Search NASA⌕ Search

SEARCH · Search NASA

Results for “CDR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Using the General Mission Analysis Tool (GMAT)

This is a software tutorial and presentation demonstrating the application of the General Mission Analysis Tool (GMAT). These slides will be used to accompany the demonstration. The demonstration discusses GMAT basics, then presents a detailed example of GMAT application to the Transiting Exoplanet Survey Satellite (TESS) mission. This talk is a combination of existing presentations and material; system user guide and technical documentation; a GMAT basics and overview, and technical presentations from the TESS projects on their application of GMAT to critical mission design. The GMAT basics slides are taken from the open source training material. The TESS slides are a streamlined version of the CDR package provided by the project with SBU and ITAR data removed by the TESS project. Slides for navigation and optimal control are borrowed from system documentation and training material.

trajectory↗

A 30+ Year AVHRR Land Surface Reflectance Climate Data Record and Its Application to Wheat Yield Monitoring

The Advanced Very High Resolution Radiometer (AVHRR) sensor provides a unique global remote sensing dataset that ranges from the 1980's to the present. Over the years, several efforts have been made on the calibration of the different instruments to establish a consistent land surface reflectance time-series and to augment the AVHRR data record with data from other sensors such as the Moderate Resolution Imaging Spectroradiometer (MODIS). In this paper, we present a summary of all the corrections applied to the AVHRR Surface Reflectance and NDVI Version 4 Product, developed in the framework of the National Oceanic and Atmospheric Administration (NOAA) Climate Data Record (CDR) program. These corrections result from assessment of the geo-location, improvement of the cloud masking and calibration monitoring. Additionally, we evaluate the performance of the surface reflectance over the AERONET sites by a cross-comparison with MODIS, which is an already validated product, and evaluation of a downstream Leaf Area Index (LAI) product. We demonstrate the utility of this long time-series by estimating the winter wheat yield over the USA. The methods developed by [1] and [2] are applied to both the MODIS and AVHRR data. Comparison of the results from both sensors during the MODIS-era shows the consistency of the dataset with similar errors of 10%. When applying the methods to AVHRR historical data from the 1980's, the results have errors equivalent to those derived from MODIS.

AVHRR↗

SLS Payload Transportation Beyond LEO

NASA has successfully completed the Critical Design Review (CDR) of the heavy lift Space Launch System (SLS) and is working towards the first flight of the vehicle in 2018. SLS will begin flying crewed missions with an Orion capsule to the lunar vicinity every year after the first 2 flights starting in the early 2020's. As early as 2021, in addition to delivering an Orion capsule to a cislunar destination, SLS will also deliver ancillary payload, termed "Co-manifested Payload (CPL)", with a mass of at least 5.5 mT and volume up to 280 m3 simultaneously to that same destination. Later SLS flights have a goal of delivering as much as 10 mT of CPL to cislunar destinations. In addition to cislunar destinations, SLS flights may deliver non-crewed, science-driven missions with Primary Payload (PPL) to more distant destinations. SLS PPL missions will utilize a unique payload fairing offering payload volume (ranging from 320 m3 to 540 m3) that greatly exceeds the largest existing Expendable Launch Vehicle (ELV) fairing available. The Characteristic Energy (C3) offered by the SLS system will generate opportunities to deliver up to 40 mT to cislunar space, and deliver double PPL mass or de-crease flight time by half for some outer planet destinations when compared to existing capabilities. For example, SLS flights may deliver the Europa Clipper to a Jovian destination in under 3 years by the mid 2020's, compared to the 7+ years cruise time required for current launch capabilities. This presentation will describe ground and flight accommodations, interfaces, resources, and performance planned to be made available to potential CPL and PPL science users of SLS. In addition, this presentation should promote a dialogue between vehicle developers, potential payload users, and funding sources in order to most efficiently evolve required SLS capabilities to meet diverse payload needs as they are identified over the next 35 years and beyond.

Creech, S. D.↗

ATM Technology Demonstration-1 Phase II Boeing Configurable Graphical Display (CGD) Software Design Description

This Software Description Document (SDD) captures the design for developing the Flight Interval Management (FIM) system Configurable Graphics Display (CGD) software. Specifically this SDD describes aspects of the Boeing CGD software and the surrounding context and interfaces. It does not describe the Honeywell components of the CGD system. The SDD provides the system overview, architectural design, and detailed design with all the necessary information to implement the Boeing components of the CGD software and integrate them into the CGD subsystem within the larger FIM system. Overall system and CGD system-level requirements are derived from the CGD SRS (in turn derived from the Boeing System Requirements Design Document (SRDD)). Display and look-and-feel requirements are derived from Human Machine Interface (HMI) design documents and working group recommendations. This Boeing CGD SDD is required to support the upcoming Critical Design Review (CDR).

Wilber, George F.↗

Launch Vehicle Selection and the Implementation of the Soil Moisture Active Passive Mission

Soil Moisture Active Passive (SMAP) is a NASA-developed Earth science satellite currently mapping the soil moisture content and freeze/thaw state of Earth's land mass from a 685km, near-polar, sun-synchronous orbit. It was launched on January 31, 2015 from Vandenberg AFB upon a Delta II 7320 launch vehicle. Due to external considerations, SMAP's launch vehicle selection remained an open item until Project Critical Design Review (CDR). Thus, certain key aspects of the spacecraft design had to accommodate a diverse range of candidate launch vehicle environments, performance envelopes, interfaces and operational scenarios. Engineering challenges stemmed from two distinct scenarios: decisions that had to be made prior to launch vehicle selection to accommodate all possible outcomes, and post-selection changes constrained by schedule and the existing spacecraft configuration. The effects of the timing of launch vehicle selection reached virtually every aspect of the Observatory's design and development. Physical environments, mass allocations, material selections, propulsion system performance, dynamic response, launch phase and mission planning, overall size and configuration, and of course all interfaces to the launch vehicle were heavily dependent on this outcome. This paper will discuss the resolution of these technical challenges.

Sherman, Sarah↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

Lessons Learned in Building Long-Term Multi-Satellite Global Precipitation Records

Efforts to construct long-term global precipitation data sets from the decades-long record of satellite (and other) data historically have fallen into one of two categories. Climate Data Records (CDR), such as the Global Precipitation Climatology Project (GPCP), prioritize homogeneity over fine-scale accuracy. On the other hand, High Resolution Precipitation Products (HRPP), such as the Tropical Rainfall Measuring Mission (TRMM) Multi-satellite Precipitation Analysis (TMPA), emphasize the use of data from all available satellites. For both types of products, experience has shown that it is critical to choose the appropriate reference standard to intercalibrate an ever-evolving constellation of satellite sensors. Towards this end, we have used passive microwave (PMW) in developing GPCP, and combined PMW-radar in TMPA.The launch of the TRMM follow-on Global Precipitation Measurement (GPM) mission in 2014 gave birth to several nearly-global HRPP's, including the Integrated Multi-satellitE Retrievals for GPM (IMERG). Our strategy in refining IMERG has been to first focus on the tropics and mid-latitudes, where we have relatively high confidence, and only more recently begin to expand into the lower-confidence high latitudes. Similarly, although GPCP has provided nearly-global estimates since its inception in the early 1990's, the advent of sensors such as CloudSat has facilitated new efforts to modernize its estimates at high latitudes.For each of these data sets, it is expected that the final merged estimate should tend to track along with its respective calibration standard. Time series depicting GPCP, TMPA, and IMERG will be presented, in order to demonstrate the extent to which this is so. Additionally, comparisons amongst the products will show areas of agreement and highlight areas where further improvements are needed.

Nelkin, Eric J.↗

Qualification of a Hybrid Propulsion System for the Mars Ascent Vehicle

Technology for a hybrid based propulsion system is being developed to support a potential Mars Sample Return campaign. A Mars Ascent Vehicle (MAV) concept for launching samples off of Mars, and delivering them to orbit for further transport to Earth may utilize hybrid propulsion due to the predicted favorable low temperature characteristics and high performance of this option. However, the hybrid option is still undergoing technology development to demonstrate these capabilities. Once development of a capable hybrid propulsion system is proven, further work will be required. This will include environmental testing relative to the mission, and integration with the vehicle reaction control systems and payload. Qualification of such a system will be a significant effort. It will require specialized procurements for the propellants and environments involved, and further testing of the more specialized designs. This paper details an estimate of the tasks required to complete development efforts from Technical Readiness Level 5 (TRL5) through qualification. A success based program was formulated to reach the required performance metrics sufficient for a standard Preliminary Design Review (PDR). Using task level inputs from team members cost and schedule were conceived for continued progress to Critical Design Review (CDR), then through Qualification.

Prince, Andrew↗

Challenges of Designing a Passive Thermal Control System for the Astrobotic Peregrine Lunar Lander

The Astrobotic Peregrine is a lunar lander currently undergoing design by Astrobotic Technology with help from NASA through the Lunar Cargo Transportation and Landing by Soft Touchdown (Lunar CATALYST) program. This paper will discuss the challenges of designing a passive thermal control system for the lander, and how the design has evolved from the initial passive concept. These challenges include drastically varying worst hot and worst cold case thermal environments, narrow temperature limits of critical components, limited available locations for spacecraft component mounting, and unexpected changes causing significant thermal impacts. The initial thermal control strategy was to cold bias the spacecraft by thermally coupling all spacecraft components to one mounting deck, which also doubled as a radiator, and using heaters to maintain each component’s temperature above its lower temperature limit when in the cold environments. As the design evolved, this strategy alone became inadequate. As heat dissipations increased and became more varying with the addition of components, the thermal design was changed and additional thermal control technologies added. Thermal control strategies incorporated into the design include dictating the lander orientation in demanding environments, defining locations for critical spacecraft components, limiting component operation when possible, and using technology to create variable thermal contacts. Additional design changes will occur as the design continues to evolve to optimize the most effective thermal control system. The thermal design of Peregrine is still in progress, with Critical Design Review (CDR) scheduled for December 2019.

Mauro, Stephanie↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

Precision Assessment of the HPLC Phytoplankton Pigment Dataset Analyzed by NASA to Quantify Global Variability in Support of Ocean Color Remote Sensing

The ability to generate chlorophyll a (Chl a) assessments from ocean color orbital sensors, such as VIIRS and MODIS, that satisfy the requirements to be climate-quality data record (CDR) quality is contingent in part on the quality of the in situ ground or sea truth observations that serve as datasets for vicarious calibration and algorithm validation activities. NASA has a mandate to collect, analyze, and distribute in situ data of the highest possible quality with documented uncertainties and in keeping with established performance metrics. Using a dataset of over 18,000 HPLC phytoplankton pigment samples representing water collected in all major ocean basins analyzed a central laboratory (Field Support Group (FSG) of the Ocean Ecology Laboratory (OEL) at NASA Goddard Space Flight Center (GSFC)), we performed an assessment of the global precision among sample replicates of Chl a as well as major accessory pigments. We investigated the impacts of filtration volume, water basin, collection technique, pigment concentration, and different filtration volumes for replicate filters on replicate filter precision, as well as investigating any pigment-specific differences. Our results quantify sample variability with the goal of understanding any systemic biases or biogeographic influences.

Thomas, Crystal S.↗

TPSAS-NF1676L-19788-DND

The calibration of the historical AVHRR visible channels has always been hindered by the degrading NOAA satellite orbits. The complete AVHRR record spans over three decades making it useful for cloud, aerosol, and land use climate studies. Studies that monitor long-term changes in these properties require climate quality calibration. The AVHRR sensors do not have any onboard visible calibration, unlike the IR channels. Many AVHRR post-launch calibration methods have been published. Some of these are based on the pseudo invariant targets such as desert and polar ice and others employ direct calibration transfer from a well-calibrated sensor such as MODIS. Most historical studies only employed only one method and reconciling calibration differences from multiple studies was difficult. This study employs multiple calibration approaches, which are then merged according to their individual uncertainty. Since the visible spectral response functions are similar across AVHRR sensor and that the morning and afternoon orbits usually degrade in the same manner, an afternoon and morning orbiter during the MODIS era is chosen as the reference AVHRR sensor. The reference AVHRR sensor is inter-calibrated with the Aqua-MODIS Collection 6 standard using simultaneous nadir overpass (SNO) radiance pairs. Three pseudo invariant target approaches are utilized, deserts, polar ice and deep convective clouds. These sites are characterized using reference AVHRR reflectances as a function of solar zenith angle. The multiple calibration approach is then validated with non-reference AVHRR sensor during the MODIS era, using AVHRR and MODIS SNO measurements. For historical AVHRR satellite having consistent calibration across invariant targets then validates the approach. This calibration effort is in sponsored by the NOAA CDR program to provide climate quality visible calibration coefficients to the remote sensing community. Each of the calibration approaches are unique and when utilized in tandem can accurately calibrate the AVHRR record. AVHRR calibration methods cannot rely on repeatable annual orbits for calibration model development. Inconsistent results prompt code and invariant target examinations that cannot be determined using only single method approaches. Results from this study will be presented at the meeting.

David Doelling↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Understanding The Top-Of-Atmosphere Fluxes Difference Between Aerocom Phase III Models And The CERES Product: Clear-Sky Perspective

The Clouds and the Earth’s Radiant Energy System (CERES) project produces a long-term global climate data record (CDR) that can be used to detect decadal changes in the Earth’s radiation budget (ERB) from the surface to the top-of-atmosphere (TOA). The CERES Energy Balanced and Filled (EBAF) product includes monthly mean shortwave (SW), longwave (LW), and net TOA all-sky and clear-sky radiative fluxes over 1-degree latitude by 1-degree longitude regions. The EBAF SW and LW fluxes are adjusted within their uncertainties to be consistent with the heat storage in the Earth-atmosphere system (Johnson et al. 2016). EBAF also provides a gap-free monthly mean clear-sky flux map by inferring clear-sky fluxes from both CERES and MODIS measurements (Loeb et al. 2018). In this study, we compare the TOA clear-sky fluxes from Aerocom phase III output with those from the CERES EBAF products. Flux differences over the ocean are generally smaller than over the land, and the magnitude of the differences shows seasonal and regional dependency. To understand the flux differences, aerosol optical depths (AOD) from the Aerocom models are compared with the satellite retrievals from MODIS and MISR. Over the ocean, the AOD differences and the flux differences show consistent regional features, indicating that the differences between models and observations are robust as the CERES EBAF clear-sky SW fluxes and MODIS/MISR AODs are determined independently. However, very little resemblance is found between the AOD and flux differences over the land. To further understand the cause of the flux differences over the land, we compare the land surface albedo from MODIS with the albedo from the models and find consistency in regional albedo differences and flux differences. Monthly regional radiative kernels of AOD and surface albedo derived using the MERRA-2 reanalysis data (Thorsen et al. 2020) are applied to AOD and surface albedo differences between models and observations. For most of the models, the AOD and surface albedo differences can explain most of the flux differences between models and CERES EBAF. The EOS era satellites have provided 20 years of carefully calibrated and validated observations that are suitable for trend analysis. Both the MODIS AOD and CERES EBAF clear-sky SW flux show decreasing trends over the coastal regions of eastern China and the eastern United States due to the emission control policies enforced in both countries, and an increasing trend off the coast of India. The AOD and clear-sky SW flux trends are less consistent over land, as the surface albedo changes complicate the clear-sky SW flux trend. The AOD and clear-sky SW flux trends from the Oslo model HIST run are also examined. However, none of the aforementioned regional trends are found in the model results.

Wenying Su↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the pre-Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Signorelli, Joel↗

Roman Space Telescope Coronagraph Engineering Design and Operating Concept

NASA’s Nancy Grace Roman Space Telescope (formerly known as WFIRST) is a flagship astrophysics mission planned for launch in 2025. The coronagraph instrument (CGI) on Roman will demonstrate the technology for direct imaging and spectroscopy of exoplanets around nearby stars. It will work with the obscured 2.4 meter diameter telescope and demonstrate starlight suppression that is up to 3 orders of magnitude deeper than the preceding space-based and ground-based coronagraphs by using active wavefront control in space with deformable mirrors. CGI has passed its Preliminary Design Review (PDR) in September 2019 and is working toward the instrument Critical Design Review (CDR) in the spring of 2021. We will describe the flow down of key and driving CGI requirements from high level performance to the instrument hardware and software, current instrument configuration and engineering design, operational concept planned for CGI observations, integrated modeling status, and performance predictions.

Tanga, Hong↗

VIPER: Mission Design & Development

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence over the long-term, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, substantial logistical complexity and costs could be saved by “living off the land”, wherever possible. The LCROSS, LRO and other missions have confirmed the presence of resources such as volatiles in polar regions, so the next step is to understand the scientific nature and physical distribution of those candidate resources. Those local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss the latest development progress by the VIPER team, following our initial introduction to this mission at IAC2021. The VIPER team has passed both its NASA Preliminary Design Review (PDR) and Critical Design Reviews (CDR), and is now looking to performing significant testing of engineering units representing the design, prior to the team turning its attention to building the flight hardware. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) delivery model with partner, Astrobotic, Inc.

Daniel Andrews↗