Search NASA⌕ Search

SEARCH · Search NASA

Results for “Local Energy Action Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The Integrated Status and Effectiveness Monitoring Program : Variation (Status and Trend) of Fine Sediment in Spawning Gravel within the Entiat River Subbasin : July 2008 - October 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance; and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Expansion of Existing Smolt Trapping Program and Steelhead Spawner Surveys : March 1st, 2008 - February 28th, 2009.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and; (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g., Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring, and Evaluation.

13 HYDRO ENERGY↗

Sandia National Laboratories, California Environmental Management System program manual

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia National Laboratories, California Environmental Management System Program Manual

Sandia National Laboratories, California (SNL/CA) has maintained environmental functions to assist with regulatory compliance for more than 30 years. During 2005, these existing functions were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009 and 2012. SNL/CA’s EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA’s EMS Program benefits from two corporate functional programs (Facilities Energy & Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.↗

Bioremediation of Chlorinated Volatile Organic Compounds: DOE Experiences and Lessons Learned

From the mid-1980s to the present, the Department of Energy (DOE) has developed, tested, and deployed diverse bioremediation strategies for chlorinated volatile organic compounds (cVOCs). A systematic review of these projects after decades of activity provides an opportunity to identify crosscutting themes and lessons learned. The knowledge provided by a DOE bioremediation retrospective represents a resource to support current and future bioremediation operations, and future decisions related to cVOC bioremediation. This systematic review examined the design, objectives, performance and outcomes for remediation projects at DOE sites including Savannah River, Hanford, Idaho, Mound and Pinellas. The results were used to identify emergent themes to provide actionable insights. The bioremediation retrospective technical team first developed standardized criteria to support the systematic review. Then, the evaluation was performed using a sequential process that was informed by local technical experts who identified and provided the structured information that served as the basis for the evaluation. The participation of these experts was invaluable to the effort. Importantly, DOE cVOC bioremediation efforts were implemented based on the foundational knowledge developed by U.S. Department of Defense (DoD) strategic and applied environmental technology development and certification programs, as well as technical, policy and regulatory guidance from the U.S. Environmental Protection Agency (EPA), Interstate Technology and Regulatory Council (ITRC), U.S. Geological Survey (USGS), industry, and universities. To maximize the value of the DOE cVOC bioremediation retrospective, the systematic review strategy focused on identifying important DOE-specific experiences, trends and lessons learned that would extend the knowledge available from these other key entities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The integrated Status and Effectiveness Monitoring Program : U.S. Forest Service Fish Abundance and Steelhead Redd Surveys Annual Report : January 1 - December 31, 2008.

This contract report is one of a series of reports that document implementation components of the Bonneville Power Administration's (BPA) funded project: Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00, Chris Jordan, NOAA-NWFSC project sponsor). Other components of the project are separately reported, as explained below. The ISEMP project has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical data management, communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring, and Evaluation (RME) program to assess the status of anadromous salmonids populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods requires the testing of multiple approaches. Thus, ISEMP has adopted an approach to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot areas, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall ISEMP, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

Explore: An Advanced Computing Agenda for Competitiveness

Over the course of this three-year grant, the Council on Competitiveness (Council) hosted six meetings of its Advanced Computing Roundtable made up of experts from a broad cross section of advanced computing users and manufacturers, and four Advanced Computing for Competitiveness Regional Forums to explore issues related to advanced computing in regions, states and localities. More than two hundred experts, stakeholders and policymakers from the federal and state levels participated in this work and provided their time and expertise to help define the opportunity in advanced computing and the barriers to it reaching its full potential as a game-changing competitive advantage for the United States economy and national security. Building on the insights of the Council’s Advanced Computing Roundtable and findings and recommendations from the four U.S. Department of Energy-supported Forums, the Council has identified several broad policy objectives for the United States related to advanced computing leadership and implementation. The United States must: Compete at the high end of advanced computing. Continue investing to be a technology leader as the world moves toward exascale computing, including in hardware, software and applications. America also must lead in strategic areas like extending Moore’s Law and quantum computing. Improve the ability of HPC-using firms to leverage advanced computing. The Council recommends steps to improve computational skills, increase industry partnerships with laboratories and academia, and expand and strengthen software partnerships. Regulatory agencies also should accelerate efforts to use modeling and simulation within the regulatory process. Expand the number of HPC-using companies in America. Too few firms are able to leverage advanced computing to innovate and compete. Federal, state and local economic development efforts should be utilized to lower barriers and teach small and medium-sized firms, particularly manufacturers, to use advanced modeling, simulation and analytics. Coordinate federal action. Federal agencies should continue to act in a coordinated fashion on advanced computing challenges through the Joint Program Office for Strategic Computing. Leverage HPC to compete in strategic technologies and applications. Leadership in advanced computing is tightly linked to leadership in artificial intelligence, the Internet of Things, cybersecurity, additive manufacturing and other emerging technologies. Public and private sector leaders should collaborate on research and partnership efforts that ensure world-class computing environments for strategic technology leadership.

advanced computing↗

Institutional impediments to using alternative water sources in thermoelectric power plants.

This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Obtaining adequate water supplies for cooling and other operations at a reasonable cost is a key factor in siting new and maintaining existing thermoelectric power plant operations. One way to reduce freshwater consumption is to use alternative water sources such as reclaimed (or recycled) water, mine pool water, and other nontraditional sources. The use of these alternative sources can pose institutional challenges that can cause schedule delays, increase costs, or even require plants to abandon their plans to use alternative sources. This report identifies and describes a variety of institutional challenges experienced by power plant owners and operators across the country, and for many of these challenges it identifies potential mitigating approaches. The information comes from publically available sources and from conversations with power plant owners/operators familiar with using alternative sources. Institutional challenges identified in this investigation include, but are not limited to, the following: (1) Institutional actions and decisions that are beyond the control of the power plant. Such actions can include changes in local administrative policies that can affect the use of reclaimed water, inaccurate growth projections regarding the amount of water that will be available when needed, and agency workloads and other priorities that can cause delays in the permitting and approval processes. (2) Developing, cultivating, and maintaining institutional relationships with the purveyor(s) of the alternative water source, typically a municipal wastewater treatment plant (WWTP), and with the local political organizations that can influence decisions regarding the use of the alternative source. Often a plan to use reclaimed water will work only if local politics and power plant goals converge. Even then, lengthy negotiations are often needed for the plans to come to fruition. (3) Regulatory requirements for planning and developing associated infrastructure such as pipelines, storage facilities, and back-up supplies that can require numerous approvals, permits, and public participation, all of which can create delays and increased costs. (4) Permitting requirements that may be difficult to meet, such as load-based discharge limits for wastewater or air emissions limitations for particulate matter (which will be in the mist of cooling towers that use reclaimed water high in dissolved solids). (5) Finding discharge options for cooling tower blowdown of reclaimed water that are acceptable to permitting authorities. Constituents in this wastewater can limit options for discharge. For example, discharge to rivers requires National Pollutant Discharge Elimination System (NPDES) permits whose limits may be difficult to meet, and underground injection can be limited because many potential injection sites have already been claimed for disposal of produced waters from oil and gas wells or waters associated with gas shale extraction. (6) Potential liabilities associated with using alternative sources. A power plant can be liable for damages associated with leaks from reclaimed water conveyance systems or storage areas, or with mine water that has been contaminated by unscrupulous drillers that is subsequently discharged by the power plant. (7) Community concerns that include, but are not limited to, increased saltwater drift on farmers fields; the possibility that the reclaimed water will contaminate local drinking water aquifers; determining the 'best' use of WWTP effluent; and potential health concerns associated with emissions from the cooling towers that use recycled water. (8) Interveners that raise public concerns about the potential for emissions of emerging pollutants of concern to cause health or environmental problems. Mitigating solutions range from proactive communications with the local communities (which can be implemented by the power plants) to technical solutions, such as developing means to reduce the concentrations of total dissolved solids (TDS) and other contaminants in cooling water to maintain plant efficiency and while meeting discharge limits. These kinds of solutions may be appropriate for DOE research and development (R&D) funding.

03 NATURAL GAS↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship at a Former Uranium Mill Tailings Site in Riverton, Wyoming WM2017-17090

The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a downgradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment–water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Stewardship at a Former Uranium Mill Tailings Site in Riverton, Wyoming - 17090

The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a down-gradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood events provided the impetus to investigate other aspects of the hydrologic system, including the unsaturated zone, naturally reduced (sulfidic) zones, and evaporite deposits. New site conceptual models, field and laboratory studies, and numerical models are being developed to explain how biogeochemical sediment-water interactions contribute to plume persistence and flood-related increases in groundwater concentrations. Updated human health and ecological risk assessments are progressing to evaluate the risk to human health and the environment based on current site conditions. Groundwater concentrations may remain above US Environmental Protection Agency maximum concentration limits beyond the 100-year natural flushing regulatory time frame. LM in its capacity as a long-term steward continues to monitor the site to ensure protectiveness is maintained and to determine the feasibility of alternative compliance and remediation strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Insights from Smart Meters: The Potential for Peak-Hour Savings from Behavior-Based Programs

The rollout of smart meters in the last several years has opened up new forms of previously unavailable energy data. Many utilities are now able in real-time to capture granular, household-level interval usage data at very high-frequency levels for a large proportion of their residential and small commercial customer population. This can be linked to other time and location-specific information, providing vast, constantly growing streams of rich data (sometimes referred to by the recently popular buzz word, “big data”). Within the energy industry there is increasing interest in tapping into the opportunities that these data can provide.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Ames Laboratory Annual Site Environmental Report: Calendar Year 2010

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical testing and compensation programs. A complete discussion of the Laboratory's beryllium characterization and remediation efforts can be found at: http://www.ameslab.gov/operations/esha/beryllium-information.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Analysis of Energy Code Compliance in Commercial Buildings

What percent of newly constructed commercial buildings comply with the energy code? How much energy and cost could be saved if the compliance increased? Which code requirements have both low compliance rates and high savings potential? These are the questions U.S. Department of Energy (DOE) is trying to answer through its Commercial Energy Code Field Study. Previous commercial studies have been very limited and did not result in a widely accepted and tested methodology. DOE’s goal is to create a standardized methodology that can produce actionable results at a reasonable study cost, that can be used by state and local governments and utilities and provides valuable information to policy makers. The field study team implemented the pilot methodology, compiling a data set of 230 office and retail buildings in two climate zones. The approach is based on identifying lost savings on a total energy cost basis rather than simply counting the quantity of measures that do not meet code. This report is focused on the analysis of the collected data. The primary goal was to analyze the data collected during the field study and determine the actual energy cost impact of each measure in a non-compliance situation. The energy impact results allowed for ranking the measures to identify which have the highest potential for lost savings. These results combined with the time required to verify each measure will allow future compliance verification to focus on measures that had a large impact on energy use over the life of the building and those that have the greatest savings recovery potential per verification hour.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗