Search NASA⌕ Search

SEARCH · Search NASA

Results for “Final”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Weather Information Communication (WINCOMM) VDL-3 and 1090ES Final Test Requirements, Test Plans, and Test Results

NASA s Aviation Safety Program was created for the purpose of making a significant reduction in the incidents of weather related aviation accidents by improving situational awareness. The objectives of that program are being met in part through advances in weather sensor technology, and in part through advances in the communications technology that are developed for use in the National Airspace System. It is this latter element, i.e., the improvements in aviation communication technologies, that is the focus of the Weather Information Communications project. This report describes the final flight test results completed under the WINCOMM project at the NASA Glenn Research Center of the 1090 Extended Squitter (1090ES) and VDL Mode 3 (VDL-3) data links as a medium for weather data exchange. It presents the use of 1090ES to meet the program objectives of sending broadcast turbulence information and the use of VDL-3 to send graphical weather images. This report provides the test requirements and test plans, which led to flight tests, as well as final results from flight testing. The reports define the changes made to both avionics and ground-based receivers as well as the ground infrastructure to support implementation of the recommended architecture, with a focus on the issues associated with these changes.

Griner, James H.↗

Observing the Final Moments of Massive Black Hole Mergers with LISA.

Mergers of binary black hole systems are one of the strongest sources of gravitational radiation expected to be observed by LISA. Recent advances in modeling the final merger and ringdown of comparable-mass systems, particularly via numerical relativity simulations, are dramatically expanding our understanding of these systems and the radiation they generate. We summarize recent modeling results, highlighting the work of Goddard s numerical relativity group, and apply this emerging knowledge to the problem of observing the final moments of binary black hole mergers with LISA.

Baker, John↗

TOPEX Radar Altimeter Engineering Assessment Report Final Update-Side B Turn-On to End-of-Mission on October 9, 2005

This is the thirteenth and final report in a series of TOPEX Radar Altimeter Engineering Assessment Reports. The initial TOPEX Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from its launch in August 1992 to February 1994. Since the time of that initial report and prior to this report, there have been eleven interim supplemental Engineering Assessment Reports, issued in March 1995, May 1996, March 1997, June 1998, August 1999, September 2000, June 2001, March 2002, May 2003, April 2004 and September 2005. The sixth supplement in September 2000 was the first assessment report that addressed Side B performance, and presented the altimeter performance from Side B turn-on until the end of calendar year 1999. This report extends the performance assessment of Side B to the final collection of data on October 9, 2005, and includes the performance assessment of Jason-1, the TOPEX follow-on mission, launched on December 7, 2001. This report provides some comparisons of Side A and Side B performance.

Lockwood, Dennis W.↗

The Final Merger of Massive Black Holes: Recoils, Gravitational Waves, and Electromagnetic Signatures

The final merger of two massive black holes produces a powerful burst of gravitational radiation, emitting more energy than all the stars in the observable universe combined. The resulting gravitational waveforms will be easily detectable by the space-based LISA out to redshifts z > 10, revealing the masses and spins ofthe black holes to high precision. If the merging black holes have unequal masses, or asymmetric spins, the final black hole that forms can recoil with a velocity exceeding 1000 km/s. And, when the black holes merge in the presence of gas and magnetic fields, various types of electromagnetic signals may also be produced. For more than 30 years, scientists have tried to compute black hole mergers using the methods of numerical relativity. The resulting computer codes have been plagued by instabilities, causing them to crash well before the black holes in the binary could complete even a single orbit. Within the past few years, however, this situation has changed dramatically, with a series of remarkable breakthroughs. This talk will focus on new results that are revealing the dynamics and waveforms of binary black hole mergers, recoil velocities, and the possibility of accompanying electromagnetic outbursts.

Centrella, Joan↗

The Final Merger of Massive Black Holes: Recoils, Gravitational Waves, and Electromagnetic Signatures

The final merger of two massive black holes produces a powerful burst of gravitational radiation, emitting more energy than all the stars in the observable universe combined. The resulting gravitational waveforms will be easily detectable by the space-based LISA out to redshifts z greater than 10, revealing the masses and spins of the black holes to high precision. If the merging black holes have unequal masses, or asymmetric spins, the final black hole that forms can recoil with a velocity exceeding 1000 km/s. And, when the black holes merge in the presence of gas and magnetic fields, various types of electromagnetic signals may also be produced. For more than 30 years, scientists have tried to compute black hole mergers using the methods of numerical relativity. The resulting computer codes have been plagued by instabilities, causing them to crash well before the black holes in the binary could complete even a single orbit. Within the past few years, however, this situation has changed dramatically, with a series of remarkable breakthroughs. This talk will focus on new results that are revealing the dynamics and waveforms of binary black hole mergers, recoil velocities, and the possibility of accompanying electromagnetic outbursts.

Centrella, Joan M.↗

Simulation Tool for Dielectric Barrier Discharge Plasma Actuators at Atmospheric and Sub-Atmospheric Pressures: SBIR Phase I Final Report

This report is the final report of a SBIR Phase I project. It is identical to the final report submitted, after some proprietary information of administrative nature has been removed. The development of a numerical simulation tool for dielectric barrier discharge (DBD) plasma actuator is reported. The objectives of the project were to analyze and predict DBD operation at wide range of ambient gas pressures. It overcomes the limitations of traditional DBD codes which are limited to low-speed applications and have weak prediction capabilities. The software tool allows DBD actuator analysis and prediction for subsonic to hypersonic flow regime. The simulation tool is based on the VORPAL code developed by Tech-X Corporation. VORPAL's capability of modeling DBD plasma actuator at low pressures (0.1 to 10 torr) using kinetic plasma modeling approach, and at moderate to atmospheric pressures (1 to 10 atm) using hydrodynamic plasma modeling approach, were demonstrated. In addition, results of experiments with pulsed+bias DBD configuration that were performed for validation purposes are reported.

Likhanskii, Alexandre↗

Multi-Point Combustion System: Final Report

A low-NOx emission combustor concept has been developed for NASA's Environmentally Responsible Aircraft (ERA) program to meet N+2 emissions goals for a 70,000 lb thrust engine application. These goals include 75 percent reduction of LTO NOx from CAEP6 standards without increasing CO, UHC, or smoke from that of current state of the art. An additional key factor in this work is to improve lean combustion stability over that of previous work performed on similar technology in the early 2000s. The purpose of this paper is to present the final report for the NASA contract. This work included the design, analysis, and test of a multi-point combustion system. All design work was based on the results of Computational Fluid Dynamics modeling with the end results tested on a medium pressure combustion rig at the UC and a medium pressure combustion rig at GRC. The theories behind the designs, results of analysis, and experimental test data will be discussed in this report. The combustion system consists of five radially staged rows of injectors, where ten small scale injectors are used in place of a single traditional nozzle. Major accomplishments of the current work include the design of a Multipoint Lean Direct Injection (MLDI) array and associated air blast and pilot fuel injectors, which is expected to meet or exceed the goal of a 75 percent reduction in LTO NOx from CAEP6 standards. This design incorporates a reduced number of injectors over previous multipoint designs, simplified and lightweight components, and a very compact combustor section. Additional outcomes of the program are validation that the design of these combustion systems can be aided by the use of Computational Fluid Dynamics to predict and reduce emissions. Furthermore, the staging of fuel through the individually controlled radially staged injector rows successfully demonstrated improved low power operability as well as improvements in emissions over previous multipoint designs. Additional comparison between Jet- A fuel and a hydrotreated biofuel is made to determine viability of the technology for use with alternative fuels. Finally, the operability of the array and associated nozzles proved to be very stable without requiring additional active or passive control systems. A number of publications have been publish

Goeke, Jerry↗

Lessons Learned Study Final Report for the Exploration Systems Mission Directorate

This report is the final product of a 90-day study performed for the Exploration Systems Mission Directorate. The study was to assemble lessons NASA has learned from previous programs that could help the Exploration Systems Mission Directorate pursue the Exploration vision. It focuses on those lessons that should have the greatest significance to the Directorate during the formulation of program and mission plans. The study team reviewed a large number of lessons learned reports and data bases, including the Columbia Accident Investigation Board and Rogers Commission reports on the Shuttle accidents, accident reports from robotic space flight systems, and a number of management reviews by the Defense Sciences Board, Government Accountability Office, and others. The consistency of the lessons, findings, and recommendations validate the adequacy of the data set. In addition to reviewing existing databases, a series of workshops was held at each of the NASA centers and headquarters that included senior managers from the current workforce as well as retirees. The full text of the workshop reports is included in Appendix A. A lessons learned website was opened up to permit current and retired NASA personnel and on-site contractors to input additional lessons as they arise. These new lessons, when of appropriate quality and relevance, will be brought to the attention of managers. The report consists of four parts: Part 1 provides a small set of lessons, called the Executive Lessons Learned, that represent critical lessons that the Exploration Systems Mission Directorate should act on immediately. This set of Executive Lessons and their supporting rationale have been reviewed at length and fully endorsed by a team of distinguished NASA alumni; Part 2 contains a larger set of lessons, called the Selected Lessons Learned, which have been chosen from the lessons database and center workshop reports on the basis of their specific significance and relevance to the near-term work of the Exploration Directorate. These lessons frequently support the Executive lessons but are more general in nature; Part 3 consists of the reports of the center workshops that were conducted as part of this activity. These reports are included in their entirety (approximately 200 pages) in Appendix G and have significance for specific managers; Part 4 consists of the remainder of the lessons that have been selected by this effort and assembled into a database for the use of the Explorations Directorate. The database is archived and hosted in the Lessons Learned Knowledge Network, which provides a flexible search capability using a wide variety of search terms. Finally, a spreadsheet lists databases searched and a bibliography identifies reports that have been reviewed as sources of lessons for this task. NASA has been presented with many learning opportunities. We have conducted numerous programs, some extremely successful and others total failures. Most have been documented with a formal lessons learned activity, but we have not always incorporated these learning opportunities into our normal modes of business. For example, the Robbins Report of 2001 clearly indicates that many project failures of the past two decades were the result of violating well documented best practices, often in direct violation of management instructions and directives. An overarching lesson emerges: that disciplined execution in accordance with proven best practices is the greatest single contributor to a successful program. The Lessons Learned task team offers a sincere hope that the lessons presented herein will be helpful to the Exploration Systems Directorate in charting and executing their course. The success of the Directorate and of NASA in general depends on our collective ability to move forward without having to relearn the lessons of those who have gone before.

Van Laak, Jim↗

Economical Production of Pu-238: NIAC Phase I Final Report

All space exploration missions traveling beyond Jupiter must use radioisotopic power sources for electrical power. The best isotope to power these sources is plutonium-238 (Pu-238). The US supply of Pu-238 is almost exhausted and will be gone within the next decade. The Department of Energy has initiated a production program with a $10M allocation from NASA but the cost is estimated at over $100M to get to production levels. The Center for Space Nuclear Research (CSNR) has conceived of a potentially better process to produce Pu-238 earlier and for significantly less cost. Potentially, the front end capital costs could be provided by private industry such that the government only had to pay for the product produced. In the Phase I NIAC (NASA Innovative Advanced Concepts) grant, the CSNR has evaluated the feasibility of using a low power, commercially available nuclear reactor to produce 1.5 kg of Pu-238 per year. The impact on the neutronics of the reactor have been assessed, the amount of Neptunium target material estimated, and the production rates calculated. In addition, the size of the post-irradiation processing facility has been established. Finally, as the study progressed, a new method for fabricating the Pu-238 product into the form used for power sources has been identified to reduce the cost of the final product. In short, the concept appears to be viable, can produce the amount of Pu-238 needed to support the NASA missions, can be available within a few years, and will cost significantly less than the current DOE program.

Plutonium↗

Free-Piston Stirling Power Conversion Unit for Fission Power System, Phase II Final Report

In Phase II, the manufacture and testing of two 6-kW(sub e)Stirling engines was completed. The engines were delivered in an opposed 12-kW(sub e) arrangement with a common expansion space heater head. As described in the Phase I report, the engines were designed to be sealed both hermetically and with a bolted O-ring seal. The completed Phase II convertor is in the bolted configuration to allow future disassembly. By the end of Phase II, the convertor had passed all of the final testing requirements in preparation for delivery to the NASA Glenn Research Center. The electronic controller also was fabricated and tested during Phase II. The controller sets both piston amplitudes and maintains the phasing between them. It also sets the operating frequency of the machine. Details of the controller are described in the Phase I final report. Fabrication of the direct-current to direct-current (DC-DC) output stage, which would have stepped down the main controller output voltage from ~700 to 120 V(sub DC), was omitted from this phase of the project for budgetary reasons. However, the main controller was successfully built, tested with the engines, and delivered. We experienced very few development issues with this high-power controller. The project extended significantly longer than originally planned because of yearly funding delays. The team also experienced several hardware difficulties along the development path. Most of these were related to the different thermal expansions of adjacent parts constructed of different materials. This issue was made worse by the large size of the machine. Thermal expansion problems also caused difficulties in the brazing of the opposed stainless steel sodium-potassium (NaK) heater head. Despite repeated attempts Sunpower was not able to successfully braze the opposed head under this project. Near the end of the project, Glenn fabricated an opposed Inconel NaK head, which was installed prior to delivery for testing at Glenn. Engine development prior to this was performed using both single- and dual-opposed (common expansion space) Inconel heads with clamp-on electric heaters.

Free-piston Stirling Power Conversion Unit↗

TRMM Microwave Imager (TMI) Updates for Final Data Version Release

The Tropical Rainfall Measuring Mission (TRMM) Microwave Imager (TMI) dataset released by the Precipitation Processing System (PPS) will be updated to a final version within the next year. These updates are based on increased knowledge in recent years of radiometer calibration and sensor performance issues. In particular, the Global Precipitation Measurement (GPM) Microwave Imager (GMI) is used as a model for many of the TMI version updates. This paper discusses four aspects of the TMI data product that will be improved: spacecraft attitude, calibration and quality control, along-scan bias corrections, and sensor pointing accuracy. These updates will be incorporated into the final TMI data version, improving the quality of the data product and ensuring accurate geophysical parameters can be derived from TMI.

Tropical Rainfall Measuring Mission↗

Aquarius Final Release Product and Full Range Calibration of L-band Radiometers

Aquarius final product V5.0 has been released. The dataset includes close to four years of global radiometric measurements at L-band. The mission's objective was to monitor sea surface salinity, but other applications of its data over land and the cryosphere have been developed. For this reason, it is important to have accurate calibration over the full range of antenna temperatures from natural targets. It is also needed in order to combine Aquarius measurements with other L-band sensors. Aquarius calibration is strongly focused on the ocean. We present a research product which is part of the final release and aims at producing an accurate calibration from the low end (celestial sky) to the high end (land and ice) of the brightness temperature scale. We calibrate the Aquarius radiometers using measurements over the Sky and oceans and assess the new calibration using measurements over land.

Radiometry↗

Preparation for Cassini Grand Finale - Validation of Saturn Ring Heating in TSS

Thermal analysis of spacecraft at Saturn have previously been restricted to three environmental heat fluxes: solar, Saturn planet IR, and Saturn planet albedo. Heat flux from Saturn’s rings were not available in any commercially available thermal analysis tools. While preparing for the Cassini Grand Finale, during which Cassini will travel extremely close to the rings of Saturn, it was determined the existing thermal model required updating to accurately predict heat fluxes from the rings. This is particularly important for Cassini’s Visual and Infrared Mapping Spectrometer infrared spectrometer (VIMS-IR), as it is cooled by a passive radiator which operates below the temperature of Saturn’s rings. This paper discusses the validation of the heat flux from solar, Saturn, and Saturn’s rings in Spacedesign’s Thermal Synthesizer System (TSS). The incorporation of heating from Saturn’s rings also led to the use of SPICE geometry to ensure accurate spacecraft positioning and pointing. Thermal model results are compared against historical heating events as well as predictive Grand Finale sequences.

Swanson, Kirsten S.↗

A Linear Analysis for the Flight Path Control of the Cassini Grand Finale Orbits

Cassini’s Grand Finale Mission begins after the last targeted Titan flyby on April 22, 2017 and ends with a series of 22 ballistic orbits each passing within a few thousand kilometers of the cloud tops of Saturn, ultimately impacting the planet on September 15, 2017. Despite the ballistic nature of the trajectory, the absence of targeted maneuvers throughout the final orbits causes position uncertainties to grow exponentially with time, posing a significant difficulty for the science sequence planning team. Thus, a strategy that incorporates trajectory correction maneuvers was developed to significantly reduce dispersions from the reference path and maintain dispersions below 250 km (1- ). In this paper, the linear method used to determine the optimal number and location of the maneuvers to control the trajectory, along with the corresponding targets, is detailed. A nonlinear Monte Carlo trajectory dispersion tool served as a testbed to validate the linear analysis results. Based on orbit determination covariance sampling with Monte Carlo simulations, the linear approach allowed the Cassini maneuver analysts to run thousands of maneuver combinations in little time, eventually finding an optimal strategy with three statistical maneuvers ( V99 < 1.5 m/s) to adequately control most of the trajectory.

Vaquero, Mar↗

Kibo Robot Programming Challenge Final Activity Report

On October 8th, 2020 the Kibo Robot Programming Challenge (RPC) Finals Event took place. Student teams from Australia, Indonesia, Japan, Singapore, Taiwan, Thailand, and UAE were the finalists of the competition and became the first students to ever upload APKs to an Astrobee robot (Bumble) on the ISS. This was the culmination of a joint effort between JAXA’s Int-Ball developing team in Tsukuba, Japan and NASA’s Astrobee Facility team at NASA Ames Research Center\ in California, USA. The collaboration between JAXA and NASA started in late 2017. Throughout this time mutual visits by the engineering and management teams were organized. In July 2019 the Kibo RPC concept was formally defined and the competition started. Hundreds of students across the Asia Pacific region participated and during the final event they did so in real time with the participation of NASA’s astronaut, Chris Cassidy. Chris interacted with the students, JAXA personnel and with the robot during the activity. This report aims to summarize the lessons learned from the several crew and non-crew tended activities, the evaluations performed on ground, the coordination of resources both in the ground and at the International Space Station (ISS) as well as operations. It identifies the issues the teams faced and the solutions put in place to mitigate them.

Astrobee↗

Cassini Power During the 20 Year Mission and Until the Final Plunge into Saturn

The NASA-ESA Cassini mission ended on September 15, 2017, after almost 20 years of operations. Electrical power telemetry data is presented for the entire mission from launch and End Of Mission (EOM). The Cassini spacecraft was powered by three Radioisotope Thermoelectric Generators (RTGs) connected in parallel. These three RTGs generated 882.1 W at the beginning of the mission. At EOM, the power level was 600.3 W. The electrical output of Cassini’s power subsystem decayed consistently, as predicted, during the entire mission between October 1997 and September 2017. Further, no heating of the RTGs was reported in telemetry during the last minutes of the mission, nor was there any variance apparent in the final output of the three RTGs that is attributable to the final plunge into Saturn.

Burk, Thomas A.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Stability and targeting in Dawn's final orbit

The Dawn spacecraft conducted two extended missions at Ceres following the completion of the primary mission in June 2016. The final orbit of the second extended mission was designed to have a 35-km periapsis altitude for 10x higher resolution science. The mission ended in this orbit when the spacecraft ran out of attitude control propellant. In this paper, we describe the final orbit and discuss the challenges of flying this low at Ceres. We also include our stability analysis showing the spacecraft will remain in orbit for more than 20 years, as stipulated by the planetary protection requirements.

Kennedy, Brian↗