Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Measurement of Global Precipitation

The Global Precipitation Measurement (GPM) Program is an international cooperative effort whose objectives are to (a) obtain increased understanding of rainfall processes, and (b) make frequent rainfall measurements on a global basis. The National Aeronautics and Space Administration (NASA) of the United States and the Japanese Aviation and Exploration Agency (JAXA) have entered into a cooperative agreement for the formulation and development of GPM. This agreement is a continuation of the partnership that developed the highly successful Tropical Rainfall Measuring Mission (TRMM) that was launched in November 1997; this mission continues to provide valuable scientific and meteorological information on rainfall and the associated processes. International collaboration on GPM from other space agencies has been solicited, and discussions regarding their participation are currently in progress. NASA has taken lead responsibility for the planning and formulation of GPM, Key elements of the Program to be provided by NASA include a Core satellite bus instrumented with a multi-channel microwave radiometer, a Ground Validation System and a ground-based Precipitation Processing System (PPS). JAXA will provide a Dual-frequency Precipitation Radar for installation on the Core satellite and launch services. Other United States agencies and international partners may participate in a number of ways, such as providing rainfall measurements obtained from their own national space-borne platforms, providing local rainfall measurements to support the ground validation activities, or providing hardware or launch services for GPM constellation spacecraft. This paper will present an overview of the current planning for the GPM Program, and discuss in more detail the status of the lead author's primary responsibility, development and acquisition of the GPM Microwave Imager.

Flaming, Gilbert Mark↗

Alouette-ISIS program summary

The Alouette-ISIS program was a joint undertaking between Canada and the United States. Canada provided the Alouette and ISIS spacecraft, data acquisition, and satellite control. The USA provided launch capability, satellite tracking, and data acquisition. Brief descriptions of the six spacecraft and of the investigations on each spacecraft are given. The Alouette-ISIS bibliography, order alphabetically by first author's name, is contained.

Jackson, John E.↗

Wind persistence from 2-18 km using a wind profiler

Existing techniques for quantifying the effects of temporal wind variability on launch vehicles employ very limited sets of wind profile pairs derived from rising balloons. Variability due to spatial differences between the drifting balloon and a vehicle trajectory are traditionally ignored. The authors developed a technique to extract high quality wind profiles at frequent time intervals from a Doppler Radar Wind Profiler. This technique was applied to a limited number of data sets gathered from December 1990 through March 1992 at the Kennedy Space Center using the NASA 50 Mhz Wind Profiler. The authors then used these derived wind profiles to demonstrate techniques for quantifying the effects of temporal and spatial variability.

Wilfong, Timothy L.↗

Application of Solar-Electric Propulsion to Robotic and Human Missions in Near-Earth Space

Solar-electric propulsion (SEP) is becoming of interest for application to a wide range of missions. The benefits of SEP are strongly influenced by system element performance, especially that for the power system. Solar array performance is increasing rapidly and promises to continue to do so for another 10 to 20 years (Fig. 1). At the same time, cost per watt is decreasing. Radiation hardness is increasing. New concepts for how to design a SEP are emerging. These improvements lead to changes in the best ways to apply SEP technology to missions, and broadening of the practical uses of SEP technology compared to competing technologies. This paper addresses the evolving characteristics of SEP technology from the point of view of mission design, and how mission profile characteristics can be designed to best take advantage of evolving SEP characteristics. Mission concepts include robotic lunar landers and orbiters; scientific planetary spacecraft; delivery of spacecraft to geosynchronous orbit from inclined and low-inclination launch orbits; and lunar cargo delivery from Earth orbit to lunar orbit. Expendable and re-usable SEP profiles are considered. Flight control considerations are abstracted from recent papers by the author to describe how these influence SEP design and operations.

Woodcock, Gordon↗

Gateway Program Safety And Mission Assurance Integration - The Future Of Safe Deep Space Human Exploration

This next wave of lunar exploration will be fundamentally different than the past. The goal today is long term human presence in Earth orbit, exploration around the Moon, exploration anywhere on the Moon, and challenging exploration missions beyond the Moon. Sustainability is the key to enabling human expansion across the solar system and bringing back to Earth new knowledge and opportunities, and requires the early engagement of scientific, international, and U.S. commercial interests, innovations, and new approaches. The Gateway’s agile acquisition strategy will shape the entire system life cycle, from design and analysis through production, verification, launch, logistics and operations. This strategy will encourage new ways of doing business to accommodate new techniques, technologies and approaches; improving affordability and maximizing Gateway utility. The full range of acquisition authorities and contracting mechanisms available to NASA will be considered and appropriately tailored in response to the unique demands of each procurement activity. Gateway will provide scientific and research benefits, in addition to providing a sustainable staging location for crewed lunar surface landings and technology demonstrations that help NASA develop the knowledge and technology needed for Mars missions. These payloads are expected to provide operational and scientific benefit for the duration of their stay on Gateway, as the hardware will provide data during the transit to the Gateway and while in lunar orbit as changes in solar activity occur over time. Gateway is designed to support a variety of utilization activities during both crewed and uncrewed periods and is planned for continuous operations throughout its lifetime. These operations include demonstrating key exploration capabilities in a relevant deep space environment, conducting science beyond the influence of Earth, and providing opportunities for Gateway partners and customers for deep space exploration. Located in cislunar orbit, the Gateway capabilities can be further leveraged to enhance lunar and Mars exploration. With the Gateway and other elements of the Artemis Program, NASA is encouraging new ways of doing business to accommodate new techniques, technologies and approaches, consider affordability, and encourage innovation from U.S. industry.

Helen Vaccaro↗

Gateway Program Safety and Mission Assurance IAASS Conference Keynote Presentation

This next wave of lunar exploration will be fundamentally different than the past. The goal today is long term human presence in Earth orbit, exploration around the Moon, exploration anywhere on the Moon, and challenging exploration missions beyond the Moon. Sustainability is the key to enabling human expansion across the solar system and bringing back to Earth new knowledge and opportunities, and requires the early engagement of scientific, international, and U.S. commercial interests, innovations, and new approaches. The Gateway’s agile acquisition strategy will shape the entire system life cycle, from design and analysis through production, verification, launch, logistics and operations. This strategy will encourage new ways of doing business to accommodate new techniques, technologies and approaches; improving affordability and maximizing Gateway utility. The full range of acquisition authorities and contracting mechanisms available to NASA will be considered and appropriately tailored in response to the unique demands of each procurement activity. Gateway will provide scientific and research benefits, in addition to providing a sustainable staging location for crewed lunar surface landings and technology demonstrations that help NASA develop the knowledge and technology needed for Mars missions. These payloads are expected to provide operational and scientific benefit for the duration of their stay on Gateway, as the hardware will provide data during the transit to the Gateway and while in lunar orbit as changes in solar activity occur over time. Gateway is designed to support a variety of utilization activities during both crewed and uncrewed periods and is planned for continuous operations throughout its lifetime. These operations include demonstrating key exploration capabilities in a relevant deep space environment, conducting science beyond the influence of Earth, and providing opportunities for Gateway partners and customers for deep space exploration. Located in cislunar orbit, the Gateway capabilities can be further leveraged to enhance lunar and Mars exploration. With the Gateway and other elements of the Artemis Program, NASA is encouraging new ways of doing business to accommodate new techniques, technologies and approaches, consider affordability, and encourage innovation from U.S. industry.

Terri Castillo↗

Potential Advantages of Conducting Short Duration Visits to the Martian Surface

Recent NASA concepts for human missions to Mars, including the Evolvable Mars Campaign and Design Reference Architecture 5.0, have focused on the conduct of missions with long duration stays on the Martian surface. The decision to focus on long duration missions (typically to a single site) is driven by a desire to increase the perceived sustainability of the human Mars campaign, predicated on the assumption that sustainability is best achieved by maximizing the level of activity on the surface, providing for continuous growth in operations, and promoting pioneering of Mars. However, executing a series of long duration missions to a single site is not the only option for human exploration of Mars that has been proposed. Other architectures have been evaluated that focus on missions with short duration surface stays, with each mission visiting a separate site on the surface. This type of architecture is less efficient in that elements are not typically reused from one mission to the next but requires a far less complex surface architecture. There are potentially valid arguments to be made that a short duration, multiple site approach could result in different types of advantages when compared to the long duration, single site approach to Mars exploration, particularly for initial human missions to Mars. These arguments revolve around four areas: Achieved Value, Risk Mitigation, Developmental Affordability, and Operational Affordability & Flexibility. The question of Achieved Value relates to the prioritization of goals for Martian exploration. As discussed, goals related to pioneering and expanding human presence are often referenced as justifications for the long duration approach. However, there are other competing goals, including science and exploration. While there is not a clear consensus among planetary scientists, many have argued that the value of being able to visit multiple sites could outweigh the value of continually visiting a single site. Risk Mitigation is a major concern for initial human missions to Mars. There are a number of hazards related to operating on the Martian surface that are not well characterized. It may be desirable to conduct a series of short duration missions to better understand the nature of these risks prior to committing to a long duration mission. Developmental Affordability relates to the ability of NASA and its partners to develop and deploy the proposed architecture. Any human missions to Mars will be among the most complex endeavors ever undertaken. The capabilities that must be developed to enable any human Mars missions are extremely challenging. The total design, development, test, and evaluation (DDT&E) budget required to develop just the essential capabilities alone will be substantial. If additional surface capabilities are required to support long duration surface stays, the development effort could be unaffordable. Operational Affordability & Flexibility relates to the continued costs to execute the Mars campaign. Long duration missions, even with some amount of in-situ resource utilization, require a significant level of resupply for every mission. This requires additional launches and in-space transportation assets, increasing the operational complexity and total operational cost. This paper will explore each of the four potential advantages of short duration missions in detail. The authors will present comparisons between proposed long duration and short duration architectures through an evaluation of relevant performance, cost, and risk metrics.

Stromgren, Chel↗

The Impact of New Trends in Satellite Launches on Orbital Debris Environment

The main goal of this study is to examine the impact of new trends in satellite launch activities on the orbital debris environment and collision risk. Starting from the launch of the first artificial satellite in 1957, space borne technology has become an indispensable part of our lives. More than 6,000 satellites have been launched into Earth orbit. Though the annual number of satellites launched stayed flat for many decades, the trend has recently changed. The satellite market has been undergoing a major evolution with new space companies replacing the traditional approach of deploying a few large, complex and costly satellites with an approach to use a multitude of smaller, less complex and cheaper satellites. This new approach creates a sharp increase in the number of satellites and so the historic trends are no longer representative. As a foundation for this study, a scenario for satellite deployments based on the publicly announced future satellite missions has been developed. These constellation-deploying companies include, but are not limited to, Blacksky, CICERO, EROS, Landmapper, Leosat, Northstar, O3b, OmniEarth, OneWeb, Orbcomm, OuterNet, PlanetIQ, Planet Labs, Radarsat, RapidEye Next Generation, Sentinel, Skybox, SpaceX, and Spire. Information such as the annual number of launches, the number of orbital planes to be used by the constellation, as well as apogee, perigee, inclination, spacecraft mass and area were included or approximated. Besides the production of satellites, a widespread ongoing effort to enhance orbital injection capabilities will allow delivery of more spacecraft more accurately into Earth orbits. A long list of companies such as Microcosm, Rocket Lab, Firefly Space Systems, Sierra Nevada Corporation and Arca Space Corporation are developing new launch vehicles dedicated for small satellites. There are other projects which intend to develop interstages with propulsive capabilities which will allow the deployment of satellites into their desired orbits beyond the restrictions of the launch vehicle used. These near future orbital injection technologies are also covered in the developed scenario. Using the above-mentioned background information, this study aims to examine how the orbital debris environment will be affected from the new dynamics of the emerging space markets. We developed a simulation tool that is capable of propagating the objects in a given deployment scenario with variable-sized time-steps as small as one second. Over the course of the run, the software also detects collisions; additional debris objects are then created according to the NASA breakup model and are fed back into the simulation framework. Examining the simulation results, the total number of particles to accumulate in different orbits can be monitored and the number of conjunctions can be tracked to assess the collision risks. The simulation makes it possible to follow the short- and long-term effects of a particular satellite or constellation on the space environment. Likewise, the effects of changes in the debris environment on a particular satellite or constellation can be evaluated. It is authors hope that the results of this paper and further utilization of the developed simulation tool will assist in the investigation of more accurate deorbiting metrics to replace the generic 25-year disposal guidelines, as well as to guide future launches toward more sustainable and safe orbits.

New Space↗

NASA’s Plans for Development of Standards for Additive Manufactured Components

There are currently no NASA standards providing specific design and construction requirements for certification of additively manufactured parts. Several international standards organizations are developing standards for additive manufacturing; however, NASA mission schedules preclude the Agency from relying on these organizations to develop standards that are both timely and applicable. NASA and its program partners in manned spaceflight (the Commercial Crew Program, the Space Launch System and the Orion Multi-purpose Crew Vehicle) are actively developing additively manufactured parts for flight as early as 2018. To bridge this gap, NASA Marshall Space Flight Center (MSFC) has authored a center-level standard (MSFC-STD-3716)1 to establish standard practices for the Laser Powder Bed Fusion (L-PBF) process. In its draft form, the MSFC standard has been used as a basis for L-PBF process implementation for each of the manned space flight programs. The development of an Agency-level standard is proposed, which based upon the principles of MSFC-STD-3716, would have application to multiple additive manufacturing processes and be readily adaptable to all NASA programs.

Russell, Richard W.↗

Development of NASA Standards for Enabling Certification of Additively Manufactured Parts

There are currently no NASA standards providing specific design and construction requirements for certification of additively manufactured parts. Several international standards organizations are developing standards for additive manufacturing; however, NASA mission schedules preclude the Agency from relying on these organizations to develop standards that are both timely and applicable. NASA and its partners in human spaceflight (Commercial Crew, Space Launch System, and Orion Multi-Purpose Crew Vehicle Programs) are actively developing additively manufactured parts for flight as early as 2018. To bridge this gap, NASA Marshall Space Flight Center (MSFC) is authoring a Center-level standard (MSFC-STD-3716) 1 to establish standard practices for the Laser Powder Bed Fusion (L-PBF) process. In its draft form, the MSFC standard has been used as a basis for L-PBF process implementation for each of the human spaceflight programs. The development of an Agency-level standard is proposed, based upon the principles of MSFC-STD-3716, which would have application to multiple additive manufacturing processes and be readily adaptable to all NASA programs.

NASA Standards↗

Rehabilitation After International Space Station Flights

Rehabilitating U.S. crew members to preflight status following flights on the Russian Mir Space Station required longer than six months for full functional recovery of some of the seven crew members. Additional exercise hardware has been added on the International Space Station as well as a rehabilitative emphasis on functional fitness/agility and proprioception. The authors will describe and present the results of the rehabilitation program for ISS and evaluate rehabilitative needs for longer missions. Pre- and in-flight programs emphasize strength and aerobic conditioning. One year before launch, crew members are assigned an Astronaut Strength and Conditioning specialist. Crew members are scheduled for 2 hours, 3 days a week, for pre-flight training and 2.5 hours, six days a week, for in-flight training. Crewmembers are tested on functional fitness, agility, isokinetic strength, and submaximal cycle ergometer evaluation before and after flight. The information from these tests is used for exercise prescriptions, comparison, and evaluation of the astronaut and training programs. The rehabilitation program lasts for 45 days and is scheduled for 2 hours during each crew workday. Phase 1 of the rehabilitation program starts on landing day and places emphasis on ambulation, flexibility, and muscle strengthening. Phase 2 adds proprioceptive exercise and cardiovascular conditioning. Phase 3 (the longest phase) focuses on functional development. All programs are tailored specifically for each individual according to their test results, preferred recreational activities, and mission roles and duties. Most crew members reached or exceeded their preflight test values 45 days after flight. Some crew members subjectively indicated the need for a longer rehabilitation period. The current rehabilitation program for returning ISS crew members seems adequate in content but may need to be extended for longer expeditions.

Chauvin, S. J.↗

Pterodactyl: Non-propulsive Control Systems for Future Planetary Missions

This white paper presents an assessment of control systems as it relates to state-of-the-art hypersonic entry vehicles and addresses technological advances that enable new control systems for future hypersonic entry vehicles. Advancements in deployable entry vehicle (DEV) technology, entry guidance, woven thermal protection systems, and affordable launch services make it possible to conceive of entry vehicles that optimize entry loads, maneuverability, usable payload mass and volume, and operational costs. NASA’s Space Technology Mission Directorate (STMD) is currently funding the authors on a project, Pterodactyl, that is using on-the-fly trajectory design and integrated software and hardware development to investigate non-propulsive entry control systems for precision targeting of mechanical DEVs. The authors recently reported key findings of these control systems for an asymmetric DEV to track bank commands for a lunar sample return entry.

Sarah D'Souza↗

A GNM mission and system design proposal

Here, the author takes an advocacy position for the proposed Mars Global Network Mission (GNM); it is not intended to be an objective review, although both pros and cons are presented in summary. The mission consists of launches from earth in the '96, '98, and '01 opportunities on Delta-class launch vehicles (approx. 1000 kg injected to Mars in 8 to 10 ft diameter shroud). The trans Mars boost stage injects a stack of small independent, aeroshelled spacecraft. The stack separates from the boost stage and each rigid (as opposed to deployable) aeroshell flies to Mars on its own, performing midcourse maneuvers as necessary. Each spacecraft flies a unique trajectory which is targeted to achieve approach atmospheric interface at the desired latitude and lighting conditions; arrival times may vary by a month or more. A direct entry is performed, there is no propulsive orbit capture. The aeroshelled rough-landers are targeted to achieve a desired attitude and entry flight path angle, and then follow a passive ballistic trajectory until terminal descent. Based on sensed acceleration (integrated to deduce altitude), the aft aeroshell skirt is jettisoned; a short later a supersonic parachute is deployed. The ballistic coefficient of the parachute is sized to achieve terminal velocity at about 8 km. However the parachute is not deployed until a few Km above the surface to minimize wind-induced drift. The nose cap descent imaging begins, a laser altimeter also measures true altitude. Based on range and range rate to the surface, the parachute is jettisoned and the lander uses descent engines to achieve touchdown velocity. A contact sensor shuts down the motors to avoid cratering, and the lander rough-lands at less than 5 m/sec. The remaining aeroshell and a deployable bladder attenuate landing loads and minimize the possibility of tip over. Science instruments are deployed and activated, and the network is established.

Bailey, Stephen↗

Studies of Dust Emission as Measured by DIRBE and IRAS

The main activity supported by this grant was to make the dust reddening map more useful for optical and microwave astronomy, and to increase our understanding of interstellar dust in general. We completed all the major objectives of the proposal, and we are eagerly awaiting the launch of Space Infrared Telescope Facility (SIRTF) so that we can check one of our most controversial conclusions. According to the ADS abstract service, the above paper has been cited 895 times. A number of authors have claimed the SFD98 dust maps are miscalibrated, but recent work suggests that the calibration is correct. The primary goal of this ADP grant was to determine the microwave / sum-mm spectrum of interstellar dust emission by cross-correlating the Far Infrared Absolute Spectrophotometer (FIRAS) spectra with a model based on the SFD98 dust map. Because of temperature variation, large (factor of two) variations are observed in submillimeter / 100 micron ratio, so a careful accounting of dust temperature data, based on Diffuse Infrared Background Experiment (DIRBE) 100 and 240 micron channels, was required. Even this improvement was unable to reduce the chi(sup 2) per degree of freedom below 30. Further study revealed that a two-component model, with the two components having different (but reasonable) optical properties, achieved a decrease in chi(sup 2) to less than 2, five times better than the next best fit in the literature. The resulting model uses density and temperature estimates based on DIRBE data, with only four global parameters fit using the FIRAS data. This dramatic reduction in chi(sup 2) using only four fit parameters may indicate that the model is physically correct, but in any case, it is an acceptable phenomenological model. We have released the appropriate data and software on our website (http://astro.berkeley.edu/dust) to allow users to compute the interstellar dust emission between from 100-3000 GHz (or 100 micron 3 mm) with approx. 15% precision. The paper describing these efforts appeared in ApJ 524, 867. This paper has to date been cited 24 times.

Davis, Marc↗

Elemental Composition of 433 Eros: New Calibration of the NEAR-Shoemaker XRS Data

We present relative elemental abundances for six elements (Mg, Al, Si, S, Ca, Fe) in the surface layer of 433 Eros, derived from a new analysis of the solar induced fluorescence measured by the NEARShoemaker X ray Spectrometer (XRS).XRS derived elemental abundances have been presented before. However, calibration of XRS data depends critically on knowledge of the incident solar spectrum, which varies greatly on time scales of seconds to minutes. Unfortunately, the gas solar monitor carried by NEAR was inadequately calibrated prior to launch. The previously published XRS results were based partly on broadband measurements by the Earthorbiting GOES8 (Geostationary Operational Environmental Satellites) Xray detectors and partly on a preliminary solar monitor calibration carried out by the present authors. The new solar monitor calibration is based on a more recent set of physical models of the solar spectrum at various temperatures, an improved fitting procedure, analysis of a large number of flight spectra, and comparison with concurrent data from the GOES Xray detectors. In addition, the new analysis includes data from three solar flares not considered in earlier papers.

Lim, L. F.↗

The 13 years of TRMM Lightning Imaging Sensor: From Individual Flash Characteristics to Decadal Tendencies

How often lightning strikes the Earth has been the object of interest and research for decades. Several authors estimated different global flash rates using ground-based instruments, but it has been the satellite era that enabled us to monitor lightning thunderstorm activity on the time and place that lightning exactly occurs. Launched into space as a component of NASA s Tropical Rainfall Measuring Mission (TRMM) satellite, in November 1997, the Lighting Imaging Sensor (LIS) is still operating. LIS detects total lightning (i.e., intracloud and cloud-to-ground) from space in a low-earth orbit (35deg orbit). LIS has collected lightning measurements for 13 years (1998-2010) and here we present a fully revised and current total lightning climatology over the tropics. Our analysis includes the individual flash characteristics (number of events and groups, total radiance, area footprint, etc.), composite climatological maps, and trends for the observed total lightning during these 13 years. We have identified differences in the energetics of the flashes and/or the optical scattering properties of the storms cells due to cell-relative variations in microphysics and kinematics (i.e., convective or stratiform rainfall). On the climatological total lightning maps we found a dependency on the scale of analysis (resolution) in identifying the lightning maximums in the tropics. The analysis of total lightning trends observed by LIS from 1998 to 2010 in different temporal (annual and seasonal) and spatial (large and regional) scales, showed no systematic trends in the median to lower-end of the distributions, but most places in the tropics presented a decrease in the highest total lightning flash rates (higher-end of the distributions).

Albrecht, R. I.↗

Follow-the-leader algorithm for the payload inspection and processing system

This report summarizes the author's summer 1995 work at NASA Kennedy Space Center in the Advanced System Division. The assignment was path planning for the Payload Inspection and Processing System (PIPS). PIPS is an automated system, programmed off-line for inspection of Space Shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-dof serpentine truss manipulator capable of snake-like motions to avoid obstacles. The path planning problem was divided into two segments: (1) determining an obstacle-free trajectory for the inspection camera at the manipulator tip to follow; and (2) development of a follow-the-leader (FTL) algorithm which ensures whole-arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1995 work focused on the FTL algorithm. This report summarizes development, implementation, testing, and graphical demonstration of the FTL algorithm for prototype PIPS hardware. The method and code was developed in a modular manner so the final PIPS hardware may use them with minimal changes. The FTL algorithm was implemented using MATLAB software and demonstrated with a high-fidelity IGRIP model. The author also supported implementation of the algorithm in C++ for hardware control. The FTL algorithm proved to be successful and robust in graphical simulation. The author intends to return to the project in summer 1996 to implement path planning for PIPS.

Williams, Robert L., II↗

Concept and implementation of the Globalstar mobile satellite system

Globalstar is a satellite-based mobile communications system which provides quality wireless communications (voice and/or data) anywhere in the world except the polar regions. The Globalstar system concept is based upon technological advancements in Low Earth Orbit (LEO) satellite technology and in cellular telephone technology, including the commercial application of Code Division Multiple Access (CDMA) technologies. The Globalstar system uses elements of CDMA and Frequency Division Multiple Access (FDMA), combined with satellite Multiple Beam Antenna (MBA) technology and advanced variable-rate vocoder technology to arrive at one of the most efficient modulation and multiple access systems ever proposed for a satellite communications system. The technology used in Globalstar includes the following techniques in obtaining high spectral efficiency and affordable cost per channel: (1) CDMA modulation with efficient power control; (2) high efficiency vocoder with voice activity factor; (3) spot beam antenna for increased gain and frequency reuse; (4) weighted satellite antenna gain for broad geographic coverage; (5) multisatellite user links (diversity) to enhance communications reliability; and (6) soft hand-off between beams and satellites. Initial launch is scheduled in 1997 and the system is scheduled to be operational in 1998. The Globalstar system utilizes frequencies in L-, S- and C-bands which have the potential to offer worldwide availability with authorization by the appropriate regulatory agencies.

Schindall, Joel↗