Search NASA⌕ Search

SEARCH · Search NASA

Results for “LONG RANGE PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses

The purpose for this workshop can be summed up by the question: Are there relevant analogs to planetary (meaning the Moon and Mars) to be found in polar exploration on Earth? The answer in my opinion is yes or else there would be no reason for this workshop. However, I think some background information would be useful to provide a context for my opinion on this matter. As all of you are probably aware, NASA has been set on a path that, in its current form, will eventually lead to putting human crews on the surface of the Moon and Mars for extended (months to years) in duration. For the past 50 V 60 years, starting not long after the end of World War II, exploration of the Antarctic has accumulated a significant body of experience that is highly analogous to our anticipated activities on the Moon and Mars. This relevant experience base includes: h Long duration (1 year and 2 year) continuous deployments by single crews, h Established a substantial outpost with a single deployment event to support these crews, h Carried out long distance (100 to 1000 kilometer) traverses, with and without intermediate support h Equipment and processes evolved based on lessons learned h International cooperative missions This is not a new or original thought; many people within NASA, including the most recent two NASA Administrators, have commented on the recognizable parallels between exploration in the Antarctic and on the Moon or Mars. But given that level of recognition, relatively little has been done, that I am aware of, to encourage these two exploration communities to collaborate in a significant way. [Slide 4] I will return to NASA s plans and the parallels with Antarctic traverses in a moment, but I want to spend a moment to explain the objective of this workshop and the anticipated products. We have two full days set aside for this workshop. This first day will be taken up with a series of presentations prepared by individuals with experience that extends back as far as the late 1940s and includes contemporary experience. The people presenting bring a variety of points of view, including not only U.S. but international, although most, if not all, have collaborated on international teams. The second day will consist of a series of small focused group interactions centered on those elements likely to be needed for traverse missions, such as mobility, habitation, and extravehicular activity (EVA, aka space suits). Our invited participants will be talking with people that specialize in these elements so that we can foster more direct interaction and exchange of experiences between these two exploration communities. After the workshop we will be preparing a report documenting these presentations and the essence of the focused interactions.

Hoffman, Stephen J.↗

Large space telescope, phase A. Volume 1: Executive summary

The Phase A study of the Large Space Telescope (LST) is reported. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. The LST is an unmanned astronomical observatory facility, consisting of an optical telescope assembly (OTA), scientific instrument package (SIP), and a support systems module (SSM). The report consists of five volumes. The report describes the constraints and trade off analyses that were performed to arrive at a reference design for each system and for the overall LST configuration. A low cost design approach was followed in the Phase A study. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and the sharing of shuttle maintenance flights with other payloads.

Source record↗

LST phase A design update study

An update is presented of the Phase A study of the Large Space Telescope (LST), based on changes in guidelines and new data developed subsequent to the Phase A study. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. A low cost design approach was followed. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and sharing of shuttle maintenance flights with other payloads (See N73-18449 through N73-18453)

Source record↗

Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions

In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.

Source record↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 1: Executive summary

The likely system concepts which might be representative of NASA and DoD space programs in the 1980-2000 time period were studied along with the programs' likely needs for major space transportation vehicles, orbital support vehicles, and technology developments which could be shared by the military and civilian space establishments in that time period. Such needs could then be used by NASA as an input in determining the nature of its long-range development plan. The approach used was to develop a list of possible space system concepts (initiatives) in parallel with a list of needs based on consideration of the likely environments and goals of the future. The two lists thus obtained represented what could be done, regardless of need; and what should be done, regardless of capability, respectively. A set of development program plans for space application concepts was then assembled, matching needs against capabilities, and the requirements of the space concepts for support vehicles, transportation, and technology were extracted. The process was pursued in parallel for likely military and civilian programs, and the common support needs thus identified.

Bekey, I.↗

Emissions and new technology programs for conventional spark-ignition aircraft engines

A long-range technology plan in support of general aviation engines was formulated and is being implemented at the Lewis Research Center. The overall program was described, and that part of the program that represents the in-house effort at Lewis was presented in detail. Three areas of government and industry effort involving conventional general-aviation piston engines were part of a coordinated overall plan: (1) FAA/NASA joint program, (2) NASA contract exhaust emissions pollution reduction program, and (3) NASA in-house emissions reduction and new technology program.

Wintucky, W. T.↗

Overview of future programs - USA

An overview of U.S. manned space flight is presented and recent advanced studies are considered. In connection with long range mission planning, studies are being conducted of future space systems, space vehicles, and space operations. An early Space Construction Base is being studied for launch in 1985 and associated geosynchronous operations are projected for 1987. The Space Construction Base is envisioned as a facility for erecting large structures in space, for basing Manned Orbital Transfer Vehicles that operate between low earth orbit and geosynchronous orbit; and for the conduct of industrial operations and scientific experiments in space. Ways and means for erecting large structures in space are examined. One particular plan involves the development of the technology to demonstrate the capabilities of a solar power station to translate solar energy to electrical energy for use on commercial power stations on earth. Advanced transportation is also being studied, particularly for needs that complement the Shuttle. The use of the Shuttle System as a Heavy Lift Launch Vehicle to place large diameter payloads up to 200,000 pounds in weight is also being explored.

Freitag, R. F.↗

Requirements for predictions and real-time monitoring for the study of travelling interplanetary phenomena

Physical processes within quiescent as well as disturbed flows of solar wind plasma, energetic particles, and magnetic and electric fields from the Sun are considered. Specifically, travelling interplanetary phenomena to be studied during the years of the solar maximum of solar cycle 21 are covered. It is noted that predictions, while needed for long range, logistical planning, is secondary to the requirements of synoptic real time monitoring over a wide range of particle energies and spectral bandwidths.

Dryer, M.↗

Environmental assessment overview

The assessment program has as its objectives: to identify the environmental issues associated with the SPS Reference System; to prepare a preliminary assessment based on existing data; to suggest mitigating strategies and provide environmental data and guidance to other components of the program as required; and to plan long-range research to reduce the uncertainty in the preliminary assessment. The key environmental issues associated with the satellite power system are discussed and include human health and safety, ecosystems, climate, and interaction with electromagnetic systems.

Valentino, A. R.↗

V/STOL propulsion control technology

Results of a NASA sponsored study of V/STOL Propulsion Control Analysis are presented. The study involved propulsion control requirements, design concepts and procedures, and control designs for supersonic V/STOL. A variable cycle engine with a remote augmented lift system was used as a basis for establishing typical operating requirements and control concepts, and a nonlinear engine model was developed for control development as a precursor to a real-time simulation capability. A simplified aircraft model was also used to investigate transition requirements, and a long-range technology plan was developed to define subsequent program requirements for achieving a real-time piloted simulation capability.

Brown, H.↗

Utility experience with two demonstration wind turbine generators

Edison has committed 360 MW of nameplate generating capacity to wind energy by year 1990 in its long-range generation plan. To reach this goal the Company's wind energy program focuses on three areas: the continuous evaluation of the wind resource, the hands-on demonstration of wind turbine generators (WTG) and an association with wind park developers. Two demonstration WTGs have been installed and operated at Edison's Wind Energy Center near Palm Springs, California: a 3 MW horizontal axis Bendix/Schachle WTG and a 500 kW vertical axis Alcoa WTG. They are part of a one to two year test program during which the performance of the WTGs will be evaluated, their system operation and environmental impact will be assessed and the design criteria of future WTGs will be identified. Edison's experience with these two WTGs is summarized and the problems encountered with the operation of the two machines are discussed.

Wehrey, M. C.↗

Analysis of potential benefits of integrated-gasifier combined cycles for a utility system

Potential benefits of integrated gasifier combined cycle (IGCC) units were evaluated for a reference utility system by comparing long range expansion plans using IGCC units and gas turbine peakers with a plan using only state of the art steam turbine units and gas turbine peakers. Also evaluated was the importance of the benefits of individual IGCC unit characteristics, particularly unit efficiency, unit equivalent forced outage rate, and unit size. A range of IGCC units was analyzed, including cases achievable with state of the art gas turbines and cases assuming advanced gas turbine technology. All utility system expansion plans that used IGCC units showed substantial savings compared with the base expansion plan using the steam turbine units.

Choo, Y. K.↗

Control of robot manipulators for handling and assembly in space

Long-range NASA planning includes construction and erection of large systems in space requiring automatic handling equipment, teleoperators, or robots under supervisory control. This paper investigates and explores some of the requirements for the control of teleoperated and autonomous space manipulators. The critical technology development areas are identified and discussed in the context of the developments at the Jet Propulsion Laboratory (JPL), and other places.

Heer, E.↗

Aeronautics Technology Possibilities for 2000: Report of a workshop

The potential of aeronautical research and technology (R&T) development, which could provide the basis for facility planning and long range guidance of R&T programs and could establish justification for support of aeronautical research and technology was studied. The projections served specific purposes: (1) to provide a base for research and future facilities needed to support the projected technologies, and development advanced vehicles; (2) to provide insight on the possible state of the art in aeronautical technology by the year 2000 for civil and military planners of air vehicles and systems. Topics discussed include: aerodynamics; propulsion; structures; materials; guidance, navigation and control; computer and information technology; human factors; and systems integration.

Source record↗

Metrication report to the Congress

The principal NASA metrication activities for FY 1989 were a revision of NASA metric policy and evaluation of the impact of using the metric system of measurement for the design and construction of the Space Station Freedom. Additional studies provided a basis for focusing follow-on activity. In FY 1990, emphasis will shift to implementation of metric policy and development of a long-range metrication plan. The report which follows addresses Policy Development, Planning and Program Evaluation, and Supporting Activities for the past and coming year.

Source record↗

Recommended Priorities for NASA'S Gamma Ray Astronomy Program 1996 - 2010

It has assessed the state of the field including current missions and approved future missions, the critical scientific problems open today, the promising technologies for the future, the mission priorities for the future, and the needs for data analysis and theory. This report presents a summary of the GRAPWG findings and gives detailed recommendations.

GAMMA RAY ASTRONOMY↗