Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELTA PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

A users manual for a computer program which calculates time optical geocentric transfers using solar or nuclear electric and high thrust propulsion

This manual is a guide for using a computer program which calculates time optimal trajectories for high-and low-thrust geocentric transfers. Either SEP or NEP may be assumed and a one or two impulse, fixed total delta V, initial high thrust phase may be included. Also a single impulse of specified delta V may be included after the low thrust state. The low thrust phase utilizes equinoctial orbital elements to avoid the classical singularities and Kryloff-Boguliuboff averaging to help insure more rapid computation time. The program is written in FORTRAN 4 in double precision for use on an IBM 360 computer. The manual includes a description of the problem treated, input/output information, examples of runs, and source code listings.

Sackett, L. L.↗

Calculation of inviscid surface streamlines and heat transfer on shuttle type configurations. Part 2: Description of computer program

A description of the computer program used for heating rate calculation for blunt bodies in hypersonic flow is given. The main program and each subprogram are described by defining the pertinent symbols involved and presenting a detailed flow diagram and complete computer program listing. Input and output parameters are discussed in detail. Listings are given for the computation of heating rates on (1) a blunted 15 deg half-angle cone at 20 deg incidence and Mach 10.6, (2) a blunted 70 deg slab delta wing at 10 deg incidence and Mach 8, and (3) the HL-10 lifting body at 20 deg incidence and Mach 10. In addition, the computer program output for two streamlines on the blunted 15 deg half-angle cone is listed. For Part 1, see N71-36186.

Dejarnette, F. R.↗

RS-84 Engine

The RS-84 is the first reusable hydrocarbon staged combustion liquid rocket engine. This engine is being developed to meet NASA s crew safety goals with a highly reliable and low cost main engine as a part of the NASA Space Launch Initiative program for the next generation reusable launch system. The NASA-MSFC and Rocketdyne team brings over 50 years of successful rocket engine development experience to meet the challenges of this new program. This team s extensive design database has been anchored with almost five decades of hydrocarbon rocket engine development and flight operations experience including Delta, Atlas, and Saturn vehicles and nearly three decades of successfully operating the world s only reusable pump-fed rocket engine, the Space Shuttle Main Engine. The team also fully benefits from the proven and experienced engineering staffs that recently completed the successful MC-1 FASTRAC , XRS-2200, and RS-68 engine development programs and the ongoing IPD and RS-76 technology development. Advances in integrated parametric design and analysis tools, advanced materials knowledge base, and state-of-the-art fabrication processes anchored and refined during the recent engine development programs are already being used by the team to design this engine.

Stegman, E.↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Heat transfer rate distribution on North American Rockwell delta wing orbiter determined by phase change paint technique at a Mach number of 8, volume 1

The results of a wind tunnel test program to determine aerodynamic heat transfer distributions on an orbiter configuration are presented. Heat-transfer rates were determined by the phase change paint technique on 0.013-scale Stycast models using Tempilaq as the surface temperature indicator. The nominal test conditions were; Mach 8, length Reynolds numbers of 6.0 x 1 million and 8.9 x 1 million, and angles of attack from 10 to 50 deg in 10-deg increments. At the higher Reynolds number, data were obtained with and without boundary layer trips. Model details, test conditions, and reduced heat-transfer data are presented. Data reduction of the phase-change paint photographs was performed by utilizing a new technique which is described in the data presentation section.

Matthews, R. K.↗

Space Shuttle adaptive delta modulator design and performance

This paper describes the detailed design of the voice digitization technique which has been selected for the Space Shuttle Program. Measured performance results are discussed and the projected characteristics of Shuttle flight hardware are described.

Batson, B. H.↗

Shuttle program. Onorbit navigation integrator results for typical shuttle orbits

Three types of navigation onorbit numerical integrators were evaluated: (1) power integrators with no delta-V incorporation, just coasting (using Taylor series expansion integrators); (2) coasting integrators using the Cowell method of special perturbations; and (3) coasting integrator using the Pines variation of parameter perturbation method. Results show that the super G integrator is a very simple and effective for 2 and 4 second time steps. Since IMU delta-V data can be easily incorporated in the integration scheme, its use as the standard onorbit navigation propagator for the maintenance of the current state was implemented in the onboard navigation software. The Pines formulation method with a Runge-Kutta-Gill fourth-order integrator method produces excellent results up to 300 second time steps. On orbit prediction with this method was implemented in the onboard onorbit navigation scheme. The Runge-Kutta third order, using Cowell's method, is an excellent general purpose determination integrator for time steps up to a 60 second duration.

Olszewski, O. W.↗

Roentgensatellit (ROSAT)

The DSN (Deep Space Network) mission support requirements for ROSAT (Roentgensatellit) are summarized. ROSAT is an international cooperative program between NASA and the Bundesministerium fuer Forschung and Technologie (BMFT). The satellite was launched on a Delta 2 vehicle and placed in a circular orbit at an altitude of 580 km, with a 53-deg inclination. The mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profile; DSN support coverage; frequency assignments; support parameters for telemetry and command; and tracking support responsibility.

Guckenbiehl, F.↗

Remote Sensing Spinoff

Delta Data Systems Inc., founded by ex-NASA engineers, used ELAS, a COSMIC-provided computer program for processing remotely sensed data as a starting point for its development of ATLAS. ATLAS is used to process satellite and aircraft data, to digitize soil topographic maps, and to generate land use maps. Among its applications are medical digital processing, food processing, and specialized services for the remote sensing community.

Source record↗

Dawn: Cooperation, not Control

On September 27, 2007, a Delta II rocket carrying the Dawn spacecraft lifted off from Kennedy Space Center. Part of NASAs Discovery program, the $370 million Dawn mission began its three-billion-mile voyage to the asteroid belt to study the asteroid Vesta and Ceres, a dwarf planet. The spacecraft is scheduled to reach Vesta in 2011. After spending nine months measuring the composition, shape, and topography of that body, it will travel a billion miles to carry out a similar analysis of Ceres in 2015. The Important Lessons: The demands of Dawn and other challenging missions have taught some important lessons for successful program and project management. These are the main ones: a) Program management, particularly of uncoupled and loosely coupled projects, should be more about enabling than controlling. You're working with motivated, high-performing teams and institutions with a track record of quality and success. Emphasize commander's intent over rudder control; let them know where you want to go and when you want to be there, then let them figure out how to get there. b) Open and honest discussion of issues is essential. People fill the void of the unknown with their worst fears. Get folks around the table and have open, honest, and frank dialogue. I've seldom seen this fail to get to the root of issues. c) You have to earn your seat at the table, proving that you are competent, trustworthy, and dedicated to the success of the mission. d) Know when to fold 'em. Your pride can get rolled up in making a milestone or launch date, but you have to make a judgment based on the realities of the situation and not wear down the team trying to meet an increasingly impossible deadline. e) The NASA governance model that gives a voice to the concerns of engineers and safety experts works-trust it and use it.

May, Todd↗

Friction Stir Weld Application and Tooling Design for the Multi-purpose Crew Vehicle Stage Adapter

The Multi-Purpose Crew Vehicle (MPCV), commonly known as the Orion capsule, is planned to be the United States' next manned spacecraft for missions beyond low earth orbit. Following the cancellation of the Constellation program and creation of SLS (Space Launch System), the need arose for the MPCV to utilize the Delta IV Heavy rocket for a test launch scheduled for 2014 instead of the previously planned Ares I rocket. As a result, an adapter (MSA) must be used in conjunction with the MPCV to account for the variation in diameter of the launch vehicles; 5.5 meters down to 5.0 meters. Prior to ight article fabrication, a path nder (test article) will be fabricated to ne tune the associated manufacturing processes. The adapter will be comprised of an aluminum frustum (partial cone) that employs isogrid technology and circumferential rings on each end. The frustum will be fabricated by friction stir welding (FSW) three individual panels together on a Vertical Weld Tool (VWT) at NASA Marshall Space Flight Center. Subsequently, each circumferential ring will be friction stir welded to the frustum using a Robotic Weld Tool (RWT). The irregular geometry and large mass of the MSA require that extensive tooling preparation be put into support structures for the friction stir weld. The tooling on the VWT will be comprised of a set of conveyors mounted on pre-existing stanchions so that the MSA will have the ability to be rotated after each of the three friction stir welds. The tooling requirements to friction stir weld the rings with the RWT are somewhat more demanding. To support the mass of the MSA and resist the load of the weld tool, a system of mandrels will be mounted to stanchions and assembled in a circle. The goal of the paper will be to explain the design, fabrication, and assembly of the tooling, to explain the use of friction stir welding on the MSA path nder, and also to discuss the lessons learned and modi cations made in preparation for ight article fabrication in support of the 2014 launch of the Orion MPCV.

Alcorn, John↗

Solar heating of the Martian dusty atmosphere

This paper examines the solar heating of the Martian atmosphere during the 1971 global dust storm observed by Mariner 9. Radiative scattering as well as absorption is included by utilizing the delta-Eddington approximation to the full radiative transfer equation. The necessary optical parameters are generated by a Mie program which uses a size distribution and a complex refractive index inferred from a number of sources, particularly from recent analyses of Mariner 9 UVS and TV observations. When uniform mixing of the dust is assumed, the solar heating per unit mass during a Martian global dust storm is remarkably uniform with height for small solar zenith angles. Heating rates may reach 80 K/day for overhead sunlight. Overall, 20% of the direct insolation is absorbed by the dust-laden atmosphere. Even optically thin widespread dust hazes may produce heating rates of several degrees Kelvin per day.

Zurek, R. W.↗

Research, planning, design and development of selected components, subsystems and systems for the Students for the Exploration and Development of Space Satellite (SEDSAT)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis↗

Research and Development of Satellites, Small Expendable Deployer System (SEDS)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the Students for the Exploration and Development of Space Satellite (SEDSAT) to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The Small Expendable Deployer System - SEDS - Earth Atmosphere and Space Imaging System (SEASIS) instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was canceled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis Ray↗

Program of Research in Flight Dynamics in the JIAFS, George Washington University at NASA Langley Research Center

The program objectives are fully defined in the original proposal entitled 'Program of Research in Flight Dynamics in GW at NASA Langley Research Center,' which was originated March 20, 1975, and in the renewals of the research program from December 1, 2000 to November 30, 2001. The program in its present form includes three major topics: 1) the improvement of existing methods and development of new methods for wind tunnel and flight test data analysis, 2) the application of these methods to wind tunnel and flight test data obtained from advanced airplanes, 3) the correlation of flight results with wind tunnel measurements, and theoretical predictions. The Principal Investigator of the program is Dr. Vladislav Klein. Three Graduate Research Scholar Assistants (K. G. Mas, M. M. Eissa and N. M. Szyba) also participated in the program. Specific developments in the program during the period Dec. 1, 2001 through Nov. 30, 2002 included: 1) Data analysis of highly swept delta wing aircraft from wind and water tunnel data, and 2) Aerodynamic characteristics of the radio control aircraft from flight test.

Klein, Vladislav↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗