Search NASA⌕ Search

SEARCH · Search NASA

Results for “MIKE SHE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Themes from a NASA workshop on gene regulatory processes in development and evolution

A memorable workshop, focused on causal mechanisms in metazoan evolution and sponsored by NASA, was held in early June 1998, at MBL. The workshop was organized by Mike Levine and Eric H. Davidson, and it included the PI and associates from 12 different laboratories, a total of about 30 people. Each laboratory had about two and one half hours in which to represent its recent research and cast up its current ideas for an often intense discussion. In the following we have tried to enunciate some of the major themes that emerged, and to reflect on their implications. The opinions voiced are our own. We would like to tender apologies over those contributions we have not been able to include, but this is not, strictly speaking, a meeting review. Rather we have focused on those topics that bear more directly on evolutionary mechanisms, and have therefore slighted some presentations (including some of our own), that were oriented mainly toward developmental processes. J. Exp. Zool. (Mol. Dev. Evol. ) 285:104-115, 1999. Copyright 1999 Wiley-Liss, Inc.

NASA Discipline General Space Life Sciences↗

Pulsar Wind Nebulae, Space Velocities and Supernova Remnant

The original proposal for this LTSA grant was for X-ray studies of pulsars, and especially pulsar wind nebulae and what they could tell us about pulsar properties, especially their space velocities. By any metric, this program has been very successful. No fewer than 14 papers on directly related topics (and several dozen more on related topics) have been published in refereed journals with the PI as lead or co-author, all observational results that have had significant impact on the field. These include the first X-ray detection of the "Duck" pulsar, a clear demonstration that estimated pulsar ages can be off by over an order of magnitude (via observations of the young supernova remnant G11.2-0.3) and the detection of the first pulsar wind nebula around a millisecond pulsar. These publications have also resulted in 4 press releases. Moreover, they also represent the thesis work of two PhD students at MIT (Froney Crawford and Mike Pivovaroff) and one postdoctoral fellow, Bryan Gaensler, now Assistant Professor at Harvard.

Source record↗

Trial by Fire

The NASa/ATK Thiokol space shuttle solid rocket motor program has doubled ground test firings and enhanced manufacturing quality and process control to increase safety for Discovery's return to flight. There are a number of places where we've strengthened our engineering and our processes, says Mike Kahn, ATK Thiokol vice president of space launch systems. Protecting the booster against corrosion in the humid Florida environment is one area that has been addressed. Since the loss of Columbia, ATK Thiokol and the Marshall Space Flight Center have completely reevaluated the shuttle solid rocket motor's design certification and found no major problems, Kahn said. The Thiokol solid motors did not play a role in the 2003 Columbia accident, but the motor's older field joint design (since replaced) was the primary cause of the 1986 Challenger accident that killed seven astronauts. The 129 X 12-ft. ATK Thiokol reusable solid rocket motor forms the core of the shuttle's two solid rocket boosters (SRBs). United Space Alliance (USA) has overall responsibility for the booster's nose-mounted systems such as recovery parachutes and aft-mounted thrust vector control systems that increase the length to 149 ft. USA and its subcontractors have also reaffirmed quality control on systems such as the booster's Hamilton Sundstrand hydraulic power units for critical thrust vector control. And to ensure greater safeguards against booster debris jeopardizing the orbiter, a bolt-catcher system to restrain the large bolts, severed at booster separation, was also redesigned.

Covault, Craig↗

STS-114: Discovery Launch Readiness Press Conference

This press conference, attended by representatives from the national, Florida, and aerospace media, addresses launch, weather, and safety issues related to Space Shuttle Discovery prior to its launch on the STS-114 Return to Flight mission. The Master of Ceremonies is George Diller from NASA Public Affairs, and the panelists are: Space Shuttle Program Manager Bill Parsons, ISS Program Manager (JSC) Bill Gerstenmaier, Space Shuttle Deputy Program Manager Wayne Hale, Director of Shuttle Processing Mike Wetmore, ISS Program Manager (JAXA) Dr. Kuniaki Shiraki, and Launch Weather Officer (USAF) Mindy Chavez. Questions included the following topics: predicted weather conditions at launch, contingency rescue plans, countdown procedures, and risk management, as well as implications of the Return to Flight for the International Space Station (ISS).

Source record↗

STS-114/Discovery Flight Readiness Review Press Briefing

This press briefing on Flight Readiness Review (FRR) for the STS-114 Discovery flight is shown. Dean Acosta, Deputy Associate Administrator for Public Affairs, introduces the panel. The panel consist of: Michael Griffin, NASA Administrator, William Readdy, Associate Administrator of Space Operations, Bill Parsons, Space Shuttle Program Manager, and Mike Leinbach, NASA Launch Director. Questions from the media includes the following topics: certification, countdown, ice on the external tank, debris, and safety of the Space Shuttle Discovery.

Source record↗

STS-114: Discovery Post MMT Press Conference

This press conference focuses on the outcome of the Mission Management Team (MMT) meeting. The launch and status of the Space Shuttle Discovery is discussed. George Diller from NASA Public Affairs introduces the panel which consists of: Wayne Hale, Space Shuttle Program Deputy Manager and Mike Wetmore, Director of Space Shuttle Processing at Nasa Kennedy Space Center. The news media asks questions about the history of the low level sensors in the hydrogen tank, the cryogenic atmosphere around the sensors, troubleshooting, astronaut activities, possible rollback procedures.

Source record↗

STS-114: Discovery Post MMT Press Conference

George Diller, NASA Public Affairs, introduces the panel who consist of: Bill Parsons, Space Shuttle Program Manager; Wayne Hale, Space Shuttle Deputy Program Manager; Ed Mango, Deputy Manager JSC Orbiter Project Office; and Mike Wetmore, Director of Shuttle Processing. Bill Parsons begins by expressing that he is still searching for the problem with the low level fuel sensor inside the external tank. Hale talks about more ambient tests that will be performed to fix this problem. Mango expresses his findings from tests in the aft engine compartment, point sensor box, orbiter wiring, and wire resistance. He also talks about looking in detail into the circuit analysis of the point sensor box. Questions from the news media about tanking tests and extending the launch window are addressed.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham from NASA Public Affairs introduces the panel who consists of: Wayne Hale, Space Shuttle Program Deputy Manager; John Muratore, Manager, Space Shuttle Systems and Integration; and Mike Wetmore, Director of Shuttle Processing. Hale begins with a video presentation of the point sensor box (black box) and discusses the troubleshooting plans that are in place to fix the low level fuel sensor inside the External Tank of the Space Shuttle Discovery. Muratore talks about exploring conditions that may be causing the problem and Wetmore discusses completing scrub securing. Questions from the news media pertaining to solutions to the sensor problem, risks involved, and anomalies are addressed.

Source record↗

STS-114: Discovery Launch Readiness Press Conference

Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

Source record↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

STS-121: TCDT (Terminal Countdown Demonstration Test) Compilation

STS-121/Discovery Flight Crew; Steve Lindsey(Commander), Mark Kelley(pilot), Mike Fossum, Lisa Nowak, Stephanie Nowak, Pierce Sellers, and Thomas Ryder completed the TCDT. The activities consisted of 1) Crew Arrival; 2) Pad 39B Media Event; 3) STA Flights at SLF; 4) Pad Walkdown and Slidewire; 5) Breakfast, Suiting, Walkout; 6) Crew Ingress in Orbiter; 7) Crew Egress and Slidewire; 8) M-113 Training; 9) Crew Payload Inspection; and 10) Crew Departure fro the SLF.

Source record↗

STS-121: Crew Activities

STS-121/Discovery Flight Crew; Steve Lindsey(Commander), Mark Kelley(pilot), Mike Fossum, Lisa Nowak, Stephanie Nowak, Pierce Sellers, and Thomas Ryder performed the following activities: 1) Crew equipment interface test at SSPF; 2) Crew equipment interface test at Kennedy Space Center; and Payload Crew equipment interface test in SSPF.

Source record↗

STS-121: Discovery Pre-Flight Crew News Briefing

The STS-121 crew is shown during this pre-flight news briefing. Steve Lindsey, Commander, begins with saying that they are only a few weeks from flight and the vehicle is in good shape. Mark Kelly, Pilot, is introduced by Lindsey and he discusses Kelly's main objective which is to direct the three spacewalks scheduled. Kelly introduces Mike Fossum, Mission Specialist. Kelly says that Fossum will be involved in three spacewalks. Fossum introduces Lisa Nowak, Mission Specialist, who is involved in robotics. Also Stephanie Wilson, Mission Specialist, will be involved in robotics. Piers Sellers, Mission Specialist, is introduced by Wilson, who is the lead spacewalker for this mission. Sellers then introduce Thomas Reiter, Mission Specialist, who is involved in spacewalks. The educational background of each crew member is given. Questions from the news media on the subjects of long term flights on the International Space Station, Ice frost ramp replacement, Orbiter Boom Sensor System (OBSS) stability, foam loss during STS-114 flight, duration of the mission, and mental preparation for test flights are addressed.

Source record↗

STS-121: Discovery Spacewalk Overview Briefing

The briefing began with the introduction of Tomas Gonzalez-Torres (Lead Extra Vehicular Activity Officer). The spacewalk team included Pierce Sellers (EV-1), Mike Fossum (EV-2) and Mark Kelly (coordinator and pilot). Three new EMU's (space suits) were provided with hardware upgrades (warning systems). The 1st EVA would take place on flight day 5 and would include the exchange of the 3 EMU's. The 1st task was the installation of the blade locker, a device used to prevent severing of cables. The team will also install the Interface Umbilical System (IUS) which is an extension cord for the mobile transporter. EVA-2 task will be to replace the old Trailing Umbilical System (TUS) with a new one.

Source record↗

STS-121: Discovery Post Launch Press Briefing

The briefing begins with Dean Acousta (NASA Press Secretary) introducing Michael Griffin (NASA Administrator), Bill Gerstenmaier (Associate Administrator for Space Operations) Wayne Hale (Space Shuttle Program Manager), John Shannon (Chairman, Mission Management Team, JSC), and Mike Leinbach (NASA Launch Director). The teams effort and dedication paid off in the form of a perfect launch and the weather cooperated. The Mission Management Team no problems during inspection. Debris assessment at 2 min. 47 sec. and 4 min. 50 sec. will be discussed when that information becomes available.The floor was then open for questions from the press.

Source record↗

Status of the STIS Instrument After Repair During Sm4

The Space Telescope Imaging Spectrograph (STIS) was installed in the Hubble Space Telescope (HST) in February of 1997, and operated until August of 2004, when an electrical malfunction in a power supply forced cessation of operations. On May 17,2009, during the fourth EVA of SM4, astronauts Michael Good and Mike Massimino undertook an eight-hour spacewalk, during which they replaced the STIS LVPS-2 circuit board containing the failed component, successfully repairing STIS. We will review the scientific capabilities and operational status of STIS after this repair. In most respects, STIS after the 2009 repair operates in much the same way as it did prior to the 2004 failure. Most changes in performance are close to what had been expected. The degradation of the STIS CCD due to radiation damage and the modest changes in optical throughput are consistent with extrapolation of previously-observed trends. Internal and external alignments of the instrument are also similar to what they were in 2004. The biggest surprise is that the dark current for the NUV MAMA detector is several times larger than had been expected and is only slowly decreasing towards its expected range. We discuss how these changes will affect science with STIS now and in the future.

Proffitt, Charles R.↗

Ducted Fan Designs Lead to Potential New Vehicles

In 1994, aerospace engineers Rob Bulaga and Mike Moshier formed Trek Aerospace Inc., based in Folsom, California, to develop personal air vehicles using a novel ducted fan design. The company relied on Ames Research Center for a great deal of testing, the results of which have provided greater lift, lowered weight, more power, and improved maneuverability. The technology has been applied to three models: the Dragonfly UMR-1, the Springtail EFV, and the OVIWUN, a small-scale version that is for sale through the company's Web site. It is safer than a manned vehicle, and its size makes it relatively difficult for it to damage itself during test flights the way a larger mass, faster craft could.

Source record↗