Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Umbilical Connect Techniques Improvement-Technology Study

The objective of this study was to develop concepts, specifications, designs, techniques, and procedures capable of significantly reducing the time required to connect and verify umbilicals for ground services to the space shuttle. The desired goal was to reduce the current time requirement of several shifts for the Saturn 5/Apollo to an elapsed time of less than one hour to connect and verify all of the space shuttle ground service umbilicals. The study was conducted in four phases: (1) literature and hardware examination, (2) concept development, (3) concept evaluation and tradeoff analysis, and (4) selected concept design. The final product of this study was a detail design of a rise-off disconnect panel prototype test specimen for a LO2/LH2 booster (or an external oxygen/hydrogen tank for an orbiter), a detail design of a swing-arm mounted preflight umbilical carrier prototype test specimen, and a part 1 specification for the umbilical connect and verification design for the vehicles as defined in the space shuttle program.

Valkema, Donald C.↗

Heterogeneous Integration Technologies for High-temperature, High-density, Low-profile Power Modules of Wide Bandgap Devices in Electric Drive Applications (Final Technical Report)

The goal of this project is to develop packaging technologies for making high-temperature, high-density, and low-profile wide-bandgap (WBG) power electronics modules for electric drives. These modules are aimed at enabling the DOE’s University Consortium to reach its 2025 inverter targets of ≥ 100 kW/L and ≤ 2.7 $/kW. The specific objectives are to: design and fabricate SiC half-bridge power modules with double-sided cooling and parasitic inductances < 5 nH, heat flux density > 400 W/cm 2 , and working junction temperature of 200 o C; design, fabricate, and deliver a gate driver with double-sided cooled modules for the construction of a 100 kW/L inverter at Oak Ridge National Lab; and design and prototype intelligent gate drivers with integrated current sensor and a low-profile DC-DC power supply with air-core transformer for testing power modules at 200 o C junction temperature. We followed an iterative technical approach of design, simulation, fabrication, and testing of various versions of modules, current sensors, and power supply. The state-of-the-art silicon carbide devices rated at 1.2 kV and 149 A were packaged by sintered-silver bonding on an aluminum nitride direct-bond-copper substrate for high thermal conductivity, high working temperature, and high joint reliability. Porous silver posts were used to interconnect the device’s source pads to the other direct-bond-copper substrate for low mechanical stresses, ease of manufacturing, and double-sided cooling. A current sensor based on package parasitic inductance was developed to measure switching current. A dynamic feedback scheme was developed to compensate the effect of parasitic resistance and temperature variation. A constant-current class-E dc-dc converter with air-core transformer was developed. Air-core transformer was used due to the unavailability of magnetic core at high temperatures. Gate driver and power supply were integrated with the double-side cooled, high temperature SiC power modules for testing the modules at 200 o C junction temperature. Double-pulse and continuous testing of the integrated technologies validated the design and fabrication of the three component technologies. Throughout the project, we overcame the challenge for design verification caused by low prototyping yield, which then helped train the graduate students, the future workforce, to learn the engineering know-how for low-cost manufacturing of reliable products. Below is a summary of the major accomplishments of this project: development of a prototyping process for fabricating double-side cooled (1200 V, 149 A) SiC phase-leg modules capable of working to 200 o C Tj; simulation and experimental verification of the improvement of thermo-mechanical reliability of the double-side cooled SiC phase-leg module by using rigid encapsulant; design and experimental validation of a current sensor based on package parasitic inductance and a compensation solution for eliminating the effect of parasitic resistance; design and experimental validation of a low-profile power supply with six-output air-core transformer for gate driver; functional demonstration of a SiC phase-leg module integrated with its gate driver, current sensor, and an air-core power supply at 200 o C Tj in a double-pulse switching test setup and Buck converter continuous test setup; successful completion of six PhD and two MS students who are or will work at Apple Inc., Tesla Inc., Wolfspeed Inc., Microchip Inc., Monolithic Power Systems Inc., and LG Magna Inc.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal design of the Galileo bus and Retro Propulsion Module

The Galileo spacecraft (S/C) consists of an Orbiter and Probe which have instruments to investigate the chemical composition and physical state of Jupiter's atmosphere, the Jovian satellites and the structure and physical dynamics of the Jovian magnetosphere. Galileo was at the Kennedy Space Center (KSC) preparing for a May 1986 launch at the time of the Challenger accident. The delay and an incraease in mission time has decreased the Radioisotope Thermoelectric Generator power output significantly. A change to the Inertial Upper Stage from the more powerful Centaur G-Prime has resulted in a trajectory that requires gravity assists once by Venus and twice by earth. The resulting peak solar intensity of this roundabout trajectory is more than twice the previous design value for the direct trajectory. Galileo was returned to the Jet Propulsion Laboratory (JPL) from KSC in February 1987 to begin the rework of the S/C thermal design. Verification of the thermal redesign was completed in the JPL 25' space simulator in August and November of 1988. This paper summarizes the thermal design and redesign of the Bus and Retro Propulsion Model.

Avila, A.↗

xEMU Wired Heart Rate Monitor

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on development and testing of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and detailed design of the xEMU Wired Heart Rate Monitor (WHRM). This paper outlines the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to WHRM are also provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

xEMU Integrated Communication System

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on development and testing of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and detailed design of the xEMU Integrated Communication System (ICS). This paper outlines the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the ICS are also provided, along with a forward strategy for final maturation into a flight-ready design.

Ian Meginnis↗

NASA Advanced Space Suit xEMU Development Report – Waist Brief Hip Assembly

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the history, development, and baseline detailed design of the xEMU Waist Brief Hip (WBH). This paper will outline the challenging technical requirements and solutions needed to overcome these challenges, and a status of the detailed design. Initial results of Design Verification Testing (DVT) as it relates specifically to WBH will also be provided, along with a forward strategy for final maturation into a flight-ready design.

xEMU↗

NASA Advanced Space Suit xEMU Development Report – Hard Upper Torso (HUT)

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU Hard Upper Torso (HUT) Assembly. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the HUT will also be provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

xEMU Shoulder Assembly

For the past several years, the Exploration Extravehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU Shoulder Assembly. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the shoulder will also be provided, along with a forward strategy for final maturation into a flight-ready design.

NASA↗

Next generation VLSI tools

This paper focuses on what features would be useful in VLSI Computer Aided Design Tools and Systems to be used in the next five to ten years. Examples of current design tasks will be used to emphasize the areas where new or expanded VLSI CAD tools are needed. To provide a basis for projecting the future of VLSI tools, a brief history of the evolution of VLSI design software and hardware platforms is presented. The role of design methodology is considered with respect to the anticipated scale of future VLSI design projects. Future requirements of design verification and manufacturing testing are projected based on the challenge of surviving in a competitive market. Examples of VLSI tools reflect the author's involvement on VLSI design teams developing integrated circuits for disk memory and other computer peripherals for the last eight years.

Gibson, J.↗

NASA Advanced Space Suit xEMU Development Report – Components

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU helmet, extra-vehicular visor assembly (EVVA), hard upper torso (HUT), shoulders, liquid cooling and ventilation garment (LCVG), boots, waist brief hip (WBH), ancillary hardware, and environmental protection garment (EPG) . This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a current status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates specifically to these components will also be provided, along with a forward strategy for final maturation into a flight-ready design.

Shane McFarland↗

Deployable beam flight experiment (MAST)

Improvement of technology of space systems control is discussed. Future space systems such as large antennas or a space station may have dimensions on the order of 30 m to 200 m, yet their basic structures may be relatively lightweight and flexible, making ground tests for loads, controls analyses, and design verifications questionable if not impossible. Abandoning the extensive ground test and analysis verification program that led to the success of previous spacecraft is not a sensible option; making it meaningful using current technology will require inefficient, ultraconservative structure and control designs. New test methods are outlined.

Hanks, B. R.↗

xEMU Helmet and Extravehicular Visor Assembly (EVVA) Hardware

The Exploration Extravehicular Mobility Unit (xEMU) spacesuit team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. This paper focuses on the development and baseline detailed design of the xEMU Helmet and Extravehicular Visor Assembly (EVVA) for the xEMU. This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates specifically to Helmet and EVVA will also be provided, along with a forward strategy for final maturation into a flight-ready design.

Spacesuit↗

Space Station automated systems testing/verification and the Galileo Orbiter fault protection design/verification

Aspects of Space Station automated systems testing and verification are discussed, taking into account several program requirements. It is found that these requirements lead to a number of issues of uncertainties which require study and resolution during the Space Station definition phase. Most, if not all, of the considered uncertainties have implications for the overall testing and verification strategy adopted by the Space Station Program. A description is given of the Galileo Orbiter fault protection design/verification approach. Attention is given to a mission description, an Orbiter description, the design approach and process, the fault protection design verification approach/process, and problems of 'stress' testing.

Landano, M. R.↗

Space shuttle OMS helium regulator design and development

Analysis, design, fabrication and design verification testing was conducted on the technological feasiblity of the helium pressurization regulator for the space shuttle orbital maneuvering system application. A prototype regulator was fabricated which was a single-stage design featuring the most reliable and lowest cost concept. A tradeoff study on regulator concepts indicated that a single-stage regulator with a lever arm between the valve and the actuator section would offer significant weight savings. Damping concepts were tested to determine the amount of damping required to restrict actuator travel during vibration. Component design parameters such as spring rates, effective area, contamination cutting, and damping were determined by test prior to regulator final assembly. The unit was subjected to performance testing at widely ranging flow rates, temperatures, inlet pressures, and random vibration levels. A test plan for propellant compatibility and extended life tests is included.

Wichmann, H.↗

xPLSS Structural Backplate Design, Manufacture, and Test Overview

NASA Johnson Space Center (JSC) has been developing and building a new detailed design of the Exploration Extravehicular Mobility Unit (xEMU) space suit to support future International Space Station (ISS) and Lunar Artemis missions. The Exploration Portable Life Support System (xPLSS) of the xEMU contains some clever new technologies to meet the requirements to provide Extra Vehicular Activity (EVA) capability on the ISS and the Moon. The suit must interface with and fit through ports and airlocks of at least three vehicles: ISS, Human Landing System (HLS), and Gateway. The first partial xPLSS experimental flight unit called SWME EXPRESS Rack Flight Experiment (SERFE) that was a rack-deployed thermal control system payload on the ISS for two years (2020-2022). The first complete assembly of the xEMU was built as a Design Verification Test (DVT) unit (2022); similar to but more extensive than an Engineering Development Unit (EDU). The xPLSS Backplate serves not only as the structural backbone of the xPLSS and SERFE systems but also contains innovative design features to reduce the: mass, complexity, parts count, number ofseals (and therefore leak potential), and outer dimensions of the entire assembly. This paper provides an overview of these new design features, manufacturing processes, system interfaces, and SERFE/DVT test results of the Backplate as part of the xPLSS/xEMU.

xPLSS↗

xPLSS Structural Backplate Design, Manufacture, and Test Overview

NASA Johnson Space Center (JSC) has been developing and building a new detailed design of the Exploration Extravehicular Mobility Unit (xEMU) space suit to support future International Space Station (ISS) and Lunar Artemis missions. The Exploration Portable Life Support System (xPLSS) of the xEMU contains some clever new technologies to meet the requirements to provide Extra Vehicular Activity (EVA) capability on the ISS and the Moon. The suit must interface with and fit through ports and airlocks of at least three vehicles: ISS, Human Landing System (HLS), and Gateway. The first partial xPLSS experimental flight unit called SWME EXPRESS Rack Flight Experiment (SERFE) that was a rack-deployed thermal control system payload on the ISS for two years (2020-2022). The first complete assembly of the xEMU was built as a Design Verification Test (DVT) unit (2022); similar to but more extensive than an Engineering Development Unit (EDU). The xPLSS Backplate serves not only as the structural backbone of the xPLSS and SERFE systems but also contains innovative design features to reduce the: mass, complexity, parts count, number ofseals (and therefore leak potential), and outer dimensions of the entire assembly. This paper provides an overview of these new design features, manufacturing processes, system interfaces, and SERFE/DVT test results of the Backplate as part of the xPLSS/xEMU.

xPLSS↗

Circuit design tool. User's manual, revision 2

The CAM chip design was produced in a UNIX software environment using a design tool that supports definition of digital electronic modules, composition of these modules into higher level circuits, and event-driven simulation of these circuits. Our design tool provides an interface whose goals include straightforward but flexible primitive module definition and circuit composition, efficient simulation, and a debugging environment that facilitates design verification and alteration. The tool provides a set of primitive modules which can be composed into higher level circuits. Each module is a C-language subroutine that uses a set of interface protocols understood by the design tool. Primitives can be altered simply by recoding their C-code image; in addition new primitives can be added allowing higher level circuits to be described in C-code rather than as a composition of primitive modules--this feature can greatly enhance the speed of simulation.

Miyake, Keith M.↗