Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Nuclear Weapons Data Strategy

This document describes the data strategy for the Nuclear Weapons Program Management Unit (NW PMU), with emphasis on functions related to the product realization lifecycle. It describes a vision to more effectively value and utilize data as an asset: data often is our product, and when it isn't, our products are made possible only through the data produced and consumed throughout each product's lifecycle. True confidence in the nuclear deterrent requires a clear understanding of how our products perform against requirements; both in the near term as well as over long periods of time. Data is the foundation for this understanding, and as such is a key enabler of the success of the NW mission. This document defines principles that enable a "culture of care" around NW data and drive the specific approaches to create a data-centric environment that is sustainable, agile, and responsive to the needs of the NW mission. The strategy outlined within this document must guide the definition of a high-level roadmap to achieve this vision, which in turn will be supported by separate detailed implementation plans.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The MidAmerica Regional Microgrid Education and Training (MARMET) Consortium

The primary goal of this project was to integrate cutting-edge research and advanced instructional methods to create a flexible, evolving approach to microgrid and distributed energy resources training for all levels of student. This goal entailed the rapid development of modular material to capture and reflect the newest trends in electric power microgrid engineering and to make it available in traditional and non-traditional settings. It was our goal to develop course material that can be readily integrated into either existing courses or organized into new courses. The target audiences include technicians, contractors and consultants, inspectors, policy makers, supervisors, and engineers and undergraduate and graduate students. The main project objectives were to: 1) Perform a gap analysis to identify the research/educational/training needs and define specific implementation plans for these activities in distributed technology and Smart Grid power engineering by working with Department of Energy, the National Network Administrator (NNA) and other Distributed Technology Training Consortia (DTTC). 2) Develop learning content related to, and driven by, microgrid research, consisting of one or more multimedia-based modules. Over the life of the project MARMET provided training to 11,012 students and developed 154,432 contact hours of material (see the IREC NNA, DE-EE0006342, final project report for added details on MARMET evaluation and assessment metrics, as well as an overview of the entire GEARED network. 3) Provide a variety of delivery mechanisms and venues for face-to-face and on-line instruction in power system engineering and related smart grid operations, including university-based courses, short courses, and workshops. 4) Assemble and engage highly-qualified advisory and steering committees of experts from utilities, universities, national laboratories, and product suppliers for this DTTC, to guide and advise the activities of the DTTC, and to assist in creating student internships, coops, research projects and academic competitions for GEARED students within the DTTC and nationally. 5) Convene regular meetings of Consortia partners to disseminate research results among the participants (universities, utilities, and industry). 6) Develop recruitment mechanisms to publicize GEARED student opportunities and highlight the educational benefits of GEARED participation to assure long-term sustainability of student recruitment and retention. 7) Participate in GEARED National Network activities to identify and adopt best practices across all GEARED consortia. 8) Organize, host and manage at least one annual Student-Centered Research Conference on behalf of the GEARED Network during the period of performance; participate in each annual national Student-Centered Research Conference.

14 SOLAR ENERGY↗

A Report on the Implementation of Smart Grids in Mexico

As part of Mexico's implementation of its constitutional energy reform and the transformation of its electric power industry, Mexico is addressing the central importance of a modernized grid. The energy sector reform laws establish a Smart Grid Program to make Mexico's power grid capable of meeting the country's lofty clean energy goals while improving efficiencies, maintaining system reliability, and increasing its security. Implementing Smart Grids in Mexico required a compilation of data and information from many sources that document Mexico's progress in implementing a Smart Grid. In this report, various knowledge experts contribute with an assessment on the topics of the legislation that created the sectoral transformation now underway; the state of smart grid technology in Mexico's power sector and the efforts undertaken to date; a review of policy in the power sector describing the development of the Smart Grid Implementation Plan by the Ministry of Energy; a review of Mexico's priorities for smart grid deployment; the mapping of several smart grid measures to the specific smart grid drivers; substantial detail from smart grid experts from NREL and from Swedish smart grid research centers describing smart grid measures to assist Mexico's move to a cleaner, more-efficient grid; institutional policies that are recommended for smart grid growth; discussion of some of the barriers to smart grid deployment, including cybersecurity concerns and consumer receptivity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precision Local Positioning System

The primary goal of the project is to lay the groundwork for a new system design, meaning that at the end of this project’s effort, a traditional LLNL project could begin. For this goal to be met, the overarching needs of potential sponsors and stakeholders must be analyzed and understood, and a clear statement of work should be able to be drafted from the finding in this report. More specifically, the results from this project should immediately feed into the drafting of requirements, an implementation plan, and a budget plan for a future project. In order to accomplish this goal, the team set a broad framework for work to be completed. First, conduct current market research and select reference technologies to decompose. From the decompositions, analyze shortcomings, possible pain-points and form metrics and architectural decisions. Next, analyze the potential market area by interviewing/researching stakeholders and understanding their needs. As an additional project goal, attempt to capture as large a market area and scope as reasonably possible by incorporating more than the traditional LLNL sponsors. From the information gathered, study stakeholder salience and understand the relationships between stakeholders, mission areas, mission critical functions, and system metrics. Further analyze the relationships to focus on critical system aspects and to group stakeholders and mission together in order to reduce system complexity while maintaining wide marketability. Finally, begin brainstorming concepts from the established architectural decision and use the found metrics to create tradespaces to down select the most viable architectures. This document presents the team’s findings as it progressed through the project’s strategy.

42 ENGINEERING↗

Sensitivity and Uncertainty Workflow of Full System SIERRA Models Supporting High Consequence Applications

Credibility of end-to-end CompSim (Computational Simulation) models and their agile execution requires an expressive framework to describe, communicate and execute complex computational tool chains representing the model. All stakeholders from system engineering and customers through model developers and V&V partners need views and functionalities of the workflow representing the model in a manner that is natural to their discipline. In the milestone and in this report we define workflow as a network of computation simulation activities executed autonomously on a distributed set of computational platforms. The FY19 ASC L2 Milestone (6802) for the Integrated Workflow (IWF) project was designed to integrate and improve existing capabilities or develop new functionalities to provide a wide range of stakeholders a coherent and intuitive platform capable of defining and executing CompSim modeling from analysis workflow definition to complex ensemble calculations. The main goal of the milestone was to advance the integrated workflow capabilities to support the weapon system analysts with a production deployment in FY20. Ensemble calculations supporting program decisions include sensitivity analysis, optimization and uncertainty quantification. The goal of the L2 milestone aligned with the ultimate goal of the IWF project is to foster cultural and technical shift toward and integrated CompSim capability based on automated workflows. Specific deliverables were defined in five broad categories: 1) Infrastructure, including development of distributed-computing workflow capability, 2) integration of Dakota (Sandia's sensitivity, optimization and UQ engine) with SAW (Sandia Analysis Workbench), 3) ARG (Automatic Report Generator introspecting analysis artifacts and generating human-readable extensible and archivable reports), 4) Libraries and Repositories aiding capability reuse, and 5) Exemplars to support training, capturing best practices and stress testing of the platform. A set of exemplars was defined to represent typical weapon system qualification CompSim projects. Analyzing the required capabilities and using the findings to plan implementation of required capabilities ensured optimal allocation of development resources focused on production deployment after the L2 is completed. It was recognized early that the end-to-end modeling applications pose a considerable number of diverse risks, and a formal risk tracking process was implemented. The project leveraged products, capabilities and development tasks of IWF partners. SAW, Dakota, Cubit, Sierra, Slycat, and NGA (NexGen Analytics, a small business) contributed to the integrated platform developed during this milestone effort. New products delivered include: a) NGW (Next Generation Workflow) for robust workflow definition and execution, b) Dakota wizards, editor and results visualization, and c) the automatic report generator ARG. User engagement was initiated early in the development process eliciting concrete requirements and actionable feedback to assure that the integrated CompSim capability will have high user acceptance and impact. The current integrated capabilities have been demonstrated and are continually being tested by a set of exemplars ranging from training scenarios to computationally demanding uncertainty analyses. The integrated workflow platform has been deployed on both SRN (Sandia Restricted Network) and SCN (Sandia Classified Network). Computational platforms where the system has been demonstrated span from Windows (Creo the CAD platform chosen by Sandia) to Trinity HPC (Sierra and CTH solvers). Follow up work will focus on deployment at SNL and other sites in the nuclear enterprise (LLNL, KCNSC), training and consulting support to democratize the analysis agility, process health and knowledge management benefits the NGW platform provides.

97 MATHEMATICS AND COMPUTING↗

Remote Handled Hot Cell Facility and Other Research Transuranic Waste (Debris)

This acceptable knowledge (AK) Summary Report has been prepared for the Central Characterization Program (CCP) for remote-handled (RH) transuranic (TRU) waste generated and managed by Sandia National Laboratories/New Mexico (SNL/NM) in Albuquerque, New Mexico. The waste described in this report was predominately generated in the SNL/NM Hot Cell Facility (HCF) during the removal and packaging of experimental material and decontamination operations in Building 6580 at Technical Area (TA)-V. The waste stream also includes a very small amount of waste (estimated at less than 1 gram of fuel similar to that used for research at the HCF) originating from classified research at TA-I. In addition, the waste also includes secondary waste termed by SNL/NM as process generated waste (PGW), created during repackaging operations for this waste at the Auxiliary Hot Cell Facility (AHCF). The waste has been stored at the Sandia Pulsed Reactor (SPR) Dense Pack Storage Facility within TA-V or the Manzano Bunkers located at Manzano Base within Kirtland Air Force Base. All of the waste is being repackaged at the AHCF. This report was prepared in accordance with CCP-TP-005, CCP Acceptable Knowledge Documentation (Reference 1), to implement the AK requirements of DOE/WIPP-02-3214, Remote-Handled TRU Waste Characterization Program Implementation Plan (WCPIP) (Reference 2); Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan (WIPP-WAP) (Reference 3); and DOE/WIPP-02-3122, Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC) (Reference 4).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Battery Electric Bus Deployment Considerations in Developing Countries

Electrifying the transportation sector holds many promises and there are numerous strategies for doing so, including the deployment of battery electric buses (BEBs). BEBs can improve air quality (particularly in urban areas), may help curb greenhouse gas emissions, and can have positive impacts on public health and the quality of life for city inhabitants. This fact sheet steps through the six essential BEB considerations: 1) implementation planning, 2) technology selection, 3) economic impacts, 4) charging infrastructure, 5) operational, and 6) maintenance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of the Los Alamos Nuclear Material Packaging Risk Ranking Method

Repackaging nuclear material into robust containers to protect workers and the public has been ongoing at LANL and around the DOE complex for nearly two decades. The number of containers at LANL is around 5,000; limited resources for repackaging material has led to extended repackaging campaigns and the need to prioritize repackaging. Various methodologies have been used to prioritize the repackaging efforts and to demonstrate progress in risk reduction over time (e.g., Boerigter, 1997). The 2000-1 DNFSB recommendation recognized the limited DOE resources for repackaging, and acknowledged the need to “prioritize and schedule tasks to be undertaken with available funds according to consideration of risks.” Later, in DNFSB recommendation 2005-1, in addition to recommending that DOE develop a packaging standard, the Board recommended that “Characterization information should also be used to develop a surveillance program prioritized according to expected material and container risk (including, for example, material type, material form, and the age and type of container).” In response to requests and recommendations from the DOE and DNSFB to prioritize according to worker risk, a risk ranking method based on the potential consequence of dropping a container from 3 meters was developed in 2007 (Smith, 2007) and updated in 2014 (Hoffman, 2014). Various LANL implementation plans for repackaging were developed over the years using this methodology (Stone, 2014). Currently, this method is utilized in conjunction with an algorithm to mitigate programmatic risk to prioritize container repackaging and material processing (Prochnow, 2015). The purpose of this study is to document how the current risk ranking method works, how it is used and potential limitations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Underground Test Area (UGTA) Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada (Closure Report)

This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from groundwater impacted by the underground nuclear testing within the YF/CM CAU. The purpose of the CR is to describe the selected corrective action. Summarize previous activities and conclusions that support CAU closure. Present final contaminant boundaries, use restriction (UR) boundaries, and regulatory boundaries. Provide an implementation plan for long-term monitoring and well network maintenance and identify the approaches and policies for institutional controls.

54 ENVIRONMENTAL SCIENCES↗

Smart, Connected Manufactured Housing Solutions through High-Performance Design. Final CRADA report

This report focuses on HVAC, domestic hot water, and miscellaneous electric loads via voluntary opportunities that may arise from partnerships with utilities, as well as future US Environmental Protection Agency ENERGY STAR and DOE Zero Energy Ready Manufactured Home programs. Phase I of this project has begun the technical dialogue toward developing an implementation plan among DOE’s Oak Ridge National Laboratory, Clayton Manufactured Homes, and US Department of Housing and Urban Development Code manufactured housing stakeholders. These activities have focused on delivering high-performance design through integration of technology. Project tasks include the following: Identifying baseline energy analysis resources opportunities from a variety of DOE and utility stakeholders; Developing a smart home and business solution by leveraging existing utility programs working with Smart Homes Partners resources such as ACE IoT Solutions, Google Nest, and Ecobee; Developing improved smarter ventilation systems with industry ventilation partners such as the Madison Group; Developing improved building science QA/QC testing equipment with manufacturers such as The Energy Conservatory, and supporting other feasible concepts vetted under DOE’s Advanced Buildings Collaborative with Slipstream, reinventing HVAC in manufactured housing; and, Developing smart home short- and long-term viable technical solutions in coordination with Clayton Manufactured Homes in new and/or revitalized community scales for future Phase II prototype demonstrations, which may include design (and perhaps construction) of single-section homes targeting rental property developers and multi-section homes targeting low- to middle-income affordable housing community developers Given the ongoing US Department of Energy (DOE) rulemaking activities, baseline energy analysis assessments of envelope prescriptive and Uo (i.e., the overall thermal energy efficiency of the home in British thermal units per square foot of exterior heat loss/gain surfaces) measures were removed from the scope of Phase I of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Review of FY23 ASC ATDM L2 Milestone, MRT #8541, ATDM Multiphysics Scaling on EAS-3

As displayed in the FY23 ASC Implementation Plan (IP) and the Milestone Reporting Tool (MRT), the milestone description and completion criteria state: Demonstrate the capability to execute mission-relevant calculations with a multiphysics code from the Ristra project at scale on the pre-El Capitan Early Access System 3 (EAS-3). These calculations must use the GPU hardware available on EAS-3, the AMD MI-250s, to achieve any reasonable performance.

97 MATHEMATICS AND COMPUTING↗

Calendar Year 2021 Underground Test Area Annual Sampling Letter Report Nevada National Security Site, Nevada (Rev. 1) WITH ROTC-1

This calendar year (CY) 2021 annual sampling letter report presents Plan implementation and a summary of field activities, sampling methods, well completion diagrams, and analytical laboratory results from sampling of wells on Pahute Mesa. The CY 2021 letter report also presents data from samples collected in CY 2019. These CY 2019 results were not reported in previous sampling reports because they were not available from the specialized laboratory (Lawrence Livermore National Laboratory [LLNL]) at the time of the previous reports’ publication.

54 ENVIRONMENTAL SCIENCES↗

Calendar Year 2023 Underground Test Area Annual Sampling Letter Report Nevada National Security Site

The calendar year 2023 annual sampling letter report presents Plan implementation and a summary of field activities, sampling methods, well completion diagrams, and analytical laboratory results from sampling of wells associated with the Pahute Mesa CAUs. The CY 2023 letter report also presents data from samples collected from Well ER-EC-11_p3 as part of a sampling investigation. This well was resampled because of anomalously low standard tritium (3H) results from bailer sampling that occurred in July 2021.

54 ENVIRONMENTAL SCIENCES↗

Building Performance Software: Portfolio-Level Capabilities and Applications

Navigating the broad and rapidly evolving market landscape of software solutions is complex whether you are a sustainability leader, building owner, energy manager, or building engineer with energy and greenhouse gas (GHG) emissions reduction goals for a portfolio of buildings. The Department of Energy’s Better Buildings partners have noted this complexity and the associated lack of publicly available information. In response, this report reviews the ecosystem of environmental, social, and governance (ESG), energy management information systems (EMIS), and decarbonization software with the goal of orienting prospective users to current offerings. Organizations can utilize this guidance to determine the specific capabilities needed to support decarbonization efforts and procure appropriate software to streamline the GHG emissions reduction process. In this paper, we refer to “decarbonization software” as the category of software that meets an organization’s needs for decarbonization planning, implementation, and tracking. This software may have a heritage in ESG or EMIS, or it may be an entirely new product. This report offers a snapshot of today’s rapidly evolving decarbonization software capabilities, along with guidance for procuring and utilizing it that will remain relevant despite any future software changes. Exploratory research was conducted on over 100 software providers, and interviews were held with 28 of them. Note that inclusion in this report does not indicate an endorsement, nor does a product’s absence from this report indicate a lack of suitability

97 MATHEMATICS AND COMPUTING↗

Zero Emission Cargo Transport (ZECT) II Demonstration: South Coast Air Quality Management District (Final Report)

The South Coast Air Quality Management District (South Coast AQMD), California Air Resources Board (CARB) and Southern California Association of Governments (SCAG) — the agencies responsible for preparing the State Implementation Plan required under the federal Clean Air Act — have agreed that attainment of federal air quality standards for the region will require a transition to the broad use of zero and near-zero emission energy sources in cars, trucks and other equipment. Accordingly, the 2012 South Coast AQMD Air Quality Management Plan, the SCAG 2012 Regional Transportation Plan, and the “Vision for Clean Air: A Framework for Air Quality and Climate Control Planning” all identify the need to immediately enact a phasing in of zero and near-zero emission technologies to meet air quality goals. In 2014, South Coast AQMD was awarded grant funding under the US Department of Energy Zero Emission Cargo Transport (ZECT) II Demonstration program to develop and demonstrate zero-emission drayage trucks for goods movement operations between the Port of Los Angeles (POLA) and Port of Long Beach (POLB) near dock rail yards and warehouses: 1) development and demonstration of zero-emission fuel cell range extended electric drayage trucks and 2) development and demonstration of hybrid electric drayage trucks. The purpose of this project was to accelerate deployment of zero emission cargo transport technologies to reduce harmful diesel emissions, petroleum consumption and greenhouse gases in the surrounding communities along the goods movement corridors that are impacted by heavy diesel traffic and the associated air pollution. Between 2014 – 2024, six ZECT II zero-emission fuel cell drayage truck platforms, including fuel cell range extended and CNG hybrid trucks, were successfully designed, developed, integrated, built, tested, and demonstrated with drayage fleet operators in transportation corridors within areas of the South Coast AQMD jurisdiction in Southern California such as in and around POLA and POLB. Portable hydrogen refueling was deployed to support the fuel cell vehicles. The project had real-time improvement with on-going debugging and optimizations while the vehicles were under demonstration. All platforms demonstrated sufficient or excess power, torque, and energy to support 82,000lbs Gross Vehicle Weight Rating and gradeability to perform their daily duty cycles. Collectively, the trucks drove over 23,000 miles during their respective demonstration phases. The ZECT II project was the first of its kind to demonstrate the commercial viability that supported the additional technology breakthroughs for Class 8 zero emission trucks and validations as well as the regulatory basis for all the zero-emission regulation that we know today, such as the Innovative Clean Transit regulation, Advanced Clean Trucks and Clean Fleet regulations.

08 HYDROGEN↗

Development of Transient MPACT-CTF Capability for RIA with DNB

The objective of this milestone was to continue the development, implementation, verification, and validation of the methods in VERA-CS necessary to solve the whole-core time-dependent neutron transport equations with pin-resolved detail for a practical PWR applications. This capability is necessary to provide the time dependent pin resolved neutron flux for analysis of the Reactivity Insertion Accident (RIA) as specified in the CASL RIA Challenge Problem Implementation Plan, CASL-I-2013-0060-000. The FY17 work reported here continued the FY16 work reported in CASL-U-2016-1188-000 which was primarily focused on MPACT and performed the methods, and Validation and Verification (V&V) efforts necessary to demonstrate the transient capability in VERA-CS in order to facilitate the L1 RIA milestone in FY18. This report describes the activities performed in FY17 in the three general areas of: User Support, Methods Improvements, and in V&V and Demonstration. In the area of User Support various user requested features were added to the code such as detailed reactivity edits and improvements to the VERA input. In the area of Methods Improvements, the features added included user controlled variable time stepping, a one-group CMFD Acceleration, and a Delayed Energy Deposition model; as well as improvements to the overall code robustness for the transient solution. In the area of V&V, the full suite of C5G7 Transient benchmarks was completed and significant progress was made on the solution of SPERT with VERA-CS. In the area of practical demonstration, a full core AP1000 demonstration problem was performed with VERA-CS. The work performed in FY17 enhanced the capability of performing VERACS transients for practical large-scale light water reactor problems with an acceptable computational burden and provided an important step in the completion of the CASL Reactivity Insertion Accident (RIA) Challenge Problem.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

WRPS Hanford Update [Slides]

The purpose of this report is to coordinate with the staff from WRPS, the current contract holder for operations at the Hanford site to better inform design decisions for the Autonomous systems for Hanford waste tank handling project. The project goals are to support risk reduction associated with monitoring, inspection and mapping of Hanford tank underground pits and includes: 1. A pit mock-up demonstration of Idaho National Laboratory’s (INL) Autonomous Pit Exploration System (APES) technology, which has two configurations: A. The Autonomous Robotic Arm, which is a proposed collaboration with Florida International University (FIU) and has capabilities to visually inspect, monitor, map and conduct simple tool manipulation tasks in the tank pits, and B. The robotic crawler configuration, which has capabilities to deploy to the bottom of the pits and conduct closer and bottom-up visual inspections. 2. An Implementation Plan that identifies Hanford site-wide application of the INL remote robotics technologies to enhance the performance of the tank farm systems and the characterization of the waste they contain to mitigate risk and optimize the overall waste mission. 3. A first-of-a-kind environmental digital twin will be produced. Digital twins to date require permanently installed sensors in order to produce asset specific predictions. This project will use the intermittent signals during inspections from deployed sensors on robotic systems to produce the data sets used by AI/ML to enable predictions of issues on tanks.

42 - ENGINEERING↗