) was successfully remediated through the construction of a passive AMD treatment system. Extensive water quality sampling both before and after the installation of the passive AMD treatment system showed that the system achieved removal efficiencies and pollutant loading reductions for acidity, iron, aluminum and manganese that were consistent with systems of similar size and design. The success of the passive AMD treatment system should have resulted in water credits if the project had not been terminated. Developing carbon sequestration credits, however, was much more complex and was not achieved in this project. The primary challenge that the project team encountered in meeting the full project objectives was the unsuccessful attempt to have the landowner sign a conservation easement for his property. This would have allowed the project team to clear and reforest the site, monitor the progress of the newly planted trees, and eventually realize carbon sequestration credits once the forest was mature. The delays caused by the lack of a conservation easement, as well as other factors, eventually resulted in the reforestation portion of the project being cancelled. The information in this report will help the public make more informed decisions regarding the potential of using water and carbon, and other credits to support the remediation of minded lands through out the United States. The hope is that by using credits that more mined lands with be remediated.