At least 145 records · Page 8

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Gila Water Resources II: Using Earth Observations to Identify Wildfire Impacts on Hydrologic Functions and Recovery in the Gila National Forest

Wildfires have the potential to cause devastating and long-lasting impacts on ecological systems. In the Gila NF, wildfire events have occurred with increasing frequency and severity over recent years. These disturbances such as the historic Whitewater-Baldy Complex Fire (2012) and Silver Fire (2013) have raised concerns over post-fire soil erosion, flooding, debris flows, and vegetation recovery. Understanding the connection between burn events and ecological functions is crucial for developing effective land management practices within the Gila NF that ensure the conservation of the watershed. Our Gila Water Resources II team worked in partnership with the US Department of Agriculture (USDA) US Forest Service’s (USFS) Gila National Forest and Region 3. This project was designed to provide insight into the influence of wildfires on increased flooding events and to determine if restoration efforts in the Gila NF are having a beneficial and noticeable impact on recovery. The goals of this project included generating data-supported end products to inform land management decisions, including the prioritization of specific regions and time scales for post-fire restoration efforts. To understand recovery trends and hydrologic impact in the Gila NF between 2000 and 2020, this project used NASA EO and ancillary data, including, but not limited to, Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), USGS stream gauge data, and data provided by USDA USFS’s Gila National Forest and Region 3.

Water Resources↗

Florida Water Resources: Assessing Coastal Resiliency Across Florida's Aquatic Preserves Response To Hurricane Forces

Intensifying weather events, sea level rise, and extensive coastal development in Southwestern Florida are escalating the need for Florida’s mangrove conservation. These mangroves are imperative for coastline stabilization, habitat provision for native species, and water quality management. Our partner, the Florida Department of Environmental Protection (FDEP), Office of Resilience and Coastal Protection is tasked with monitoring and conserving the Charlotte Harbor, Estero Bay, Rookery Bay, and Pinellas County Aquatic Preserves. We developed the Growth, Resilience, and Optical Vegetation Evaluator (GROVE) Google Earth Engine toolset for partners to determine mangrove forest extent through time, analyze mangrove forest health, and collect several water quality parameters within the preserves from January 2002–August 2022. The toolset provides easily accessible data from Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Landsat 9 Operational Land Imager 2 (OLI-2), and the Shuttle Radar Topography Mission (SRTM). Using training datasets of known mangrove forest locations, we also established a machine learning approach to create mangrove extent maps. Maps from all four preserves indicated migration of mangrove forests inland as the greatest areas of change were transitional zones. Additionally, normalized difference vegetation index (NDVI), normalized difference turbidity index (NDTI), and chlorophyll-a maps were generated for the partners. This project provides decision makers with a useful tool for understanding temporal changes in Florida’s aquatic preserves, identifying areas of ecological stress, and providing actionable data to make informed plans for mangrove preservation.

Samuel Perrello↗

Florida Water Resources: Assessing Coastal Resiliency Across Florida's Aquatic Preserves in Response to Hurricane Forces

Intensifying weather events, sea level rise, and extensive coastal development in Southwestern Florida are escalating the need for Florida’s mangrove conservation. These mangroves are imperative for coastline stabilization, habitat provision for native species, and water quality management. Our partner, the Florida Department of Environmental Protection (FDEP), Office of Resilience and Coastal Protection is tasked with monitoring and conserving the Charlotte Harbor, Estero Bay, Rookery Bay, and Pinellas County Aquatic Preserves. We developed the Growth, Resilience, and Optical Vegetation Evaluator (GROVE) Google Earth Engine toolset for partners to determine mangrove forest extent through time, analyze mangrove forest health, and collect several water quality parameters within the preserves from January 2002–August 2022. The toolset provides easily accessible data from Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Landsat 9 Operational Land Imager 2 (OLI-2), and the Shuttle Radar Topography Mission (SRTM). Using training datasets of known mangrove forest locations, we also established a machine learning approach to create mangrove extent maps. Maps from all four preserves indicated migration of mangrove forests inland as the greatest areas of change were transitional zones. Additionally, normalized difference vegetation index (NDVI), normalized difference turbidity index (NDTI), and chlorophyll-a maps were generated for the partners. This project provides decision makers with a useful tool for understanding temporal changes in Florida’s aquatic preserves, identifying areas of ecological stress, and providing actionable data to make informed plans for mangrove preservation.

Remote sensing↗

Mesoamerica Ecological Forecasting: Assessing Land Cover Change to Inform Management Planning for the Mesoamerican Biological Corridor

In 1992, Central America and Mexico drew up an agreement to establish the Mesoamerican Biological Corridor (MBC) which defines natural corridors to connect nearly 600 protected areas. The MBC is home to 9% of the world's terrestrial species on 0.7% of the world's landmass, yet this biodiverse area has been impacted by great levels of deforestation. The MBC supports protected areas and the important conservation efforts that are tied into the area’s economic and sustainable development. The NASA DEVELOP team partnered with NASA SERVIR, Sistema de la Integración Centroamericana (SICA), Tropical Agriculture Research and High Education Center (CATIE), and Ministries of the Environment for Costa Rica, El Salvador, and Guatemala to assess forest cover change in the MBC. While the southern states of Mexico are included in the MBC, the team excluded Mexico in this study. The team acquired data from Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), and Landsat 9 OLI-2 to develop a forest versus non-forest classification. This classification was used to create a Land Use Land Cover Change (LULC) trend map and Deforestation Detection Time Series analysis between 1992 and 2022. The team found that minimum distance classification was the most effective classifier for the project scope. Analysis showed that 6.18% of the study area experienced forest loss and 10.99% experienced forest growth. These observations will help partners visualize the evolution and severity of deforestation and allow decision making for future land management and transboundary conservation efforts.

Hanna Jung↗

The NASA Energy Conservation Program

Large energy-intensive research and test equipment at NASA installations is identified, and methods for reducing energy consumption outlined. However, some of the research facilities are involved in developing more efficient, fuel-conserving aircraft, and tradeoffs between immediate and long-term conservation may be necessary. Major programs for conservation include: computer-based systems to automatically monitor and control utility consumption; a steam-producing solid waste incinerator; and a computer-based cost analysis technique to engineer more efficient heating and cooling of buildings. Alternate energy sources in operation or under evaluation include: solar collectors; electric vehicles; and ultrasonically emulsified fuel to attain higher combustion efficiency. Management support, cooperative participation by employees, and effective reporting systems for conservation programs, are also discussed.

Gaffney, G. P.↗

Planning fuel-conservative descents with or without time constraints using a small programmable calculator: Algorithm development and flight test results

A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight tests flown with a T-39A (Sabreliner) airplane are presented.

Knox, C. E.↗

Evaluation of Flight Deck-Based Interval Management Crew Procedure Feasibility

Air traffic demand is predicted to increase over the next 20 years, creating a need for new technologies and procedures to support this growth in a safe and efficient manner. The National Aeronautics and Space Administration's (NASA) Air Traffic Management Technology Demonstration - 1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The integration of these technologies will increase throughput, reduce delay, conserve fuel, and minimize environmental impacts. The ground-based tools include Traffic Management Advisor with Terminal Metering for precise time-based scheduling and Controller Managed Spacing decision support tools for better managing aircraft delay with speed control. The core airborne technology in ATD-1 is Flight deck-based Interval Management (FIM). FIM tools provide pilots with speed commands calculated using information from Automatic Dependent Surveillance - Broadcast. The precise merging and spacing enabled by FIM avionics and flight crew procedures will reduce excess spacing buffers and result in higher terminal throughput. This paper describes a human-in-the-loop experiment designed to assess the acceptability and feasibility of the ATD-1 procedures used in a voice communications environment. This experiment utilized the ATD-1 integrated system of ground-based and airborne technologies. Pilot participants flew a high-fidelity fixed base simulator equipped with an airborne spacing algorithm and a FIM crew interface. Experiment scenarios involved multiple air traffic flows into the Dallas-Fort Worth Terminal Radar Control airspace. Results indicate that the proposed procedures were feasible for use by flight crews in a voice communications environment. The delivery accuracy at the achieve-by point was within +/- five seconds and the delivery precision was less than five seconds. Furthermore, FIM speed commands occurred at a rate of less than one per minute, and pilots found the frequency of the speed commands to be acceptable at all times throughout the experiment scenarios.

Wilson, Sara R.↗

Grand Valley Ecological Forecasting II: Forecasting Trends in Pinyon-Juniper and Sagebrush Habitat Relative to Wildfire, Drought, Beetle Disturbance, and Treatment Impact for Management Planning

Disturbances and landcover change in pinyon-juniper and sagebrush ecosystems are exacerbated by environmental conditions such as variability in climate characteristics. Our DEVELOP team partnered with the National Park Service (NPS) in Colorado National Monument and the Bureau of Land Management (BLM) in McInnis Canyons and Dominguez-Escalante National Conservation Areas to investigate disturbances to land cover. NPS partners were interested in identifying areas at risk of pinyon-juniper die-off or encroachment by invasive species. The BLM partners prioritized identifying areas suitable for fire reduction and prevention treatment. To address these concerns, we forecasted landcover change in the Grand Valley region of Colorado using NASA Earth observation data from Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper (ETM+), Landsat 8 Operational Land Imager (OLI), and Moderate Resolution Imaging Spectroradiometer (MODIS) aboard Terra and Aqua. We collected and analyzed these data in conjunction with Term I of this project. We found that the primary drivers of forecasted landcover change in the study area were aspect and elevation. Our forecasted land cover maps, created using the Idrisi TerrSet Land Change Modeler, indicated that by 2040, ecosystems within partner management areas will likely see tree encroachment on shrublands. These maps addressed the needs of our partners by showing potential habitat suitability trends, which will inform management planning.

Bill Curtiss↗

Mapping Application for Penguin Populations and Projected Dynamics (MAPPPD): Data and Tools for Dynamic Management and Decision Support

The Mapping Application for Penguin Populations and Projected Dynamics (MAPPPD) is a web-based, open access, decision-support tool designed to assist scientists, non-governmental organizations and policy-makers working to meet the management objectives as set forth by the Commission for the Conservation of Antarctic Marine Living Resources (CCAMLR) and other components of the Antarctic Treaty System (ATS) (that is, Consultative Meetings and the ATS Committee on Environmental Protection). MAPPPD was designed specifically to complement existing efforts such as the CCAMLR Ecosystem Monitoring Program (CEMP) and the ATS site guidelines for visitors. The database underlying MAPPPD includes all publicly available (published and unpublished) count data on emperor, gentoo, Adelie) and chinstrap penguins in Antarctica. Penguin population models are used to assimilate available data into estimates of abundance for each site and year.Results are easily aggregated across multiple sites to obtain abundance estimates over any user-defined area of interest. A front end web interface located at www.penguinmap.com provides free and ready access to the most recent count and modelled data, and can act as a facilitator for data transfer between scientists and Antarctic stakeholders to help inform management decisions for the continent.

Humphries, G. R. W.↗

Grand Valley Ecological Forecasting II: Forecasting Trends in Pinyon-Juniper and Sagebrush Habitat Relative to Wildfire, Drought, Beetle Disturbance, and Treatment Impact for Management Planning

Disturbances and landcover change in pinyon-juniper and sagebrush ecosystems are exacerbated by environmental conditions such as variability in climate characteristics. Our DEVELOP team partnered with the National Park Service (NPS) in Colorado National Monument and the Bureau of Land Management (BLM)in McInnis Canyons and Dominguez-Escalante National Conservation Areas to investigate disturbances to land cover. NPS partners were interested in identifying areas at risk of pinyon-juniper die-off or encroachment by invasive species. The BLM partners prioritized identifying areas suitable for fire reduction/prevention treatment. To address these concerns, we forecasted landcover change in the Grand Valley region of Colorado using NASA Earth observation data from Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper (ETM+), Landsat 8 Operational Land Imager (OLI), and Moderate Resolution Imaging Spectroradiometer (MODIS) aboard Terra and Aqua. We collected and analyzed these data in conjunction with Term I of this project. We found that the primary drivers of forecasted landcover change in the study area were aspect and elevation. Our forecasted landcover change maps, created using the Idrisi TerrSet Land Change Modeler, addressed the needs of our partners by showing potential habitat suitability trends, which will inform management planning. Forecasted landcover maps indicated that by 2040, ecosystems within partner management areas will likely see tree encroachment on shrublands.

William Curtiss↗

ERTS-1 flood hazard studies in the Mississippi River Basin

The Spring 1973 Mississippi River flood was investigated using remotely sensed data from ERTS-1. Both manual and automatic analyses of the data indicate that ERTS-1 is extremely useful as a regional tool for flood and floodplain management. The maximum error of such flood area measurements is conservatively estimated to be less than five percent. Change detection analysis indicates that the flood had major impacts on soil moisture, land pattern stability, and vegetation stress. Flood hazard identification was conducted using photointerpretation techniques in three study areas along the Mississippi River using pre-flood ERTS-1 imagery down to 1:100,000 scale. Flood prone area boundaries obtained from ERTS-1 were generally in agreement with flood hazard maps produced by the U.S. Army Corps of Engineers and the U.S. Geological Survey although the latter are somewhat more detailed because of their larger scale. Initial results indicate that ERTS-1 digital mapping of the flood-prone areas can be performed at least 1:62,500 which is comparable to conventional flood hazard map scales.

Rango, A.↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Africa Food Security & Agriculture: Predicting the Likelihood of Human-elephant Conflict and Assessing Elephant Habitat Conditions During Extreme Drought and Crop Deficit in the Kavango-Zambezi Area

Human-wildlife conflict is increasingly more common due to human population growth, habitat fragmentation, and changing climatic conditions. This conflict is particularly evident in the Kavango-Zambezi area, where over three million people share the landscape with an abundant megafauna population. As the changing climate continues to exacerbate drought severity and subsequent food availability, conflict between humans and wildlife has become more prevalent. In the Kavango-Zambezi area, conflict between elephants and humans has resulted in crop loss, property damage, and threats to public safety. In order to manage current and future conflict, The Ecoexist Project and Connected Conservation have been working to empower farmers and conserve the natural habitat. This DEVELOP project employed Earth observations to conduct a time series analysis of vegetation health change, elephant movement, and climate conditions, from 2017 to 2020. Data were aggregated into the wet (November through April) and dry (May through October) seasons. The resulting analysis demonstrated the potential to use Landsat 8 Operational Land Imager (OLI), Global Precipitation Measurement’s Integrated Multi-satellite Retrievals for GPM (GPM IMERG), and TerraClimate data to identify potential areas of conflict under increased seasonal variability. An improved understanding of conflict drivers will help support sustainable wildlife conservation and food security in the future.

DEVELOP Project Summary↗

Africa Food Security & Agriculture: Predicting the Likelihood of Human-elephant Conflict and Assessing Elephant Habitat Conditions During Extreme Drought and Crop Deficit in the Kavango-Zambezi Area

Human-wildlife conflict is increasingly more common due to human population growth, habitat fragmentation, and changing climatic conditions. This conflict is particularly evident in the Kavango-Zambezi area, where over three million people share the landscape with an abundant megafauna population. As the changing climate continues to exacerbate drought severity and subsequent food availability, conflict between humans and wildlife has become more prevalent. In the Kavango-Zambezi area, conflict between elephants and humans has resulted in crop loss, property damage, and threats to public safety. In order to manage current and future conflict, The Ecoexist Project and Connected Conservation have been working to empower farmers and conserve the natural habitat. This DEVELOP project employed Earth observations to conduct a time series analysis of vegetation health change, elephant movement, and climate conditions, from 2017 to 2020. Data were aggregated into the wet (November through April) and dry (May through October) seasons. The resulting analysis demonstrated the potential to use Landsat 8 Operational Land Imager (OLI), Global Precipitation Measurement’s Integrated Multi-satellite Retrievals for GPM (GPM IMERG), and TerraClimate data to identify potential areas of conflict under increased seasonal variability. An improved understanding of conflict drivers will help support sustainable wildlife conservation and food security in the future.

DEVELOP Tech Paper↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗