Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fast Operation Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Influence of Plasma Unsteadiness on the Spectrum and Shape of Microwave Pulses in a Plasma Relativistic Microwave Amplifier

Dependence of the shape of a microwave pulse in a plasma relativistic microwave amplifier (PRMA) on the initial plasma electron density in the system is detected experimentally. Depending on the plasma density, fast disruption of amplification, stable operation of the amplifier during the relativistic electron beam (REB) pulse, and its delayed actuation can take place. A reduction in the output signal frequency relative to the input frequency is observed experimentally. The change in the shape of the microwave signal and the reduction in its frequency are explained by a decrease in the plasma density in the system. The dynamics of the plasma density during the REB pulse is determined qualitatively from the experimental data by using the linear theory of a PRMA with a thin-wall hollow electron beam. The processes in a PRMA are analyzed by means of the KARAT particle-in-cell code. It is shown that REB injection is accompanied by an increase in the mean energy of plasma electrons and a significant decrease in their density.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Software Framework for Federated Science Instruments

There is an unprecedented promise of enhanced capabilities for federations of leadership computing systems and experimental science facilities by leveraging software technologies for fast and efficient operations. These federations seek to unify different science instruments, both computing and experimental, to effectively support science users and operators to execute complex workflows. The FedScI project addresses the software challenges associated with the formation and operation of federated environments by leveraging recent advances in containerization of software and softwarization of hardware. We propose a software framework to streamline the federation usage by science users and it’s provisioning and operations by facility providers. A distinguishing element of our work is the support for improved interaction between experimental devices, such as beam-line instruments, and more traditional high-performance computing resources, including compute, network, storage systems. We present guiding principles for the software framework and highlight portions of a current prototype implementation. We describe our science use case involving neutron imaging beam-lines (SNAP/BL-3, Imaging/CG-1D) at the Spallation Neutron Source and High Flux Isotope Reactor facilities at Oak Ridge National Laboratory. Additionally, we detail plans for a more direct instrument interaction within a federated environment, which could enable more advanced workflows with feedback loops to shorten the time to science.

Naughton III, Thomas↗

Contingency Analysis Post-Processing With Advanced Computing and Visualization

Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

Chen, Yousu↗

Joint Planning of EV Fast Charging Stations and Power Distribution Systems With Balanced Traffic Flow Assignment

To tackle the challenges introduced by the fast-growing charging demand of electric vehicles (EVs), the power distribution systems (PDSs) and fast charging stations (FCSs) of EVs should be planned and operated in a more coordinated fashion. However, existing planning approaches generally aim to minimize investment costs in PDSs while ignoring the risk of worsening traffic conditions. To overcome this research gap, this article integrates the interests of traffic networks into PDS and FCS joint planning model to mitigate negative impacts on traffic conditions caused by installing FCSs. First, a novel microscopic method that is different from traditional assignment methods is proposed to simulate the influences of FCSs on traffic flows and EV charging loads. Then, a multiobjective joint planning model is developed to minimize both the planning costs and unbalanced traffic flows. A new bilayer Benders decomposition algorithm is designed to solve the proposed joint planning model. Numerical results on two practical systems in China validate the feasibility of our microscopic method by comparing the simulated results with real data. Compared with existing approaches, it is also demonstrated that the proposed joint planning approach helps to balance traffic flow assignments and relieve traffic congestion.

bilayer expanded Benders decomposition↗

All-solid-state supercapacitors on silicon using graphene from silicon carbide

Carbon-based supercapacitors are lightweight devices with high energy storage performance, allowing for faster charge-discharge rates than batteries. Here, we present an example of all-solid-state supercapacitors on silicon for on-chip applications, paving the way towards energy supply systems embedded in miniaturized electronics with fast access and high safety of operation. We present a nickel-assisted graphitization method from epitaxial silicon carbide on a silicon substrate to demonstrate graphene as a binder-free electrode material for all-solid-state supercapacitors. We obtain graphene electrodes with a strongly enhanced surface area, assisted by the irregular intrusion of nickel into the carbide layer, delivering a typical double-layer capacitance behavior with a specific area capacitance of up to 174 μF cm{sup −2} with about 88% capacitance retention over 10 000 cycles. The fabrication technique illustrated in this work provides a strategic approach to fabricate micro-scale energy storage devices compatible with silicon electronics and offering ultimate miniaturization capabilities.

36 MATERIALS SCIENCE↗

Control of Laser Plasma Based Accelerators up to 1 GeV

This dissertation documents the development of a broadband electron spectrometer (ESM) for GeV class Laser Wakefield Accelerators (LWFA), the production of high quality GeV electron beams (e-beams) for the first time in a LWFA by using a capillary discharge guide (CDG), and a statistical analysis of CDG-LWFAs. An ESM specialized for CDG-LWFAs with an unprecedented wide momentum acceptance, from 0.01 to 1.1 GeV in a single shot, has been developed. Simultaneous measurement of e-beam spectra and output laser properties as well as a large angular acceptance (> ± 10 mrad) were realized by employing a slitless scheme. A scintillating screen (LANEX Fast back, LANEX-FB)--camera system allowed faster than 1 Hz operation and evaluation of the spatial properties of e-beams. The design provided sufficient resolution for the whole range of the ESM (below 5% for beams with 2 mrad divergence). The calibration between light yield from LANEX-FB and total charge, and a study on the electron energy dependence (0.071 to 1.23 GeV) of LANEX-FB were performed at the Advanced light source (ALS), Lawrence Berkeley National Laboratory (LBNL). Using this calibration data, the developed ESM provided a charge measurement as well. The production of high quality electron beams up to 1 GeV from a centimeter-scale accelerator was demonstrated. The experiment used a 310 μm diameter gas-filled capillary discharge waveguide that channeled relativistically-intense laser pulses (42 TW, 4.5 x 10 18 W/cm 2 ) over 3.3 centimeters of sufficiently low density (≃ 4.3 x 10 18 /cm 3 ) plasma. Also demonstrated was stable self-injection and acceleration at a beam energy of ≃ 0.5 GeV by using a 225 μm diameter capillary. Relativistically-intense laser pulses (12 TW, 1.3 x 10 18 W/cm 2 ) were guided over 3.3 centimeters of low density (≃ 3.5 x 10 18 /cm 3 ) plasma in this experiment. A statistical analysis of the CDG-LWFAs performance was carried out. By taking advantage of the high repetition rate experimental system, several thousands of shots were taken in a broad range of the laser and plasma parameters. An analysis program was developed to sort and select the data by specified parameters, and then to evaluate performance statistically. The analysis suggested that the generation of GeV-level beams comes from a highly unstable and regime. By having the plasma density slightly above the threshold density for self injection, (1) the longest dephasing length possible was provided, which led to the generation of high energy e-beams, and (2) the number of electrons injected into the wakefield was kept small, which led to the generation of high quality (low energy spread) e-beams by minimizing the beam loading effect on the wake. The analysis of the stable half-GeV beam regime showed the requirements for stable self injection and acceleration. A small change of discharge delay t dsc , and input energy E in , significantly affected performance. The statistical analysis provided information for future optimization, and suggested possible schemes for improvement of the stability and higher quality beam generation. A CDG-LWFA is envisioned as a construction block for the next generation accelerator, enabling significant cost and size reductions.

43 PARTICLE ACCELERATORS↗

The Initial Development of a Computerized Operator Support System

A computerized operator support system (COSS) is a collection of resilient software technologies to assist operators in monitoring overall nuclear power plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast- moving, complex events. A prototype COSS for a chemical volume control system at a nuclear power plant has been developed in order to demonstrate the concept and provide a test bed for further research. The development process identified four underlying elements necessary for the prototype, which consist of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. An operational prototype resides at the Idaho National Laboratory (INL) using the U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). Several human-machine interface (HMI) considerations are identified and incorporated in the prototype during this initial round of development.

99 GENERAL AND MISCELLANEOUS↗

Robust System Separation Strategy Considering Online Wide-Area Coherency Identification and Uncertainties of Renewable Energy Sources

With the fast growth of renewable energy sources (RES), more and more uncertainties are involved and influencing the stable operation of power systems. Controlled islanding is the last measure to prevent power system blackouts, thus this paper aims to propose a novel model of system separation based on Online Coherency Identification and Adjustable Robust Optimization Programming (OCI-AROP) for minimizing load shedding considering the uncertainties of RES. First, Fuzzy C-Means (FCM) clustering method with F-statistics is utilized to identify the coherent generator groups with the frequency data measured by Phasor Measurement Units (PMUs). Then, the OCI-AROP model considering coherent group constraints, connectivity constraints and robustness constraints about RES are presented. Finally, the case studies on IEEE-39 bus system and WECC-179 bus system are employed to demonstrate the effectiveness of the proposed OCI-AROP model, and comparisons among the OCI-AROP model and the other models are also given to show its superiority.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of coated heat flux gauges for fast responding measurements

Thermal systems often exhibit transient behaviors that have important implications for the operation of the system and can be difficult to predict. For these reasons, experimental testing is often required to ensure system durability requirements are achieved. One important parameter governing the survivability of components in hot, high-stress environments is the heat flux into the part that dictates the temperature distribution for the component. However, sensors required to experimentally characterize heat fluxes in extreme environments must also be resilient. Here, this study presents the development of coated heat transfer gauges capable of robust, high-frequency measurements in turbine research facilities. The addition of a protective coating increases the durability of the gauge, but inherent of that coating is the attenuation of high-frequency temperature penetrations. As a result, this study first outlines the use of analytical solutions to define a gauge design for a specific frequency range and heat transfer, ensuring that subsurface signals can be rectified to surface conditions through inverse methods. Then, the fabrication of polyimide substrate sensors with a parylene-F coating is described. Micro surface heaters added to the custom sensors were used to determine important geometric and thermal properties necessary to calculate accurate surface heat flux. Ultimately, this work shows increased sensor robustness in a turbine test bed and experimentally validates that the frequency response of the fabricated sensors meet the design intent.

47 OTHER INSTRUMENTATION↗

A fast method for solving both the time-dependent Schroedinger equation in angular coordinates and its associated 'm-mixing' problem

An efficient split-operator technique for solving the time-dependent Schroedinger equation in an angular coordinate system is presented, where a fast spherical harmonics transform accelerates the conversions between angle and angular momentum representations. Unlike previous techniques, this method features facile inclusion of azimuthal asymmetries (solving the ''m-mixing'' problem), adaptive time stepping, and favorable scaling, while simultaneously avoiding the need for both kinetic and potential energy matrix elements. Several examples are presented.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Design of High Temperature Ultrasonic Linear Arrays for Under-Sodium Viewing

This paper summarizes the design process for high temperature ultrasonic phased array transducers for imaging in liquid sodium at temperatures up to 260C. The project is funded by the USDOE Generation IV Reactor Program and includes collaboration with the Japanese Atomic Energy Agency. The transducer system is being designed to be able to provide images inside a sodium cooled fast reactor, to support operation and maintenance activities including potentially location of looseor damaged parts during service outages. The prototype transducer array is being designed for 8 to 16, 3MHz rectangular lead niobate (K-81) or bismuth titanate (K-15) piezoelectric elements spaced at λ/2 (wavelength in sodium). A nickel or nickel alloy faceplate serves as the sodium wetting surface. Scan angle of the focused ultrasonic beam is ±30 degrees. Imaging spatial resolution is ≤ 1mm. The array is designed to be operated using a commercial phased array control system and it is planned that array testing will be performed in room temperature water, hot oil (260C), and molten sodium (260C).

liquid metal fast reactor↗

Improved Collective Thomson Scattering measurements of fast ions at ASDEX upgrade

Understanding the behaviour of the confined fast ions is important in both current and future fusion experiments. These ions play a key role in heating the plasma and will be crucial for achieving conditions for burning plasma in next-step fusion devices. Microwave-based Collective Thomson Scattering (CTS) is well suited for reactor conditions and offers such an opportunity by providing measurements of the confined fast-ion distribution function resolved in space, time and 1D velocity space. We currently operate a CTS system at ASDEX Upgrade using a gyrotron which generates probing radiation at 105 GHz. A new setup using two independent receiver systems has enabled improved subtraction of the background signal, and hence the first accurate characterization of fast-ion properties. Here we review this new dual-receiver CTS setup and present results on fast-ion measurements based on the improved background characterization. These results have been obtained both with and without NBI heating, and with the measurement volume located close to the centre of the plasma. The measurements agree quantitatively with predictions of numerical simulations. Hence, CTS studies of fast-ion dynamics at ASDEX Upgrade are now feasible. The new background subtraction technique could be important for the design of CTS systems in other fusion experiments.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OPERATIONAL EXPERIENCE WITH BEAM ABORT SYSTEM FOR SUPERCONDUCTING UNDULATOR QUENCH MITIGATION*

A beam abort system has been implemented in the Advanced Photon Source storage ring. The abort system works in tandem with the existing machine protection system (MPS), and its purpose is to control the beam loss location and, thereby, minimize beam loss-induced quenches at the two superconducting undulators (SCUs). The abort system consists of a dedicated horizontal kicker designed to kick out all the bunches in a few turns after being triggered by MPS. The abort system concept was developed on the basis of single- and multi-particle tracking simulations using elegant and bench measurements of the kicker pulse. Performance of the abort system—kick amplitudes and loss distributions of all bunches—was analyzed using beam position monitor (BPM) turn histories, and agrees reasonably well with the model. Beam loss locations indicated by the BPMs are consistent with the fast fiber-optic beam loss monitor (BLM) diagnostics described elsewhere [1,2]. Operational experience with the abort system, various issues that were encountered, limitations of the system, and quench statistics are described.

Harkay, Katherine C.↗

High-resolution in-beam video rate imaging with the ClearXCam for synchrotron beamlines

The ClearXCam detector is a new video rate imaging in-beam monitor based on a diamond sensor. Imaging with 2304 effective pixels is achieved by sequentially biasing one of 48 metal stripes on one side of a diamond sensor, while reading out the current from 48 stripes on the other side of the sensor. This system was characterized for real-time X-ray beam diagnostics at synchrotron beam­line 17-BM at the National Synchrotron Light Source II. Significant results include: detection of in-beam structure via the imaging mode, beam focusing in one minute with real-time imaging feedback during a focusing event, linearity over five orders of magnitude, validation of a fast mode operating at 100 Hz, and sub-micron beam-positioning resolution. The system is now available commercially.

36 MATERIALS SCIENCE↗

Microgrid Fast Charging Station (MFCS) Design Platform Project (Summary Report)

This report documents the important steps and outcomes of the Microgrid Fast Charging Station (MFCS) Design Platform project, executed by XENDEE Corporation and its testing and validation by Idaho National Laboratory (INL). This final summary report builds on the first summary released on April 30th, 2021 and adds the final results from the Hardware in the Loop (HIL) simulations and tests, which have been completed July 14th 2021. With this report XENDEE Corporation and Idaho National Laboratory conclude the first version of the Microgrid Fast Charging Station (MFCS) Design Platform as well as all related tests and validations for two in-depth case studies for islanded and non-islanded operation. The platform itself utilizes XENDEE’s advanced modeling systems and INL’s HIL system to ensure project viability and technical feasibility. It also intelligently maps all cables, transformers, and distributed technology interactions to anticipate and mitigate problems during peak usage or adverse conditions. Finally, the system is designed to optimize dispatch and generation at each time step of the day allowing the Microgrid to take advantage of energy sales to the utility and best manage the charging of an electrical fleet. This allows operators to reliably build bankable Microgrid systems and to operate them to reach the maximum efficiency even under the dynamic needs of electric vehicle fast charging

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliability Value of Fast State Estimation on Power Systems

Monitoring the state of a power system under stress is key to achieving reliable operation. State estimation and timely measurements become more important when applying and designing corrective control actions (manual and automatic) to arrest or mitigate cascading blackouts. The execution time of each process, including state estimation, should be as short as possible to allow for timely action. In this paper, we provide a methodology for estimating one of the components of value of faster and more frequent state estimation: the reliability value of state estimation to assist corrective control actions for arresting or mitigating cascading blackouts. We present a new algorithm for estimating the time between successive line trips in a cascading failure. The algorithm combines power flow calculations with characteristics of the protection system to estimate the time between successive equipment trips. Using this algorithm, we illustrate the value of fast state estimation by calculating the time remaining for automatic or manual corrective actions after state estimation is finalized.

Power system state estimation, cascading failures,↗