Search NASA⌕ Search

SEARCH · Search NASA

Results for “Help Request”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Constraints in the Remediation of Uranium Former Uranium Mining Sites - 19586

Uranium mining and milling legacy sites still exist all over the world. Financial constraints play a key role in constraining the remediation of these sites, but a series of other factors must also be considered. The IAEA has been assisting its Member States in moving forward their remediation projects, and more specifically the Central Asian region has received dedicated attention in this aspect. In association with other international organisations such as the European Commission and European Bank of Reconstruction and Development among others in the scope of the CGULS initiative (Coordination Group of Uranium Legacy Sites), a series of activities have been put in place to assist the countries in that region. Through its Technical Cooperation Department, the IAEA has also supported other Member States to manage their legacies. The IAEA CIDER Project (Constraints in Decommissioning and Environmental Remediation) in its first phase investigated possible constraint to implementation of both decommissioning and environmental remediation projects, and collected successful experiences and lessons learned from remediation projects all over the world. It started with a survey in which almost 30 Member States participated. Constraints were examined in three main areas: i) Institutional Aspects (regulatory and policy); ii) Technological and iii) Social. These results have been published in a dedicated report available in the IAEA web page (also called the CIDER Baseline Report). Under the request of participating Member States, a second phase of CIDER has been initiated with a more focused (action oriented) character. In this regard experts developed a framework for helping countries in need under two major areas: Strategy Development and Implementation and Stakeholder Engagement Support. Two other initiatives under CIDER Phase II consisted of the Enhanced Capacity Building in Environmental Remediation (the so-called School of Environmental Remediation) and a database depicting the sites in and in need of remediation in a global perspective. This paper is intended to present and promote some aspects of the methodology conceived in CIDER Phase II to help countries establish remediation strategies that will facilitate overcoming some of the barriers mentioned above. Furthermore, it aims to discuss aspects that might be improved in the assistance provided by international organisations to countries in need of developing remediation projects, pointing out to some of the documented causes for not achieving more robust results. It is expected that the combination of different tools to share good practices e.g. web-based tools, e-Learning, webinars in addition to face-to-face training events, may enhance the chances of successful implementation of remediation of legacy sites, including former uranium production sites. This initiative opens a wide avenue for cooperation while providing a platform to bring together practitioners, regulators, contractors, funding organisations to enhance the support to be provided. By working together, more effective and sustainable results can be achieved and remediation of such sites implemented in a timely, safe and cost-effective way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The AskIT Service Desk: A Model for Improving Productivity and Reducing Costs

This was prepared for the business process improvement presentation to the Department of Energy. Los Alamos National Laboratory provides a single point of contact, the AskIT Service Desk, to address issues that impact customer productivity. At the most basic level, what customers want is for their calls to be received, to get a response from a knowledgeable analyst, and to have their issues resolved and their requests fulfilled. Providing a centralized, single point of contact service desk makes initiating technical or business support simple for the customer and improves the odds of immediately resolving the issue or correctly escalating the request to the next support level when necessary. Fulfilling customer requests through automated workflow also improves customer productivity and reduces costs. Finally, customers should be provided the option to solve their own problems through easy access to self-help resources such as frequently asked questions (FAQs) and how-to guides. To accomplish this, everyone who provides and supports services must understand how these processes and functions work together. Service providers and those who support services must “speak the same language” and share common objectives. The Associate Directorate for Business Innovation (ADBI) began the journey to improve services by selecting a known service delivery framework (Information Technology Infrastructure Library, or ITIL). From this framework, components that contribute significant business value were selected.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Summary of Observations from the 2017 Federal Radiological Monitoring and Assessment Center (FRMAC) Laboratory Analysis Training and Capstone Event

On August 15th thru 17th, 2017 the Federal Radiological Monitoring and Assessment Center (FRMAC) Laboratory Analysis division, the FRMAC Fly Away Laboratory (FAL), the FRMAC Assessment division, and the Mobile Environmental Response Laboratory (MERL) held a training and capstone event for staff from the Environmental Protection Agency (EPA), Remote Sensing Laboratory (RSL), Lawrence Livermore National Laboratory (LLNL), and Sandia National Laboratories (SNL). LAB-100, "Sample Control Training", LAB-200 "QA Specialist Training", and LAB-300 "Laboratory Analysis Manager Training" was given the first two days of the event. The purpose of the training and capstone event was to meet training requirements for billeted FRMAC Lab Analysis staff from RSL, LLNL, and SNL as well as raise awareness of the FRMAC Lab Analysis process with EPA staff as part of a Federal Emergency Management Agency — Nuclear Incident Response Team (FEMA-NIRT) laboratory standardization project. An objective of the standardization project was to help improve the transition of operations from DOE to EPA during a response. To do this effectively, detailed knowledge of the FRMAC Lab Analysis process by the EPA is needed. This training provided a good opportunity for this knowledge transfer. A capstone was held after the two-day training event to allow participants to practice the skills they learned in a realistic scenario. A scenario that was previously developed for a quarterly Consequence Management drill (i.e. Dark Phoenix) was used as the basis for the capstone, with laboratory analysis focused injects used to drive the exercise play. Each position within the FRMAC Lab Analysis Division exercised to specific objectives and helped to uncover gaps in the established processes. The lessons learned during this capstone are broken out in the following categories: Sample Control, In-Situ Gamma Spectroscopy, Analysis Request Forms (ARF), Shipping, QA/QC, Fly Away Laboratory (FAL), and Management.

54 ENVIRONMENTAL SCIENCES↗

Bioscience COVID Rapid Response Report

The COVID-19 disease outbreak and its impact on global health and economies have highlighted the national security threat posed by pathogens with pandemic potential and the need for rapid development of effective diagnostics and medical countermeasures. The Bioscience IA selected for funding rapid COVID LDRD project proposals that addressed critical R&D gaps in pandemic response that could be accomplished in 1-3 months with the requested funding. In total, the Bioscience IA funded nine rapid projects that addressed 1) rapid and accurate methods for SARS-CoV-2 RNA detection, 2) modeling tools to help prioritize populations for diagnostic testing, 3) bioinformatic tools to track SARS-CoV-2 genomic sequence changes over time, 4) molecular inhibitors of SARS-CoV-2 cellular infection, and 5) method for rapid staging of COVID19 disease to enable administration of more effective treatments. In addition, LDRD funded one larger project to be completed in FY21 that leverages Sandia capabilities to address the need for platform diagnostics and therapeutics that can be rapidly tailored against emerging pathogen targets.

59 BASIC BIOLOGICAL SCIENCES↗

Data call questions related to potential NEPA/Data gaps

Based on review of the related NEPA documents, and consideration of the potential gaps in NEPA coverage, a number of questions have been generated. These questions are generally higher level (less detailed) questions that should help to establish the applicability of analyses in existing NEPA documents and the ability of these documents to provide NEPA coverage for the Proposed Action. These questions do not request detailed information about SRS facilities/activities and the Proposed Action like typically would be requested when performing impacts analyses for an EIS. We do not believe detail information is needed; if it is needed, it may be an indication that an SA is not the appropriate level of NEPA documentation for the Proposed Action.

54 ENVIRONMENTAL SCIENCES↗

Plug and Process Loads Capacity and Power Requirements Analysis

This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus of this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Partnership Comments on Atlas II (Work Product 1.2.b)

On August 27, 2008, the SECARB team received a request from MIT and NETL for revisions to the draft document entitled “Atlas II.” The following report outlines revisions submitted on August 28, 2008, in response to this request. The project team prepared the geological storage portion of the update to the Regional Atlas II, providing information on the priority sinks, their storage capacity and other factors to help illustrate the potential to store CO 2 in the SECARB region. Additionally, the CO 2 sources in the region were updated and the data provided to NATCARB. On August 28, 2008, Work Product 1.2.b was completed upon submittal of final SECARB Partnership comments on Atlas II.

54 ENVIRONMENTAL SCIENCES↗

Problem Definition and Solution Concept for En Route Constrained Airspace Problems

NASA's AATT Program is investigating potential ground-based decision support tool (DST) development for en route controllers and managers. NASA's previous work in en route DST development has focused on Transition airspace, where aircraft are impacted by constraints associated with the transition of aircraft from en route to terminal airspace. This paper investigates the problems associated with aircraft in non-transitional en route airspace, termed Constrained Airspace. A literature search was performed to catalog previously identified constrained airspace problems. The results of this search were investigated with industry representatives to validate these problems were significant in constrained airspace. Three general problem areas were identified. The first problem area involves negative impacts caused by a loss of airspace (e.g., activation of Special Use Airspace (SUA), weather cell formation, and overloaded sectors). The second problem area is the lack of identifying and taking advantage of gained airspace (e.g., SUA deactivation, weather dissipation, and sector loading reductions). The third problem area is unforeseen negative impacts caused by the acceptance of user routing requests (e.g., a route change into an area of congestion that negated the users intended benefit). Based upon the problems identified, an operational concept was developed for a DST to help handle these problems efficiently. The goal is to strategically identify constrained airspace problems and to provide functionality to support ARTCC TMUs in resolving the identified impacts. The capability lends itself well to TMU and Airline Operations Center (AOC) collaboration.

Green, Steven↗

Web-Based Software for Managing Research

aeroCOMPASS is a software system, originally designed to aid in the management of wind tunnels at Langley Research Center, that could be adapted to provide similar aid to other enterprises in which research is performed in common laboratory facilities by users who may be geographically dispersed. Included in aeroCOMPASS is Web-interface software that provides a single, convenient portal to a set of project- and test-related software tools and other application programs. The heart of aeroCOMPASS is a user-oriented document-management software subsystem that enables geographically dispersed users to easily share and manage a variety of documents. A principle of "write once, read many" is implemented throughout aeroCOMPASS to eliminate the need for multiple entry of the same information. The Web framework of aeroCOMPASS provides links to client-side application programs that are fully integrated with databases and server-side application programs. Other subsystems of aeroCOMPASS include ones for reserving hardware, tracking of requests and feedback from users, generating interactive notes, administration of a customer-satisfaction questionnaire, managing execution of tests, managing archives of metadata about tests, planning tests, and providing online help and instruction for users.

Computer software and hardware↗

Discovery Through Biospecimen Sharing: The Nasa Biological Institutional Scientific Collection (NBISC)

NASA Ames Research Center has fostered collaborations with other NASA centers, universities, and international space agencies by sharing non-human biospecimens from spaceflight and space-relevant ground experiments since the 1960s. These collaborations have advanced the field of space exploration by helping to maximize the data gained from spaceflight experiments. Non-human tissues archived from experiments funded by NASA’s Space Biology and Human Research Programs (HRP) are available for request through the NASA Life Sciences Portal (NLSP) and distributed by the NASA Biological Institutional Scientific Collection (NBISC). NBISC coordinates closely with the Ames Biospecimen Sharing Program (BSP) which is responsible for sample collection from spaceflight and ground experiments. NBISC currently houses more than 90,000 biospecimens in its facility at NASA Ames. Until recently, NBISC primarily distributed samples from Space Biology funded research. In 2022 NBISC partnered with HRP Space Radiation Element to also archive samples from studies which primarily involve rodents exposed to galactic cosmic radiation simulations at the NASA Space Radiation Laboratory (NSRL) and other analog facilities. In this presentation we will highlight several success stories of analyses carried out using archived NBISC samples received by researchers in recent years and will detail the process for proposing and receiving samples from NBISC. Making available these 90,000+ unique biospecimens to the scientific research community, NBISC not only functions as a resource for storing and distributing non-human biospecimens, but as a warehouse for future discoveries for the benefit of NASA and humankind.

NBISC↗

Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating Reduced Consumption for Dynamic Demand Response

Growing demand is straining our existing electricity generation facilities and requires active participation of the utility and the consumers to achieve energy sustainability. One of the most effective and widely used ways to achieve this goal in the smart grid is demand response (DR), whereby consumers reduce their electricity consumption in response to a request sent from the utility whenever it anticipates a peak in demand. To successfully plan and implement demand response, the utility requires reliable estimate of reduced consumption during DR. This also helps in optimal selection of consumers and curtailment strategies during DR. While much work has been done on predicting normal consumption, reduced consumption prediction is an open problem that is under-studied. In this paper, we introduce and formalize the problem of reduced consumption prediction, and discuss the challenges associated with it. We also describe computational methods that use historical DR data as well as pre-DR conditions to make such predictions. Our experiments are conducted in the real-world setting of a university campus microgrid, and our preliminary results set the foundation for more detailed modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BuildingSync® v.2.5.0 2024 [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas↗

BuildingSync® v.2.7.0 (released 9.11.2025) [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. Version 2.7.0 adds new elements for file attachment feature and FederalBuilding, and generalizes usage of Optional Elements (e.g. EquipmentCondition, EquipmentID) to all assets/systems. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas [National Renewable Energy Lab. (NR↗

Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

Wheeler, mark M.↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Characterization of low concentration uranium glass working materials

A series of uranium-doped silicate glasses were created at (Lawrence Livermore National Laboratory) LLNL, to be used as working reference material analogs for low uranium concentration research. Specifically, the aim of this effort was the generation of well-characterized glasses spanning a range of concentrations and compositions, and of sufficient homogeneity in uranium concentration and isotopic composition, for instrumentation research and development purposes. While the glasses produced here are not intended to replace or become standard materials for uranium concentration or uranium isotopic composition, it is hoped that they will help fill a current gap, providing low-level uranium glasses sufficient for methods development and method comparisons within the limitations of the produced glass suite. Glasses are available for research use by request.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Long Range Community Planning Process for Fusion Sciences and Plasma Physics (Final Technical Report)

This grant facilitated the APS-DPP Community Planning Process (DPP-CPP) which was a strategic planning process with the goals of identifying scientific and technological opportunities in the fields of Plasma Physics and Fusion Energy Science, and making consensus recommendations for a strategy to address these opportunities to the DOE Office of Fusion Energy Science Advisory Committee (FESAC). The DPP-CPP was initiated by the APS-DPP executive committee in order to help FESAC fulfill a charge from DOE to develop a strategic plan for the DOE Office of Fusion Energy Science (FES). In this charge, the DOE Deputy Director for Science, Dr. Stephen Binkley, requests “that the Fusion Energy Sciences Advisory Committee (FESAC) undertake a new long-range strategic planning activity for the Fusion Energy Sciences (FES) program. The strategic planning activity - to encompass the entire FES research portfolio (namely, burning plasma science and discovery plasma science) - should identify and prioritize the research required to advance both the scientific foundation needed to develop a fusion energy source, as well as the broader FES mission to steward plasma science.” The process as set out in the proposal (and below) was successful in meeting all of its stated goals culminating in the final report to the FESAC subcommittee given the charge.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗