Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

Koelfgen, Syri J.↗

Animal life support transporters for Shuttle/Spacelab

Two transporter devices have been developed by the NASA Ames Research Center, primarily for the purpose of stowing small vertebrates and primates in the mid-deck avionics bay of the Shuttle during launch and re-entry. These animals will be used in Life Science Spacelab experiments. Stowage in the mid-deck area will reduce animal exposure to the high noise levels existing in Spacelab during launch; further, the possible exposure of the animals to high temperatures in Spacelab during re-entry and post-landing will be eliminated. The transporters will provide experimenters more timely access to their animals during experiment-critical, pre-launch, and post-landing periods. Rechargeable batteries in the transporters will provide life support system functions for the animals during periods of transfer and during mission phases in which power is temporarily unavailable. The transporters have been successfully designed, fabricated, and tested. Integrated testing of the transporters was performed in the Space Mission Development III (SMD III) Simulation at the NASA Johnson Space Center.

Berry, W. E.↗

International R&M/Safety Cooperation Lessons Learned Between NASA and JAXA

Presented are a number of important experiences gained and lessons learned from the collaboration of the National Aeronautics and Space Administration (NASA) and the Japanese Aerospace Exploration Agency (JAXA) on the CoNNeCT (Communications, Navigation, and Networking re-Configurable Testbed) project. Both space agencies worked on the CoNNeCT Project to design, assemble, test, integrate, and launch a communications testbed facility mounted onto the International Space Station (ISS) truss. At the 2012 RAMS, two papers about CoNNeCT were presented: one on Ground Support Equipment Reliability & System Safety, and the other one on combined application of System Safety & Reliability for the flight system. In addition to the logistics challenges present when two organizations are on the opposite side of the world, there is also a language barrier. The language barrier encompasses not only the different alphabet, it encompasses the social interactions; these were addressed by techniques presented in the paper. The differences in interpretation and application of Spaceflight Requirements will be discussed in this paper. Although many, but definitely not all, of JAXA's Spaceflight Requirements were inspired by NASA, there were significant and critically important differences in how they were interpreted and applied. This paper intends to summarize which practices worked and which did not for an international collaborative effort so that future missions may benefit from our experiences. The CoNNeCT flight system has been successfully assembled, integrated, tested, shipped, launched and installed on the ISS without incident. This demonstrates that the steps taken to facilitate international understanding, communication, and coordination were successful and warrant discussion as lessons learned.

Fernandez, Rene↗

Gateway bi-propellant refueling development testing and model validation activities

The Gateway is an upcoming long term lunar exploration program to be completed by NASA in partnership with ESA and other US and international partners. The system design of the Gateway contains both a high performance Xenon based Solar Electric Propulsion system, as well as a bi-propellant attitude control system. Both propulsion systems are designed for on-orbit refueling to enable long life performance of the Gateway. The ESPRIT-RM is a module which will expand the pressurized volume of Gateway, while also providing refueling capability for both the Xenon and Bipropellant propulsion systems, therefore extending the Gateway life on orbit. As part of the Gateway bi-propellant refueling system development, a simplified fluidic breadboard system was created to evaluate system performance and response using simulant fluids. The test plan includes verification activities with simulant (water, HFE-7100) to verify joined subsystem behavior in the critical operations, including propellant transfer demonstration between modules, transient tests and venting tests. Integrated testing occurred at TASUK in collaboration with NASA to support joint verification activities to de-risk the major functions of the ESPRIT BTS and the overall CONOPS of the refueling of the Gateway chemical propulsion system. Initially collected test data from the system testing is presented, as well as initial model validation, and correlated to collected high frequency test data and system response is shown. Initially collected data has shown the architected system performance is closing initial design assumptions, but much forward work remains to characterize and develop the system.

Christopher Daniel Radke↗

ATM test and integration

The test and checkout philosophy of the test program for the Skylab ATM module and the overall test flow including in-process, post-manufacturing, vibration, thermal vacuum, and prelaunch checkout activities are described. Capabilities and limitations of the test complex and its use of automation are discussed. Experiences with the organizational principle of using a dedicated test team for all checkout activities are reported. Material on the development of the ATM subsystems, the experimental program and the requirements of the scientific community, and the integration and verification of the complex systems/subsystems of the ATM are presented. The performance of the ATM test program in such areas as alignment, systems and subsystems, contamination control, and experiment operation is evaluated. The conclusions and recommendations resulting from the ATM test program are enumerated.

Moore, J. W.↗

MIUS Integration and Subsystem Test (MIST) data system

A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.

Pringle, L. M.↗

Orion ECLSS/Suit System - Ambient Pressure Integrated Suit Test

The Ambient Pressure Integrated Suit Test (APIST) phase of the integrated system testing of the Orion Vehicle Atmosphere Revitalization System (ARS) technology was conducted for the Multipurpose Crew Vehicle (MPCV) Program within the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate. Crew and Thermal Systems Division performed this test in the eleven-foot human-rated vacuum chamber at the NASA Johnson Space Center. This testing is the first phase of suit loop testing to demonstrate the viability of the Environmental Control and Life Support System (ECLSS) being developed for Orion. APIST is the first in a series, which will consist of testing development hardware including the Carbon dioxide and Moisture Removal Amine Swing-bed (CAMRAS) and the air revitalization loop fan with human test subjects in pressure suits at varying suit pressures. Follow-on testing, to be conducted in 2013, will utilize the CAMRAS and a development regulator with human test subjects in pressure suits at varying cabin and suit pressures. This paper will discuss the results and findings of APIST and will also discuss future testing.

Barido, Richard A.↗

Orion ECLSS/Suit System Intermediate Pressure Integrated Suit Test

The Intermediate Pressure Integrated Suit Test (IPIST) phase of the integrated system testing of the Orion Vehicle Atmosphere Revitalization System (ARS) technology was conducted for the Multipurpose Crew Vehicle (MPCV) Program within the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate. This test was performed in the eleven-foot human-rated vacuum chamber at the NASA Johnson Space Center by the Crew and Thermal Systems Division. This testing is the second phase of suit loop testing to demonstrate the viability of the Environmental Control and Life Support System (ECLSS) being developed for Orion. The IPIST configuration consisted of development hardware that included the CAMRAS, air revitalization loop fan and suit loop regulator. Two test subjects were in pressure suits at varying suit pressures. Follow-on testing, to be conducted in 2014, will utilize the same hardware with human test subjects in pressure suits at vacuum. This paper will discuss the results and findings of IPIST and will also discuss future testing.

Barido, Richard A.↗

Small Project Rapid Integration and Test Environment (SPRITE) An Innovation Space for Small Projects Design, Development, Integration, and Test

Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

Lee, Ashley↗

Building Automation System Replacement and Improvements during Concurrent Integration and Testing for the Spacecraft Systems Development and Integration Facility

The Spacecraft Systems Development and Integration Facility (SSDIF), the premier cleanroom for NASA Goddard Space Flight Center (GSFC), has gone through multiple iterations of changes to its building automation system (BAS). NASA flight projects require more stringent environmental controls for temperature, humidity, air exchange rates, and pressurization. This led to increasingly difficult circumstances with replacing and improving the BAS during Integration and Testing (I&T) operations. The SSDIF was partially transitioned to a new BAS during November and December of 2023. Transition occurred in a live environment, while regular I&T activities resumed for the Roman Space Telescope. This resulted in the development and execution of a comprehensive method of procedure. Strategies such as sequencing equipment transition, and using temporary controls for critical equipment, avoided detriments to cleanroom environment. While the new BAS was being built, data points on the previous system would become obsolete, leading to data gaps and uncertainties. Critical data points were distinguished and trended on the new system, providing key insights on equipment functionality, while the BAS was completed. Control hunting and environmental deviations were persistent cases with the SSDIF. In some instances, proportional-integral-derivative (PID) tuning was implemented on current logic to bring smooth PID loop hunting. In other situations, controls logic was completely altered by changing setpoints or sequences. This provided greater laminar flow, more stable pressurization, and improved temperature and humidity controls. This paper documents the transitionary procedure to a new BAS, the improvements made, and challenges faced when altering a BAS during I&T operations.

Cleanroom↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Strategies for Ground Based Testing of Manned Lunar Surface Systems

Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.

Beyer, Jeff↗