Search NASA⌕ Search

SEARCH · Search NASA

Results for “Energy Futures Grant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

134 records · Page 8

Cosmogenic neutron production in water at SNO+

Accurate measurement of the cosmogenic muon-induced neutron yield is crucial for constraining a significant background in a wide range of low-energy physics searches. Although previous underground experiments have measured this yield across various cosmogenic muon energies, SNO+ is uniquely positioned due to its exposure to one of the highest average cosmogenic muon energies at 364 GeV. Using ultrapure water, we have determined a neutron yield of 𝑌 𝑛 = (3.3⁢8$^{+0.23}_{−0.30}$) × 10 −4 cm 2 g −1 𝜇 −1 at SNO+. Comparison with simulations demonstrates clear agreement with the FLUKA neutron production model, highlighting discrepancies with the widely used GEANT 4 model. Furthermore, this measurement reveals a lower cosmogenic neutron yield than that observed by the SNO experiment, which used heavy water under identical muon flux conditions. This result provides new evidence that nuclear structure and target material composition significantly influence neutron production by cosmogenic muons, offering fresh insight with important implications for the design and background modeling of future underground experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Scaling Equitable Finance

Driven by dramatic declines in up-front cost, the U.S. solar photovoltaics (PV) industry has taken off over the past decade, growing from 1 gigawatt of installed capacity in 2009 to 89 gigawatts in 2020—or enough capacity to power roughly 19 million homes. The industry is expected to double in size over just the next 5 years.1 Much of the growth has been driven by large, utility-scale projects that can produce 5 mega- watts or more of power—enough to power at least 1,000 homes. The cost of electricity produced by these projects has decreased by more than 70 percent since 2010. As of Q3 2020, development costs of large, util- ity-scale solar PV power plants were under $1 per watt, down by more than 70 percent from 2010.2 A robust array of investors has come forward to efficiently deliver capital to these kinds of utility-scale projects including large banks, insurance companies, pension funds, and others. But low- and moderate-income communities, including communities of color, are at risk of being left behind in the transition to clean energy. Mission- driven solar project developers and financial institu- tions have been working alongside energy justice advocates to open up solar access for these communi- ties, using strategies ranging from community solar, to solar installations on affordable multifamily housing, to distributed solar and storage programs, and more. Their goals go beyond simply generating more green energy to advancing social equity by: • empowering communities to control their energy future • stabilizing energy prices, saving money, and build- ing wealth for low-income families • creating quality jobs • improving health by reducing pollution • providing energy resilience for vulnerable communities Mission-driven actors are successfully deploying a wide variety of strategies to meet these goals, from helping low-income homeowners get solar—and some- times battery storage, to developing solar projects serv- ing affordable rental housing and community facilities, to building larger “shared solar” projects to which households from across the community can subscribe. However, the financing ecosystem does not work nearly as well for these “mission driven” solar proj- ects as it does for utility-scale projects. For home rooftop solar, even if low-income consumers have a home and suitable roof, they may fail to qualify for federal tax incentives, lack adequate credit to qualify for a loan—or the mission-driven lenders seeking to serve them may not be adequately capitalized to make long-term loans. For mission-driven commercial or community-scale projects, assembling nearly every component of the project capital stack—whether bridging early-stage costs, attracting tax credit equity investors, securing long-term debt, or coming up with sponsor equity and filling gaps—can present challenges. A variety of obstacles contribute to the scarcity of financing for low-income solar, including small project sizes, lack of developer balance sheet capacity, both real and perceived issues with credit risk, elevated technical assistance needs, and greater subsidy requirements to pursue goals such as deep energy affordability, climate resilience, or job creation. Still other obstacles are regulatory: for example, not all states allow community solar projects or Power Purchase Agreements, common strategies used for providing low-income solar—and the potential for regulations to shift over time creates risks that mission-driven projects can ill afford. This report synthesizes information garnered from 47 key informant interviews, four focus group discus- sions involving 60 stakeholders, and a review of the substantial existing literature on low-income solar finance to assess the current landscape of mission- driven solar development in the United States, examine the roles that community-based financial institutions could play, and recommend public invest- ments and policy changes that could help to scale the provision of equitable solar finance. Key recommen- dations for policymakers and funders in the renew- able energy and community development fields that emerge from this process include the following: • Help to capitalize and support community-based lenders to provide flexible, low-cost, and long- term financing to mission-driven solar projects— including providing guarantees or other forms of credit enhancement. • Provide federal support for equitable solar, including a grant-in-lieu-of-credits option for the Investment Tax Credit to improve access to this critical government subsidy. • Develop pools of government and philanthropic support that can complement financing from community-based lenders to complete the capi- tal stack for mission-driven projects, as well as to support education and technical assistance to both consumers and potential project sponsors. • Create a national Renewable Energy Credits pro- gram that includes social equity targets to provide a baseline of support for clean energy generation. • Change utility regulations to remove barriers to low-income solar projects; lower permitting costs; provide greater certainty for developers, consumers and owners; and measure progress toward equity in renewable energy policy implementation.

14 SOLAR ENERGY↗

Modeling Photovoltaics Innovation and Deployment Dynamics

PV’s historically rapid cost reduction is exceptional among technologies. Further cost reductions could play a major role in increasing deployment in the future. To enable such cost reductions, new modeling frameworks are needed to understand the determinants of innovation in PV. In this project, we study the mechanisms driving PV module and system cost reductions, delving deeply into the specific technological innovations that have occurred in the past and the policies that encouraged them, and also opportunities for future cost reduction and widespread deployment. The project contributes new fundamental insight on the determinants of technological innovation by developing novel methods and insights that are generalizable and can therefore be applied to other technologies. The results will allow policy makers, engineers, and other stakeholders to better prioritize their efforts and investments in the future. The project is organized around four journal articles as described below. The first article [1] identifies ‘low-level’ (e.g. conversion efficiency improvement) and ‘high- level’ (e.g. R&D efforts) mechanisms of cost reduction in PV systems (Tasks 1-4). This work builds on a previous DOE grant, where we developed a framework for technological innovation leading to PV module cost reduction [2]. We advance a method to disentangle the contributions of physical (‘hardware’) and non-physical (‘soft technology’) changes. Our results uncover reasons behind the relatively slow evolution of soft technology and can inform new innovation approaches to these technologies. The second article [3] identifies specific engineering or institutional innovations that enabled the low-level mechanisms of cost reduction in PV module and balance-of-systems (BOS) (Tasks 5, 9, 10). We identify 85 innovations and connect them to the cost variables they affected. By developing an innovations typology, this study shows the differences between the types of innovations affecting PV modules and BOS components. Finally, by analyzing the industry origins of innovations, this study also finds that PV was well-positioned within an ecosystem of continuously advancing technologies. The third article [4] studies prospective cost reduction opportunities (Task 10). We explore how design approaches that emphasize standardization and automation, such as plug-and-play PV systems, can create cost reduction opportunities by reducing interactions and speeding up activities with high process costs. We show that this can lead to cost reduction in cost components with the most untapped opportunity for improvement such as installation labor, overhead, electrical BOS, and customer acquisition. The fourth article [5] analyzes how various policies supporting PV deployment and R&D contributed to PV’s cost improvement by enabling high-level mechanisms, specific innovations, and ultimately low-level mechanisms of cost reduction (Tasks 8, 13, 14). We investigate examples from different countries and connect these policies to quantifiable cost change mechanisms. Our study sheds light on the roles that different nations played over time, through a diverse set of policy approaches.

14 SOLAR ENERGY↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Thermal Model Heat Rate Predictions of the AGR-5/6/7 Experiment

Several fuel and material irradiation experiments have been planned for the U.S. Department of Energy Advanced Gas Reactor Fuel Development and Qualification Program, which supports the development and qualification of tristructural isotropic (TRISO) coated particle fuel for use in high-temperature gas-cooled reactors. The goals of these experiments are to provide irradiation performance data to support fuel process development, qualify fuel for normal operating conditions, support development of fuel performance models and codes, and provide irradiated fuel and materials for post-irradiation examination and safety testing. Originally planned and named as separate fuel experiments, but subsequently combined into a single test train. AGR-5/6/7 will test low-enriched uranium oxycarbide (UCO – a heterogeneous mixture of uranium oxide and uranium carbide) TRISO fuel. The AGR-5/6 portion of the experiment will provide data to support qualification of the selected reference fuel design, while the AGR-7 portion will serve as a margin test, irradiating the fuel beyond normal operating conditions. During irradiation, the temperature in each capsule is controlled by varying the helium / neon gas mixture flowing through the capsule until the desired thermocouple temperature is reached. Further adjustments can be made by changing the lobe power and the neutron filter. Three neutron filters are available to use as the experiment burns up the fissionable fuel. A thermal finite element model has been created for the five capsules comprising the AGR-5/6/7 experiment. Heat rates from a physics analysis are imported into the model along with fast neutron fluence. Graphite shrinkage due to the fast neutron fluence is incorporated into the model. Gas gaps change as a function of fast neutron fluence. Radiation heat transfer is a major contributor in this model. This is a large model with more than 1 million finite element brick elements. More than 150 different parts are modeled in the finite element model and communicate with each other from a heat transfer sense. More than 50 thermocouples are used in the experiment and are compared to actual measurements. The experiment is composed of five separate stainless steel capsules all welded together. This paper presents a method used to predict the gas mixture in the event that all of the thermocouples fail in a particular capsule. Curve fitting of heat rates from previous cycles and projecting them into the future is the basis of the method.

36 MATERIALS SCIENCE↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

The Next Stage for Smart Cities: Metrics to Spur an Evolution from Technology for Efficiency to Technology for People's Needs

The Smart Cities movement is about a decade old, energized by the USDOT Smart Cities grant that sparked cities to dream big. Now, 10 years later, and multitudes of conferences and papers later, the biggest question regarding Smart Cities is whether any progress has been made? Smart Cities forums are typically led by the technology sector, either telecommunications, internet access, or most recently artificial intelligence (AI) concerns. Each of these areas have grown and found new applications in the context of Smart Cities, however, these technology applications are just tools toward ends. Do digital communications and assistance enable or foster improved access to real, tactile, non-virtual goods and services such as transportation, food, housing, trash removal, health care, education, social interaction? These and other topics are not 'big tech', but are each critical to quality of life outcomes and are day-to-day necessities, comprising many of the touch points through which citizens interact with municipal agencies. Regarding Smart Cities, relationships have not been fully refined as to how best to merge the emerging generation of technology and related trends with more mundane but essential requirements of tactile services. How should municipal managers and operators bring the range of new technology tools (e.g. on-demand transit, automated vehicles, digital connectivity) to bear to improve functions serving real- physical- non-virtual needs? How do we make cities more efficient in providing access to services and opportunities for improved quality of life? This paper examines the current Smart City movement, emerging trends, and the need to put metrics with respect to the delivery, access, and provision of real-life needs. Using a few case studies of past, present, and projected future scenarios, this paper attempts to bring Smart Cities into the real cities domain, perhaps pushing the moniker away from 'Smart' to 'Efficient' - something that can be measured, counted, and assessed. Through the consideration of the next stage of the evolution of cities from 'Smart' to 'Efficient', the combined efforts and experience of multiple researchers at the NREL and their network of collaborators highlights the need for updates metrics that can be used to start guiding efforts toward productive initiatives to improve quality of life.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗