Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission Extension”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Extensibility of PICA TPS for Future Sample Return Missions

Stardust was the first successful robotic sample return mission delivering samples of the Comet Wild 2 to Earth in 2006. Genesis followed Stardust, in the era of “faster, better, cheaper,” collecting samples of solar wind. The Genesis sample return capsule (SRC) was larger and the program did not have the time nor funding to scale up the Stardust PICA heatshield and so, utilized an alternate heatshield. The successful Stardust mission led to future mission concepts baselining Stardust EDL, especially the entry heatshield. OSIRIS REx, was one such concept and the mission was designed to include build-to-print elements of the Stardust design. The primary scale-up limitation beyond Stardust and OSIRIS REx is the single-piece net cast PICA heatshield. In the past three years, FMI working with NASA Ames, expanded the manufacturing capability of PICA and demonstrated a 1.3 m PICA single piece TPS. This was done in anticipation of the Mars Sample Return mission as well as future Sample Return missions requiring larger-scale SRCs. This effort also identified a sustainable domestic replacement precursor for the PICA preform as the heritage precursor was discontinued in 2016 and FMI has gone through multiple rayon replacements since Stardust. As part of the effort, PICA was also tested at conditions higher than the Stardust or OSIRIS REx entry envelope to establish an expanded performance envelope and enable future sample return missions at higher entry speeds. The poster will highlight PICA sustainability and extensibility as part of the Sample Return to Earth session.

PICA thermal protection↗

Post Galileo-Europa-Mission Satellite Tour Design

The Galileo orbiter mission as originally envisioned would orbit Jupiter eleven times, closely encountering either Europa, Ganymede, or Callisto on ten of those orbits. This nominal or prime mission began with Jupiter orbit insertion on December 7, 1995 and ended as designed ten encounters later on December 1, 1997. An extension to this nominal mission was proposed, developed and accepted in 1997 and was designed to continue orbital operations through an additional two years until December 31, 1999. This follow- on mission, labelled the Galileo Europa Mission, visits Europa eight times, Callisto four times, and ends with two visits to Io. It augments the prime mission by offering many attractive additional opportunities for science, especially remote sensing. The opportunities include increased scrutiny of Europa, a world with a possible global ocean hidden beneath the surface ice-cap, and the first high resolution images of Io (the only major satellite not encountered during the nominal tour). In 1998 a new effort was begun to investigate a possible extension to GEM. Remote sensing observations will continue to be important but moreover, valuable unique in situ fields and particles measurements will be a high priority motivation in the design and selection of any post-GEM tour. A significant design feature of a possible post-GEM tour would be the extension of the mission through the December 2000 timeframe. This would permit the possibility of simultaneous fields and particles experiments coordinated with the Cassini spacecraft as it swings by the Jupiter system for the final gravity assist enroute to Saturn.

Wilson, M. G.↗

Characterization of Large-Area Silicon Ionization Detectors for the ACE Mission

We report on extensive tests of large-area (10cm diameter) high-purity ion-implanted silicon detectors for th Solar Isotope Spectrometer (SIS), and lithium-drifted silicon detetors for the Cosmic Ray Isotope Spectrometer (CRIS), which are under development for launch on the Advanced Composition Explorer (ACE) mission.

silicon↗

Pioneer Jupiter Orbiter/Probe mission. II - Atmospheric Probe design considerations

Probe design considerations for a 1981 Pioneer Jupiter Orbiter/Probe mission are summarized. Extensive engineering analysis, design, and proof-of-concept testing of a reference probe system developed during the past three years are reviewed. Mission compatibility, science measurements, environmental characteristics, spacecraft interfaces, subsystem constraints, technology development, and programmatic factors are reviewed and discussed. It is demonstrated that for a low-entry-angle, daylight mission to Jupiter a 150 kg semiautonomous entry probe system utilizing state of the art technology is compatible with all the requirements.

Bradley, F. E.↗

Flight Plasma Diagnostics for High-Power, Solar-Electric Deep-Space Spacecraft

NASA’s Asteroid Redirect Robotic Mission (ARRM) mission concept plans included a set of plasma and space environment instruments, the Plasma Diagnostic Package (PDP), to fulfill ARRM requirements for technology extensibility to future missions. The PDP objectives were divided into the classes of 1) Plasma thruster dynamics, 2) Solar array-specific environmental effects, 3) Plasma environmental spacecraft effects, and 4) Energetic particle spacecraft environment. A reference design approach and interface requirements for ARRM’s PDP was generated by the PDP team at JPL and GRC. The reference design consisted of redundant single-string avionics located on the ARRM spacecraft bus as well as solar array, driving and processing signals from multiple copies of several types of plasma, effects, and environments sensors distributed over the spacecraft and array. The reference design sensor types were derived in part from sensors previously developed for USAF Research Laboratory (AFRL) plasma effects campaigns such as those aboard TacSat-2 in 2007 and AEHF-2 in 2012. ARRM project leadership also encouraged the PDP team to convene a team of topical subject matter experts from across the country to review and confirm the reference design and to consider effective alternatives and/or enhancements to the reference design. This activity was proposed and accepted as an interactive, informal JPL “A-team” study and a cadre of 25 participants gathered in early 2017 for discussions. The outcome of the two-day A-team study was that the PDP reference design would allow the most important induced-environment unknowns to be measured in the appropriate space environment. Another outcome addressed technology developments of new or improved space plasma environmental sensors. The A-team study concluded that selected developments would lead to improved measurements that could efficiently provide important and otherwise unavailable information about plasma thruster operation in the space environment as well as the plasma induced spacecraft environment. Specifically, the A-team group recommended greater sensor diversity, by inclusion of deployed sensor capabilities in the thruster plume, or by occasional gimbaling of the thruster(s) toward the sensor arrays. The A-team also recommended developing high-speed probes, optical plasma probes, energy selective probes, and direct erosion/deposition sensors, among others; and recommended the inclusion of cameras as well as, since ARRM was to be recovered in cis-lunar orbit by a crewed mission, astronaut assessments of thruster induced environments and collection of sample coupons. Overall, the PDP A-team study provided a clear, consensus supported validation of the reference design PDP approach and pointed out important directions for future flight plasma sensor development.

Choi, Maria↗

Flight Plasma Diagnostics for High-Power, Solar-Electric Deep-Space Spacecraft

NASA's Asteroid Redirect Robotic Mission (ARRM) project plans included a set of plasma and space environment instruments, the Plasma Diagnostic Package (PDP), to fulfill ARRM requirements for technology extensibility to future missions. The PDP objectives were divided into the classes of 1) Plasma thruster dynamics, 2) Solar array-specific environmental effects, 3) Plasma environmental spacecraft effects, and 4) Energetic particle spacecraft environment. A reference design approach and interface requirements for ARRM's PDP was generated by the PDP team at JPL and GRC. The reference design consisted of redundant single-string avionics located on the ARRM spacecraft bus as well as solar array, driving and processing signals from multiple copies of several types of plasma, effects, and environments sensors distributed over the spacecraft and array. The reference design sensor types were derived in part from sensors previously developed for USAF Research Laboratory (AFRL) plasma effects campaigns such as those aboard TacSat-2 in 2007 and AEHF-2 in 2012.

Johnson, Lee↗

Parametric Modeling of NTP Engine Performance for a Crewed Mars Mission

Nuclear thermal propulsion (NTP) has been studied extensively for use on a crewed mission to Mars, and NASA and DARPA are partnering in the development and demonstration of an NTP engine as part of the DRACO project. The specific impulse and thrust achieved by an engine in the context of a mission determines the propellant amount required to close the mission and the size of the vehicle required. An NTP engine has a slower start-up/shut-down transient than traditional chemical engines and requires post-firing cooling, and thus the average Isp for a burn is a function of the power ramp-up rate and the duration of the burn. An initial demonstration engine may target a lower Isp than the 900 sec that has been extensively studied by NASA. This paper shows the effect on the mission closure and vehicle sizing of the transient ramp rate performance and of lower than 900 sec specific impulse. Ammonia is considered as an alternate NTP propellant, with mission performance estimated.

NTP↗

Correlation of the Hubble Space Telescope (HST) Space Telescope Imaging Spectrometer (STIS) On-Orbit Data with Pre-launch Predictions and Ground Contamination Controls

The Hubble Space Telescope (HST) Space Telescope Imaging Spectrograph (STIS) was deployed on-orbit in February 1997. The contamination program for STIS was stringently controlled as the five-year end-of-life deposition was set at 158, per optical element. Contamination was controlled through materials selection, extensive vacuum outgassing certifications, cleaning techniques, and environmental controls. In addition to ground contamination controls, on-orbit contamination controls were implemented for both the HST servicing mission activities and early post-servicing mission checkout. The extensive contamination control program will be discussed and the STIS on-orbit data will be correlated with the prelaunch analytical predictions.

Hansen, Patricia A.↗

Mars Sample Return Using Commercial Capabilities: Propulsive Entry, Descent and Landing

Mars Sample Return (MSR) is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. The objective of the study was to determine whether emerging commercial capabilities can be integrated into to such a mission. The premise of the study is that commercial capabilities can be more efficient than previously described systems, and by using fewer systems and fewer or less extensive launches, overall mission cost can be reduced. This presentation describes an EDL technique using planned upgrades to the Dragon capsule to perform a Supersonic Retropulsion Entry - Red Dragon concept. Landed Payload capability meets mission requirements for a MSR Architecture that reduces complexity.

Entry↗

The Effect of Forebody Geometry on Turbulent Heating and Thermal Protection System Sizing for Future Mars Mission Concepts

Past Mars entry missions have made extensive use of 70° sphere-cone forebody heatshields. This shape was chosen for its aerodynamic stability during direct entry, either ballistic or low L/D trajectories. Historic missions, including Viking in 1976, Pathfinder in1997, and Mars Rover in 2004, have provided a large aerodynamic and aerothermodynamic database for the70° sphere-cone shape that perpetuates continued use for future Mars missions. Using 3D Real-Gas Navier-Stokes simulations, we show that once turbulent heating occupies a significant portion of the mission trajectory, undesirable aerothermodynamic properties arise associated with the 70° sphere-cone heatshield geometry. As an additional consideration, the pitch angle to achieve high L/D of a Mars aerocapture trajectory mitigates the stability justification for the 70° sphere-cone. This suggests that alternative forebody geometries should be considered for future Mars missions.

Aeroheating↗

Electric Power System Technology Options for Lunar Surface Missions

In 2004, the President announced a 'Vision for Space Exploration' that is bold and forward-thinking, yet practical and responsible. The vision explores answers to longstanding questions of importance to science and society and will develop revolutionary technologies and capabilities for the future, while maintaining good stewardship of taxpayer dollars. One crucial technology area enabling all space exploration is electric power systems. In this paper, the author evaluates surface power technology options in order to identify leading candidate technologies that will accomplish lunar design reference mission three (LDRM-3). LDRM-3 mission consists of multiple, 90-day missions to the lunar South Pole with 4-person crews starting in the year 2020. Top-level power requirements included a nominal 50 kW continuous habitat power over a 5-year lifetime with back-up or redundant emergency power provisions and a nominal 2-kW, 2-person unpressurized rover. To help direct NASA's technology investment strategy, this lunar surface power technology evaluation assessed many figures of merit including: current technology readiness levels (TRLs), potential to advance to TRL 6 by 2014, effectiveness of the technology to meet the mission requirements in the specified time, mass, stowed volume, deployed area, complexity, required special ground facilities, safety, reliability/redundancy, strength of industrial base, applicability to other LDRM-3 elements, extensibility to Mars missions, costs, and risks. For the 50-kW habitat module, dozens of nuclear, radioisotope and solar power technologies were down-selected to a nuclear fission heat source with Brayton, Stirling or thermoelectric power conversion options. Preferred energy storage technologies included lithium-ion battery and Proton Exchange Membrane (PEM) Regenerative Fuel Cells (RFC). Several AC and DC power management and distribution architectures and component technologies were defined consistent with the preferred habitat power generation technology option and the overall lunar surface mission. For rover power, more than 20 technology options were down-selected to radioisotope Stirling, liquid lithium-ion battery, PEM RFC, or primary fuel cell options. The author discusses various conclusions that can be drawn from the findings of this surface power technologies evaluation.

Kerslake, Thomas W.↗

Bridging the Engineering and Medicine Gap

A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

Walton, M.↗

Geotail MCA Plasma Wave Investigation Data Analysis

The primary goals of the International Solar Terrestrial Physics/Global Geospace Science (ISTP/GGS) program are identifying, studying, and understanding the source, movement, and dissipation of plasma mass, momentum, and energy between the Sun and the Earth. The GEOTAIL spacecraft was built by the Japanese Institute of Space and Astronautical Science and has provided extensive measurements of entry, storage, acceleration, and transport in the geomagnetic tail and throughout the Earth's outer magnetosphere. GEOTAIL was launched on July 24, 1992, and began its scientific mission with eighteen extensions into the deep-tail region with apogees ranging from around 60 R(sub e) to more than 208 R(sub e) in the period up to late 1994. Due to the nature of the GEOTAIL trajectory which kept the spacecraft passing into the deep tail, GEOTAIL also made 'magnetopause skimming passes' which allowed measurements in the outer magnetosphere, magnetopause, magnetosheath, bow shock, and upstream solar wind regions as well as in the lobe, magnetosheath, boundary layers, and central plasma sheet regions of the tail. In late 1994, after spending nearly 30 months primarily traversing the deep tail region, GEOTAIL began its near-Earth phase. Perigee was reduced to 10 R(sub e) and apogee first to 50 R(sub e) and finally to 30 R(sub e) in early 1995. This orbit provides many more opportunities for GEOTAIL to explore the upstream solar wind, bow shock, magnetosheath, magnetopause, and outer magnetosphere as well as the near-Earth tail regions. The WIND spacecraft was launched on November 1, 1994 and the POLAR spacecraft was launched on February 24, 1996. These successful launches have dramatically increased the opportunities for GEOTAIL and the GGS spacecraft to be used to conduct the global research for which the ISTP program was designed. The measurement and study of plasma waves have made and will continue to make important contributions to reaching the ISTP/GGS goals and solving the significant problems of sun-earth connections. Plasma waves are involved in the energization and de-energization of plasma and energetic particles via numerous wave-particle interaction processes. Plasma waves in many instances are the source for the heating or cooling of the particles. They can cause particle precipitation by scattering particles into the loss cone. They move particles across boundaries in mass and energy dependent ways. Identifying the waves and the instabilities which produce them are thus crucial for understanding the plasma processes. Wave-particle interaction processes are especially important at various boundaries between the different regions of geospace including the bow shock, magnetopause, and interfaces in the geomagnetic tail between the magnetosheath, lobe, plasmasheet, boundary layers, and neutral sheet. In addition to identifying the characteristics of the instabilities and generation mechanisms encountered, plasma wave measurement are used in conjunction with other fields and particle measurements to identify the region of space the spacecraft is in or the boundary that is being crosed.

Anderson, Roger R.↗

Operational Experience with Long Duration Wildfire Mapping: UAS Missions Over the Western United States

The National Aeronautics and Space Administration, United States Forest Service, and National Interagency Fire Center have developed a partnership to develop and demonstrate technology to improve airborne wildfire imaging and data dissemination. In the summer of 2007, a multi-spectral infrared scanner was integrated into NASA's Ikhana Unmanned Aircraft System (UAS) (a General Atomics Predator-B) and launched on four long duration wildfire mapping demonstration missions covering eight western states. Extensive safety analysis, contingency planning, and mission coordination were key to securing an FAA certificate of authorization (COA) to operate in the national airspace. Infrared images were autonomously geo-rectified, transmitted to the ground station by satellite communications, and networked to fire incident commanders within 15 minutes of acquisition. Close coordination with air traffic control ensured a safe operation, and allowed real-time redirection around inclement weather and other minor changes to the flight plan. All objectives of the mission demonstrations were achieved. In late October, wind-driven wildfires erupted in five southern California counties. State and national emergency operations agencies requested Ikhana to help assess and manage the wildfires. Four additional missions were launched over a 5-day period, with near realtime images delivered to multiple emergency operations centers and fire incident commands managing 10 fires.

Hall, Philip↗

Human Factors in Training - Space Flight Resource Management Training

Accidents and incidents show that high workload-induced stress and poor teamwork skills lead to performance decrements and errors. Research on teamwork shows that effective teams are able to adapt to stressful situations, and to reduce workload by using successful strategies for communication and decision making, and through dynamic redistribution of tasks among team members. Furthermore, superior teams are able to recognize signs and symptoms of workload-induced stress early, and to adapt their coordination and communication strategies to the high workload, or stress conditions. Mission Control Center (MCC) teams often face demanding situations in which they must operate as an effective team to solve problems with crew and vehicle during onorbit operations. To be successful as a team, flight controllers (FCers) must learn effective teamwork strategies. Such strategies are the focus of Space Flight Resource Management (SFRM) training. SFRM training in MOD has been structured to include some classroom presentations of basic concepts and case studies, with the assumption that skill development happens in mission simulation. Integrated mission simulations do provide excellent opportunities for FCers to practice teamwork, but also require extensive technical knowledge of vehicle systems, mission operations, and crew actions. Such technical knowledge requires lengthy training. When SFRM training is relegated to integrated simulations, FCers can only practice SFRM after they have already mastered the technical knowledge necessary for these simulations. Given the centrality of teamwork to the success of MCC, holding SFRM training till late in the flow is inefficient. But to be able to train SFRM earlier in the flow, the training cannot rely on extensive mission-specific technical knowledge. Hence, the need for a generic SFRM training framework that would allow FCers to develop basic teamwork skills which are mission relevant, but without the required mission knowledge. Work on SFRM training has been conducted in collaboration with the Expedition Vehicle Division at the Mission Operations Directorate (MOD) and with United Space Alliance (USA) which provides training to Flight Controllers. The space flight resource management training work is part of the Human Factors in Training Directed Research Project (DRP) of the Space Human Factors Engineering (SHFE) Project under the Space Human Factors and Habitability (SHFH) Element of the Human Research Program (HRP). Human factors researchers at the Ames Research Center have been investigating team work and distributed decision making processes to develop a generic SFRM training framework for flight controllers. The work proposed for FY10 continues to build on this strong collaboration with MOD and the USA Training Group as well as previous research in relevant domains such as aviation. In FY10, the work focuses on documenting and analyzing problem solving strategies and decision making processes used in MCC by experienced FCers.

Bryne, Vicky↗

NASA's Biosentinel Mission: Lessons Learned and What's Next

In the last two years, two BioSentinel payloads were launched to space. The ISS mission launched in December 2021, and returned to the ground in August 2022 after successfully completing eight biological experiments while validating the different instruments. On the other hand, the deep space mission launched onboard Artemis I in November 2022, and is currently in a heliocentric orbit over 20 million kilometers away from the Earth. Even though all hardware subsystems were validated in deep space, the microfluidic subsystems experienced anomalies throughout the initial 6-month mission. The main goals of this presentation are (1) to present flight data from the deep space payload, including biology, fluidics, electronics, data processing, and mission operations, and (2) to discuss the lessons learned – what worked and what did not – from this unique complex mission, and how these lessons are aiding in the development of the Lunar Exploration Instrument for space biology Applications (LEIA) mission, launching to the lunar surface on a commercial lander in 2026. As of the writing of this abstract, the satellite continues to work nominally, communicating to Earth via the Deep Space Network (DSN) twice per week. Importantly, the mission received and extension to continue recording data on the deep space radiation environment on its way to solar maximum (i.e., higher probability of solar particle events). BioSentinel is supported by NASA Exploration Systems Development Mission Directorate (ESDMD).

BioSentinel↗

CECE: A Deep Throttling Demonstrator Cryogenic Engine for NASA's Lunar Lander

As one of the first technology development programs awarded under NASA's Vision for Space Exploration, the Pratt & Whitney Rocketdyne (PWR) Deep Throttling, Common Extensible Cryogenic Engine (CECE) program was selected by NASA in November 2004 to begin technology development and demonstration toward a deep throttling, cryogenic Lunar Lander engine for use across multiple human and robotic lunar exploration mission segments with extensibility to Mars. The CECE program leverages the maturity and previous investment of a flight-proven hydrogen/oxygen expander cycle engine, the RL10, to develop and demonstrate an unprecedented combination of reliability, safety, durability, throttlability, and restart capabilities in a high-energy, cryogenic engine. NASA Marshall Space Flight Center and NASA Glenn Research Center personnel were integral design and analysis team members throughout the requirements assessment, propellant studies and the deep throttling demonstrator elements of the program. The testbed selected for the initial deep throttling demonstration phase of this program was a minimally modified RL10 engine, allowing for maximum current production engine commonality and extensibility with minimum program cost. In just nine months from technical program start, CECE Demonstrator No. 1 engine testing in April/May 2006 at PWR's E06 test stand successfully demonstrated in excess of 10:1 throttling of the hydrogen/oxygen expander cycle engine. This test provided an early demonstration of a viable, enabling cryogenic propulsion concept with invaluable system-level technology data acquisition toward design and development risk mitigation for both the subsequent CECE Demonstrator No. 2 program and to the future Lunar Lander Design, Development, Test and Evaluation effort.

Giuliano, Victor J.↗

Teaching old spacecraft new tricks

The technique of sending existing space probes on extended mission by altering their orbital paths with gravity-assist maneuvers and relatively brief rocket firings is examined. The use of the technique to convert the International Sun-Earth Explorer 3 mission into the International Cometary Explorer mission is discussed. Other examples are considered, including the extension of the Giotto mission and the retargeting of the Sakigake spacecraft. The original and altered trajectories of these three missions are illustrated.

Farquhar, Robert↗