Search NASA⌕ Search

SEARCH · Search NASA

Results for “Battery energy storage systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

A 150-kW 99% Efficient All-Silicon-Carbide Triple-Active-Bridge Converter for Solar-Plus-Storage Systems

Solar-plus-storage systems could effectively mitigate the uncertainties of the photovoltaic (PV) generation and improve system reliability by adding an integrated battery energy storage system. As a three-port bidirectional isolated dc–dc converter with soft-switching capability, the triple-active-bridge (TAB) converter inherently matches the requirements of the solar-plus-storage system. However, challenges still remain in the TAB converter design to further improve system efficiency. In this article, the detailed design, implementation, and demonstration for a silicon carbide (SiC) 150-kW TAB converter are presented. Starting from a brief review of the TAB converter, the modulation scheme, power characteristics, and soft-switching region are analyzed. Then, the detailed design of the H-bridge converter building block is given. Here, to improve the system efficiency, a comprehensive characterization of the SiC gate driver with various external gate resistances is performed to address tradeoffs between switching loss and voltage overshoot during transients, as well as the thermal performance of the H-bridge building block. In addition, the design and characterization of the 20-kHz three-port transformer are also given. Comprehensive experimental studies are conducted on a full-power prototype to verify the proposed design. With a measured 99.1% peak efficiency, the proposed TAB converter can fulfill the requirements for solar-plus-storage applications.

14 SOLAR ENERGY↗

Branching Dueling Q-Network Based Online Scheduling of a Microgrid With Distributed Energy Storage Systems

This letter investigates a Branching Dueling Q-Network (BDQ) based online operation strategy for a microgrid with distributed battery energy storage systems (BESSs) operating under uncertainties. Additionally, the developed deep reinforcement learning (DRL) based microgrid online optimization strategy can achieve a linear increase in the number of neural network outputs with the number of distributed BESSs, which overcomes the curse of dimensionality caused by the charge and discharge decisions of multiple BESSs. Numerical simulations validate the effectiveness of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bad River Band of Lake Superior Chippewa Indians Solar Project

The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.

14 SOLAR ENERGY↗

Photovoltaic power for Space Station Freedom

Space Station Freedom is described with special attention given to its electric power system. The photovoltaic arrays, the battery energy storage system, and the power management, and distribution system are also discussed. The current design of Freedom's power system and the system requirements, trade studies, and competing factors which lead to system selections are referenced. This will be the largest power system ever flown in space. This system represents the culmination of many developments that have improved system performance, reduced cost, and improved reliability. Key developments and their evolution into the current space station solar array design are briefly described. The features of the solar cell and the array including the development, design, test, and flight hardware production status are given.

Baraona, Cosmo R.↗

Photovoltaic power for Space Station Freedom

Space Station Freedom is described with special attention to its electric power system. The photovoltaic arrays, the battery energy storage system, and the power management and distribution system are also discussed. The current design of Freedom's power system and the system requirements, trade studies, and competing factors which lead to system selections are referenced. This will be the largest power system ever flown in space. This system represents the culmination of many developments that have improved system performance, reduced cost, and improved reliability. Key developments and their evolution into the current space station solar array design are briefly described. The features of the solar cell and the array including the development, design, test, and flight hardware production status are given.

Baraona, Cosmo R.↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Where and When Does Solar Plus Storage Make Sense for Commercial Buildings?

As the capital cost of battery energy storage systems (BESS) declines, opportunities for commercial buildings to achieve net savings through peak demand management and energy arbitrage are emerging. National Renewable Energy Laboratory researchers modeled energy storage project economics - with and without accompanying solar photovoltaic systems - using local utility rates, ASHRAE climate zones, and solar intensity data to identify regions where these systems deliver life cycle savings now and in future cost scenarios.

battery energy storage systems↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

PyBLM (Python-based Battery Life Model) [SWR-21-50]

PyBLM is a battery life model to predict the capacity fade of two home battery energy storage systems, manufactured by LG and Tesla. The battery life model is built from experimental test data, and accounts for calendar and cycling aging mechanisms as functions of cell environmental conditions and use. PyBLM is developed in Python and formatted to work in conjunction with another NREL software named TEMPEST (Thermo-Electric Model for Powering Energy Storage Technologies).

Mishra, Partha↗

Impacts of Control Set-Points on Battery Energy Storage Performance for Peak Shaving Application

This article presents the impact of battery energy storage system’s (BESS) control triggers on its performance during peak shaving application. With the increasing deployment of BESS for load leveling and grid capacity relief, the sensitivity of BESS performance to its set-points is yet to be investigated. Most utilities have defined thresholds for activating BESS control during peak demand leveling and baseload BESS charging. However, this study shows that without using optimal setpoints for control applications, the BESS can be under-utilized. Simulations results of the peak shaving algorithm implementation in 30-minute time step over a period of 10 years show the impact of different set-points on distribution transformer loading, line and system losses.

battery energy storage system↗

Providencia Island High-Level Power System Capacity Expansion Analyses [Slides]

Results of a high level cost-benefit analysis using HOMER Pro software are presented for Providencia Island, Colombia. The analysis focuses on integrating solar photovoltaics (PV) and a battery energy storage system (BESS) into an existing diesel-only remote power system. The analysis uses fuel costs and discount rates provided by the stakeholders and NREL-derived capital cost estimates.

14 SOLAR ENERGY↗

A Comprehensive Method to Mitigate Forced Oscillations in Large Interconnected Power Grids

Multiple severe forced oscillation events have recently been observed across the North American interconnections and around the world. These forced oscillations have caused power swings, limited power transfer capability, damaged equipment, and persisted indefinitely until the driving source was located and removed. This paper proposes a comprehensive method to mitigate forced oscillations. Once a forced oscillation is detected, a new source location algorithm can be used to locate the source based on the oscillation mode angle without requiring system topology information. If the source cannot be quickly located and removed, a control strategy can be activated to modulate the active power of utility-scale inverterbased battery energy storage systems (BESSs) to reduce the energy of forced oscillations to a safe level and allow sufficient time for locating the exact source. The proposed source location algorithm is validated using measurements collected during the January 11, 2019 forced oscillation event in North America and other actual grid events, while the proposed control strategy is verified using the Eastern Interconnection dynamic model under the replicated January 11, 2019 forced oscillation event. The simulation results demonstrated that the proposed source location algorithm can accurately identify the forced oscillation source, and the proposed control strategy can significantly reduce forced oscillation energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Forming PV Inverter: Technology Development and Microgrid Applications

Presently, excluding residential backup power applications, grid-forming (GFM) inverters are commercially available for battery energy storage system (BESS) and some PV plus battery systems but not yet for stand-alone PV. This tech update investigates the control design for GFM PV inverter, especially the control required to provide active power reserve and to stabilize the dc link voltage. Subsequently, the use cases of GFM PV plants in utility-level microgrids are discussed considering fully inverter-based microgrids (i.e., with PV and BESS) as well as mixed-source microgrids (i.e., with PV and diesel generator). Scenarios where active power up-reserve from GFM PV plants is beneficial are illustrated. Moreover, requirements and specifications for GFM PV plant, especially for its active power reserve function are developed. In addition, stability of an example utility-level microgrid with two GFM PV plants and a diesel generator is analyzed to shed light on the potential unstable interaction between multiple GFM resources and the countermeasures. This research aims to advance GFM PV technology to offer more flexibility in microgrid design. With GFM PV available, depending on the level of reliability required, cost-benefit analysis, etc., the GFM BESS or diesel generator may be sized smaller while leveraging the full potential of PV generation inside the microgrid.

14 SOLAR ENERGY↗

Investigating capacity credit sensitivity to reliability metrics and computational methodologies

Assigning capacity value to renewable energy sources (RES) is a challenge faced in planning their integration with the grid. The difficulties stem from the natural characteristics of variability and intermittency of wind and solar sources. The capacity credit (CC) analysis evaluates the system’s actual power output compared with a constant capacity generator, i.e., conventional generator and determines an effective capacity to use for planning and operation. Herein this paper presents different factors that could affect the CC of a system. Two methods are proposed to determine the CC, namely equivalent firm capacity (EFC) and effective load carrying capability (ELCC). Since these methods are based on satisfying reliability criteria, daily loss of load expectation (LOLE), hourly loss of load (LOLH), and expected energy not served (EENS) have been employed as indices. To obtain the CC value, both methods apply two techniques: traditional and optimization. Genetic algorithm (GA) is the optimization approach used in this paper. Then, this work compares the two techniques and shows the superior performance of the optimization approach. Two hybrid systems, stand-alone (SA) and grid-connected (GC) modes, are proposed and used as case studies. The hybrid systems consist of photovoltaic (PV), wind turbine (WT), and battery energy storage system (BESS). In this work, three different scenarios are used to compare capacity credit: system as a whole, only wind, and no batteries. Finally, sensitivity analysis is carried out to examine the impact of varying the wind speed, solar irradiation, and load. It is demonstrated that the choice of reliability index plays an important role in determining the capacity credit and it is shown that EENS is a more comprehensive and consistent index of reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Offshore Wind Farm Turbine and Energy Storage Optimization

Abstract This paper evaluates the technical and economic feasibility of repurposing decommissioned offshore oil and gas platforms as electrical substations for offshore wind projects in the U.S. Gulf of America, a region characterized by relatively low and highly variable wind speeds, extensive legacy offshore infrastructure, and exposure to merchant electricity markets. A unified techno-economic framework is developed using the Repurposing Offshore Infrastructure for Continued Energy (ROICE) Economic Model (REM) to integrate Gulfspecific wind resource assessment, commercial wind turbine performance, offshore infrastructure cost modeling, and wholesale electricity market exposure. Gulf wind speed data are vertically extrapolated to turbine hub height and combined with manufacturer power curves to compute annual energy production and capacity factors across a broad portfolio of commercial turbines, enabling identification of turbine designs best suited for low-wind offshore environments. Hourly electricity price data from the Midcontinent Independent System Operator (MISO) day-ahead market are incorporated to characterize revenue potential, price volatility, and the temporal alignment between wind generation and market conditions. In addition, a conceptual framework for offshore battery energy storage system (BESS) integration is developed to support future investigation of market-responsive energy shifting at repurposed platforms. Results from the turbine evaluation demonstrate that machines with lower cut-in wind speeds and earlier ‘rated-power’ characteristics significantly outperform larger, industry-standard offshore turbines for the same net power under Gulf wind conditions, underscoring the need for region-specific technology selection. Market analysis further reveals substantial price variability and limited intrinsic alignment between wind production and high-price periods, motivating consideration of operational flexibility mechanisms. While storage optimization is not implemented in this study, the REM framework establishes a transparent and replicable foundation for co-evaluating turbine selection, infrastructure constraints, and market exposure, providing a practical pathway for assessing the potential role of repurposed offshore platforms in enabling economically viable offshore wind development in the Gulf of America.

02 PETROLEUM↗

Electric-vehicle battery second-life and recycling pathways: How economics depend on chemistry, processing, and application

We assess the economics of repurposing and recycling electric vehicle (EV) batteries by estimating the maximum acquisition price repurposers and recyclers could pay for used EV packs across cathode chemistries, first-life conditions, second-life applications, and recycling processes. We develop a novel open-source process-based cost model of a UL-1974-certified repurposing facility and leverage battery degradation models to estimate the maximum acquisition price repurposers could pay for used EV batteries while producing second-life battery energy storage systems with life-adjusted costs equivalent to new systems. We compare these maximum price estimates to maximum prices for recyclers based on cost and revenue estimates from the EverBatt model. We find that repurposing is more economical than recycling for lithium iron phosphate (LFP) batteries, due to their relatively long life and low value materials; recycling is generally more economical than repurposing for lithium nickel cobalt aluminum oxide (NCA) batteries, due to their shorter life and higher value materials; and the economics for lithium nickel manganese cobalt oxide (NMC) batteries depend more heavily on first life retirement conditions and second life application intensity. These results suggest an overall strategy: reuse LFP, recycle NCA, and sort NMC into recycling or repurposing pathways based on state of health and second-life application.

25 ENERGY STORAGE↗

Securing Digital Energy Infrastructure: BESS Procurement Guidance & Sample Contract Terms

Presentation for Procurement webinar providing technical guidance for entities, procuring Battery Energy Storage Systems (BESS), Inverter Based Resources (IBR), Distributed Energy Resource Management Systems (DERMS) and other energy digital systems and services on how to incorporate cybersecurity requirements into the procurement process to enhance both supply chain security as well as entity-specific supply chain risk management (SCRM) programs.

99 GENERAL AND MISCELLANEOUS↗