Search NASA⌕ Search

SEARCH · Search NASA

Results for “ACT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Lignin impairs Cel7A degradation of in vitro lignified cellulose by impeding enzyme movement and not by acting as a sink

Abstract Background Cellulose degradation by cellulases has been studied for decades due to the potential of using lignocellulosic biomass as a sustainable source of bioethanol. In plant cell walls, cellulose is bonded together and strengthened by the polyphenolic polymer, lignin. Because lignin is tightly linked to cellulose and is not digestible by cellulases, is thought to play a dominant role in limiting the efficient enzymatic degradation of plant biomass. Removal of lignin via pretreatments currently limits the cost-efficient production of ethanol from cellulose, motivating the need for a better understanding of how lignin inhibits cellulase-catalyzed degradation of lignocellulose. Work to date using bulk assays has suggested three possible inhibition mechanisms: lignin blocks access of the enzyme to cellulose, lignin impedes progress of the enzyme along cellulose, or lignin binds cellulases directly and acts as a sink. Results We used single-molecule fluorescence microscopy to investigate the nanoscale dynamics of Cel7A from Trichoderma reesei , as it binds to and moves along purified bacterial cellulose in vitro. Lignified cellulose was generated by polymerizing coniferyl alcohol onto purified bacterial cellulose, and the degree of lignin incorporation into the cellulose meshwork was analyzed by optical and electron microscopy. We found that Cel7A preferentially bound to regions of cellulose where lignin was absent, and that in regions of high lignin density, Cel7A binding was inhibited. With increasing degrees of lignification, there was a decrease in the fraction of Cel7A that moved along cellulose rather than statically binding. Furthermore, with increasing lignification, the velocity of processive Cel7A movement decreased, as did the distance that individual Cel7A molecules moved during processive runs. Conclusions In an in vitro system that mimics lignified cellulose in plant cell walls, lignin did not act as a sink to sequester Cel7A and prevent it from interacting with cellulose. Instead, lignin both blocked access of Cel7A to cellulose and impeded the processive movement of Cel7A along cellulose. This work implies that strategies for improving biofuel production efficiency should target weakening interactions between lignin and cellulose surface, and further suggest that nonspecific adsorption of Cel7A to lignin is likely not a dominant mechanism of inhibition.

09 BIOMASS FUELS↗

Hedgehog Signaling Acts with the Temporal Cascade to Promote Neuroblast Cell Cycle Exit

In Drosophila postembryonic neuroblasts, transition in gene expression programs of a cascade of transcription factors (also known as the temporal series) acts together with the asymmetric division machinery to generate diverse neurons with distinct identities and regulate the end of neuroblast proliferation. However, the underlying mechanism of how this ‘‘temporal series’’ acts during development remains unclear. Here, we show that Hh signaling in the postembryonic brain is temporally regulated; excess (earlier onset of) Hh signaling causes premature neuroblast cell cycle exit and underproliferation, whereas loss of Hh signaling causes delayed cell cycle exit and excess proliferation. Moreover, the Hh pathway functions downstream of Castor but upstream of Grainyhead, two components of the temporal series, to schedule neuroblast cell cycle exit. Interestingly, hh is likely a target of Castor. Hence, Hh signaling provides a link between the temporal series and the asymmetric division machinery in scheduling the end of neurogenesis.

59 BASIC BIOLOGICAL SCIENCES↗

Interactions between Energy Efficiency Programs funded under the Recovery Act and Utility Customer-Funded Energy Efficiency Programs

Since the spring of 2009, billions of federal dollars have been allocated to state and local governments as grants for energy efficiency and renewable energy projects and programs. The scale of this American Reinvestment and Recovery Act (ARRA) funding, focused on 'shovel-ready' projects to create and retain jobs, is unprecedented. Thousands of newly funded players - cities, counties, states, and tribes - and thousands of programs and projects are entering the existing landscape of energy efficiency programs for the first time or expanding their reach. The nation's experience base with energy efficiency is growing enormously, fed by federal dollars and driven by broader objectives than saving energy alone. State and local officials made countless choices in developing portfolios of ARRA-funded energy efficiency programs and deciding how their programs would relate to existing efficiency programs funded by utility customers. Those choices are worth examining as bellwethers of a future world where there may be multiple program administrators and funding sources in many states. What are the opportunities and challenges of this new environment? What short- and long-term impacts will this large, infusion of funds have on utility customer-funded programs; for example, on infrastructure for delivering energy efficiency services or on customer willingness to invest in energy efficiency? To what extent has the attribution of energy savings been a critical issue, especially where administrators of utility customer-funded energy efficiency programs have performance or shareholder incentives? Do the new ARRA-funded energy efficiency programs provide insights on roles or activities that are particularly well-suited to state and local program administrators vs. administrators or implementers of utility customer-funded programs? The answers could have important implications for the future of U.S. energy efficiency. This report focuses on a selected set of ARRA-funded energy efficiency programs administered by state energy offices: the State Energy Program (SEP) formula grants, the portion of Energy Efficiency and Conservation Block Grant (EECBG) formula funds administered directly by states, and the State Energy Efficient Appliance Rebate Program (SEEARP). Since these ARRA programs devote significant monies to energy efficiency and serve similar markets as utility customer-funded programs, there are frequent interactions between programs. We exclude the DOE low-income weatherization program and EECBG funding awarded directly to the over 2,200 cities, counties and tribes from our study to keep its scope manageable. We summarize the energy efficiency program design and funding choices made by the 50 state energy offices, 5 territories and the District of Columbia. We then focus on the specific choices made in 12 case study states. These states were selected based on the level of utility customer program funding, diversity of program administrator models, and geographic diversity. Based on interviews with more than 80 energy efficiency actors in those 12 states, we draw observations about states strategies for use of Recovery Act funds. We examine interactions between ARRA programs and utility customer-funded energy efficiency programs in terms of program planning, program design and implementation, policy issues, and potential long-term impacts. We consider how the existing regulatory policy framework and energy efficiency programs in these 12 states may have impacted development of these selected ARRA programs. Finally, we summarize key trends and highlight issues that evaluators of these ARRA programs may want to examine in more depth in their process and impact evaluations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recovery Act: SeaMicro Volume Server Power Reduction Research Development

Cloud data centers are projected to be the fastest growing segment of the server market through 2015, according to IDC. Increasingly people and businesses rely on the Cloud to deliver digital content quickly and efficiently. Recovery Act funding from the Department of Energy has helped SeaMicro's technologies enhance the total cost of operation, performance and energy efficiency in large data center and Cloud environments. SeaMicro's innovative supercomputer fabric connects thousands of processor cores, memory, storage and input/output traffic. The company's fabric supports multiple processor instruction sets. Current systems featuring SeaMicro technology typically use one quarter the power and take one sixth the space of traditional servers with the same compute performance, yet deliver up to 12 times the bandwidth per core. Mozilla and eHarmony are two customers successfully using SeaMicro's technology. Numerous non-public customers have been successfully using the SeaMicro product in test and production facilities. As a result of the Recovery Act funding from the U.S. Department of Energy, more than 50 direct jobs were created at SeaMicro. To date, they primarily have been high-value, engineering jobs. Hardware, software and manufacturing engineering positions have been created, as well as sales and sales engineering. The positions have allowed SeaMicro to significantly accelerate engineering development and accelerate commercialization. As a result, commercialization and delivery to market are months ahead of initial schedule. Additional jobs were indirectly created through the development of the SeaMicro product. Through many years of research and hard work prior to receipt of public funding, SeaMicro was awarded 2 patents for its work. SeaMicro's product led the way for industry leaders to reconsider the market for low power servers and create new product lines. With valuable support of the U.S. Department of Energy and through SeaMicro's product, the market has been reshaped by the company's unique approach and ground breaking technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling the Gila-San Francisco Basin using system dynamics in support of the 2004 Arizona Water Settlement Act

Water resource management requires collaborative solutions that cross institutional and political boundaries. This work describes the development and use of a computer-based tool for assessing the impact of additional water allocation from the Gila River and the San Francisco River prescribed in the 2004 Arizona Water Settlements Act. Between 2005 and 2010, Sandia National Laboratories engaged concerned citizens, local water stakeholders, and key federal and state agencies to collaboratively create the Gila-San Francisco Decision Support Tool. Based on principles of system dynamics, the tool is founded on a hydrologic balance of surface water, groundwater, and their associated coupling between water resources and demands. The tool is fitted with a user interface to facilitate sensitivity studies of various water supply and demand scenarios. The model also projects the consumptive use of water in the region as well as the potential CUFA (Consumptive Use and Forbearance Agreement which stipulates when and where Arizona Water Settlements Act diversions can be made) diversion over a 26-year horizon. Scenarios are selected to enhance our understanding of the potential human impacts on the rivers ecological health in New Mexico; in particular, different case studies thematic to water conservation, water rights, and minimum flow are tested using the model. The impact on potential CUFA diversions, agricultural consumptive use, and surface water availability are assessed relative to the changes imposed in the scenarios. While it has been difficult to gage the acceptance level from the stakeholders, the technical information that the model provides are valuable for facilitating dialogues in the context of the new settlement.

54 ENVIRONMENTAL SCIENCES↗

Recovery Act: ArcelorMittal USA Blast Furnace Gas Flare Capture

The U.S. Department of Energy (DOE) awarded a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to ArcelorMittal USA, Inc. (ArcelorMittal) for a project to construct and operate a blast furnace gas recovery boiler and supporting infrastructure at ArcelorMittal’s Indiana Harbor Steel Mill in East Chicago, Indiana. Blast furnace gas (BFG) is a by-product of blast furnaces that is generated when iron ore is reduced with coke to create metallic iron. BFG has a very low heating value, about 1/10th the heating value of natural gas. BFG is commonly used as a boiler fuel; however, before installation of the gas recovery boiler, ArcelorMittal flared 22 percent of the blast furnace gas produced at the No. 7 Blast Furnace at Indiana Harbor. The project uses the previously flared BFG to power a new high efficiency boiler which produces 350,000 pounds of steam per hour. The steam produced is used to drive existing turbines to generate electricity and for other requirements at the facility. The goals of the project included job creation and preservation, reduced energy consumption, reduced energy costs, environmental improvement, and sustainability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

Economic Impact of Fuel Cell Deployment in Forklifts and for Backup Power under the American Recovery and Reinvestment Act

Through the American Recovery and Reinvestment Act (the Recovery Act or ARRA), the United States Department of Energy (DOE) funded several projects to deploy polymer electrolyte membrane (PEM) fuel cells in forklift and backup power applications. DOE invested $\$$9.7 million to deploy fuel cells in forklifts and an additional $\$$11.8 million was contributed through industry cost shares, for a total investment of $\$$21.5 million in forklift projects. DOE invested $\$$18.5 million to deploy fuel cells in backup power projects and an additional $\$$30.8 million was contributed through industry cost shares, for a total investment of $\$$49.3 million in backup power projects.

Mintz, M.↗

Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extracellular ATP acts as a damage-associated molecular pattern (DAMP) signal in plants

As sessile organisms, plants have evolved effective mechanisms to protect themselves from environmental stresses. Damaged (i.e., wounded) plants recognize a variety of endogenous molecules as danger signals, referred to as damage-associated molecular patterns (DAMPs). ATP is among the molecules that are released by cell damage, and recent evidence suggests that ATP can serve as a DAMP. Although little studied in plants, extracellular ATP is well known for its signaling roles in animals, including acting as a DAMP during the inflammatory response and wound healing. If ATP acts outside the cell, then it is reasonable to expect that it is recognized by a plasma membrane-localized receptor. Recently, DORN1, a lectin receptor kinase, was shown to recognize extracellular ATP in Arabidopsis. DORN1 is the founding member of a new purinoceptor subfamily, P2K (P2 receptor kinase), which is plant-specific. P2K1 (DORN1) is required for ATP-induced cellular responses (e.g., cytosolic Ca2+ elevation, MAPK phosphorylation, and gene expression). Genetic analysis of loss-of-function mutants and overexpression lines showed that P2K1 participates in the plant wound response, consistent with the role of ATP as a DAMP. In this review, we summarize past research on the roles and mechanisms of extracellular ATP signaling in plants, and discuss the direction of future research on extracellular ATP as a DAMP signal.

54 ENVIRONMENTAL SCIENCES↗

Constraints on cosmology and baryonic feedback with joint analysis of Dark Energy Survey Year 3 lensing data and ACT DR6 thermal Sunyaev-Zel'dovich effect observations

We present a joint analysis of weak gravitational lensing (shear) data obtained from the first three years of observations by the Dark Energy Survey and thermal Sunyaev-Zel'dovich (tSZ) effect measurements from a combination of Atacama Cosmology Telescope (ACT) and Planck data. A combined analysis of shear (which traces the projected mass) with the tSZ effect (which traces the projected gas pressure) can jointly probe both the distribution of matter and the thermodynamic state of the gas, accounting for the correlated effects of baryonic feedback on both observables. We detect the shear$~\times~$tSZ cross-correlation at a 21$\sigma$ significance, the highest to date, after minimizing the bias from cosmic infrared background leakage in the tSZ map. By jointly modeling the small-scale shear auto-correlation and the shear$~\times~$tSZ cross-correlation, we obtain $S_8 = 0.811^{+0.015}_{-0.012}$ and $\Omega_{\rm m} = 0.263^{+0.023}_{-0.030}$, results consistent with primary CMB analyses from Planck and P-ACT. We find evidence for reduced thermal gas pressure in dark matter halos with masses $M < 10^{14} \, M_{\odot}/h$, supporting predictions of enhanced feedback from active galactic nuclei on gas thermodynamics. A comparison of the inferred matter power suppression reveals a $2-4\sigma$ tension with hydrodynamical simulations that implement mild baryonic feedback, as our constraints prefer a stronger suppression. Finally, we investigate biases from cosmic infrared background leakage in the tSZ-shear cross-correlation measurements, employing mitigation techniques to ensure a robust inference. Our code is publicly available on GitHub.

Pandey, S. [Johns Hopkins U.; Columbia U.] (ORCID:↗

Caenorhabditis elegans Dicer acts with the RIG-I-like helicase DRH-1 and RDE-4 to cleave dsRNA

Invertebrates use the endoribonuclease Dicer to cleave viral dsRNA during antiviral defense, while vertebrates use RIG-I-like Receptors (RLRs), which bind viral dsRNA to trigger an interferon response. While some invertebrate Dicers act alone during antiviral defense, Caenorhabditis elegans Dicer acts in a complex with a dsRNA binding protein called RDE-4, and an RLR ortholog called DRH-1. We used biochemical and structural techniques to provide mechanistic insight into how these proteins function together. We found RDE-4 is important for ATP-independent and ATP-dependent cleavage reactions, while helicase domains of both DCR-1 and DRH-1 contribute to ATP-dependent cleavage. DRH-1 plays the dominant role in ATP hydrolysis, and like mammalian RLRs, has an N-terminal domain that functions in autoinhibition. A cryo-EM structure indicates DRH-1 interacts with DCR-1’s helicase domain, suggesting this interaction relieves autoinhibition. Our study unravels the mechanistic basis of the collaboration between two helicases from typically distinct innate immune defense pathways.

59 BASIC BIOLOGICAL SCIENCES↗

Science Goals for the ARM Recovery Act Radars

Science Goals for the ARM Recovery Act Radars. In October 2008, an ARM workshop brought together approximately 30 climate research scientists to discuss the Atmospheric Radiation Measurement (ARM) Climate Research Facility's role in solving outstanding climate science issues. Through this discussion it was noted that one of ARM's primary contributions is to provide detailed information about cloud profiles and their impact on radiative fluxes. This work supports cloud parameterization development and improved understanding of cloud processes necessary for that development. A critical part of this work is measuring microphysical properties (cloud ice and liquid water content, cloud particle sizes, shapes, and distribution). ARM measurements and research have long included an emphasis on obtaining the best possible microphysical parameters with the available instrumentation. At the time of the workshop, this research was reaching the point where additional reduction in uncertainties in these critical parameters required new instrumentation for applications such as specifying radiative heating profiles, measuring vertical velocities, and studying the convective triggering and evolution of three-dimensional (3D) cloud fields. ARM was already operating a subset of the necessary instrumentation to make some progress on these problems; each of the ARM sites included (and still includes) a cloud radar (operating at 35 or 94 GHz), a cloud lidar, and balloon-borne temperature and humidity sensors. However, these measurements were inadequate for determining detailed microphysical properties in most cases. Additional instrumentation needed to improve retrievals of microphysical processes includes radars at two additional frequencies for a total of three at a single site (35 GHz, 94 GHz, and a precipitation radar) and a Doppler lidar. Evolving to a multi-frequency scanning radar is a medium-term goal to bridge our understanding of two-dimensional (2D) retrievals to the 3D cloud field. These additional microphysical measurements would allow detailed cloud properties to be derived even in the presence of light precipitation. It is important to couple these detailed measurements of cloud microphysics to vertical motion on the cloud scale to couple microphysics with meteorological processes. Vertically pointing Doppler radars provide the vertical motion of cloud particles but, to separate particle motion from air motion, a wind profiler is required. The American Recovery and Reinvestment Act provided the means to address these needs and implement a multi-frequency suite of radars, including scanning radars, at each of the ARM sites. In addition, Doppler lidars have been deployed at several sites. With these new measurement capabilities, ARM has the measurement capabilities to tackle the problems of improving microphysical profile descriptions and evaluating the relationship between our current narrow-field-of view, zenith perspective on clouds to a description of the full 3D cloud field and its temporal evolution.

54 ENVIRONMENTAL SCIENCES↗

The National Historic Preservation Act is Not Your Problem, But How You are Addressing it for Your CERCLA Project May Be - 12344

The 1995 Environmental Protection Agency (EPA) and U.S. Department of Energy (DOE) joint 'Policy on Decommissioning of Department of Energy Facilities Under CERCLA was developed so that decommissioning could occur in a manner that ensures protection of worker and public health and the environment, that is consistent with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), that provides for stakeholder involvement, and that achieves risk reduction without unnecessary delay'. The source of the 'unnecessary delays' the joint policy intended to avert could be attributed to numerous factors such as obtaining permits, conducting administrative activities, or implementing regulatory processes that could yield, among other things, differing preferred alternatives. Why, you might ask, more than fifteen years later, does DOE continue to struggle through CERCLA projects with unnecessary delays? From problem identification, to determination of nature and extent, to alternative analysis and ultimately remedy selection and implementation, reaching a compliant and effective clean-up end-point can be a process that seems to mimic geologic timescales. The source of these delays is often the failure to use all of the tools the CERCLA process offers. As one example, renewed commitment to follow the CERCLA process to address the regulatory reviews pursuant to the National Historic Preservation Act (NHPA) is called for. Project managers implementing CERCLA actions in any agency, not only DOE, do not need to be apprehensive about using the CERCLA process for NHPA review but should welcome it. It is critical that methods are used that address substantive NHPA requirements clearly and consistently, and that they are shared and communicated as frequently as needed to interested and questioning stakeholders. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Endangered species act impacts on office of legacy management activities at the Rocky Flats, Colorado, Site - 15268

The Endangered Species Act was passed by Congress in 1973 to protect and recover imperiled species and the ecosystems they rely on. The Preble's meadow jumping mouse (Preble's mouse, Zapus hudsonius preblei) was discovered living along the streams at the Rocky Flats Site on the Front Range of Colorado, in the early 1990's during baseline ecological monitoring. In 1998, the Preble's mouse was classified as a federally listed threatened species under the Endangered Species Act. As a result, the mouse and its habitat are protected and Section 7 consultation with the US Fish and Wildlife Service (US FWS) is required before activities may be conducted in Preble's mouse habitat. This requirement has the potential to impact Rocky Flats project schedules and costs since approval from US FWS is needed prior to conducting activities. To reduce the need to consult with US FWS for projects on a case-by-case basis, a programmatic approach was taken. A master list of ongoing activities and other potential future activities was developed and evaluated in a Programmatic Biological Assessment (PBA) that was written for site activities. The PBA that was approved in 2004 worked well during closure, but did not address many ongoing, postclosure US DOE Office of Legacy Management activities. As a result, the PBA was rewritten in 2013 to address postclosure routine and project-specific activities. The use of a programmatic approach has reduced the time and costs associated with getting individual US FWS approvals, which has in turn minimized impacts to schedules. The programmatic approach could prove useful for other US DOE sites with federally listed species. (authors)

54 ENVIRONMENTAL SCIENCES↗