Search NASA⌕ Search

SEARCH · Search NASA

Results for “software validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

ATCCfinder - Download and Search the ATCC Genome Portal

Much strain-specific sequence data exists in research conducted before the deployment of large sequencing repositories, making it challenging to identify and validate the identity of strains used in these studies through bioinformatics and phenotyping. The American Type Culture Collection (ATCC) is an organization that sells a wide variety of microbes with strain-level taxonomy classification and associated sequenced reference genomes. Currently, ATCC does not provide a method for searching for sequence similarity between a query sequence and their database of reference genomes. Here I propose the software ATCCfinder, which utilizes ATCC application interface software (API) to generate query-able databases from ATCC Genome resources.

Koehler, Samuel↗

Sensitivity-based Similarity Metrics for New Experiment Design Optimization

The nuclear data used in advanced reactor simulations requires validation. Data from nuclear criticality experiments can provide this validation. New nuclear criticality experiment design requires extensive knowledge and expert judgement such that the experimental design parameters are selected in such a way to keep the experiment subcritical. To aide in this experimental design process, professionals can utilize sensitivity and uncertainty analysis. Sensitivity and uncertainty analysis relies on matching new application experiments with currently existing benchmark experiments. Currently, there is functionality in the Whisper 1.1 software package to calculate a similarity metric based on neutron multiplication factor sensitivity coefficients between a new application designed by the user and existing International Criticality Safety Benchmark Experiment Project (ICSBEP) benchmarks. The Whisper 1.1 software package is included in Monte Carlo N-Particle ® Code Version 6.21 (MCNP ® 6.2). This work is geared toward expanding this capability to new similarity metrics based on beta-effective sensitivity coefficients and reactivity coefficient sensitivity coefficients. While the investigation of these sensitivity coefficients is presented in detail in separate works at this same conference, this work will be primarily focused on studying the similarity metrics in more detail. These similarity metrics will then be incorporated into the optimization algorithms used for experiment design in EUCLID (Experiments Underpinned by Computational Learning for Improvements in nuclear Data), which is a Los Alamos National Laboratory (LANL) project designed to constrain nuclear data of interest, such that adjustments can be made to possible inaccuracies. A more detailed optimization can be subsequently performed by breaking down these similarity metrics by isotope, reaction, and energy.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Low-Energy Solvents For Carbon Dioxide Capture Enabled By A Combination Of Enzymes And Vacuum Regeneration

An integrated bench-scale system combining the attributes of the bio-renewable enzyme carbonic anhydrase (CA) with low-enthalpy CO 2 absorption solvents and vacuum regeneration was designed, built and operated for 500 hours using simulated flue gas. The objective was to develop a CO 2 capture process with improved efficiency and sustainability when compared to NETL Case 10 monoethanolamine (MEA) scrubbing technology. The use of CA accelerates inter-conversion between dissolved CO 2 and bicarbonate ion to enhance CO 2 absorption, and the use of low enthalpy CO 2 absorption solvents makes it possible to regenerate the solvent at lower temperatures relative to the reference MEA-based solvent. The vacuum regeneration-based integrated bench-scale system operated successfully for an accumulated 500 hours using aqueous 23.5 wt% K 2 CO 3 -based solvent containing 2.5 g/L enzyme to deliver an average 84% CO 2 capture when operated with a 20% enzyme replenishment rate per ~7 hour steady-state run period. The total inlet gas flow was 30 standard liters per minute with 15% CO 2 and 85% N 2 . The absorber temperature was 40°C and the stripper operated under 35 kPa pressure with an approximate 77°C stripper bottom temperature. Tests with a 30°C absorber temperature delivered >90% capture. On- and off-line operational measurements provided a full process data set, with recirculating enzyme, that allowed for enzyme replenishment and absorption/desorption kinetic parameter calculations. Dissolved enzyme replenishment and conventional process controls were demonstrated as straightforward approaches to maintain system performance. Preliminary evaluation of a novel flow-through ultrasonically enhanced regeneration system was also conducted, yet resulted in CO2 release within the range of temperature-dependent release, and further work would be needed to validate the benefits of ultrasonic enhanced stripping. A full technology assessment was completed in which four techno-economic cases for enzyme-enhanced aqueous K 2 CO 3 solvent with vacuum stripping were considered and a corresponding set of sensitivity studies were developed. The cases were evaluated using bench-scale and laboratory-based observations, AspenPlus® process simulation and modeling, AspenTech’s CCE® Parametric Software, current vendor quotations, and project partners’ know-how of unit operations. Overall, the DOE target of 90% CO 2 capture could be met using the benign enzyme-enhanced aqueous K 2 CO 3 -based alternative to NETL Case 10. The model-predicted plant COE performance, scaled to 550 MWe net output, was 9% higher than NETL Case 10 for an enzyme-activated case with minimized technical risk and highest confidence in physical system performance utilizing commercially available equipment. A COE improvement of 2.8% versus NETL Case 10 was predicted when favorable features of improved enzyme longevity and additional power output from a very low pressure (VLP) turbine were combined, wherein corresponding high capital and operational costs limited the level of COE benefit. The environmental, health and safety (EH&S) profile of the system was found to be favorable and was compliant with the Federal EH&S legislation reviewed. Further work on a larger scale test unit is recommended to reduce the level of uncertainty inherent in extrapolating findings from a bench-scale unit to a full scale PCC plant, and to further investigate several identified opportunities for improvement. Production feasibility and suitability of carbonic anhydrases for scale-up testing was confirmed both through the current project and through parallel efforts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Surface and top-of-atmosphere radiative feedback kernels for CESM-CAM5

Radiative kernels at the top of the atmosphere are useful for decomposing changes in atmospheric radiative fluxes due to feedbacks from atmosphere and surface temperature, water vapor, and surface albedo. Here we describe and validate radiative kernels calculated with the large-ensemble version of CAM5, CESM1.1.2, at the top of the atmosphere and the surface. Estimates of the radiative forcing from greenhouse gases and aerosols in RCP8.5 in the CESM large-ensemble simulations are also diagnosed. As an application, feedbacks are calculated for the CESM large ensemble. The kernels are freely available at https://doi.org/10.5065/D6F47MT6 , and accompanying software can be downloaded from https://github.com/apendergrass/cam5-kernels .

54 ENVIRONMENTAL SCIENCES↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

TREAT reactor LEU fuel-clad chemical interaction empirical modeling analysis

DOE is converting TREAT (Transient Reactor Test) facility from its existing highly enriched uranium (HEU) core to a low-enriched uranium (LEU) core. In order to assess the magnitude of chemical interaction between fuel and cladding materials during physical contact under expected TREAT operational limits, planned transients tests, and reactivity accident scenarios, a combination of experimental testing and thermodynamic modeling was performed to predict the expected chemical interactions among fuel and cladding chemical constituents. Thermodynamic calculations were then validated with empirical data from experiments that emulate TREAT's expected upper operational limits. Pellet samples composed of LEU oxide powder dispersed in a graphite matrix had intimate contact with zirconium-based alloy cladding. The samples were subjected to long-term isothermal heating under high vacuum. Specimen characterization consisted of scanning electron microscopy, x-ray diffraction analysis, and x-ray tomography. ThermoCalc software and Ellingham's diagrams were used for thermodynamic calculations. The X-ray tomography and SEM analysis of the pellets showed a homogeneous distribution of UO{sub 2} particles within the graphite matrix with isolated larger UO{sub 2} agglomerates. The SEM analysis showed the formation of a lamellar structure between the large UO{sub 2} agglomerate and the graphite matrix. This is an indication that diffusion is taking place at a rather moderate temperature and reaction time during the pellet fabrication. Secondary phases, with high Al and Mg content, were detected inside a UO{sub 2} agglomerate using SEM in SE/EBSD mode and chemical analysis with EDS. LEU feedstock impurities, as Al and Mg, seem to promote the chemical reactivity between UO{sub 2} particles and graphite matrix. XRD analysis of a pellet sample showed the presence of UO{sub 2} and graphite, but no other crystalline phases were detected with this technique. Thermodynamic analysis through the use of Ellingham diagrams showed that within TREAT's operational to reactivity accident temperature (278-820 Celsius degrees), UO{sub 2} can be reduced to U metal by Zr due to a more favorable ΔG for the oxidation of Zr.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety software release options to support plant start-up and commissioning activities - 285

The schedule demands on new nuclear power plant site testing and commissioning programs challenge the plant's Instrumentation and Control (I and C) supplier's ability to provide certified safety software releases to meet the needs of these programs. This paper outlines the typical certified safety software development and certification process which follows a Waterfall software life-cycle model. The conflicts that result between supporting the site program and the safety software supplier's internal certification program are identified. An adapted 'functional' safety release process is presented that supports the site program's needs for software changes and in parallel enables the safety software certification process to proceed. Comparisons between the two safety software release processes are examined and the benefits realized through the use of the adapted 'functional' safety software release process are discussed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparing Control Performance Between Simulation and Experiment using the Microreactor Automated Control System Testbed

In the advanced reactor domain, a flexible and scalable software/hardware infrastructure is crucial for integrating and validating various control technologies. This study used the Microreactor Automated Control System (MACS) hardware platform as a testbed. MACS was originally designed to mirror Idaho National Laboratory (INL)'s Microreactor Applications Research Validation and Evaluation (MARVEL), a 85-kW thermal fission microreactor. It features control drums for simulated reactivity control; lights that function as a surrogate reactor core, with the brightness being proportional to the reactor power; and light sensors that emulate neutron detectors. To transform MACS into a physical twin of MARVEL for evaluating control methods, the Control and Optimization Modular Modeling Application for Nuclear Deployment (COMMAND) software was employed. This software integrated the hardware with two models of the MARVEL core, based on Reactor Excursion and Leak Analysis Program (RELAP5-3D) and Monte Carlo N-Particle (MCNP) models. The study aimed to demonstrate the gap between control theory and actual practice—a gap that often necessitates empirical adjustments such as control gain retuning, filters, time discretization, and integrator anti-windup measures. Controllers were developed based on increasingly complex simulations without hardware, starting from the base MARVEL model and then introducing actuator saturation constraints and sensor noise. The final control strategy was then tested using MACS, and a comparative performance analysis was conducted.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

SU-D-BRC-03: Development and Validation of an Online 2D Dose Verification System for Daily Patient Plan Delivery Accuracy Check

Purpose: All plan verification systems for particle therapy are designed to do plan verification before treatment. However, the actual dose distributions during patient treatment are not known. This study develops an online 2D dose verification tool to check the daily dose delivery accuracy. Methods: A Siemens particle treatment system with a modulated scanning spot beam is used in our center. In order to do online dose verification, we made a program to reconstruct the delivered 2D dose distributions based on the daily treatment log files and depth dose distributions. In the log files we can get the focus size, position and particle number for each spot. A gamma analysis is used to compare the reconstructed dose distributions with the dose distributions from the TPS to assess the daily dose delivery accuracy. To verify the dose reconstruction algorithm, we compared the reconstructed dose distributions to dose distributions measured using PTW 729XDR ion chamber matrix for 13 real patient plans. Then we analyzed 100 treatment beams (58 carbon and 42 proton) for prostate, lung, ACC, NPC and chordoma patients. Results: For algorithm verification, the gamma passing rate was 97.95% for the 3%/3mm and 92.36% for the 2%/2mm criteria. For patient treatment analysis,the results were 97.7%±1.1% and 91.7%±2.5% for carbon and 89.9%±4.8% and 79.7%±7.7% for proton using 3%/3mm and 2%/2mm criteria, respectively. The reason for the lower passing rate for the proton beam is that the focus size deviations were larger than for the carbon beam. The average focus size deviations were −14.27% and −6.73% for proton and −5.26% and −0.93% for carbon in the x and y direction respectively. Conclusion: The verification software meets our requirements to check for daily dose delivery discrepancies. Such tools can enhance the current treatment plan and delivery verification processes and improve safety of clinical treatments.

60 APPLIED LIFE SCIENCES↗

The Coal-Seq III Consortium. Advancing the Science of CO 2 Sequestration in Coal Seam and Gas Shale Reservoirs

The Coal-Seq consortium is a government-industry collaborative that was initially launched in 2000 as a U.S. Department of Energy sponsored investigation into CO2 sequestration in deep, unmineable coal seams. The consortium’s objective aimed to advancing industry’s understanding of complex coalbed methane and gas shale reservoir behavior in the presence of multi-component gases via laboratory experiments, theoretical model development and field validation studies. Research from this collaborative effort was utilized to produce modules to enhance reservoir simulation and modeling capabilities to assess the technical and economic potential for CO2 storage and enhanced coalbed methane recovery in coal basins. Coal-Seq Phase 3 expands upon the learnings garnered from Phase 1 & 2, which has led to further investigation into refined model development related to multicomponent equations-of-state, sorption and diffusion behavior, geomechanical and permeability studies, technical and economic feasibility studies for major international coal basins the extension of the work to gas shale reservoirs, and continued global technology exchange. The first research objective assesses changes in coal and shale properties with exposure to CO2 under field replicated conditions. Results indicate that no significant weakening occurs when coal and shale were exposed to CO2, therefore, there was no need to account for mechanical weakening of coal due to the injection of CO2 for modeling. The second major research objective evaluates cleat, Cp, and matrix, Cm, swelling/shrinkage compressibility under field replicated conditions. The experimental studies found that both Cp and Cm vary due to changes in reservoir pressure during injection and depletion under field replicated conditions. Using laboratory data from this study, a compressibility model was developed to predict the pore-volume compressibility, Cp, and the matrix compressibility, Cm, of coal and shale, which was applied to modeling software to enhance model robustness. Research was also conducted to improve algorithms and generalized adsorption models to facilitate realistic simulation of CO2 sequestration in coal seams and shale gas reservoirs. The interaction among water and the adsorbed gases, carbon dioxide (CO2), methane (CH4), and nitrogen (N2) in coalbeds is examined using experimental in situ laboratory techniques to comprehensively model CBM production and CO2 sequestration in coals. An equation of state (EOS) module was developed which is capable of predicting the density of pure components and mixtures involving the wet CBM gases CH4, CO2, and N2 at typical reservoir condition, and is used to inform CO2 injection models. The final research objective examined the effects adsorbed CO2 has on coal strength and permeability. This research studied the weakening or failure of coal by the adsorption of CO2 from empirically derived gas production data to develop models for advanced modeling of permeability changes during CO2 sequestration. The results of this research effort have been used to construct a new and improved model for assessing changes in permeability of coal reservoirs due CO2 injection. The modules developed from these studies and knowledge learned are applied to field validation and basin assessment studies. These data were used to assess the flow and storage of CO2 in a shale reservoir, test newly developed code against large-scale projects, and conduct a basin-oriented review of coal storage potential in the San Juan Basin. The storage potential and flow of CO2 was modeled for shale sequestration of a proprietary Marcellus Shale horizontal gas production well using COMET3 simulation software. Simulation results from five model runs indicate that stored CO2 quantities are linked to the duration of primary production preceding injection. Matrix CO2 saturation is observed to increase in each shale zone after injection with an increase in primary production, and the size of the CO2 plume is also observed to increase in size the longer initial production is sustained. The simulation modules developed around the Coal-Seq experimental work are also incorporated into a pre-existing large-scale numerical simulation model of the Pump Canyon CO2-ECBM pilot in the San Juan Basin. The new model was applied to re-history match the data set to explore the improvements made in permeability prediction against previously published data sets and to validate this module. The assessment of the new data, however, indicates that the impact of the variable Cp is negligible on the overall behavior of the coal for CO2 storage purposes. Applying these new modules, the San Juan Basin and the Marcellus Shale are assessed for their technical ECBM/AGR and CO2 storage potential and the economic potential of these operations. The San Juan Basin was divided into 4 unique geographic zones based on production history, and the Marcellus was divided into nine. Each was assessed based upon each zone’s properties, and simulations were run to assess the potential of full Basin development. Models of a fully developed San Juan Basin suggest the potential for up to 104 Tcf of CO2 storage, and 12.3 Tcf of methane recovery. The Marcellus models suggest 1,248 Tcf of CO2 storage and 924 Tcf of AGR. The economics are deemed favorable where credits cover the cost of CO2 in the San Juan Basin, and in many cases in the Marcellus, but to maximize storage potential, credits need to extend to pay the operator to store CO2.

01 COAL, LIGNITE, AND PEAT↗

SU-E-T-250: Determining VMAT Machine Limitations of An Elekta Linear Accelerator with Agility MLC for Accurate Modeling in RayStation and Robust Delivery

Purpose: To implement VMAT in RayStation with the Elekta Synergy linac with the new Agility MLC, and to utilize the same vendor softwares to determine the optimum Elekta VMAT machine parameters in RayStation for accurate modeling and robust delivery. Methods: iCOMCat is utilized to create various beam patterns with user defined dose rate, gantry, MLC and jaw speed for each control point. The accuracy and stability of the output and beam profile are qualified for each isolated functional component of VMAT delivery using ion chamber and Profiler2 with isocentric mounting fixture. Service graphing on linac console is used to verify the mechanical motion accuracy. The determined optimum Elekta VMAT machine parameters were configured in RayStation v4.5.1. To evaluate the system overall performance, TG-119 test cases and nine retrospective VMAT patients were planned on RayStation, and validated using both ArcCHECK (with plug and ion chamber) and MapCHECK2. Results: Machine output and profile varies <0.3% when only variable is dose rate (35MU/min-600MU/min). <0.9% output and <0.3% profile variation are observed with additional gantry motion (0.53deg/s–5.8deg/s both directions). The output and profile variation are still <1% with additional slow leaf motion (<1.5cm/s both direction). However, the profile becomes less symmetric, and >1.5% output and 7% profile deviation is seen with >2.5cm/s leaf motion. All clinical cases achieved comparable plan quality as treated IMRT plans. The gamma passing rate is 99.5±0.5% on ArcCheck (<3% iso center dose deviation) and 99.1±0.8% on MapCheck2 using 3%/3mm gamma (10% lower threshold). Mechanical motion accuracy in all VMAT deliveries is <1°/1mm. Conclusion: Accurate RayStation modeling and robust VMAT delivery is achievable on Elekta Agility for <2.5cm/s leaf motion and full range of dose rate and gantry speed determined by the same vendor softwares. Our TG-119 and patient results have provided us with the confidence to use VMAT clinically.

60 APPLIED LIFE SCIENCES↗

Hydrodynamic Analysis of a Suspended Cylinder Under Regular Wave Loading Based on Computational Fluid Dynamics: Preprint

An investigation into the computation of hydrodynamic loads on a suspended cylinder in regular waves is presented. The primary goal was to perform a three-way-validation of the loads between experimental measurements and simulations from two computational methods. Experimental measurements of the longitudinal inline force on a cylinder suspended at a fixed po- sition were available from the Offshore Code Comparison Col- laboration, Continued, with Correlation (OC5) project, Phase Ia. These measurements were compared to Computational Fluid Dynamics (CFD) simulations based on the solution of Reynolds- averaged Navier-Stokes (RANS) equations, as implemented in STAR-CCM plus. The study encompassed a sensitivity analysis of the loads computed in STAR-CCM plus based on wave modeling, boundary conditions, turbulence modeling, and spatial and tem- poral discretization. The analysis was supplemented by results generated with the offshore wind turbine engineering software OpenFAST, based on a hybrid combination of second-order po- tential flow and viscous drag fromMorison's equation. The focus of the investigation was on the assessment of the accuracy of the computation of first- and higher-order hydrodynamic loads. Sub- stantial differences were observed in the numerical prediction of the second and third harmonic force contribution. Local flow field analysis with CFD was applied to study the physics of wave run-up and diffraction dynamics to identify the causes.

16 TIDAL AND WAVE POWER↗

Enabling Graph Mining in RDF Triplestores using SPARQL for Holistic In-situ Graph Analysis

The graph analysis is now considered as a promising technique to discover useful knowledge in data with a new perspective. We envi- sion that there are two dimensions of graph analysis: OnLine Graph Analytic Processing (OLGAP) and Graph Mining (GM) where each respectively focuses on subgraph pattern matching and automatic knowledge discovery in graph. Moreover, as these two dimensions aim to complementarily solve complex problems, holistic in-situ graph analysis which covers both OLGAP and GM in a single system is critical for minimizing the burdens of operating multiple graph systems and transferring intermediate result-sets between those systems. Nevertheless, most existing graph analysis systems are only capable of one dimension of graph analysis. In this work, we take an approach to enabling GM capabilities (e.g., PageRank, connected-component analysis, node eccentricity, etc.) in RDF triplestores, which are originally developed to store RDF datasets and provide OLGAP capability. More specifically, to achieve our goal, we implemented six representative graph mining algorithms using SPARQL. The approach allows a wide range of available RDF data sets directly applicable for holistic graph analysis within a system. For validation of our approach, we evaluate performance of our implementations with nine real-world datasets and three different computing environments - a laptop computer, an Amazon EC2 instance, and a shared-memory Cray XMT2 URIKA-GD graph-processing appliance. The experimen- tal results show that our implementation can provide promising and scalable performance for real world graph analysis in all tested environments. The developed software is publicly available in an open-source project that we initiated.

97 MATHEMATICS AND COMPUTING↗

Interpretation of energy deposition data from historical operation of the transient test facility (TREAT)

The Transient Test Reactor (TREAT) at Idaho National Laboratory will resume operations in late 2017 after a 23 year hiatus while maintained in a cold standby state. Over that time period, computational power and simulation capabilities have increased substantially and now allow for new multiphysics modeling possibilities that were not practical or feasible for most of TREAT's operational history. Hence the return of TREAT to operational service provides a unique opportunity to apply state-of-the-art software and associated methods in the modeling and simulation of general three-dimensional steady state and kinetic behavior for reactor operation, and for coupling of the core power transient model to experiment simulations. However, measurements taken in previous operations were intended to predict power deposition in experimental samples, with little consideration of three-dimensional core power distributions. Hence, interpretation of data for the purpose of validation of modern methods can be challenging. For the research discussed herein, efforts are described for the process of proper interpretation of data from the most recent calibration experiments performed in the core, the M8 calibration series (M8-CAL). These measurements were taken between 1990 and 1993 using a set of fission wires and test fuel pins to estimate the power deposition that would be produced in fast reactor test fuel pins during the M8 experiment series. Because of the decision to place TREAT into a standby state in 1994, the M8 series of transients were never performed. However, potentially valuable information relevant for validation is available in the M8-CAL measurement data, if properly interpreted. This article describes the current state of the process of recovery of useful data from M8-CAL measurements and quantification of biases and uncertainties to potentially apply to the validation of multiphysics methods.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wireless Sensor Network for Improving the Energy Efficiency of Data Centers

Data centers occupy less than 2% of the federally owned portfolio under the jurisdiction, custody or control of the U.S. General Services Administration (GSA), but represent nearly 5% of the agency’s overall energy budget. Assuming that energy use in GSA’s data centers tracks with industry averages, GSA can anticipate that data center energy use will grow at an annual rate of 15%, a doubling of energy use every five years.1 In fact, energy is the single largest operating expense for most data centers. Improving the energy performance of data center systems supports progress toward meeting federally mandated greenhouse gas emission-­reduction goals, while reducing operating and energy costs and allowing for greater flexibility in future expansion by eliminating the need to provide additional power and cooling. Studies sponsored by the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) have shown that energy use can be reduced by 25% through implementation of best practices and commercially available technologies. The present study evaluated the effectiveness of a strategy to cost- effectively improve the efficiency of data center cooling, which is the single largest non-­IT load. The technology that was evaluated consists of a network of wireless sensors—including branch circuit power monitors, temperature sensors, humidity sensors, and pressure sensors, along with an integrated software product to help analyze the collected data. The technology itself does not save energy; however, its information collection and analysis features enable users to understand operating conditions and identify problem areas. In addition, data obtained by this technology can be input into assessment tools that can identify additional best practice measures. Energy savings result from the implementation of the best practices. The study was conducted to validate the premise that providing data center operators with detailed, real- time measurement of environmental parameters and power consumption enables them to establish baseline performance, discover areas of sub-optimal performance, and identify concrete opportunities for improvement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗