Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Passive Active Multi-Junction 3, 7 GHZ launcher for Tore-Supra Long Pulse Experiments. Manufacturing Process and Tests

The design and the fabrication of a new Lower Hybrid (LH) actively cooled antenna based on the passive active concept is a part of the CIMES project (Components for the Injection of Mater and Energy in Steady-state). The major objectives of Tore-Supra program is to achieve 1000 s pulses with this LH launcher, by coupling routinely >3 MW of LH wave at 3.7 GHz to the plasma with a parallel index n{sub ||} = 1.7 {sup {+-}}{sup 0.2}. The launcher is on its way to achieve its validation tests--low power Radio Frequency (RF) measurements, vacuum and hydraulic leak tests--and will be installed and commissioned on plasma during the fall of 2009.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Testing the Shuttle heat-protection armor

The article deals with the thermal protection system (TPS) designed to keep Space Shuttle structures at 350 F ratings over a wide range of temperatures encountered in orbit, but also during prelaunch, launch, deorbit and re-entry, landing and turnaround. The structure, function, fabrication, and bonding of various types of reusable surface insulation and composite materials are described. Test programs are developed for insulation, seals, and adhesion bonds; leak tests and acoustic fatigue tests are mentioned. Test facilities include arc jets, radiant heaters, furnaces, and heated tunnels. The certification tests to demonstrate TPS reusability, structural integrity, thermal performance, and endurance will include full-scale assembly tests and initial orbital flight tests.

Strouhal, G.↗

Seal testing of large diameter rocket motors

This investigative program examines leakage testing of elastomeric O-ring seals for a solid rocket casing and provides direction towards an improved nondestructive postassembly test. It also details test equipment for the Space Shuttle systems solid rocket boosters (SRB). The results are useful to designers of hardware for pressure containment vessels which use O-ring seals. Using several subscale seal and groove configuration test fixtures equipped with either two or three O-ring seals in series, seal integrity is investigated with both a pressure decay and flowmeter methods. Both types of test equipment adequately detect the practical range of expected seal leak rates of 1 to 0.0001 sccs. The flowmeter leak test equipment appears to reduce testing time substantially. Limited seal leakage testing is performed on full-sized rocket motor segment seals, a pre-Challenger short stack, providing comparison of bore seals to test specimen bore and face seals. The conclusions are that seal reliability, verified via a performance pressure test, can be affected by temperature, quantity of grease, test pressure, and seal pressure load direction. Potential seal failure scenarios including contamination, seal damage, and sealing surface damage are discussed. Recommendations are made for an improved test procedure.

Moore, N. B.↗

Experimental Evaluation of Refrigerant Leak Characteristics for Different HVAC&R Equipment Types

The US Department of Energy (DOE) Building Technology Office (BTO) and the Air-conditioning, Heating & Refrigeration Technology Institute (AHRTI) collaborated to sponsor an experimental study of refrigerant leak characteristics at ORNL; AHRTI project 9012. The original objectives were to conduct refrigerant leak tests on several heating, ventilating, air conditioning and refrigeration (HVAC&R) systems under operating conditions representative of actual applications to document the pressure decay rate and the mass flow rate of leaked refrigerant as a function of time. Estimates of the quality (vapor versus liquid) of the leaking refrigerant and oil escaping with the leak were also desired. The project involved imposing refrigerant leaks on five systems and collecting data to meet the project objectives. Systems chosen covered three air-conditioning (AC) applications (packaged terminal AC or PTAC, 3-ton residential split system AC, and 5-ton packaged rooftop AC) and two refrigeration applications (split system unit cooler, and standalone display case). AHRTI members donated the test systems used for the project. The systems were to be tested at two different leak rates (catastrophic high rate simulating full line break and a lower flow rate), two leak locations (high-pressure side and low-pressure side), and two operating conditions (compressor on or off).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Leakage Through a Channel Formed by a Gasket, a Sealing Surface, and a Filament Trapped Between Them

Plumbing for the transport of liquid Hydrogen or liquid Oxygen at the Kennedy Space Center (KSC) is very critical. Every piece of hardware for handling such a hazardous cryogen is subject to testing prior to installation and use. Safe, realistic testing of all such hardware is prohibitively expensive, which leads, perforce, to expidients such as: (1) lead testing with non-flammable tracer fluids (e.g, liquid nitrogen) and (2) leak testing with room temperature tracer fluids (e.g. liquid helium). Such expedients undermine the realism of the tests. If however, one could apply rational fluid dynamics methods to derive a general analytical expression with which one could relate the throughput of gaseous Helium through a given leak channel to the throughput of liquid Hydrogen through the same channel, then one could recover much of the information that one would otherwise forfeit through these expedients. These facts lead to the following questions: (1) What would be an example of a generic flaw in a gasket?; and (2) How can one calculate the flow of fluid in it? The report addresses these questions. It considers a particular leak geometry, namely one formed by a gasket, a sealing surface, and a filament trapped between them (so that the cross section of the leak channel is a flat bottomed curvilinear triangle, two sides of which are circular arcs and which has cusps on all three corners).

Russell, John↗

Nondestructive testing of brazed rocket engine components

Report details study made of nondestructive radiographic, ultrasonic, thermographic, and leak test methods used to inspect and evaluate the quality of the various brazed joints in liquid-propellant rocket engine components and assemblies. Descriptions of some of the unique equipment and methods developed are included.

Adams, C. J.↗

Preparation of calibrated test packages for particle impact noise detection

A standard calibration method for any particle impact noise detection (PIND) test system used to detect loose particles responsible for failures in hybrid circuits was developed along with a procedure for preparing PIND standard test devices. Hybrid packages were seeded with a single gold ball, hermetically sealed, leak tested, and PIND tested. Conclusions are presented.

Source record↗

Aging Behavior of Viton{sup R} O-Ring Seals in the 9975 Shipping Package - 12594

The Savannah River Site (SRS) is storing plutonium (Pu) materials in the K-Area Materials Storage (KAMS) facility. The Pu materials were packaged according to the DOE-STD-3013 standard and shipped to the SRS in Type B 9975 packages. The robust 9975 shipping package was not designed for long-term product storage, but it is a specified part of the storage configuration and the KAMS facility safety basis credits the 9975 design with containment. Within the 9975 package, nested stainless steel containment vessels are closed with dual O-ring seals based on Viton{sup R} GLT or GLT-S fluoro-elastomer. The aging behavior of the O-ring compounds is being studied to provide the facility with advanced notice of nonconformance and to develop life prediction models. A combination of field surveillance, leak testing of surrogate fixtures aged at bounding service temperatures, and accelerated-aging methodologies based on compression stress-relaxation and oxygen consumption analysis is being used to evaluate seal performance. A summary of the surveillance program relative to seal aging behavior is presented. The aging behavior of fluoro-elastomer seals based on Viton{sup R} GLT and GLT-S is being studied to develop life prediction models in support of long-term storage of plutonium materials in the 9975 shipping packages at the Savannah River Site. Field surveillance data in combination with accelerated-aging data suggest a significant lifetime for the seals. Typical storage conditions are not anticipated to challenge the leak-tightness of the seals for many years. Early life prediction models based on compression stress relaxation indicate a seal lifetime of ∼12 years at the maximum service temperature predicted (93 deg. C). Seal lifetimes at lower, more realistic conditions are likely significantly longer. Service life predictions based on CSR data are thus far conservative relative to predictions based on time to leakage failure. Surveillance data on packages examined after 6 years in storage show only minor compression set of the O-rings and no significant degradation. Surveillance and testing will continue as needed to validate and refine life prediction models. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Maintenance Manual (Rev. 1)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium(He) leak test: ICV upper main O-ring seal, ICV outer vent port plug O-ring seal, OCV upper main O-ring seal, and OCV vent port plug O-ring seal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade of the ILC Cryomodule

Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions (Ti/SS, Nb/SS) have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest version of the Nb/Ti/SS transition element has led to improvement of the ILC cryomodule. This new component resolves problems of residual stress, and its specific design prevents the possibility of a shift due to the difference in the linear expansion coefficients of the constituent metals. Furthermore, leak tests with the He gas revealed no leaks at the background rate of ≈0.2 × 10$^{–10}$ atm cc/s. The test results are very encouraging. The up-to-date design of trimetallic Nb/Ti/SS element promises technologically simpler and less expensive manufacture. Investigations have shown that explosion welding allows unique trimetallic components to be made not only for cryogenic units of accelerators but also for laboratory equipment and for general engineering applications.

43 PARTICLE ACCELERATORS↗

RH Packaging Maintenance Manual (Rev. 4)

This part of the manual provides instructions for performing inner containment vessel (IV) and outer containment vessel (OC)maintenance leakage rate tests on the following packaging seals and corresponding seal surfaces using a non-destructive helium(He) leak test: IV middle main O-ring seal, IV gas sampling port closure bolt O-ring seal, IV backfill port closure bolt O-ring seal, OC lower main O-ring seal, OC gas sampling port closure bolt O-ring seal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term ageing and materials degradation of hybrid mica compressive seals for solid oxide fuel cells

Hybrid phlogopite mica seals with silver interlayers were evaluated in long term isothermal ageing tests in a dual environment consisting of dilute hydrogen vs. air at 800 degrees C. High-temperature leak tests with helium showed very stable leakage of 0.01-0.02 sccm/cm for 28366 hrs under a low applied compressive stress of 82 kPa (12 psi). Post-mortem SEM and EDS analyses of the mica showed minimum degradation in terms of changes in microstructure and chemical composition, although there appeared to be some Ag migration and segregation at interstices between mica flakes. Fluorine was also found to be released from mica. Overall, the low, constant leakage through the hybrid mica/Ag seals clearly demonstrated a very promising candidate for SOFC sealing.

Chou, Y S↗

Modeling and measurement of the performance of a branched conduit sampling system in a mass spectrometer leak detector

In the leak testing of a large engineering system, one may distinguish three stages, namely leakage measurement by an overall enclosure, leak location, and leakage measurement by a local enclosure. Sniffer probes attached to helium mass spectrometer leak detectors are normally designed for leak location, a qualitative inspection technique intended to pinpoint where a leak is but not to quantify its rate of discharge. The main conclusion of the present effort is that local leakage measurement by a leak detector with a sniffer probe is feasible provided one has: (1) quantitative data on the performance of the mass separator cell (a device interior to the unit where the stream of fluid in the sample line branches); and (2) a means of stabilizing the mass transfer boundary layer that is created near a local leak site when a sniffer probe is placed in its immediate vicinity. Theoretical models of the mass separator cell are provided and measurements of the machine-specific parameters in the formulas are presented. A theoretical model of a porous probe end for stabilizing the mass transfer boundary is also presented.

Russell, John M.↗

Large-Scale Spray Releases: Additional Aerosol Test Results

One of the events postulated in the hazard analysis for the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak event involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids that behave as a Newtonian fluid. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and in processing facilities across the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are mostly absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale testing. The small-scale testing and resultant data are described in Mahoney et al. (2012b), and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used to mimic the relevant physical properties projected for actual WTP process streams.

42 ENGINEERING↗

Assessment of Pre-Irradiation SiC CMC Joint Performance in Representative Cladding Geometries

Silicon carbide fiber reinforced, silicon carbide matrix composites (SiC-SiC) offer strength at high temperatures, corrosion resistance, and stability during irradiation, and are being developed by General Atomics as cladding for accident tolerant fuel (ATF) applications and advanced reactor concepts. Advanced joining techniques capable of withstanding harsh reactor environments are key to enable GA’s SiGAtm SiC-SiC composite. The objective of this work is to obtain joint-specific material properties for assemblies in representative planar and cladding geometries that will allow for the generation of a material properties database and more accurate simulation of SiC joint behavior across arange of temperatures and irradiation conditions. To support this, three different joint formulations are being assessed for mechanical and thermal performance pre and post irradiation in the High Flux Isotope Reactor (HIFR) at ORNL. GA has previously identified its hybrid SiC (HSiC) joint as the most promising and best suited joining approach for cladding applications [1]. Additionally, oxide and transeutectic phase (TEP) joints are being investigated to make the material property database more comprehensive as these joints have previously shown strength resilience under irradiation in planar geometries [2]. The thermal and mechanical data obtained in this work will address vital knowledge gaps, enabling more accurate modeling of joints in SiC-based components for accelerated material qualification.The scope of work presented here focuses on the mechanical and thermal performance of the joint material prior to irradiation in HFIR. Endplug push-out (EPPO) testing to determine joint strength in tube geometries, and shear strength testing for planar geometries have provided a benchmark for pre-irradiation mechanical performance. These results show that all three selected joint methodologies result in cladding joints capable of withstanding the expected joint stresses in a LWR reactor environment [3]. This has been accompanied by He leak testing of the joint regions on tube specimens to assess the suitability of each joint methodology for cladding applications. Here, only the HSiC formulation consistently met critical leak rate requirements suggesting that other joining strategies require additional development. Finally, pre-irradiation thermal testing has been completed to establish a baseline for comparison after irradiation. Subsequent irradiation of these joints types in HFIR will provide further detail on joint material properties and their appropriateness for nuclear applications.

Gonderman, Sean↗

Analysis of a Memory Device Failure

The recent failure of a vintage memory device presented a unique challenge to failure analysts. Normally device layouts, fabrication parameters and other technical information were available to assist the analyst in the analysis. However, this device was out of production for many years and the manufacturer was no longer in business, so the information was not available. To further complicate this analysis, the package leads were all but removed making additional electrical testing difficult. Under these conditions, new and innovative methods were used to analyze the failure. The external visual exam, radiography, PIND, and leak testing were performed with nominal results. Since electrical testing was precluded by the short lead lengths, the device was delidded to expose the internal structures for microscopic examination. No failure mechanism was identified. The available electrical data suggested an ESD or low level EOS type mechanism which left no visible surface damage. Due to parallel electrical paths, electrical probing on the chip failed to locate the failure site. Two non-destructive Scanning Electron Microscopy techniques, CIVA (Charge Induced Voltage Alteration) and EBIC (Electron Beam Induced Current), and a liquid crystal decoration technique which detects localized heating were employed to aid in the analysis. CIVA and EBIC isolated two faults in the input circuitry, and the liquid crystal technique further localized two hot spots in regions on two input gates. Removal of the glassivation and metallization revealed multiple failure sites located in the gate oxide of two input transistors suggesting machine (testing) induced damage.

Nicolas, David P.↗

Alternatives to Silicon Rubber Thermal Barrier in RSRM Nozzle Joints

Thiokol Propulsion encountered a situation where gas path can form in the Filler material in joints between the phenolic in the Space Shuttle Reusable Solid Rocket Motor nozzle. An investigation determined that the method for injecting the filler material into the joint created a pressurized pocket of air that forced its way to the surface while the filler was curing. The path that the air took remained open some situations leaving a path for hot gas to get deep into the joint. The condition that created the gas path has been corrected by modifications to the manufacturing process, but a design solution that would reduce processing time is being pursued. A strip of open cell installed deep into the joint, can serve as a barrier to the Filler material. Testing indicates that the foam eliminates the pressure pocket, and does not prevent detection of leakage of the o-ring seals during leak test. Open cell foam does not have thermal resistance capability and mechanical structure, which would be required in the event of a gas path. A replacement to open cell foam is now being considered. Braided carbon fiber rope has the permeability characteristics of foam and it has thermal resistance characteristics as well. Braided carbon fiber rope (BCFR) has been tested in simulated joints in subscale rocket motor. Results of the testing indicate that braided carbon fiber rope can significantly reduce gas temperature by as much es 3000 F in a nozzle joint configuration. BCFR can be installed as a barrier to stop the joint filler material or it can used as the thermal barrier alone.

Totman, Peter D.↗

Nitrile/Buna N Material Failure Assessment for an O-Ring used on the Gaseous Hydrogen Flow Control Valve (FCV) of the Space Shuttle Main Engine

After the rollout of Space Shuttle Discovery in April 2005 in preparation for return-to-flight, there was a failure of the Orbiter (OV-103) helium signature leak test in the gaseous hydrogen (GH2) system. Leakage was attributed to the Flow Control Valve (FCV) in Main Engine 3. The FCV determined to be the source of the leak for OV-103 is designated as LV-58. The nitrile/Buna N rubber O-ring seal was removed from LV-58, and failure analysis indicated radial cracks providing leak paths in one quadrant. Cracks were eventually found in 6 of 9 FCV O-rings among the three Shuttle Orbiters, though none were as severe as those for LV-58, OV-103. Testing by EM10 at MSFC on all 9 FCV O- rings included: laser dimensional, Shore A hardness and properties from a dynamic mechanical analyzer (DMA) and an Instron tensile machine. The following test data was obtained on the cracked quadrant of the LV-58, OV-103 O-ring: (1) the estimated compression set was only 9.5%, compared to none for the rest of the O-ring; (2) Shore A hardness for the O.D. was higher by almost 4 durometer points than for the rest of the O-ring; and (3) DMA data showed that the storage/elastic modulus E was almost 25% lower than for the rest of the O-ring. Of the 8 FCV O-rings tested on an Instron, 4 yielded tensile strengths that were below the MIL spec requirement of 1350 psi-a likely influence of rubber cracking. Comparisons were made between values of modulus determined by DNA (elastic) and Instron (Young s). Each nitrile/Buna N O-ring used in the FCV conforms to the MIL-P-25732C specification. A number of such O-rings taken from shelf storage at MSFC and Kennedy Space Center (KSC) were used to generate a reference curve of DMA glass transition temperature (Tg) vs. shelf storage time ranging from 8 to 26 years. A similar reference curve of TGA onset temperature (of rubber weight loss) vs. shelf storage time was also generated. The DMA and TGA data for the used FCV O-rings were compared to the reference curves. Correlations were also made between the DMA modulus (at 22 C) and Shore A hardness for all 9 of the FCV O-rings used among the three Shuttle Orbiters. The radial cracking in the FCV O-rings was determined to be due to ozone attack, as nitrile/Buna N rubber is susceptible to such attack. Nitrile/Buna N material under MIL-P25732C should be used in a hydraulic fluid environment to help protect it from cracking. However, the FCV O-rings were used in an air only environment. The FCV design has as much as a 9-mil gap that allows the O.D. of the O-ring to be directly exposed to ozone, pressurized air and some elevated temperatures, accelerating the weathering process that leads to O-ring cracking. Space Shuttle flights will likely not continue past 2010. Therefore, Shuttle management decided to continue using the nitrile/Buna N material for the FCVs, but have each O-ring replaced after 3 years to minimize any chances for crack initiation.

Wingard, Doug↗