Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maneuver plans”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

On the Maneuvers Operational Response for NASA’s Soil Moisture Active-Passive (SMAP) Mission

The Soil-Moisture Active-Passive (SMAP) spacecraft requires various kinds of in-orbit maneuvers over the course of its three-year mission. The types of maneuvers include pre-planned commissioning maneuvers to reach its science orbit, regularly executed orbit maintenance maneuvers to overcome drag and other nominally occurring phenomena, as well as (the possibility of) collision avoidance maneuvers. The architecture of the spacecraft – in terms of availability of commanding via ground assets, the inherited avionics' ability to sequence and execute commands, and the capability of available subsystems able to carry out maneuvers – was well defined early in the development of the spacecraft and mission, well before the operational plan for responding to maneuver requests was cemented. The systems engineering challenge became: how to accommodate all three types of maneuvers in the confines of this well-defined architecture. This paper will describe how the operations team on SMAP successfully met this challenge. Specifically, it will dive into the three pronged approach that SMAP developed to handle each type of maneuver described above – to meet the timeliness requirements leveraged on the operations team to execute said maneuvers, while continuing to fit within the allotted staffing profile during nominal operations. Defining this paradigm to fit the mission’s architecture meant re-defining the original paradigm, (planned maneuvers being thought of separately than collision avoidance maneuvers), and re-classifying all responses to maneuver requests as variations and permutations of a singular operational response to a maneuver request. This paper will also describe the tools that were created to simplify the human interface and automate as much of the response as was possible. Finally, this paper will describe, at a very high level, some of the problems encountered and lessons learned by the operations team when this process was executed the first four times during the first ninety days of operations. Though the architecture of the operations team's response to maneuver requests will never be repeated exactly, the flexibility that was inserted via redefining the scope of the problem and by redefining the human interfaces should influence future projects' architectures earlier in their development – in the hopes that said influence will save time and money in the future.

Tirona, Joseph↗

The 7 Year Evolution of EOS CA Support for Planning & Executing Risk Mitigation Maneuvers

This presentation will discuss the evolution of Collision Avoidance (CA) support for planning and executing Risk Mitigation Maneuvers (RMMs) for the Earth Observing System (EOS) Aqua, Aura, and Terra satellites within the seven-year period of January 2015 through December 2021. Several enhancements were implemented by the EOS team to expedite and improve the RMM planning and execution process, including updates to High Interest Event (HIE) analysis, maneuver preparation, maneuver ephemeris generation, conjunction event data screening, and maneuver commanding. As of 2022, these advancements allow the EOS team to plan and execute an RMM within 5 hours of identification with an accurate and low-risk solution. This represents a vast improvement from the 30 hours required to turn around an RMM back in 2015. In addition, the current process is substantially less error prone. Details of this progression and the specific aspects of each supporting component are explicated in the content of the presentation.

Syed Hasan↗

Aqua/Aura Inclination Adjust Maneuver Series Spring 2018 Planning

This will be presented at the International Earth Science Constellation Mission Operations Working Group meeting on December 6-8, 2017 to discuss the Aqua/Aura Spring 2018 Inclination Adjust Maneuver series planning. Presentation has been reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.

MOW↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches may occur that need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron. However the conjunction screening process in use by the 19th was developed over 30 years ago and was not designed with automation in mind, so screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process. Many operators assume that automated maneuver planning must be real-time; however this time between planning and execution to allow for screening is possible if planned for during system design. In an effort to speed up the screening process, NASA has developed a prototype system for performing near-real-time screenings. This prototype system was necessitated to support the NASA Starling mission, a constellation of 4 cubesats that planned to fly at the same altitude as the SpaceX Starlink constellation, both performing automated maneuvering. Without screening of the planned maneuvers, the two constellations risked a collision. Once converted from a prototype to an operational system, this capability will greatly help smallsats, for example those that are planning to test propulsive capabilities, by allowing fast turnaround feedback to ensure safety form collision with other objects. This paper describes the existing CA process, the prototype real-time capability, and results from the experiment that tested the prototype.

Matthew Hejduk↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

Orbit Determination of Spacecraft in Earth-Moon L1 and L2 Libration Point Orbits

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS P1 spacecraft executed numerous stationkeeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar L1 orbit. The ARTEMIS P2 spacecraft entered a L1 Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous stationkeeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions. In order to effectively perform lunar Lissajous stationkeeping maneuvers, the ARTEMIS operations team has provided orbit determination solutions with typical accuracies on the order of 0.1 km in position and 0.1 cm/s in velocity. The ARTEMIS team utilizes the Goddard Trajectory Determination System (GTDS), using a batch least squares method, to process range and Doppler tracking measurements from the NASA Deep Space Network (DSN), Berkeley Ground Station (BGS), Merritt Island (MILA) station, and United Space Network (USN). The team has also investigated processing of the same tracking data measurements using the Orbit Determination Tool Kit (ODTK) software, which uses an extended Kalman filter and recursive smoother to estimate the orbit. The orbit determination results from each of these methods will be presented and we will discuss the advantages and disadvantages associated with using each method in the lunar Lissajous regions. Orbit determination accuracy is dependent on both the quality and quantity of tracking measurements, fidelity of the orbit force models, and the estimation techniques used. Prior to Lissajous operations, the team determined the appropriate quantity of tracking measurements that would be needed to meet the required orbit determination accuracies. Analysts used the Orbit Determination Error Analysis System (ODEAS) to perform covariance analyses using various tracking data schedules. From this analysis, it was determined that 3.5 hours of DSN TRK-2-34 range and Doppler tracking data every other day would suffice to meet the predictive orbit knowledge accuracies in the Lissajous region. The results of this analysis are presented. Both GTDS and ODTK have high-fidelity environmental orbit force models that allow for very accurate orbit estimation in the lunar Lissajous regime. These models include solar radiation pressure, Earth and Moon gravity models, third body gravitational effects from the Sun, and to a lesser extent third body gravitational effects from Jupiter, Venus, Saturn, and Mars. Increased position and velocity uncertainties following each maneuver, due to small execution performance errors, requires that several days of post-maneuver tracking data be processed to converge on an accurate post-maneuver orbit solution. The effects of maneuvers on orbit determination accuracy will be presented, including a comparison of the batch least squares technique to the extended Kalman filter/smoother technique. We will present the maneuver calibration results derived from processing post-maneuver tracking data. A dominant error in the orbit estimation process is the uncertainty in solar radiation pressure and the resultant force on the spacecraft. An estimation of this value can include many related factors, such as the uncertainty in spacecraft reflectivity and surface area which is a function of spacecraft orientation (spin-axis attitude), uncertainty in spacecraft wet mass, and potential seasonal variability due to the changing direction of the Sun line relative to the Earth-Moon Lissajous reference frame. In addition, each spacecraft occasionally enters into Earth or Moon penumbra or umbra and these shadow crossings reduche solar radiation force for several hours. The effects of these events on orbit determination accuracy will be presented. In order to plan for upcoming stationkeeping maneuvers, the maneuver planning team must take the current orbit estimate, propagate it forward to the planned maneuver time, and determine the optimal maneuver to maintain the Lissajous orbit for one or more revolutions. The propagation is performed using a Runge-Kutta 7/8 integrator and typically the position and velocity uncertainty increases with propagation time, increasing the overall uncertainty of the orbit state at the maneuver execution time. The effect of orbit knowledge uncertainty on stationkeeping operations will be presented.

Woodard, Mark↗

A-Train Mission Operations Working Group: CALIPSO Mission Status

This series of viewgraphs presents an introduction to the status of the Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation (CALIPSO),lessons learned during CALIPSO inclination maneuvers, the planning for CALIPSO's inclination maneuver to take place in 2009, examines a decision whether to precess or not, the plans to change CALIPSO's pitch, and the plans to change CALIPSO's pitch from the viewpoint of the payload.

Cisewski, Michael S.↗

Wild2 approach maneuver strategy used for Stardust spacecraft (extended abstract)

Stardust, NASA's first dedicated sample return mission to a comet, successfully flew through the comet dust around Wold2 on January 2, 2004. The spacecraft flew within 236 km of the comet, meeting the mission requirement of 250+/- 50 km on flyby distance. Stardust collected dust particles and took several images of the comet while flying close to Wild2. The spacecraft will return to earth with the comet samples on January 15, 2006. To accomplish the above objective, a large Deep Space Maneuver (DSM#) was implemented during June 17 and 18, 2003 and a series of Trajectory Correction Maneuvers (TCMs) were also implemented during the 30 days prior to encounter. Both maneuver design and executions were influenced by number of factors including the small body ephemeris uncertainty, predictability of small forces arising from 3-axis attitude limit cycling and spacecraft slews. Maneuver design processes, including contingency plans, and maneuver performance characteristics, are discussed in this paper.

dust↗

Operational Experiences in Planning and Reconstructing Aqua Inclination Maneuvers

As the lead satellite in NASA's growing Earth Observing System (EOS) PM constellation, it is increasingly critical that Aqua maintain its various orbit requirements. The two of interest for this paper are maintaining an orbit inclination that provides for a consistent mean local time and a semi-major Axis (SMA) that allows for ground track repeatability. Maneuvers to adjust the orbit inclination involve several flight dynamics constraints and complexities which make planning such maneuvers challenging. In particular, coupling between the orbital and attitude degrees of freedom lead to changes in SMA when changes in inclination are effected. A long term mission mean local time trend analysis was performed in order to determine the size and placement of the required inclination maneuvers. Following this analysis, detailed modeling of each burn and its Various segments was performed to determine its effects on the immediate orbit state. Data gathered from an inclination slew test of the spacecraft and first inclination maneuver uncovered discrepancies in the modeling method that were investigated and resolved. The new modeling techniques were applied and validated during the second spacecraft inclination maneuver. These improvements should position Aqua to successfully complete a series of inclination maneuvers in the fall of 2004. The following paper presents the events and results related

Rand, David↗

A manned maneuvering unit proximity operations planning and flight guidance display and control system

This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display elements are being developed, including a 3DOF flight detector for attitude commanding, a different flight detector for translation commands, and a pictorial representation of velocity deviations.

Gershzohn, Gary R.↗

Charting a course to the sun: flight path control for Parker Solar Probe

The successful launch of the Parker Solar Probe (PSP) on August 12, 2018 with a Delta IV rocket and Star-48BV third stage has placed the spacecraft on a 7-year trajectory to study the Sun. The goals of PSP are to better characterize our solar environment and advance our understanding of the Sun at 9.86 Rs. A total of 42 trajectory correction maneuvers are planned. This paper documents trajectory correction maneuver analysis performed just prior to launch until just past the first solar encounter. The pre-launch analysis culminated in two final design cycles which analyzed 24 reference trajectories.

Ryne, Mark↗

Development of a cooperative operational rendezvous plan for Eureca and other maneuvering Shuttle payloads

This paper discusses the development of a new class of US Space Shuttle rendezvous missions which involve a maneuvering target vehicle. The objective of the analysis was to develop an operational plan to take advantage of the target spacecraft's maneuvering ability by making it responsible for a portion of the maneuvers necessary to achieve rendezvous. This work resulted in the development of a region in space relative to the Shuttle, called the control box, into which the target vehicle maneuvers. Furthermore, a mission operations plan was developed to implement the control box technique.

Gavin, R. T.↗

Aqua/Aura Updated Inclination Adjust Maneuver Performance Prediction Model

This presentation will discuss the updated Inclination Adjust Maneuver (IAM) performance prediction model that was developed for Aqua and Aura following the 2017 IAM series. This updated model uses statistical regression methods to identify potential long-term trends in maneuver parameters, yielding improved predictions when re-planning past maneuvers. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager.

adjust↗