Search NASA⌕ Search

SEARCH · Search NASA

Results for “LONG RANGE PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Satellite Servicing in Mission Design Studies at the NASA GSFC

Several NASA missions in various stages of development have undergone one-week studies in the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) Integrated Mission Design Center (IMDC), mostly in preparation for proposals. The possible role of satellite servicing has been investigated for several of these missions, applying the lessons learned from Hubble Space Telescope (HST) servicing, taking into account the current state of the art, projecting into the future, and implementing NASA long-range plans, and is presented here. The general benefits and costs of injecting satellite servicing are detailed, including components such as mission timeline, mass, fuel, spacecraft design, risk abatement, life extension, and improved performance. The approach taken in addressing satellite servicing during IMDC studies is presented.

Leete, Stephen J.↗

Europa's Icy Shell: A Bridge Between Its Surface and Ocean

Europa, a Moon-sized, ice-covered satellite of Jupiter, is second only to Mars in its astrobiological potential. Beneath the icy surface, an ocean up to 150 km deep is thought to exist, providing a potential habitat for life,and a tempting target for future space missions. The Galileo mission to the Jovian system recently ended, but there are already long-range plans to send much more capable spacecraft,such as the proposed Jupiter Icy Moons Orbiter (JIMO), to take a closer look at Europa and her siblings, Ganymede and Callisto, some time in the next two decades. Europak outer icy shell is the only interface between this putative ocean and the surface, but many aspects of this shell are presently poorly understood; in particular, its composition, thickness, deformational history, and mechanical properties. To discuss the ice shell and our current understanding of it, 78 scientists from the terrestrial and planetary science communities in the United States and Europe gathered for a 3-day workshop hosted by the Lunar and Planetary Institute in Houston in February. A key goal was to bring researchers from disparate disciplines together to discuss the importance and limitations of available data on Europa with a post-Galileo perspective. The workshop featured 2 days of reviews and contributed talks on the composition, physical properties, stratigraphy, tectonics, and future exploration of the ice shell and underlying ocean. The final morning included an extended discussion period, moderated by a panel of noted experts, highlighting outstanding questions and areas requiring future research.

Schenk, Paul↗

Future Mars outpost architecture

This paper describes an outpost designed with the JPL Mars Long Range Planning Team's goals in mind. The design focuses on subsurface mapping and characterization, accomplished through seismic mapping and deep drilling.

outpost robotic Mars↗

Guide to Modeling Earth's Trapped Radiation Environment

The report will close with a detailed discussion of the current status of modeling of the radiation environment and recommend a long range plan for enhancing capabilities in this important environmental area.

Trapped Radiation modeling magnetic field space sy↗

Biomedical Aspects of Lunar and Mars Exploration Missions

Recent long-range planning for exploration-class missions has emphasized the need for anticipating the medical and human factors aspects of such expeditions. Missions returning Americans to the moon for stays of up to 6 months at a time will provide the opportunity to demonstrate the means to function safely and efficiently on another planet. Details of mission architectures are still under study, but a typical Mars design reference mission comprises a six-month transit from Earth to Mars, eighteen months in residence on Mars, and a six-month transit back to Earth. Physiological stresses will come from environmental factors such as prolonged exposure to radiation, weightlessness en route to Mars and then back to Earth, and low gravity and a toxic atmosphere while on Mars. Psychological stressors will include remoteness from Earth, confinement, and potential interpersonal conflicts, all complicated by circadian alterations. Medical risks including trauma must be considered. The role of such risk-modifying influences as artificial gravity and improved propulsion technologies to shorten round-trip time will also be discussed. Results of planning for assuring human health and performance will be presented.

Charles, John B.↗

Climate Teleconnections and Recent Patterns of Human and Animal Disease Outbreaks

Recent clusters of outbreaks of mosquito-borne diseases (Rift Valley fever and chikungunya) in Africa and parts of the Indian Ocean islands illustrate how interannual climate variability influences the changing risk patterns of disease outbreaks. Extremes in rainfall (drought and flood) during the period 2004 - 2009 have privileged different disease vectors. Chikungunya outbreaks occurred during the severe drought from late 2004 to 2006 over coastal East Africa and the western Indian Ocean islands and in the later years India and Southeast Asia. The chikungunya pandemic was caused by a Central/East African genotype that appears to have been precipitated and then enhanced by global-scale and regional climate conditions in these regions. Outbreaks of Rift Valley fever occurred following excessive rainfall period from late 2006 to late 2007 in East Africa and Sudan, and then in 2008 - 2009 in Southern Africa. The shift in the outbreak patterns of Rift Valley fever from East Africa to Southern Africa followed a transition of the El Nino/Southern Oscillation (ENSO) phenomena from the warm El Nino phase (2006-2007) to the cold La Nina phase (2007-2009) and associated patterns of variability in the greater Indian Ocean basin that result in the displacement of the centres of above normal rainfall from Eastern to Southern Africa. Understanding the background patterns of climate variability both at global and regional scale and their impacts on ecological drivers of vector borne-diseases is critical in long-range planning of appropriate response and mitigation measures.

Anyamba, Assaf↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is charged with delivering a new capability for human and scientific exploration beyond Earth orbit (BEO). The SLS may also provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle (MPCV) on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and Ground Systems Development and Operations (GSDO) programs are working together to create streamlined, affordable operations for sustainable exploration for decades to come.

Singer, Joan A.↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human and scientific exploration beyond Earth orbit. The SLS also will provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130 t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and 21st Century Ground Systems programs are working together to create streamlined, affordable operations for sustainable exploration.

Singer, Joan A.↗

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗

NASA Space Rocket Logistics Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

Neeley, James R.↗

Handling Late Changes to Titan Science

The Cassini mission has been in orbit for eight years, returning a wealth of scientific data from Titan and the Saturnian system. The mission, a cooperative undertaking between NASA, ESA and ASI, is currently in its second extension of the prime mission. The Cassini Solstice Mission (CSM) extends the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbital Science Team (TOST) has the task of integrating the science observations for all 56 targeted Titan flybys in the CSM. In order to balance Titan science across the entire set of flybys during the CSM, to optimize and influence the Titan flyby altitudes, and to decrease the future workload, TOST went through a "jumpstart" process before the start of the CSM. The "jumpstart" produced Master Timelines for each flyby, identifying prime science observations and allocating control of the spacecraft attitude to specific instrument teams. Three years after completing this long-range plan, TOST now faces a new challenge: incorporating changes into the Titan Science Plan without undoing the balance achieved during the jumpstart.

Pitesky, Jo Eliza↗

International Earth Science Constellation (ESC) Introduction

This is the Welcome and Introduction presentation for the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) meeting held in Albuquerque NM from September 27-29. It contains an org chart, charter, history, significant topics to be discussed, AquaAura 2017 inclination adjust maneuver calendar, a-train long range plans, upcoming events, and action items.

ECS↗

Temperature Constraints on the Storage and Curation of Volatile-Rich Samples from the Lunar Poles

Final Document is attached. Introduction: NASA's Lunar Exploration Campaign includes Lunar sample return efforts beginning in the mid-2020's and human landed missions in the late 2020's-early 2030's. Volatile-rich samples from the Lunar poles will be high-priority targets due to their resource potential for human explorers and high science value. In order to precisely characterize the nature of these polar volatile materials upon return to Earth, they will need to be transported and curated under conditions that minimize their chemical and physical alteration. NASA Policy Directive (NPD) 7100.10F mandates the preservation of existing extraterrestrial samples with minimal alteration, extensive and quantitative documentation of alteration that is provided to investigators, and "the development of long-range plans" for samples yet to be acquired. This abstract summarizes new efforts by the Astromaterials Acquisition and Curation Office at JSC to assess the optimal

Mitchell, J. L.↗

Twin Telescope Tests: Assessing Station Oriented Systematic Errors

Each of NASA’s three Deep Space Network sites has multiple large antennas capable of acquiring VLBI data. The long range plan is to have four 34-meter beam waveguide antennas at each site. At present Goldstone has three, Canberra has three, and Madrid has two with two more under construction. These antennas offer the opportunity to do connected element interferometry (CEI) over the few hundred meter baselines within each complex. Given that all antennas within a site are of nominally the same structural design, are run off the same clock, observe through almost the same atmosphere, and are subject to almost the same geophysics, doing CEI experiments is an excellent way to probe the limits of VLBI accuracy and expose station-specific systematic errors. This paper will report the results of just such tests which achieved about 0.2 mm baseline precision per pass. Some stations exhibit more than 1 mm systematics. Based on this data we will discuss the implications for whether the IAG’s goal of 1 mm station stability in VLBI geodesy is possible for large antennas.

Jacobs, Christopher↗

An Initial Study of Using the 34-m Antenna for Lunar Missions Support

As a part of the long-range planning of future Mars and lunar missions, a rudimentary study has been made of a 34-m antenna system with differentially pointed multiple beams. The performance loss mechanisms of the differentially pointed multiple-beam systems were identified and quantified. The goal is to determine the feasibility of using the 34-m antenna to support widely separated elements associated with lunar missions.

lunar↗

Neutrinoless Double Beta Decay

This White Paper, prepared for the Fundamental Symmetries, Neutrons, and Neutrinos Town Meeting related to the 2023 Nuclear Physics Long Range Plan, makes the case for double beta decay as a critical component of the future nuclear physics program. The major experimental collaborations and many theorists have endorsed this white paper.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Autonomous Navigation by a Mobile Robot

ROAMAN is a computer program for autonomous navigation of a mobile robot on a long (as much as hundreds of meters) traversal of terrain. Developed for use aboard a robotic vehicle (rover) exploring the surface of a remote planet, ROAMAN could also be adapted to similar use on terrestrial mobile robots. ROAMAN implements a combination of algorithms for (1) long-range path planning based on images acquired by mast-mounted, wide-baseline stereoscopic cameras, and (2) local path planning based on images acquired by body-mounted, narrow-baseline stereoscopic cameras. The long-range path-planning algorithm autonomously generates a series of waypoints that are passed to the local path-planning algorithm, which plans obstacle-avoiding legs between the waypoints. Both the long- and short-range algorithms use an occupancy-grid representation in computations to detect obstacles and plan paths. Maps that are maintained by the long- and short-range portions of the software are not shared because substantial localization errors can accumulate during any long traverse. ROAMAN is not guaranteed to generate an optimal shortest path, but does maintain the safety of the rover.

Huntsberger, Terrance↗