Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar Relay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Evolution of NASA's Near-Earth Tracking and Data Relay Satellite System (TDRSS)

NASA's Tracking and Data Relay Satellite System (TDRSS) is now in its 23rd year of operations and its spacecraft fleet includes three second-generation spacecraft launched since the year 2000; a figure illustrates the first generation TDRSS spacecraft. During this time frame the TDRSS has provided communications relay support to a broad range of missions, with emphasis on low-earth-orbiting (LEO) spacecraft that include unmanned science spacecraft (e.g., Hubble Space Telescope), and human spaceflight (Space Shuttle and Space Station). Furthermore, the TDRSS has consistently demonstrated its uniqueness and adaptability in several ways. First, its S- and K-band services, combined with its multi-band/steerable single-access (SA) antennas and ground-based configuration flexibility, have permitted the mission set to expand to unique users such as scientific balloons and launch vehicles. Second, the bent-pipe nature of the system has enabled the introduction of new/improved services via technology insertion and upgrades at each of the ground terminals; a specific example here is the Demand Access Service (DAS), which, for example, is currently providing science-alert support to NASA science missions Third, the bent-pipe nature of the system, combined with the flexible ground-terminal signal processing architecture has permitted the demonstration/vaIidation of new techniques/services/technologies via a real satellite channel; over the past 10+ years these have, for example, included demonstrations/evaluations of emerging modulation/coding techniques. Given NASA's emerging Exploration plans, with missions beginning later this decade and expanding for decades to come, NASA is currently planning the development of a seamless, NASA-wide architecture that must accommodate missions from near-earth to deep space. Near-earth elements include Ground-Network (GN) and Near-Earth Relay (NER) components and both must efficiently and seamlessly support missions that encompass: earth orbit, including dedicated science missions and lunar support/cargo vehicles; earth/moon transit; lunar in-situ operations; and other missions within approximately 2 million km of earth (e.g., at the sun/earth libration points). Given that the NER is an evolution of TDRSS, one element of this NASA-wide architecture development activity is a trade study of future NER architecture candidates. The present paper focuses on trade study aspects associated with the NER, highlights study elements, and provides representative interim results.

Flaherty, Roger↗

Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

Stengle, Thomas↗

Lagrange-Based Options for Relay Satellites to Eliminate Earth-Mars Communications Outages During Solar Superior Conjunctions

Recent conjunction class Mars human mission plans have generally assumed that there will inevitably be periods of communications outages between Earth and Mars. This has significant cost and risk implications for not only Mars missions, but also precursor missions in the lunar environment. But are there ways to avoid these outages? The potential exists for communications to be interrupted by Solar Superior Conjunctions (SSCs). Depending on the communications system, used, there can be communications outages up to as many as 78 days. The higher bandwidth systems experience the greatest outage. If these communications channels are interrupted due to an SSC, there are of course resulting challenges to mission operations. An outage of a few days to a few weeks could allow minor disturbances to become major concerns or even trigger subsystems failures. An inability to consult with the ground at the wrong time could result in loss of mission, loss of an element, or loss of life. Each planet in the solar system has a set of five Lagrange points associated with it and the Sun. At any given point in time, a planet or either its L4 or L5 point is visible to any other planet in the solar system, regardless of the position of the sun relative to the two. Thus, L4 and L5 have high value as relay systems to prevent communications outages. There are four sets of solar Lagrange points that may be of potential use in this study: Mars-Sun L4 and L5 points, Earth-Sun L4 and L5, Venus-Sun L4 and L5, and Mercury-Sun L4 and L5. A candidate relay satellite system will be identified, with consideration of both new technology developments and existing telecommunications satellites. This system may have implications for not only the Mars human mission architectures, but also Gateway and human lunar surface architectures as these other studies are tasked with paving the way to human Mars missions. If Mars communications outages can be eliminated, then the degree of autonomy necessary in Mars and precursor systems may be reduced.

Relay Satellite↗

The 4-meter lunar engineering telescope

The 16-meter diffraction limited lunar telescope incorporates a primary mirror with 312 one-meter segments; 3 nanometer active optics surface control with laser metrology and hexapod positioners; a space frame structure with one-millimeter stability; and a hexapod mount for pointing. The design data needed to limit risk in this development can be obtained by building a smaller engineering telescope on the moon with all of the features of the 16-meter design. This paper presents a 4.33-meter engineering telescope concept developed by the Summer 1990 Student Program of the NASA/JHU Space Grant Consortium Lunar Telescope Project. The primary mirror, made up of 18 one-meter hexagonal segments, is sized to provide interesting science as well as engineering data. The optics are configured as a Ritchey-Chretien with a coude relay to the focal plane beneath the surface. The optical path is continuously monitored with 3-nanometer precision interferometrically. An active optics processor and piezoelectric actuators operate to maintain the end-to-end optical configuration established by wave front sensing using a guide star. The mirror segments, consisting of a one-centimeter thick faceplate on 30-cm deep ribs, maintain the surface figure to a few nanometers under lunar gravity and thermal environment.

Peacock, Keith↗

Laser altimeter for Apollo lunar orbit.

The function of the altimeter is to provide precise measurements of Apollo vehicle height above known positions on the lunar surface. A short duration light pulse from the laser is directed through a telescope in a narrow beam to the lunar surface. A portion of the light is reflected by the moon back to the altimeter where it is intercepted by a receiving telescope and relayed to a detector. The time from the moment when the light pulse leaves the laser until its return, which is measured with the aid of a quartz crystal controlled clock oscillator, is a measure for the altitude.

Woodward, J. H.↗

LOITA: Lunar Optical/Infrared Telescope Array

LOITA (Lunar Optical/Infrared Telescope Array) is a lunar-based interferometer composed of 18 alt-azimuth telescopes arranged in a circular geometry. This geometry results in excellent uv coverage and allows baselines up to 5 km long. The angular resolution will be 25 micro-arcsec at 500 nm and the main spectral range of the array will be 200 to 1100 nm. For infrared planet detection, the spectral range may be extended to nearly 10 mu m. The telescope mirrors have a Cassegrain configuration using a 1.75 m diameter primary mirror and a 0.24 m diameter secondary mirror. A three-stage (coarse, intermediate, and fine) optical delay system, controlled by laser metrology, is used to equalize path lengths from different telescopes to within a few wavelengths. All instruments and the fine delay system are located within the instrument room. Upon exiting the fine delay system, all beams enter the beam combiner and are then directed to the various scientific instruments and detectors. The array instrumentation will consist of CCD detectors optimized for both the visible and infrared as well as specially designed cameras and spectrographs. For direct planet detection, a beam combiner employing achromatic nulling interferometry will be used to reduce star light (by several orders of magnitude) while passing the planet light. A single telescope will be capable of autonomous operation. This telescope will be equipped with four instruments: wide field and planetary camera, faint object camera, high resolution spectrograph, and faint object spectrograph. These instruments will be housed beneath the telescope. The array pointing and control system is designed to meet the fine pointing requirement of one micro-arcsec stability and to allow precise tracking of celestial objects for up to 12 days. During the lunar night, the optics and the detectors will be passively cooled to 70-80 K temperature. To maintain a continuous communication with the earth a relay satellite placed at the L4 libration point will be used in conjunction with the Advanced Tracking and Data Relay Satellite System (ATDRSS). Electrical power of about 10 kW will be supplied by a nuclear reactor based on the SP-100 technology. LOITA will be constructed in three phases of six telescopes each. The total mass of the first operational phase is estimated at 58,820 kg. The cost of the fully operational first phase of the observatory is estimated at $8.9 billion. LOITA's primary objectives will be to detect and characterize planets around nearby stars (up to ten parsec away), study physics of collapsed stellar objects, solar/stellar surface features and the processes in nuclear regions of galaxies and quasars. An interferometric array such as LOITA will be capable of achieving resolutions three orders of magnitude greater than Hubble's design goal. LOITA will also be able to maintain higher signal to noise ratios than are currently attainable due to long observation times available on the moon.

Source record↗

Spaceborne Gravity Gradiometers. Part 2: Role of gravity gradiometers in NASA's programs

Sources of information for present knowledge of Earth's gravitational field are discussed as well as the Goddard Earth models. Improvements to these models can be achieved by using additional data and reprocessing some earlier data. Plans for using satellite-to-satellite tracking and gravity gradiometers for the geopotential research mission are considered as well as the relative merits of each method. Present knowledge of solar system bodies and strategies for their exploration are also described. A core program for planetary exploration through the year 2000 is summarized as well as ten candidate subsequent missions. Of these, the lunar geoscience orbiter has the best justification for a gravity gradiometer since far side gravity data can be acquired without the requirement for a separate communications relay satellite. For rendezvous missions, the gradiometer can permit on-board automation of orbit computation and control thus reducing the time devoted to communication with an orbiter.

Source record↗

The Architecture of the Laser Communications Relay Demonstration Ground Stations: An Overview

NASA's Laser Communication Relay Demonstration (LCRD) will be NASA's first long-duration demonstration of laser communications (lasercom) in space, providing geosynchronous-satellite-hosted bidirectional relay services between two Earth ground stations. LCRD will leverage and enhance existing ground stations. Ground Station 1 (GS-1) will leverage the Optical Communications Telescope Laboratory (OCTL) built by JPL, while Ground Station 2 (GS-2) will leverage the Lunar Laser Communications Demonstration (LLCD) Ground Terminal (LLGT) built by MIT Lincoln Laboratory. While each ground system has unique telescopes and integrated optics, many of the backend subsystems (e.g., communications, environmental monitoring, control, user simulators) will be common to both terminals. Here we provide an overview of the architecture of the LCRD ground stations, and the planned enhancements to the existing facilities.

deformable mirror↗

NASA Lunar Exploration – Gateway’s Power and Propulsion Element Communications Links

As a key part of NASA’s Artemis program to return to the moon, the Lunar Gateway will provide a platform for staging lunar missions, for gaining experience in operations beyond earth orbit, and for creating sustainable infrastructure. Of specific interest, the Lunar Gateway will provide communications support to landers, orbiters, and surface systems, including in the South Polar Region where direct line of sight (LOS) to Earth is limited or non-existent. A foundational segment of the Gateway is the Power and Propulsion Element (PPE), which will carry: solar arrays to provide power to the Gateway; electric propulsion to maintain the Gateway in its operational orbit; and communication links between the Earth and Gateway, the Moon and Gateway, and relays from the Moon to the Earth. PPE Communication Links include an X-band link to Earth for Command, Ranging, and Telemetry (CR&T), which also carries low to medium rate data; a Ka-band Direct to Earth(DTE) link for high rate data transmissions; and a Ka-band Lunar link for high data rate connections to lunar systems. This paper describes the PPE communication links from a technical perspective. Other Gateway links supported by other modules are outside the scope of this paper.

ARTEMIS↗

Flight and Direct to Earth/Space Relay Communication System Architecture for GSFC CubeSat Missions

The CubeSat platform is finding increasing use in space science applications due to its low cost and comparative ease of launch. It is becoming a key scientific discovery tool in low Earth orbit (LEO) and beyond, including geosynchronous equatorial orbit (GEO), the Lagrange Points, Lunar missions, and more. The increasing complexity of these missions and their scientific goals must be supported by equal advancements in communications technology. Higher data rates and greater reliability are required every year. However, the reduced Size, Weight, and Power (SWaP) constraints of CubeSat platforms introduce unique challenges in the area of satellite communications. There is currently a lack of communication equipment tailored specifically to the CubeSat platform. This lack of standardized, tested equipment extends development time and reduces mission confidence. Furthermore, missions utilizing the CubeSat platform are often subject to more difficult design constraints. Antenna placement, size, and pointing are often subordinate to the requirements of the payload instruments and mission goals. Traditional link margin estimation techniques are insufficient in these cases, as they emphasize worst case scenarios. In reality the actual link parameters may vary widely even during a single pass. This presents new challenges in predicting communications performance and scheduling ground station contacts, but also new opportunities for improving efficiency. This paper presents the integration, testing, and validation process for a new software defined radio (SDR) designed for the CubeSat platform in conjunction with Vulcan Wireless, Inc. The SDR is planned for use on 5 upcoming CubeSat missions at NASAs Goddard Space Flight Center (GSFC) including a Geosynchronous Transfer Orbit (GTO) mission and it may also serve as a standard and well-tested option for future missions by enabling a standardized, rapid and low cost CubeSat communication system network integration process. Detailed simulations have been developed to estimate the communication performance of these missions, taking the unique antenna placements and attitude behavior of each satellite into account. These simulations allow a much more accurate analysis of the expected link margin, which varies considerably during each pass for the NASA Space Relay (SR) and Direct to Earth (DTE) network. The modelling procedures are outlined, and the results are used to predict communications performance of the missions.

Space Networks↗

Conceptual communications system design in the 25.25-27.5 and 37.0-40.5 GHz frequency bands

Future space applications are likely to rely heavily on Ka-band frequencies (20-40 GHz) for communications traffic. Many space research activities are now conducted using S-band and X-band frequencies, which are becoming congested and require a degree of pre-coordination. In addition to providing relief from frequency congestion, Ka-band technologies offer potential size, weight, and power savings when compared to lower frequency bands. The use of the 37.0-37.5 and 40.0-40.5 GHz bands for future planetary missions was recently approved at the 1992 World Administrative Radio Conference (WARC-92). WARC-92 also allocated the band 25.25-27.5 GHz to the Intersatellite Service on a primary basis to accommodate Data Relay Satellite return link requirements. Intersatellite links are defined to be between artificial satellites and thus a communication link with the surface of a planetary body, such as the moon, and a relay satellite orbiting that body are not permitted in this frequency band. This report provides information about preliminary communications system concepts for forward and return links for earth-Mars and earth-lunar links using the 37.0-37.5 (return link) and 40.0-40.5 (forward link) GHz frequency bands. In this study we concentrate primarily on a conceptual system for communications between earth and a single lunar surface terminal (LST), and between earth and a single Mars surface terminal (MST). Due to large space losses, these links have the most stringent link requirements for an overall interplanetary system. The earth ground station is assumed to be the Deep Space Network (DSN) using either 34 meter or 70 meter antennas. We also develop preliminary communications concepts for a space-to-space system operating at near 26 GHz. Space-to-space applications can encompass a variety of operating conditions, and we consider several 'typical' scenarios described in more detail later in this report. Among these scenarios are vehicle-to-vehicle communications, vehicle-to-geosyncronous satellite (GEO) communications, and GEO-to-GEO communications. Additional details about both the interplanetary and space-to-space communications systems are provided in an 'expanded' final report which has been submitted to the Tracking and Communications Division (TCD) at the NASA Johnson Space Center.

Thompson, Michael W.↗

Evaluation of IEEE 802.11g and 802.16 for Lunar Surface Exploration Missions Using MACHETE Simulations

In this paper, we investigated the suitability of terrestrial wireless networking technologies for lunar surface exploration missions. Specifically, the scenario we considered consisted of two teams of collaborating astronauts, one base station and one rover, where the base station and the rover have the capability of acting as relays. We focused on the evaluation of IEEE 802.11g and IEEE 802.16 protocols, simulating homogeneous 802.11g network, homogeneous 802.16 network, and heterogeneous network using both 802.11g and 802.16. A mix of traffic flows were simulated, including telemetry, caution and warning, voice, command and file transfer. Each traffic type had its own distribution profile, data volume, and priority. We analyzed the loss and delay trade-offs of these wireless protocols with various link-layer options. We observed that 802.16 network managed the channel better than an 802.11g network due to controlled infrastructure and centralized scheduling. However, due to the centralized scheduling, 802.16 also had a longer delay. The heterogeneous (hybrid) of 802.11/802.16 achieved a better balance of performance in terms of data loss and delay compared to using 802.11 or 802.16 alone.

Segui, John↗

Lunar EXOCAM - Remotely Deployable In-Situ Sensor Suite to Inform Lunar PSI

Lunar ExoCam is a remotely deployed lunar sensor suite payload that can land within an operable ranged distance of approx. 5 – 20 m to lander. The sensor suite will enable a fully immersive 360° environmental characterization of regolith dispersion captured during the final descent of the landing craft. Ejecting and reaching the lunar surface prior to the descending vehicle, the ExoCam sensor suite is then poised to gather in-situ measurements throughout the full cycle of plume-surface interaction (PSI), utilizing various onboard instrumentation to capture and relay synchronous data over time. Following completion of the landing cycle and brief surface activity, these data are relayed via Wi-Fi back to the lander for subsequent transmission to Earth

Jason Achilles Mezilis↗

Deep Space Network and Lunar Network Communication Coverage of the Moon

In this article, we describe the communication coverage analysis for the lunar network and the Earth ground stations. The first part of this article focuses on the direct communication coverage of the Moon from the Earth's ground stations. In particular, we assess the coverage performance of the Moon based on the existing Deep Space Network (DSN) antennas and the complimentary coverage of other potential stations at Hartebeesthoek, South Africa and at Santiago, Chile. We also address the coverage sensitivity based on different DSN antenna scenarios and their capability to provide single and redundant coverage of the Moon. The second part of this article focuses on the framework of the constrained optimization scheme to seek a stable constellation six relay satellites in two planes that not only can provide continuous communication coverage to any users on the Moon surface, but can also deliver data throughput in a highly efficient manner.

lunar network↗

Optical space-to-ground link availability assessment and diversity requirements

The application of optical space-to-ground links (SGLs) for high speed data distribution from geosynchronous and low earth orbiting satellites (e.g., sensor data from the planned Earth Observing System), for lunar and Mars links, and for links from interplanetary probes has been a topic of considerable recent interest. These optical SGLs could conceivably represent the system's operational baseline, or could represent backup links in the event of a GEO relay terminal failure. In this paper the availability of optical SGLs for various system/orbit configurations is considered. Single CONUS sites are assessed for their probability of cloud free line of sight (PCFLOS), and cloud free field of view (PCFFOV). PCFLOS represents an availability metric for geosynchronous platforms, while PCFFOV is a relevant performance metric for non-geostationary platforms (e.g., low earth orbiting satellites). Additionally, the availability of multiple ground terminals utilized in a diversity configuration is considered. Availability statistics vs. the number of diversity sites are derived from climatological data bases for CONUS sites.

Chapman, William↗

Using Indium Tin Oxide To Mitigate Dust on Viewing Ports

NASA plans to use a number of onboard viewing ports to measure lunar regolith in situ and to monitor robotic and human activities on the lunar or Martian surface. Because of the size and abundance of dust particles on these bodies, the potential for dust to occlude viewing ports and windows is high enough to threaten system lifetime and reliability, especially when activities rely on relaying video to either a habitat module or controllers on Earth. This project uses a technology being developed by KSC's Electrostatics and Surface Physics Laboratory to remove dust from windowlike surfaces. The technology applies an alternating electric potential to interlaced electrodes. In this application, we use indium tin oxide (ITO) to create various electrode patterns in order to determine the most reliable pattern for dust removal. This technology has application to systems where optical clarity is important. Specifically, this project considers the in situ resource utilization (ISRU) application of a viewing port for Raman spectroscopy, where the electrode pattern on glass would be coated with a scratch-resistant sapphire film (Al2O3).

Source record↗

A Proposed Robotic Astronomy Mission to the Lunar South Polar Regions

This paper outlines a possible mission to emplace a robotic infrared / submillimeter wave interferometer array near the lunar south pole. This region has now been investigated by the Clementine and Lunar Prospector missions, and by Earth-based radar, and its topography and thermal environment are fairly well-known. The area would be exceptionally suitable for infrared / submillimeter astronomy because of the continually low temperatures, approaching that of liquid nitrogen (77K) in some places. A submillimeter spaceborne interferometer mission, Submillimeter Probe of the Evolution of the Cosmic Structure (SPECS) has been proposed by John Mather and others, covering the 40 - 500 micron region with 3 formation flying telescopes. The present paper proposes a lunar adaptation of the SPECS concept, LSPECS. This adaptation would involve landing 4 telescopes on the area north of Shackleton crater at zero degrees longitude. This is in nearly year round darkness but is continually radar visible from Earth. The landed payload of LSPECS would include a telerobotic rover, 4 three meter submm telescopes, a solar power array to be emplaced on the continually sunlit north rim of Shackleton crater, and an S-band antenna for data relay to Earth. Passive cooling without the use of expendable cryogenics. might be possible, trading long exposure time for instrument temperatures above that of liquid helium. The LSPECS would permit long-term study of an extremely wide range of cosmic and solar system phenomena in the southern celestial hemisphere. For complete sky coverage, a similar installation near the north pole would be required. The LSPECS site would also be suitable other types of observation, such as optical interferometry or centimeter wavelength radio astronomy. The lunar south pole is also of great interest because of its extensive ice deposits, which may represent cometary infall with pre-biotic compounds.

Lowman, Paul D., Jr.↗