Search NASA⌕ Search

SEARCH · Search NASA

Results for “AM-1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The 12 micron band of ethane: A spectral catalog from 765 cm(-1) to 900 cm(-1)

The high resolution laboratory absorption spectrum of the 12 micro band of ethane gas is studied. The data were obtained using the McMath Solar Telescope 1 meter Fourier Transform interferometer at Kitt Peak National Observatory and tunable diode laser spectrometers at the University of Tennessee and NASA/Goddard Space Flight Center. Over 200 individual vibration rotation transitions were analyzed taking into account many higher order effects including torsional splitting. Line positions were reproduced to better than 0.001/cm. Both ground and upper state molecular constants were determined in the analysis. The experimental details, the analysis procedures and the results are addressed. A list of ethane transitions occurring near (14)CO2 laser lines needed for heterodyne searches for C2H6 in extraterrestrial sources is also included. A spectral catalog of the ethane nu sub g fundamental from 765/cm to 900/cm is provided. A high dispersion (1/cm 12 in.) plot of both the Kitt Peak interferometric data and a simulated spectrum with Doppler limited resolution, a table of over 8500 calculated transitions listed quantum number assignments, frequencies and intensities are provided.

Atakan, A. K.↗

The V3, V4 and V6 bands of formaldehyde: A spectral catalog from 900 cm(-1) to 1580 cm(-1)

The results of a complete high resolution study of the three vibration-rotation bands v sub 3, v sub 4, and V sub 6 using both TDLs and FT-IR spectroscopy are presented. The reults are given in terms of a table of over 8000 predicted transition frequencies and strengths. A plot of the predicted and calculated spectra is shown. Over 3000 transitions were assigned and used in the simultaneous analysis of the three bands. The simultaneous fit permitted a rigorous study of Coriolis and other type iterations among bands yielding improved molecular constants. Line intensities of 28 transitions measured by a TDL and 20 transitions from FTS data were used, along with the eigenvectors from the frequency fitting, in a least squares analysis to evaluate the band strengths.

Nadler, Shachar↗

A high-resolution atlas of the infrared spectrum of the sun and the earth atmosphere from space. A compilation of ATMOS spectra of the region from 650 to 4800 cm-1 (2.3 to 16 microns). Volume 2: Stratosphere and mesosphere, 650 to 3350 cm-1

During the period April 29 to May 2, 1985, the Atmospheric Trace Molecule Spectroscopy (ATMOS) experiment was operated for the first time, as part of the Spacelab-3 payload of the shuttle Challenger. The principal purpose of this experiment was to study the distributions of the atmosphere's minor and trace molecular constituents. The instrument, a modified Michelson interferometer covering the frequency range from 600 to 5000/cm-1 at a spectral resolution of 0.01/cm-1, recorded infrared absorption spectra of the sun and of the earth's atmosphere at times close to entry into and exit from occultation by the earth's limb. Spectra were obtained that are free from absorptions due to constituents of the atmosphere (i.e., they are pure solar spectra), as well as spectra of the atmosphere itself, covering line-of-sight tangent altitudes that span the range from the lower thermosphere to the bottom of the troposphere. This atlas presents a compilation of these spectra arranged in a hardcopy format suitable for quick-look reference purposes. Volume 2 covers the stratosphere and mesosphere (i.e., tangent altitudes from 20 to 80 km) for frequencies from 650 to 3350/cm-1.

Farmer, Crofton B.↗

High Resolution Emission Spectroscopy of the Alpha Pi-1 - Chi Sigma-1(+) Fourth Positive Band System of CO from Electron Impact

We report electron-impact induced fluorescence spectra [300 mA full width at half maximum (FWHM)] of CO for 20 and 100 eV impact energies of the spectral region of 1300 to 2050 A and high resolution spectra (FWHM) of the v'=5 to v"=l and the v'=3 to v"=O bands showing that the rotational structure of the band system are modeled accurately. The excitation function of the (0,1) band (1597 A) was measured from electron impact in the energy range from threshold to 750 eV and placed on an absolute scale from modem calibration standards.

Beegle, Luther W.↗

Analysis of Multi-Scale Radiometric Data Collected during the Cold Land Processes Experiment-1 (CLPX-1)

Brightness temperature maps at 18.7 and 37 GHz collected at the Fraser and North Park Meso-Scale Areas during the Cold Land Processes Experiment by the NOAA Polarimetric Scanning Radiometer (PSWA) airborne sensor are analyzed. The Fraser site is mostly covered by forest with a typical snowpack depth of 1 m while North Park has no forest cover and is characterized by patches of shallow snow. We examine histograms of the brightness temperatures at 500 m resolution for both the Fraser and North Park areas. The histograms can be modelled by a log-normal distribution in the case of the Fraser MSA and by a bi-modal distribution in the case of the North Park MSA. The histograms of the brightness temperatures at coarser resolutions are also plotted to study the effects of sensor resolution on the shape of the distribution, on the values of the average brightness temperatures and standard deviations. Finally, the values of brightness temperatures obtained by re-sampling (aggregating) the data at 25 km resolution are compared with the values of the brightness temperatures collected by the Advanced Microwave Scanning Radiometer (AMSR-E) and Special Sensor Microwave/Imager (SSMII) satellite radiometers. The results show that in both areas for sensor footprint larger than 5000 m, the brightness temperatures show a flat distribution and the memory of the initial distribution is lost. The values of the brightness temperatures measured by the satellite radiometers are in good agreement with the values obtained averaging the airborne data, even if some discrepancies occur.

Tedesco, M.↗

Tethered Space Satellite-1 (TSS-1): Wound About a Bolt

In the early 1990's US and Italian scientists collaborated to study the electrodynamics on a long tether between two satellites as it moved through the electrically charged portion of Earth's atmosphere called the ionosphere. Potential uses for the electrical current induced in the long wire include power and thrust generation for a satellite, momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization. The Tethered Space Satellite (TSS) was a first-of-its-kind experiment with long tethers in space. It consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. The whole mechanism sits on a pallet that is installed into the Shuttle bay. At an altitude of 160 nautical miles above earth, the satellite would be deplodeployed from the Shuttle bay by raising it on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism would slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. A receiver spool to catch the 12.5 mile tether as it was being unwound by the deployer reel mechanism was set up to do the system-level test of deployer real mechanism prior to installing the loaded pallet into the Shuttle bay. The system level tests were required before the pallet could be installed into the Space Shuttle cargo bay. A few months before flight, the system level tests, including unreeling and reeling the tether, were completed at Kennedy Space Center (KSC) and the TSS payload was installed onto the Spacelab pallet. Some of this testing equipment was then shipped back to the contractor, Martin Marietta. Integration with the Shuttle began. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. An analysis, called Coupled loads analysis, incorporates any updates to the model due to system level tests of all the different payloads, and any changes that were found during integration. Engineering analysis examines the worst case scenarios for the loads the hardware will see. The two times during the mission where the dynamic loads are the worst were 1) the first 10-second portion of Shuttle lift off, and 2) a 2-second time during landing when the landing gears hit the ground. The coupled loads analysis using the final verification loads showed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail - during touch down. Hardware certification rules do not allow for hardware to fly with negative margins. A structural failure of one payload could have serious or catastrophic consequences to other payloads, or may significantly damage the Orbiter. The issue had to be resolved before the flight.

O'Connor, Brian↗

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗

Caveolin-1 regulates shear stress-dependent activation of extracellular signal-regulated kinase

Fluid shear stress activates a member of the mitogen-activated protein (MAP) kinase family, extracellular signal-regulated kinase (ERK), by mechanisms dependent on cholesterol in the plasma membrane in bovine aortic endothelial cells (BAEC). Caveolae are microdomains of the plasma membrane that are enriched with cholesterol, caveolin, and signaling molecules. We hypothesized that caveolin-1 regulates shear activation of ERK. Because caveolin-1 is not exposed to the outside, cells were minimally permeabilized by Triton X-100 (0.01%) to deliver a neutralizing, polyclonal caveolin-1 antibody (pCav-1) inside the cells. pCav-1 then bound to caveolin-1 and inhibited shear activation of ERK but not c-Jun NH(2)-terminal kinase. Epitope mapping studies showed that pCav-1 binds to caveolin-1 at two regions (residues 1-21 and 61-101). When the recombinant proteins containing the epitopes fused to glutathione-S-transferase (GST-Cav(1-21) or GST-Cav(61-101)) were preincubated with pCav-1, only GST-Cav(61-101) reversed the inhibitory effect of the antibody on shear activation of ERK. Other antibodies, including m2234, which binds to caveolin-1 residues 1-21, had no effect on shear activation of ERK. Caveolin-1 residues 61-101 contain the scaffolding and oligomerization domains, suggesting that binding of pCav-1 to these regions likely disrupts the clustering of caveolin-1 or its interaction with signaling molecules involved in the shear-sensitive ERK pathway. We suggest that caveolae-like domains play a critical role in the mechanosensing and/or mechanosignal transduction of the ERK pathway.

Non-NASA Center↗