Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Multipass Beam Breakup Study at Jefferson Lab for the 12 Ge V CEBAF U pgrade

Recirculating linear accelerators (linacs) provide a compact and efficient way of accelerating particle beams to medium and high energies by reusing the same linac for multiple passes. In recirculating linacs, maximum current can be limited by multipass beam breakup (BBU), which occurs when an electron beam interacts with the higher order modes (HOMs) of accelerating cavities during multipass recirculations. The average current of the CEBAF 12 GeV Upgrade accelerator at Jefferson Lab, a 5-pass recirculating linac, may be limited by multipass BBU. This disserta- tion work was performed as part of the 12 GeV Upgrade project at Jefferson Lab to investigate limits on average beam currents from the BBU instability. Exper- imental and simulation studies were carried out, and revealed that the multipass BBU will not be a limiting factor to the average beam current in the 12 GeV Upgrade of the CEBAF accelerator. This dissertation includes the theoretical calculation for longitudinal BBU, which revealed that the maximum current limit from longitudinal BBU is much higher than the transverse one. Therefore, longitudinal BBU will not become a problem, as long as transverse BBU does not cause instability. A cumulative BBU simulation study for a new injector in the 12 GeV accelerator also was conducted. The results showed that the transient behavior of cumulative BBU in the injector is not problematic.

Shin, Ilkyoung↗

Design Studies of High-Luminosity Ring-Ring Electron-Ion Collider at CEBAF

An electron-ion collider of a center-of-mass energy up to 90 GeV at luminosity up to 1035 cm-2s-1 with both beams highly polarized is essential for exploring the new QCD frontier of strong color fields in nuclear and precisely imaging the sea-quarks and gluons in the nucleon. A conceptual design of a ring-ring collider based on CEBAF (ELIC) with energies up to 9 GeV for electrons/positrons and up to 225 GeV for protons and 100 GeV/u for ions has been proposed to fulfill the science desire and to serve as the next step for CEBAF after the planned 12 GeV energy upgrade of the fixed target program. Here, we summarize recent design progress for the ELIC complex with four interaction points (IP); including interaction region optics with chromatic aberration compensation scheme and complete lattices for the Figure-8 collider rings. Further optimization of crab crossing angles at the IPs, simulations of beam-beam interactions, and electron polarization in the Figure-8 ring and its matching at the IPs are also discussed.

Bogacz, Slawomir↗

20 Years Experience with the World's Largest Superconducting RF Application: CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) uses over 350 multi-cell resonant rf structures to accelerate a precision high-power electron beam for nuclear physics research. These cavities are made of bulk niobium and operated CW at 2.07K, employing the world's 2nd largest sub-lambda cryogenics system. The superconducting system is a vital part of this unique tool for fundamental research. Through 20 years of system construction and operation the preparation methods have evolved and the performance levels have continued to climb. State-of-the practice now supports > 50 MV/m surface electric fields and > 100 mT surface magnetic fields while maintaining < 30 nOhm surface resistance. The evolution of the superconducting aspects of CEBAF will be reviewed, together with the associated production methods.

Reece, Charles↗

Alignment of the 12 Gev CEBAF Accelerator

Alignment of the 12 Gev CEBAF Accelerator Jefferson lab has just completed an upgrade to its CEBAF accelerator which allows for an increase in the energy of delivered beam from 6Gev to 12 Gev. The enhancements to the accelerator have included the addition of 10 new high performance cryomodules, and the removal, upgrade and refurbishment of almost 300 existing transport magnets. Outside of the main accelerator, a new experimental hall has been constructed, and the three existing halls are currently being upgraded to take advantage of the higher energies. For this project, a new survey network has been measured and almost every element in the accelerator has been re-aligned. Commissioning of the accelerator took place at the beginning of this year, during the course of which, it became apparent that there was a significant difference between the expected and the actual path length in the machine. This paper describes the measurements taken and analysis used to try and understand this situation.

Curtis, Christopher↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

The FFA@CEBAF energy upgrade study aims to approximately double the final energy of the electron beam at the Continuous Electron Beam Accelerator Facility (CEBAF). It will do this by replacing the highest-energy recirculating arcs with fixed-field alternating gradient (FFA) arcs, allowing for several more passes to circulate through the machine. This upgrade necessitates the re-design of the vertical spreader sections, which separates each pass into different recirculation arcs. Additionally, the FFA arcs will need horizontal splitter lines to correct for time of flight and R56. This work will present the current state of the spreader re-design and splitter design.

Benesch, J.↗

Status of Error Correction Studies in Support of FFA@CEBAF

In this work, we examine the beam correction requirements for the FFA@CEBAF energy upgrade. Both hardware and software diagnostic and corrector components are under investigation; in particular the relationship between hardware and software optimization will be developed. To generate a representative sample of errors---from the machine lattice and other beam properties---we construct a Markov Chain Monte Carlo (MCMC) sampler which considers different probability distributions for different types of errors. This sample is used to investigate the statistical sensitivity of the beam to various diagnostic and corrective schema. Once statistics are acquired, we plan to use a variety of optimization techniques to minimize correction time for the electron beam in the FFA arcs designed for the CEBAF upgrade.

Benesch, J.↗

First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.

Eremeev, G.↗

First Results from two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Labcoating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quartercryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for bothcavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc =7.9 MV/m and the other - 13.3 MV/m at 4 K

Eremeev, G.↗

BEAM EMITTANCE MEASUREMENT TOOL FOR CEBAF OPERATIONS

A new software tool was created at Jefferson Lab to measure the emittance of the CEBAF electron beams. The tool consists of device control and data analysis applications. The device control application handles the work of wire scanners and writes their measurement results as well as the information about accelerator settings during these measurements into wire scanner data files. The data analysis application reads these files and calculates the beam emittance on the basis of a wire scanner data processing model. Both applications are computer platform independent but are mostly used on LINUX PCs recently installed in the accelerator control room. The new tool significantly simplifies beam emittance measurement procedures for accelerator operations and contributes to a very high availability of the CEBAF machine for the nuclear physics program at Jefferson Lab.

43 PARTICLE ACCELERATORS↗

Design of the Trigger Interface and Distribution Board for CEBAF 12 GeV Upgrade

The design of the Trigger Interface and Distribution (TID) board for the 12 GeV Upgrade at the Continuous Electron Beam Accelerator Facility (CEBAF) at TJNAL is described. The TID board distributes a low jitter system clock, synchronized trigger, and synchronized multi-purpose SYNC signal. The TID also initiates data acquisition for the crate. With the TID boards, a multi-crate system can be setup for experiment test and commissioning. The TID board can be selectively populated as a Trigger Interface (TI) board, or a Trigger Distribution (TD) board for the 12 GeV upgrade experiments. When the TID is populated as a TI, it can be located in the VXS crate and distribute the CLOCK/TRIGGER/SYNC through the VXS P0 connector; it can also be located in the standard VME64 crate, and distribute the CLOCK/TRIGGER/SYNC through the VME P2 connector or front panel. It initiates the data acquisition for the front crate where the TI is positioned in. When the TID is populated as a TD, it fans out the CLOCK/TRIGGER/SYNC from trigger supervisor to the front end crates through optical fibres. The TD monitors the trigger processing on the TIs, and gives feedback to the TS for trigger flow control. Field Programmable Gate Arrays (FPGA) is utilised on TID board to provide programmability. The TID boards were intensively tested on the bench, and various setups.

CEBAF upgrade↗

New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab

The CEBAF Accelerator at Jefferson Lab presently consists of 50 MeV injector, two anti-parallel superconducting linacs and two arcs for transporting beam between the linacs. By the mid-1990s, the accelerator was providing electrons up to 5.75 GeV. The 12 GeV Upgrade is a major accelerator project aimed at doubling the energy by adding 10 (five per linac) new high gradient cryomodules, each providing 100 MV of field. The new cryomodule will consist of eight 7-cell superconducting cavities operating at an average accelerating gradient of 19.5 MV/m and with an external Q=3.2 x 10^7. The high gradient, very high quality factor and large Lorentz detuning coefficient (KL up to 4) pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new digital LLRF control system has been developed. The main highlights of the new RF Control system include: a RF front-end with low temperature drift and good linearity, a large FPGA

43 PARTICLE ACCELERATORS↗

Design of the Trigger Interface and Distribution Board for CEBAF 12 GeV Upgrade

The design of the Trigger Interface and Distribution (TID) board for the 12 GeV Upgrade at the Continuous Electron Beam Accelerator Facility (CEBAF) at TJNAL is described. The TID board distributes a low jitter system clock, synchronized trigger, and synchronized multi-purpose SYNC signal. The TID also initiates data acquisition for the crate. With the TID boards, a multi-crate system can be setup for experiment test and commissioning. The TID board can be selectively populated as a Trigger Interface (TI) board, or a Trigger Distribution (TD) board for the 12 GeV upgrade experiments. When the TID is populated as a TI, it can be located in the VXS crate and distribute the CLOCK/TRIGGER/SYNC through the VXS P0 connector; it can also be located in the standard VME64 crate, and distribute the CLOCK/TRIGGER/SYNC through the VME P2 connector or front panel. It initiates the data acquisition for the front crate where the TI is positioned in. When the TID is populated as a TD, it fans out the CLOCK/TRIGGER/SYNC from trigger supervisor to the front end crates through optical fibres. The TD monitors the trigger processing on the TIs, and gives feedback to the TS for trigger flow control. Field Programmable Gate Arrays (FPGA) is utilised on TID board to provide programmability. The TID boards were intensively tested on the bench, and various setups.

CEBAF upgrade↗

Start-to-End Optics Validation of FFA-Based Energy Upgrade to CEBAF

This project will thoroughly validate the optics for a proof-of-principal, proposed FFA-based energy upgrade for CEBAF. This upgrade consists of CBETA-like FFA arcs in place of the highest-energy recirculating arcs in the machine, allowing for several more passes through the linacs. This should enable a highest beam energy of 20-24 GeV. This LDRD project will include Start-to-End (S2E) optics and beam dynamics simulations, beam loss and power deposition, and indicate requirements for updates to diagnostics.

43 PARTICLE ACCELERATORS↗

Options for an 11 GeV RF Beam Separator for the Jefferson Lab CEBAF Upgrade

The CEBAF accelerator at Jefferson Lab has had, since first demonstration in 1996, the ability to deliver a 5-pass electron beam to experimental halls (A, B, and C) simultaneously. This capability was provided by a set of three, room temperature 499 MHz rf separators in the 5th pass beamline. The separator was two-rod, TEM mode type resonator, which has a high shunt impedance. The maximum rf power to deflect the 6 GeV beams was about 3.4kW. The 12 GeV baseline design does not preserve the capability of separating the 5th pass, 11 GeV beam for the 3 existing halls. Several options for restoring this capability, including extension of the present room temperature system or a new superconducting design in combination with magnetic systems, are under investigation and are presented.

43 PARTICLE ACCELERATORS↗

Evaluation and Correction of the Non-linear Distortion of CEBAF Beam Position Monitors

The beam position monitors at CEBAF have four antenna style pickups that are used to measure the location of the beam. There is a strong nonlinear response when the beam is far from the electrical center of the device. In order to conduct beam experiments at large orbit excitation we need to correct for this nonlinearity. The correction algorithm is presented and compared to measurements from our stretched wire BPM test stand.

43 PARTICLE ACCELERATORS↗

Fabrication and Testing Status of CEBAF 12 GeV Upgrade Cavities

The 12 GeV upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) is under way. All cavities have been built by industry and are presently undergoing post-processing and final low and high power qualification before cryomodule assembly. The status is reported including fabrication-related experiences, observations and issues throughout production, post-processing and qualification.

43 PARTICLE ACCELERATORS↗

HIGH POWER TEST OF RF SEPARATOR FOR 12 GEV UPGRADE OF CEBAF AT JLAB

CEBAF at JLab is in the process of an energy upgrade from 6 GeV to 12 GeV. The existing setup of the RF separator cavities in the 5th pass will not be adequate to extract the highest energy (11 GeV) beam to any two existing halls (A, B or C) while simultaneously delivering to the new hall D in the case of the proposed 12 GeV upgrade of the machine. To restore this capability, we are exploring the possibility of extension of existing normal conducting 499 MHz TEM-type rf separator cavities. Detailed numerical studies suggest that six 2-cell normal conducting structures meet the requirements; each 2-cell structure will require up to 4 kW RF input power in contrast with the current nominal operating power of 1.0 to 2.0 kW. A high power test of 4 kW confirms that the cavity meet the requirement.

43 PARTICLE ACCELERATORS↗