Search NASA⌕ Search

SEARCH · Search NASA

Results for “NEGOTIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Creating Innovative Frameworks to Spur Cultural Change at NASA Armstrong Flight Research Center

Changing the culture of an organization is a monumental task that often takes years and has no set formula. Steps can be taken, however, to spur cultural change by creating spaces and infrastructure to serve as the initial driving force. An innovation space and a bicycle sharing (bike share) program were implemented at the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) with a vision toward connecting Center personnel, fostering collaboration and innovation, retaining newer employees, promoting flexibility, and improving the culture and workplace atmosphere. This paper discusses the steps taken, challenges faced, novel culture-change-focused design elements, lessons learned, acquired metrics, and how these initiated cultural change at AFRC. For both the innovation space and the bike share program, funding was negotiated and provided through the NASA Convergent Aeronautics Solutions (CAS) project, which was seeking to improve the innovation and collaboration capabilities at each of the four NASA aeronautics Centers. Key stakeholders across AFRC from upper management, facilities, safety, engineering, and procurement were identified early in the process and were consulted and included throughout execution to ensure that any encountered roadblocks could be easily navigated. Research was then conducted by attending conferences and visiting culture-changing organizations both inside and outside United States Government agencies. Distilling the research, identifying available space, and deciding on specific design elements for the space was conducted by a subset of individuals of diverse backgrounds to enable quick, effective decision-making. Decisions were made with the intent to increase usage and diversity of users of the space; care was taken to ensure a well-crafted atmosphere that would foster the desired culture change. The allocated physical space required major structural modifications, new furniture, and new capabilities that would bring people in. Decisions and desires underwent a rapid reiterative process in order to stay within budget and short deadlines, while holding firm to what was seen as fundamental elements of an innovation space. The framework for cultural change being established, the more difficult task began: incubating the desired culture. Intentional workday use of the innovation space was encouraged, and organized events coordinated in order to truly foster culture change. Such incubation supports the organic spread of culture change to all areas of AFRC. This framework was complemented and expanded by the implementation of the bike share program. Steps for implementation included bike selection based on lessons learned, creating bike stations and signage, implementing bike share rules, and building a volunteer maintenance infrastructure. A novel user-reporting feedback system at each bike station is a low-impact method of capturing usage metrics. Due to the nature of the work conducted at AFRC, the bike share program and feedback system were negotiated and vetted through various organizations including legal, safety, and operations. The innovation space and the bike share program together are an effective initial framework for innovation and collaboration. Culture change takes time, but the innovation space and the bike share program are already showing signs of making a positive impact on the AFRC workforce.

rooms↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Air Traffic Management Demonstration 2 project is investigating Integrated Arrival-Departure-Surface (IADS) air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the IADS areas under study are departure release-time approval request (APREQ) traffic management initiatives. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations. It describes APREQ-compliance improvements observed as the ATD-2 electronic negotiation process has matured and discusses contributing factors.

call for release↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Airspace Technology Demonstration 2 project is investigating Integrated Arrival-Departure-Surface air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the areas under study are departure release-time approval request (APREQ) traffic management initiatives. Scheduling departures at downstream points and complying with approved departure release times helps flights fit smoothly into busy traffic streams. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations over fourteen months beginning in January 2018. It describes APREQ-compliance improvements observed as the electronic negotiation process has matured and discusses contributing factors, including renegotiation of departure release times.

Call for release↗

Towards Persistent Space Observations through Autonomous Multi-Agent Formations

Sensing platforms must advance in scale and sophistication in order to support increasingly ambitious missions across Earth and space science; intelligence, surveillance, and reconnaissance (ISR); and planetary exploration. Distributed, persistent observation platforms have the potential to play a pivotal role in next generation missions through improved area coverage, enhanced situational awareness, and faster identification of trends and changes. The Multi-Agent Clusters for Persistent Observations from Space (MACPOS) project at NASA Langley Research Center is developing key technologies for the autonomous, heterogeneous formations that will comprise such platforms. Research thrusts include dynamic formation negotiation for self-assembling clusters of agents, distributed motion planning, and coordinated trajectory execution. Adaptive leader-follower formation negotiation allows agents to cluster and break off as necessary to adapt to both nominal and new mission objectives. Coordinated motion planning and execution maintain the formation while ensuring safe separation distances among agents and obstacles in the environment. These capabilities align MACPOS with NASA’s initiative for space and surface in-situ assembly through fundamental technology development for autonomous multi-agent systems. This paper presents an overview and early progress for the MACPOS project. We describe the system architecture for both individual agents and the overall fleet. Design considerations are given for the planning, control, and metrology subsystems. Finally, we discuss planned project milestones and the expected course of development.

Matthew P Vaughan↗

ETM Industry: Tabletop Defining Notions for Cooperative Operating Practices

This tabletop plans to cover 3 main topics in regards to the research that NASA has conducted for High-E Traffic Management (ETM), as well as implementing it to stand up an ETM system in the Airspace Operations Lab to invite industry participants to join us in a collaborative evaluation at the end of 2023. (Or earlier for system architectural connectivity). Working to define the notions that go into Cooperative Operating Practices for a collaborative traffic management process, we will be showing and training to some of our early prototype concepts and discussing: 1. Operational Intent: We have built an OI generation tool and would like to discuss specifics to the requirements of OI size, update rates, and duration. 2. Strategic Conflict Detection: We have built a concept to detect overlapping OI’s and would like to discuss the output information; time horizon, geometry and confidence level of intersection. In addition we are looking at a service that would provide all users with additional information in regards to the probability of your actual flight intent getting within a specified separation envelope. 3. Cooperative Operating Practices (COPS): Specifically looking at COPs for strategic deconfliction, we are looking to industry to build the actual COPS based on various criteria; vehicle-to-vehicle interactions, or company to company agreements. What is the strategy when OIs intersect; wait and see, take a pre-negotiated COPS action, or ad-hoc negotiation and discuss what that looks like.

High-E Traffic Management (ETM)↗

Towards a tactical nuclear weapons treaty? Is There a Role of IAEA Tools of Safeguards?

In recent years, there is growing interest in formal negotiations on non-strategic or tactical nuclear weapons. With the negotiations of New START, there has been much speculation that a tactical nuclear weapons treaty should be included in the follow on to New START. This paper examines the current policy environment related to tactical weapons and some of the issues surrounding the definition of tactical nuclear weapons. We then map out the steps that would need to be taken in order to begin discussions on a tactical nuclear weapons treaty. These steps will review the potential role of the IAEA in verification of a tactical nuclear weapons treaty. Specifically, does IAEA involvement in various arms control treaties serve as a useful roadmap on how to overcome some of the issues pertaining to a tactical nuclear weapons treaty?

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Wireless Power Transfer

Wireless Power Transfer is an innovative approach using magnetic resonance coupling of air core transformers designed for today's growing plug-in electric vehicle market. This technology can provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions. Plug-in Electric Vehicles (PEV) are burdened by the need for cable and plug charger, galvanic isolation of the on-board electronics, bulk and cost of this charger and the large energy storage system (ESS) packs needed. With a system where you have to physically plug in there are a number of occasions where the owner could very well forget to charge the vehicle. For stationary applications (like charging of a PHEV at home), ORNL's innovative wireless power transfer technology adds a convenience factor compared to actually plugging in which will mean that the vehicle will have a full charge every morning. Electric vehicle charging must be safe, compact and efficient in order to be convenient for customers. By reconfiguring the transformer and altering the resonance frequency, energy is transferred to the battery with lower energy losses and with fewer demands on the primary circuit by the rest of the transformer system. The ORNL discovery shows that sufficient power for the battery can be transferred from the primary to secondary circuits without significant energy losses if the operating frequency is set at 50% to 95% of the resonance frequency of the circuit. The electrical power is then transmitted to the chargeable battery, which is electrically coupled to the secondary circuit through the air core transformer. Some advantages include: Reduced energy losses during transfer of energy to the battery; A charge potential that is relatively unaffected by up to 25% misalignment of vehicle; and Other receiving components draw less power from the primary circuit. These advantages allow wireless power technology applications to expand at the workplace and beyond as the demand for EV rises. For vehicles that operate over a fixed route such as busses and shuttle vehicles, Wireless Power Transfer (WPT) means that a smaller battery pack can be used. In the traditional system, the battery pack is designed to accommodate the needs of the entire route or shift. With WPT the battery can be downsized because it can be charged when the vehicle stops on its route (a rental car shuttle bus, for example, can charge when it waits in the terminal and again when it waits at the rental car place. Thus the battery only needs enough charge to get to the next stop. This decrease in battery size means significant cost savings to electrify the vehicle. This technology enables efficient "opportunity charging stations" for predefined routes and planned stops reducing down time. Charging can occur in minutes. This improvement also eliminates the harmful emissions that occur in garages while buses are at idle during charging. In larger cities, dynamic charging offers an even greater impact utilizing existing infrastructure. As vehicles travel along busy freeways and interstate systems, wireless charging can occur while the vehicle is in motion. With this technology a vehicle essentially has unlimited electric range while using a relatively small battery pack. In-motion charging stations use vehicle sensors to alert the driver. Traveling at normal speeds, sensors establish in-motion charging. WPT transmit pads sequentially energize to the negotiated power level based on vehicle speed and its requested charging energy. Lower power when vehicle speed is slow and much higher power for faster moving vehicles. Vehicle to Infrastructure communications (V2I) coordinates WPT charging level according to on-board battery pack state-of-charge. V2I activates the roadway transmit pads placing them in standby mode and negotiates charging fee based on prevailing grid rate and vehicle energy demand. Dynamic charging would allow electricity to supply a very large fraction of the energy for the transportation sector and reduce greatly petroleum consumption. Previously worrisome traffic delays now provide longer periods of charge while passing over in-motion chargers. Inclement weather such as rain and snow do not affect the charging capability. At ORNL, we are working to develop the robust nature of wireless power technology to provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions.

33 ADVANCED PROPULSION SYSTEMS↗

An Innovative Approach for the Calculation of Exposure Point Concentrations for Large Areas of Surface Radionuclide Contamination

The Department of Energy Rocky Flats site was designated as a wildlife refuge by the Rocky Flats National Wildlife Refuge Act of 2001. Rocky Flats was considered to be one of the most highly contaminated radiological sites in the country. Some portions of the site have low-level radionuclide contamination in surface soils. A site-wide risk and dose assessment to evaluate threats to human health and the environment were performed, so that the site could be released for this land use. The aggressive accelerated action program combined with defensible and innovative risk assessment methods resulted in there being no radionuclides of concern in the final comprehensive risk assessment (DOE 2006). An innovative approach for delineating functional exposure areas and area-weighted exposure point concentration-activities (EPCs) was negotiated with the regulatory agencies in Colorado. This procedure leads to realistic estimates of risk and dose to workers and visitors. This innovative approach to the calculation of EPCs was negotiated with both State and Federal regulators. The value of developing and maintaining good working relationships with regulators responsible for a site can not be overestimated. The building of trust and confidence among responsible parties and regulators is essential for the development and implementation of innovative methods and technologies.

54 ENVIRONMENTAL SCIENCES↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brexit, Euratom and Nuclear Liabilities - 18643

The outcome of the UK referendum on withdrawal from the European Union has resulted in a UK government decision that the UK must withdraw from Euratom. As at the date of the Waste Management Symposia, half of the 2-year programme for agreeing the terms of exit and putting in place replacement arrangements will have passed. If no agreement is reached by 29 March 2019 and no extension of that deadline is agreed the UK will automatically exit Euratom on that date. Aside from potential trade tariffs, Euratom exit will create binary questions on acceptability of nuclear trade and collaboration with the UK, reflecting current reliance on the UK's status as a Euratom member in establishing and implementing acceptable safeguarding requirements, ensuring inclusion of the UK within the scope of existing Euratom nuclear cooperation agreements, and as a basis for current UK bilateral nuclear cooperation agreements. This in turn risks disruption of international nuclear cooperation and trade, including provision of resources and know-how in support of the UK waste and decommissioning effort and international movement of waste for treatment. The paper will consider the current status of negotiations for UK withdrawal from Euratom, development of replacement safeguarding arrangements and replacement of international nuclear cooperation agreements essential to future nuclear cooperation and trade with the UK, taking into account: - the current and future legal basis of UK safeguarding obligations, including potential changes to the UK's Voluntary Offer Safeguards Agreement under the Non-Proliferation Treaty and likely acceptability of replacement arrangements to key nuclear trading partners; - practical arrangements for meeting those obligations post Euratom reliance via independent safeguarding arrangements; and - the need for and challenges in replacement of the UK's current reliance on its status as a Euratom member in taking the benefit of the existing US / Euratom s123 Agreement and other Euratom nuclear cooperation agreements. The paper will also provide a brief update on recent developments in international nuclear liabilities. The last 2 years have seen significant changes, with the Convention on Supplementary Compensation finally entering into force on 15 April 2015 and significant progress towards ratification of the 2004 Protocols to the Paris and Brussels Conventions. These changes are to be welcomed as beneficial to international cooperation, but also bring changes to liabilities risks associated with international movement of nuclear materials. Despite clear advances nuclear liabilities risks remain a significant consideration in negotiation of international nuclear contracts, recognising beneficial changes as well as on-going areas of risk and uncertainty. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wastewater Treatment at the Fernald Preserve-Past, Present, and Future - 19555

Industrial wastewater treatment at the Fernald Preserve, Ohio, Site has been ongoing since a uranium metals refinery was constructed there at the beginning of the Cold War in 1951. Initially, the primary purpose of treatment was to recover uranium for reuse. Later, when cleanup of the site was progressing in the 1990's, wastewater treatment efforts greatly expanded. Large treatment facilities were constructed to handle contaminated surface water, groundwater, remediation wastewater, and leachate from the on-site disposal facility. These new facilities were designed to reduce uranium concentration to meet the US Environmental Protection Agency (EPA) drinking water standard and not generate large quantities of contaminated waste. Anion-exchange resin was chosen as the treatment media. The centerpiece of these facilities was the Advanced Wastewater Treatment facility, which had a treatment capacity of 10,978 liters per minute (lpm) (2900 gallons per minute [gpm]). Forecasts estimated that with the exception of groundwater the site's remediation would be completed in 2006. In 2003, the US Department of Energy (DOE) Office of Environmental Management began negotiations with the EPA and Ohio Environmental Protection Agency to reduce wastewater treatment capacity at the Fernald Environmental Management Project. These negotiations resulted in the site's treatment capacity being reduced to 6814 lpm (1800 gpm) via the Converted Advanced Wastewater Treatment facility (CAWWT). By 2010, the uranium concentration in the groundwater being pumped had been reduced to the degree that only intermittent treatment for uranium removal was needed. As a result, the CAWWT was considerably oversized. Increased maintenance on the aging CAWWT equipment led the DOE Office of Legacy Management (LM) to commission an assessment of the facility, which was completed in early 2015. The condition assessment identified numerous components at or near the end of their design life. Based on the assessment's findings and the fact that the current facility's treatment capacity was substantially greater than needed, LM began looking at options for an appropriately sized treatment system to handle the site's needs until the groundwater remediation was completed (currently projected for 2039). Options were evaluated in the spring of 2015, and LM presented the recommended changes to regulators and stakeholders. Approvals for a new, smaller system with a 189 lpm (50 gpm) capacity were obtained through a series of meetings in the summer of 2015. After more detailed planning in the fall of 2015, LM initiated the project in 2016. The project comprises the following four phases: (1) Removal and disposal of used media, piping, and tanks to make room for the new system in the existing building (completed in January 2017); (2) design of the new system (completed in April 2017); (3) construction, installation, and startup of the new system (completed in May 2018); and (4) backwash basin refurbishment (yet to be completed). In the late 2030's, when groundwater remediation is projected to be completed at the site, it is anticipated that the only remaining wastewater treatment need will be for small quantities of leachate from the on-site disposal facility. Results of leachate treatment testing in 2003 indicate it may be feasible to utilize a small passive treatment system for this leachate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ensuring that ecological science contributes to natural resource management using a Delphi-derived approach

This chapter approaches participatory modeling in environmental decision making from an atypical perspective. It broadly addresses the question of how to assure that science conducted to assist practitioners improves resource management. More specifically, it describes a case involving environmental science and natural resource management at Fort Benning, a U.S. Army installation in the southeastern United States where disparate environmental research projects were funded by a single federal agency to enhance the ability of Fort Benning resource managers to achieve their resource management goals. The role of our effort was to integrate the scientific studies in a manner that would be meaningful and useful for resource managers. Hence we assembled a team consisting of an anthropologist, ecologist, microbiologist, statistician, and geographic information systems specialist who developed a common framework that served as the basis for this integration. The team first used a Delphi expert elicitation, which evolved into an approach more akin to facilitated negotiation. This second approach arose organically, particularly when our team took advantage of an opportunity for face-to-face interaction. Although the shift in our approach was unplanned, it proved to be highly productive. We discuss the potential utility of our approach for other situations and suggest that it would be useful to initiate at the beginning of research where the aim is to produce scientific results that meet practitioners needs, specifically in the realm of environmental science and resource management.

Delphi approach↗

Multi-jurisdictional environmental impact assessment: Canadian experiences

This research examines complexities surrounding environmental impact assessment (EIA) in a multi-jurisdictional environment, with a specific focus on opportunities for public participation. With almost universal adoption of EIA, projects are increasingly subject to more than one assessment process. Thus there is demand to facilitate inter-jurisdictional coordination of EIAs. Canada has growing expertise with multijuristictional EIA that serves to illustrate the costs and opportunities associated with three different approaches to coordination: standardization, harmonization and substitution. Findings suggest that, although fraught with issues, harmonization is the most realistic approach for coordinating efforts. Harmonization has the potential to minimize duplication, avoid process uncertainty and increase efficiency and effectiveness in EIA. Furthermore, the analysis demonstrates that a bilateral agreement between jurisdictions is the best approach to harmonization, so long as negotiation of the agreement includes opportunities for meaningful participation, and implementation includes activities designed to communicate the assessment responsibilities of each jurisdiction, activities and schedules to the public. The experience of participants of different coordinated EIAs in Canada serves as counsel for on-going and future efforts to facilitate inter-jurisdictional coordination.

07 ISOTOPE AND RADIATION SOURCES↗

Public participation and environmental impact assessment: Purposes, implications, and lessons for public policy making

In recent years the need to enhance public participation in Environmental Impact Assessment (EIA), and the efficacy of alternative mechanisms in achieving this goal, have been central themes in the EIA literature. The benefits of public participation are often taken for granted, and partly for this reason the underlying rationale for greater public participation is sometimes poorly articulated, making it more difficult to determine how to pursue it effectively. The reasons for seeking public participation are also highly diverse and not always mutually consistent. There has been limited analysis of the implications of different forms and degrees of public participation for public decision making based on EIA, and little discussion of how experience with public participation in EIA relates to debates about participation in policy making generally. This paper distinguishes various purposes for public participation in EIA, and discusses their implications for decision making. It then draws on some general models of public participation in policy making to consider how approaches to participation in EIA can be interpreted and valued, and asks what EIA experience reveals about the utility of these models. It argues that the models pay insufficient attention to the interaction that can occur between different forms of public participation; and to the fact that public participation raises issues regarding control over decision making that are not subject to resolution, but must be managed through ongoing processes of negotiation.

54 ENVIRONMENTAL SCIENCES↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

DE-FG02-04ER25606 Identity Federation and Policy Management Guide: Final Report

The goal of this 3-year project was to facilitate a more productive dynamic matching between resource providers and resource consumers in Grid environments by explicitly specifying policies. There were broadly two problems being addressed by this project. First, there was a lack of an Open Grid Services Architecture (OGSA)-compliant mechanism for expressing, storing and retrieving user policies and Virtual Organization (VO) policies. Second, there was a lack of tools to resolve and enforce policies in the Open Services Grid Architecture. To address these problems, our overall approach in this project was to make all policies explicit (e.g., virtual organization policies, resource provider policies, resource consumer policies), thereby facilitating policy matching and policy negotiation. Policies defined on a per-user basis were created, held, and updated in MyPolMan, thereby providing a Grid user to centralize (where appropriate) and manage his/her policies. Organizationally, the corresponding service was VOPolMan, in which the policies of the Virtual Organization are expressed, managed, and dynamically consulted. Overall, we successfully defined, prototyped, and evaluated policy-based resource management and access control for OGSA-based Grids. This DOE project partially supported 17 peer-reviewed publications on a number of different topics: General security for Grids, credential management, Web services/OGSA/OGSI, policy-based grid authorization (for remote execution and for access to information), policy-directed Grid data movement/placement, policies for large-scale virtual organizations, and large-scale policy-aware grid architectures. In addition to supporting the PI, this project partially supported the training of 5 PhD students.

97 MATHEMATICS AND COMPUTING↗

Final Report - Facilitating Wind Energy: Addressing Challenges around Visual Impacts, Noise, Credible Data, and Local Benefits through Creative Stakeholder Engagement

The project team consisting of the Consensus Building Institute, Inc., Raab Associates, Ltd., and the MIT-Harvard Program on Negotiation created a model and set of tools for building the capacity of state officials to effectively collaborate with diverse stakeholders in advancing wind development policy formation, wind facility siting, and transmission policy and siting. The model was used to enhance the ability of state officials to advance wind development in their states. Training was delivered in Cambridge, MA, in Spring 2011. The training and associated materials, including a Wind Energy Workbook, website, and simulations, is available for ongoing and widespread dissemination throughout the US.

17 WIND ENERGY↗

Develop Improved Materials to Support the Hydrogen Economy

The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects with near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.

08 HYDROGEN↗